Parliament Question: Drainage Issues and Flooding on NH-66 in Kannur

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is a response to Unstarred Question No. 1888 in Lok Sabha, answered on December 11, 2025, regarding drainage issues and flooding on National Highway-66 in Kannur. It addresses concerns raised by Shri K. Sudhakaran about the impact of the highway's six-laning work. The document outlines mitigation measures, corrective actions, and technical aspects related to drainage and water flow. **Key Points / Main Content** * **Flooding and Slush Ingress:** * The government is aware of the issue in Kuppam Area. * Mitigation measures include channelizing water flow, cleaning downstream drains, and constructing permanent drainage and slope protection works. * For areas where outfalls are unavailable due to habitation, resolution is sought through consultation with State Government/Local Bodies. * Local Bodies are directed by Chief Secretary to take up outfall works outside National Highway Right of Way. * **High Embankment Impact:** * Adequate cross-drainage structures (culverts, minor bridges) are being provided in low-lying paddy fields to maintain natural water flow. * Longitudinal lined drains with cross culverts have been added in built-up areas for proper stormwater discharge. * Local drainage issues are being reverified, and designs revised accordingly. * **Cross-Drainage and Retaining Walls:** * The project includes multiple cross-drainage structures such as box culverts and balancing culverts. * Retaining walls and cross drainage are being implemented as per site-specific requirements and the concession agreement. * Annexures detail the Cross Drainage Structures. * **Project Implementation and Audit:** * The projects are being implemented under Hybrid Annuity Mode (HAM)/Engineering Procurement Construction (EPC). * The Concessionaire/Contractor is responsible for detailed design, subject to review and approval by the Independent/Authority Engineer. * The Detailed Project Report (DPR) is indicative, and drainage designs are being verified for site suitability. * An Expert Committee submitted a report on 04.08.2025 on Reinforced Soil Walls and Slope Protection Works after inspecting vulnerable locations; actions are underway per the report. * **Pre-Monsoon Activity:** * The government issues regular internal directions to implementing agencies, including NHAI, to conduct pre-monsoon activities. * NHAI has instructed the Concessionaire to expedite drainage-related construction works before the next monsoon. **Impact Analysis** **Stakeholder: Local Residents of Kuppam and Taliparamba, Kannur District** * **Impact:** Residents are affected by flooding and slush ingress into their homes due to highway construction blocking natural water flow. * **Action Required:** Be aware of the ongoing mitigation measures being implemented by the government to alleviate flooding issues. Cooperate with local authorities for any necessary outfall works. **Stakeholder: National Highways Authority of India (NHAI) / Concessionaire** * **Impact:** They are responsible for executing the corrective drainage works, including constructing cross-drainage structures and retaining walls, to address the flooding issues. * **Action Required:** Expeditiously complete all construction and drainage-related works before the onset of the next monsoon. Verify drainage designs for suitability and site conditions. **Stakeholder: State Government/Local Bodies** * **Impact:** They are involved in resolving drainage issues where outfalls are unavailable due to habitation. * **Action Required:** Undertake outfall works beyond the National Highway Right of Way (ROW), as directed by the Chief Secretary. Coordinate with NHAI and local residents to ensure effective drainage solutions.

Key Entities Referenced

Ministry of Road Transport and Highways: The ministry responsible for addressing the drainage and flooding issues on NH-66. National Highways Authority of India (NHAI): The implementing agency directed by the Ministry to complete corrective drainage works. National Highway-66: The specific location where drainage issues and flooding are occurring, particularly between Taliparamba and Muzhappilangad in Kannur District. Lok Sabha: Referenced as the parliamentary body where the question regarding the drainage issues was raised. Hybrid Annuity Mode (HAM)/Engineering Procurement Construction (EPC): The mode of project implementation for the works on NH-66.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 1888 ANSWERED ON 11TH DECEMBER, 2025 DRAINAGE ISSUES AND FLOODING ON NH-66 IN KANNUR 1888. SHRI K SUDHAKARAN: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) whether the Government is aware of the severe flooding and entry of slush into residential homes in Kuppam and Taliparamba, Kannur District, caused by the ongoing six-laning work of National Highway-66, Taliparamba to Muzhappilangad stretch, if so the details thereof; (b) whether it has been identified that the high embankment construction has blocked natural water flow channels and traditional drainage systems in these low-lying paddy zones, forcing local residents to stage protests and block the highway, if so the details thereof; (c) the specific details of the cross-drainage works and retaining walls planned to rectify this engineering flaw; (d) whether the Ministry has directed the National Highways Authority of India (NHAI)/concessionaire to complete these corrective drainage works strictly before the onset of the next monsoon to prevent the submergence of villages and if so, the details thereof; and (e) whether any technical audit has been conducted to determine if the original Detailed Project Report failed to account for the hydrological requirements of this specific terrain and if so, the details thereof? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI)(a) Yes Sir. To address the issue of water logging and slush ingress, during the monsoon season in 2025 and thereafter, mitigation measures including channelizing water flow, cleaning of downstream drains, construction of permanent drainage & slope protection works in the affected stretches etc. are undertaken in Kuppam Area. At some locations, outfalls are not available due to habitation. The issue is being resolved through consultation with State Government/Local Bodies. Chief Secretary has directed Local Bodies to take up the outfall works beyond National Highway (NH) Right of Way (ROW). (b) To address the issue of high embankment, adequate number of cross- drainage structures, including culverts, minor bridges etc. in low-lying paddy fields are provided, to ensure continuity of natural water flow. No instances of village-wise flooding have been reported. In built-up areas, longitudinal lined drains with cross culverts have also been provided to facilitate proper stormwater discharge to nearest natural water channel. Wherever local drainage issues have been brought to notice, they are being reverified and, if necessary, the designs are being revised accordingly to mitigate issue. (c) The project includes provision of multiple cross-drainage structures such as box culverts, and balancing culverts at frequent intervals to effectively cater storm water. Retaining walls and cross drainage are being executed as per site-specific requirements and as per scope of Concession Agreement. The details of Cross Drainage Structures are annexed. (d) Government on time to time at regular internal issues direction to all its implementing agencies including NHAI to take pre-monsoon activity before the onset of Monsoon. NHAI has informed that the Concessionaire has been instructed to expedite all construction works including drainage-related works to complete before the onset of the next monsoon. (e) The projects are being implemented on Hybrid Annuity Mode (HAM)/Engineering Procurement Construction (EPC), wherein the responsibility for detailed design lies with the Concessionaire/Contractor and the final designs are subject to review and approval by the Independent/Authority Engineer. The Detailed Project Report (DPR) is indicative in nature. All drainage designs are being verified accordingly to ensure suitability to site conditions. An Expert Committee inspected the vulnerable locations in each project with regard to Reinforced Soil Walls and Slope Protection Works and submitted its report on 04.08.2025. Actions are being taken as per report of Committee.ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA UNSTARRED QUESTION NO. 1888 ANSWERED ON 11TH DECEMBER, 2025 ASKED BY SHRI K SUDHAKARAN REGARDING ‘DRAINAGE ISSUES AND FLOODING ON NH-66 IN KANNUR’. Cross Drainage Structure Sl. Span Arrangement Site Design Chainage Proposed Structure Type status of work No. (No. x Lx D) 1 134+744 1 x 2.00 x 2.00 Box Culvert completed 2 135+110 1 x 2.00 x 2.00 Box Culvert completed 3 135+877 1 x 3.00 x 2.00 Box Culvert completed 4 136+788 1 x 2.00 x 2.00 Box Culvert completed 5 137+230 1 x 2.00 x 2.00 Box Culvert completed 6 137+729 1 x 2.00 x 2.00 Box Culvert completed 7 137+961 1 x 2.00 x 2.00 Box Culvert completed 8 138+878 1 x 2.00 x 2.00 Box Culvert completed 9 139+202 1 x 2.00 x 2.00 Box Culvert completed 10 139+492 1 x 2.00 x 2.00 Box Culvert completed 11 139+852 1 x 2.00 x 2.00 Box Culvert completed 12 140+231 1 x 2.00 x 2.00 Box Culvert completed 13 140+421 1 x 3.00 x 2.00 Box Culvert completed 14 140+657 1 x 3.00 x 2.00 Box Culvert completed 15 141+128 1 x 2.00 x 2.00 Box Culvert completed 17 141+830 1 x 2.00 x 2.00 Box Culvert completed 18 142+128 1 x 3.00 x 2.00 Box Culvert completed 19 142+458 1 x 3.00 x 2.00 Box Culvert completed 20 142+591 1 x 2.00 x 2.00 Box Culvert completed 21 143+049 1 x 2.00 x 2.00 Box Culvert completed 22 143+450 1 x 3.00 x 2.00 Box Culvert completed 23 143+900 1 x 2.00 x 2.00 Box Culvert completed 24 144+757 1 x 2.00 x 2.00 Box Culvert completed 25 145+160 1 x 2.00 x 2.00 Box Culvert completed 26 146+400 1 x 2.00 x 2.00 Box Culvert completed 27 146+597 1 x 2.00 x 2.00 Box Culvert completed28 146+797 1 x 2.00 x 2.00 Box Culvert completed 29 146+997 1 x 2.00 x 2.00 Box Culvert completed 30 147+457 1 x 2.00 x 2.00 Box Culvert completed 31 147+617 1 x 2.00 x 2.00 Box Culvert completed 32 147+997 1 x 2.00 x 2.00 Box Culvert completed 33 148+000 1 x 2.00 x 2.00 Box Culvert completed 34 148+200 1 x 2.00 x 2.00 Box Culvert completed 35 148+400 1 x 2.00 x 2.00 Box Culvert completed 36 148+600 1 x 2.00 x 2.00 Box Culvert completed 37 149+747 1 x 2.00 x 2.00 Box Culvert completed 38 149+947 1 x 2.00 x 2.00 Box Culvert completed 39 150+092 1 x 3.00 x 3.00 Box Culvert completed 40 150+254 1 x 2.00 x 2.00 Box Culvert completed 41 150+422 1 x 3.00 x 2.00 Box Culvert completed 42 150+602 1 x 2.00 x 2.00 Box Culvert completed 43 151+207 1 x 2.00 x 2.00 Box Culvert completed 44 151+359 1 x 2.00 x 2.00 Box Culvert completed 45 151+647 1 x 2.00 x 2.00 Box Culvert completed 46 152+037 1 x 2.00 x 2.00 Box Culvert completed 47 153+797 1 x 3.00 x 3.00 Box Culvert completed 48 153+900 1 x 2.00 x 2.00 Box Culvert completed 49 153+997 1 x 2.00 x 2.00 Box Culvert completed 50 154+112 1 x 2.00 x 2.00 Box Culvert completed 51 154+207 1 x 6.00 x 3.00 Box Culvert completed 52 154+407 1 x 2.00 x 2.00 Box Culvert completed 53 154+600 1 x 5.00 x 3.00 Box Culvert completed 54 154+801 1 x 3.00 x 2.00 Box Culvert completed 55 156+077 1 x 2.00 x 2.00 Box Culvert completed 56 156+492 1 x 2.00 x 2.00 Box Culvert completed 57 156+734 1 x 2.00 x 2.00 Box Culvert completed 58 157+391 1 x 2.00 x 2.00 Box Culvert completed 59 157+781 1 x 2.00 x 2.00 Box Culvert completed 60 157+929 1 x 2.00 x 2.00 Box Culvert completed 61 158+181 1 x 2.00 x 2.00 Box Culvert completed 62 158+347 1 x 2.00 x 2.00 Box Culvert completed63 158+554 1 x 2.00 x 2.00 Box Culvert completed 64 159+071 1 x 3.00 x 2.00 Box Culvert completed 65 159+290 1 x 3.00 x 2.00 Box Culvert completed 66 159+377 1 x 3.00 x 2.00 Box Culvert completed 67 160+040 1 x 2.00 x 2.00 Box Culvert completed 68 160+174 1 x 2.00 x 2.00 Box Culvert completed 69 160+381 1 x 2.00 x 2.00 Box Culvert completed 70 160+585 1 x 3.00 x 3.00 Box Culvert completed 71 160+690 1 x 2.00 x 2.00 Box Culvert completed 72 161+050 1 x 2.00 x 2.00 Box Culvert completed 73 161+306 1 x 2.00 x 2.00 Box Culvert completed 74 161+535 1 x 2.00 x 2.00 Box Culvert completed 75 161+690 1 x 2.00 x 2.00 Box Culvert completed 76 162+140 1 x 2.00 x 2.00 Box Culvert completed 77 162+290 1 x 2.00 x 2.00 Box Culvert completed 78 162+366 1 x 4.00 x 2.00 Box Culvert completed 79 162+757 1 x 2.00 x 2.00 Box Culvert completed 80 163+213 1 x 2.00 x 2.00 Box Culvert completed 81 163+549 1 x 2.00 x 2.00 Box Culvert completed *****