3411. SHRI RAMBHUAL NISHAD:
Will the Minister of PORTS, SHIPPING AND WATERWAYS be pleased to state:-
प(cid:419)न, पोत प(cid:464)रवहन और जलमाग (cid:91) म(cid:287)ं ी
(a) the details of new port development projects, inland waterways and shipping
infrastructure set up in various States across the country during the last three years
and the current year, State/district-wise;
(b) whether the Government has implemented any scheme to promote the
development of inland waterways, construction of new terminals and port-related
projects, particularly in Uttar Pradesh and if so, the details thereof;
(c) the details of funds sanctioned, allocated and utilized for these projects,
State/district-wise particularly in Uttar Pradesh; and
(d) whether the Government has recently accorded administrative approval and
financial sanction for new projects related to waterways or shipping infrastructure in
various districts of Uttar Pradesh, including Sultanpur and if so, the details along with
the proposed timeline thereof?
ANSWER
MINISTER OF PORTS, SHIPPING AND WATERWAYS
(SHRI SARBANANDA SONOWAL)
(a) to (c) The Government has implemented several policy and promotional initiatives
for the development of Inland Water Transport (IWT) sector, including notification of
the National Waterways (Construction of Jetties/ Terminals) Regulation, 2025,
Jalvahak scheme and extension of Tonnage Tax benefits, besides development of
Multi Modal Terminals (MMT)/ Inter Modal Terminal (IMT), jetties and fairway
maintenance. The details of IWT/ new port infrastructure projects, including the
projects of Uttar Pradesh implemented on National Waterway (NW)-1 (Haldia to
Prayagraj) are attached as Annexure-I. The details of major project undertaken and
being undertaken to strengthen trade and connectivity through inland waterways in theNorth-Eastern Region on NW-2, NW-16 in Assam are attached as Annexure -II. The
details of projects on other waterways are attached at Annexure -III.
(d) IWT projects for which approval have been given recently for implementation in
Uttar Pradesh are given below:
S.
Projects Timeline
No.
1 Work awarded on
29.04.2026
Development of Ship Repair Facility at
Scheduled completion 2
Varanasi
years
2 PPP bidding in progress.
Development of Freight Village-Multimodal Letter of Award targeted
Logistics Park at Varanasi October,2026Annexure-I
Details of New Port Development Projects and IWT Infrastructure Projects.
A.National Waterway-1
Sl. Cost (Rs
No State District Project Status . in crore
. )
Uttar
1 Prad Varanasi Multimodal Terminal Varanasi Completed 182.33
esh
Uttar Varanasi/ Ch
2 Prad andauli/ Gha 15 Community Jetties Completed 14.23
esh zipur/Ballia
Uttar
Work in Pro
3 Prad Varanasi Ship Repair Facility Varanasi 182.93
gress
esh
Uttar
2 Nos. of River Cruise Terminals at V DPR in Pro
4 Prad Varanasi 200
aranasi gress
esh
Uttar
DPR in Pro
5 Prad Varanasi Regional Centre of Excellence 250
gress
esh
Uttar
Development of Freight Village- MML PPP Biddin
6 Prad Varanasi 188
P Varanasi g ongoing.
esh
Uttar 1 Installed a
Five Location
7 Prad Quick Pontoon Opening Mechanism nd 4 Under 51.61
s
esh construction
Fairway Development
Uttar
Various Locaa. Majhauwa – Ghazipur
8 Prad Ongoing 221.51
tion
esh b. Ghazipur to Varanasi
Uttar
Launch of Hydrogen vessels at Varan
9 Prad Varanasi Completed 24
asi
eshUttar Installation of Jetty and operationaliza
10 Prad Ayodhya tion of hybrid electric vessels at Ayod Completed 16
esh hya on NW-40 is completed
Uttar Development of IWT Infrastructure &
Mathura & Vr
11 Prad Fairway Maintenance on NW-110 alo Completed 12
indavan
esh ng Mathura & Vrindavan stretch
Feasibilit
Uttar Varanasi, Ay
Development of Water Metro project y study c
12 Prad odhya & Pray Ongoing
at Varanasi, Ayodhya and Praygraj ompleted
esh agraj
.
1 Installed a
Five Locatio
13 Bihar Quick Pontoon Opening Mechanism nd 4 Under 55
n
construction
Work in Pro
14 Bihar Patna Ship Repair Facility Patna 210.56
gress
DPR in Pro
15 Bihar Patna River Cruise Terminals at Patna 100
gress
16 Bihar Saran Intermodal Terminal, Kalughat Completed 87.13
17 Bihar Patna Upgradation of NINI Patna Completed 6.35
Fairway Development
a. Farakka – Kahalgaon
Various Locab. Sultanganj – Barh
18 Bihar Ongoing 377.56
tions
c. Barh – Digha
d. Digha – Majhauwa
21 Location
19 Bihar Development of Community Jetties Completed 39.21
s
Jhark
20 Sahibganj Multimodal Terminal Sahibganj Completed 278.44
hand
Jhark
21 2 locations Development of Community Jetties Completed 2.60
hand
West
22 Beng Haldia Multimodal Terminal, Haldia Completed 508.36
al
West
Intermodal Terminal, Balagarh, West Under Imple
23 Beng Balagarh 27.41
Bengal mentation
alWest
24 Beng Murshidabad New Navigational Lock at Farakka Completed 369.53
al
West
25 Beng Murshidabad Modernization of Existing Lock Gate Ongoing 172.95
al
Fairway Development
a. Tribeni – Katwa
West
Various Loca
26 Beng Ongoing 175.84
b. Katwa – Farakka
tion
al
c. Haldia Access Channel
West
27 Beng 22 Locations Development of Community Jetties Completed 39.21
al
B. New Port Infrastructure Projects
Sl. No. State Project Cost (Rs. in crore)
1 Maharashtra Vadhavan Green Field Deep water Port 76220Annexure-II
A. MAJOR COMPLETED PROJECTS IN NER:
Cost
Sl.
State District Project Status (Rs.
No.
crore)
Construction of High
1 Assam Kamrup Completed 43.89
Level Jetty at Pandu
Construction of Jetty
2 Assam Dhubri and allied works for Completed 47
Dhubri Terminals
Development of IWT
3 Assam Bongaigaon Terminal at MMLP Completed 82.04
Jogighopa
Construction of
4 Assam Dibrugarh Cargo-cum-Tourist Completed 101
Terminal at Bogibeel
Floating Tourist Jetty
5 Assam Dibrugarh, Kamrup Completed 9.75
at Bogibeel & Pandu
Renovation of
Existing Shore
6 Assam Karimganj Facilities at Badarpur Completed 6.4
and Karimganj
Terminal
Construction &
Development of IWT
7 Tripura Sepahijala Completed 6.91
Terminal at
Sonamura, Tripura
Customs &
8 Assam Dibrugarh Immigration Building Completed 8.87
at Bogibeel
Customs &
9 Assam Dibrugarh Immigration Building Completed 9.31
at Dhubri & Bogibeel
Construction of
10 Assam Bongaigaon Boundary Wall at Completed 12.33
Jogighopa Terminal
Renovation of
11 Assam Dibrugarh Heritage Building at Completed 6
Dibrugarh
Tinsukia, Dhemaji, Dibrugarh, Operational &
12 Assam Lakhimpur, Majuli, Jorhat, Maintenance of other Completed 508.3
Sivasagar, Golaghat, works includingBiswanath, Sonitpur, Nagaon, terminals and
Morigaon, Kamrup (Metro), fairway development
Kamrup, Nalbari, Barpeta, (2014–2026)
Goalpara, Bongaigaon, South
Salmara–Mankachar, and
Dhubri
Construction of Steel
13 Assam Kamrup Gangway with Yoke Completed 2.88
System at Pandu
Approach Road to
14 Assam Kamrup Pandu Jetty from Completed 180
NH-27
B. MAJOR ONGOING PROJECTS IN NER:
Sl. Cost
State District Project Status
No. (₹ Cr.)
Dhubri, South
Fairway
Salmara–
Development in
Mankachar, Work in progress
NER through DCI
1 Assam Goalpara (Physical Progress: 143
for NW-2
Bongaigaon 67.70%)
(Bangladesh
(Jogighopa),
Border to Pandu)
Barpeta, Kamrup
Work in progress
[Physical Progress:
98.46 % for civil
Ship Repair Facility works and total
2 Assam Kamrup 283.33
at Pandu project completion
68% (Civil,
Mechanical and
Electrical works)]
Construction of
Tourist Jetty at Work awarded to
Bishwanath Ghat & IPRCL on Deposit
3 Assam Jorhat 158
Cargo-cum-Cruise Work basis. Tender
Terminal at under process.
Neamati Ghat
Work awarded to
Development of IPRCL on Deposit
4 Assam Dibrugarh 207.65
RCoE at Dibrugarh Work basis.Tender
under process.Construction of
Building for
Work awarded to
Regional Office,
IPRCL on Deposit
5 Assam Kamrup MSDC, Guest 50
Work basis. Tender
House and Office
under process.
Space for ITAT at
Fancy Bazar
Link Road
Work in progress
connecting Pandu
6 Assam Kamrup (Physical Progress: 55
Terminal with Ship
30.00%)
Repair Facility
Development &
Maintenance of Work in progress
7 Assam Karimganj Fairway in Bhanga– (Physical Progress: 41.67
Badarpur (10.5 km) 67.70%)
stretch through DCI
Construction of
Work in progress
Berthing Pontoon
8 Assam Karimganj (Physical Progress: 2.57
with Gangway at
72.50%)
Badarpur Terminal
Construction of
Work in progress
Crane Pontoon with
9 Assam Karimganj (Physical Progress: 4.42
Gangway at
65.00%)
Karimganj Terminal
Procurement of Work in progress
10 Assam Karimganj One Survey Vessel (Physical Progress: 4.97
for NW-16 60.00%)
Procurement of
Three Amphibian Under Tendering
11 Assam Karimganj 30
Dredgers for NW- Stage
16 & IBP Route
Procurement of
Two (25×6 m) Steel Work in progress
12 Assam Dhubri Pontoons for River (Physical Progress: 3.4
Brahmaputra (NW- 90.00%)
2)
Procurement of
Two SDB Vessels Work in progress
13 Assam Kamrup for River (Physical Progress: 2.88
Brahmaputra (NW- 55.00%)
2)Project for
Providing 10 Nos. Work in progress
14 Assam Silchar RPL Passenger (Physical Progress: 13.02
Vessels for River 55.00%)
Barak
Construction of All-
weather Approach
15 Assam Dibrugarh Road from NH-15 Under DPR Stage 0.43
to Bogibeel
Terminal (DPR)
Tinsukia,
Dibrugarh,
DPR for
Sivasagar,
Construction of
Goalpara,
Assam, Community Jetties Under Tendering
16 Kamrup, 5.56
Meghalaya. on NW-30, NW-32, Stage
Morigaon,
NW-50, NW-57 &
Nagaon,
NW-95
Lakhimpu, Majuli,
West Garo HillsAnnexure-III
A. COMPLETED TERMINALS ON OTHER NWs
Sl. Cost (₹
State District Project Status
No. Cr.)
Andhra 4 nos floating steel pontoon
1. NTR Completed 5.84
Pradesh terminals on NW-4 (River Krishna)
Andhra
2. NTR Permanent Ro-Ro terminal Completed 13.27
Pradesh
North 4 nos floating concrete terminals on
3. Goa Completed 9.6
Goa NW-68 (River Mandovi)
B. ONGOING TERMINALS ON OTHER NWs
Sl Stat District Description National WatSize of Concrete Status Ti
. e erways Pontoons m
N eli
o. ne
1 Goa North Go Design, ConstrucCumbarjua C 10 nos. concrete j Casting coDe
a / South tion, Supply, Inst anal (NW-27) etties of size 24 m mpleted. 3 c-2
Goa allation, Testing ; Mandovi Rivx 6 m. of 10 sites 6
& Commissionin er (NW-68); Z finalized f
g of 10 nos. Com uari River (N or installat
munity Jetties. W-111) ion.
2 GujaNarmada Design, ConstrucNarmada Riv 1 jetty at Mokhdi viCasting coDe
rat / Chhota tion, Supply, Inst er (NW-73) llage (36 m x 9 m) mpleted. I c-2
Udepur allation, Testing & 1 at Hafeswar T nstallation 6
& Commissionin emple (24 m x 6 mafter appr
g of 2 nos. Concr ). oach road.
ete jetties.
2 GujaSurat Design, ConstrucTapi River (N 1 jetty at Surat Ca Casting yeDe
A rat tion, Supply, Inst W-100) stle (36 m x 9 m) t to start. c-2
allation, Testing & 1 at Dumas Bea 6
& Commissionin ch (24 m x 6 m).
g of 2 nos. Concr
ete jetties.
3 Jam Srinagar/ Design, ConstrucJhelum River 8 jetties (30 m x 6 Casting in De
mu Anantnag tion, Supply, Inst (NW-49); Ch m) on Jhelum; 2 je progress. c-2
& K /Bandipor allation, Testing enab River ( tties (30 m x 6 m) 6
ash a; Jammu& Commissionin NW-26); Ravi at Akhnoor & Rea
mir /Reasi/Ka g of 8 + 3 concretRiver (NW-84si; 1 jetty (24 m x
thua e jetties. ) 6 m) at Satwain.4 KarnMysuru / Design, ConstrucSharavati (N 2 jetties (36 m x 9 Casting yeDe
atak Uttara Ka tion, Supply, Inst W-90); Kabini m) at Beeramballi t to start. c-2
a nnada allation, Testing (NW-51) & Gerosuppa; 1 jet 6
& Commissionin ty (24 m x 6 m) at
g of 3 nos. Concr Honnavar.
ete jetties.
5 OdisKendrapa Design, ConstrucMahanadi (N 2 jetties (36 m x 9 Casting yeMa
ha ra tion, Supply, Inst W-64); Baitar m) at Bahakuda & t to start. r-2
allation, Testing ani (NW-14) Musadia; 1 jetty (2 7
& Commissionin 4 m x 6 m) at Gupt
g of 3 nos. Concr i Ghat.
ete jetties.
6 WesNorth 24 Design & Inspect Ichamati Rive8 HDPE Pontoons Fabricatio Ma
t Be Parganas ion for 08 nos. H r (NW-44) at Harishpur, Bajit n yet to st r-2
ngal DPE Pontoons at pur, Kathatala, Me art. 7
Ichamati River. dey, Purna, Media
, Kabilpur & Media
Ferry Ghats.
7 KeraKottayam Design & Inspect Kollam-Kotta 04 HDPE Pontoon Fabricatio Ma
la / Alappuz ion for 04 nos. H puram & Wess at Vaikkom, Che n yet to st r-2
ha DPE Pontoons. t Coast Canal rthala (Thanneerm art. 7
(NW-3) ukkom), Alappuzh
a & Kayamkulam.
*****