GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
RAJYA SABHA
UNSTARRED QUESTION NO. 3304
ANSWERED ON 20.03.2026
ELECTRIFICATION OF RAILWAY TRACKS IN ODISHA
3304 SMT. SULATA DEO:
Will the Minister of RAILWAYS be pleased to state:
(a) whether Government proposes to electrify the remaining non-electrified railway sections in Odisha;
and
(b) if so, the details and timeline thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) & (b) Electrification of railway network on Indian Railways (IR) has been taken up in mission
mode. So far, about 99.4% of Broad Gauge (BG) network has been electrified. The electrification in
remaining network has been taken up. Electrification carried out during 2014-25 and before 2014 is as
under:
Period Route Kilometer
Before 2014 (about 60 years) 21,801
2014-25 46,900
In Odisha, entire existing BG network has been electrified. Further, all new line / multi-tracking
projects are being sanctioned and constructed with electrification.
*****
§