(a) the details of the number of Railway lines electrified in kilometres since
2014 compared to the last six decades including the acceleration
strategy was adopted for this change;
(b) the details of the numbers of railway zones and coverage across all the
states that have achieved complete broad-gauge electrification
including the zones and timelines for remaining network completion
particularly in Bihar, Uttar Pradesh, Andhra Pradesh and Madhya
Pradesh;
(c) whether India's electrification rate positions it ahead of the developing
countries and if so, the details thereof including the global standing
among major rail networks;
(d) whether transition from diesel to electric traction has avoided industrial
pollution and if so, the details thereof including the diesel savings and
associated cost reduction achieved; and
§ Page 1 of 6(e) whether electrified railways enable the integration of solar and wind
renewable energy for traction power and if so, the details thereof
including the capacity of renewable energy infrastructure is being
deployed to support net-zero emission goals?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e) Electrification of railway network on Indian Railways has been
taken up in mission mode. So far, about 99.6% of Broad Gauge (BG)
network has been electrified. The electrification in remaining network has
been taken up. Electrification carried out during 2014-26 and before 2014 is
as under:
Period Route Kilometer
Before 2014 (about 60 years) 21,801
2014-26 48,072
Further, all new line / multi-tracking projects are being sanctioned and
constructed with electrification.
Mission 100% Electrification is a highly challenging project, as it
involves electrifying railway lines that are already in operation and
encountering unforeseen various challenges during execution. To expedite
railway electrification work, various steps have been taken by Indian
Railways which include among others; formation of Project Monitoring
Group (PMG) portal to resolve the constraints being faced during
commissioning, ensuring effective project monitoring mechanism, assured
funding and enhanced financial powers to field units.
Page 2 of 6Zone wise status of electrification is as under:
SN ZONE % Electrified
1 Central Railway 100%
2 East Coast Railway 100%
3 East Central Railway 100%
4 Eastern Railway 100%
5 Konkan Railway 100%
6 Kolkata Metro 100%
7 North Central Railway 100%
8 North Eastern Railway 100%
9 Northern Railway 100%
10 South Central Railway 100%
11 South Coast Railway 100%
12 South East Central Railway 100%
13 South Eastern Railway 100%
14 West Central Railway 100%
15 Western Railway 100%
16 North Western Railway 99.8%
17 Northeast Frontier Railway 98.7%
18 Southern Railway 98.7%
19 South Western Railway 96.1%
State/UT wise status of electrification including Bihar, Uttar Pradesh,
Andhra Pradesh and Madhya Pradesh is as under:
Page 3 of 6% %
SN STATE SN STATE
Electrified Electrified
1 Andhra Pradesh 100% 16 Mizoram 100%
Arunachal
2 100% 17 Nagaland 100%
Pradesh
3 Bihar 100% 18 Odisha 100%
4 Chandigarh 100% 19 Puducherry 100%
5 Chhattisgarh 100% 20 Punjab 100%
6 Delhi 100% 21 Telangana 100%
7 Gujarat 100% 22 Tripura 100%
Uttar
8 Haryana 100% 23 100%
Pradesh
Himachal
9 100% 24 Uttarakhand 100%
Pradesh
Jammu &
10 100% 25 West Bengal 100%
Kashmir
11 Jharkhand 100% 26 Rajasthan 99.8%
12 Kerala 100% 27 Tamil Nadu 98.3%
13 Madhya Pradesh 100% 28 Assam 97.9%
14 Maharashtra 100% 29 Karnataka 96.8%
15 Meghalaya 100% 30 Goa 91.4%
Indian Railways (IR) has undertaken one of the fastest railway
electrification programs in the world. While many countries prioritize
electrifying only their busiest passenger and freight corridors, India has
chosen to electrify its entire broad gauge network. Indian Railways’
achievement in railway electrification stand out globally. According to the
latest report of International Union of Railways (UIC) of June, 2025, railway
electrification in important railway systems is as under:
Page 4 of 6Country Railway Electrification
Switzerland 100%
India 99.6%
China 82%
Spain 67%
Japan 64%
France 60%
United Kingdom 39%
By network coverage, Indian Railways is now among the most
extensively electrified large railway systems in the world. Indian Railways
had electrified 99.6% of its broad-gauge network, completing one of the
world’s largest infrastructure transformation programs in a decade.
Electric traction is not only environmental friendly but energy
efficient also. Reduction in CO emissions in transportation by railways as
2
compared to transportation by road is as under (Ref:- NITI Aayog Report
titled “Fast Tracking Freight In India”, June 2021)
Mode of CO emission for transportation of 1
2
Transportation tonne for 1 km
Road 101 gm
Rail 11.5 gm (about 89% less)
Further, electrification of railway tracks reduces dependency on fossil
fuels, decreased diesel consumption resulting in lower carbon emission.
Electrification enables better haulage capacity and higher train speeds,
leading to reduced travel time and enhanced efficiency.
Page 5 of 6Reduction in IR’s diesel consumption for traction purpose by 185
crore litres with about 108 crore litres consumption in 2024-25 as
compared to 293 crore litres in 2015-16. This has resulted in saving of
precious foreign exchange with Government of India exchequer, which
would have otherwise been needed for import of fuel which has been saved
due to electrification.
Electrified railways are well suited for integrating solar, wind & other
renewable energy into traction power systems, making them most effective
transport systems for utilizing renewable electricity. Indian Railways is
committed to sustainable operations through near total Railway
Electrification combined with use of renewable energy sources, based on
strategic power procurement planning, thus contributing to carbon
footprint reduction.
Indian Railways aims to progressively meet its electric traction power
requirements through renewable energy sources including solar, wind and
hybrid systems (solar, wind and energy storage) thereby reducing carbon
footprints of IR. As of June, 2026 about 1161 Mega Watt (MW) of solar
plants (both on Rooftops and on land) and about 103 MW of Wind power
plants have been commissioned.
*****