GOVERNMENT OF INDIA
MINISTRY OF CIVIL AVIATION
LOK SABHA
UNSTARRED QUESTION NO. : 3054
( TO BE ANSWERED ON THE 6th August 2026 )
EXPANSION OF AIRPORT INFRASTRUCTURE IN TAMIL NADU
3054. SHRI SELVAM G
DR. RANI SRIKUMAR
SHRI C N ANNADURAI
Will the Minister of CIVIL AVIATION
be pleased to state:-
(a) whether the Government has undertaken or proposes to undertake
expansion, modernization and capacity enhancement of airports in Tamil Nadu
and if so, the details thereof, airport-wise;
(b) the details of the projects approved or under consideration including new
terminals, runway expansion, passenger amenities, cargo infrastructure and
improved air connectivity along with the expected timeline fixed for
completion;
(c) the likely impact of these airport expansion projects on regional
connectivity, tourism, trade, investment and employment in Tamil Nadu; and
(d) the further measures proposed to strengthen aviation infrastructure and
enhance air connectivity across the State?
ANSWER
Minister of State in the Ministry of CIVIL AVIATION
(Shri Murlidhar Mohol)
(a) & (b): Upgradation, modernization and capacity enhancement of existing
airports is a continuous process and is undertaken by the Airports Authority of
India (AAI) and other airport operators from time to time based on passenger
demand forecasts, operational requirements, demand from airlines, availability
of land, financial viability, statutory and regulatory clearances, and other site-
specific factors.
Major expansion and development works at airports in Tamil Nadu include:
Chennai Airport: Phase-II modernization at a cost of 2,467 crore to enhance
passenger handling capacity from 30 Million Passengers Per Annum (MPPA) to
35 MPPA, along with storm water drain modification (209.01 crore),refurbishment of Terminal-1 (81.80 crore) and development of airside
infrastructure (480.06 crore).
Tiruchirappalli Airport: Construction of a New ATC Tower-cum-Technical
Block at a cost of 80.17 crore.
Coimbatore Airport: Construction of the boundary wall on newly acquired land
at a cost of 51.31 crore and addition and alteration to the existing terminal
building at a cost of 13.71 crore.
The timeline for completion of the airport projects depends upon many factors
such as land acquisition, availability of mandatory clearances, financial closure
etc.
(c) & (d): International Civil Aviation Organisation (ICAO) study titled
'Economic Benefits of Civil Aviation: Ripples of Prosperity', shows that the air
connectivity has an economic multiplier of 3.25 and employment multiplier of
6.1.
In the state of Tamil Nadu, Salem Airport has been developed and
operationalised whereas Vellore and Neyveli are being developed under the
UDAN Scheme. The next phase of the scheme includes development of 100
airports, connecting 120 destinations across the country including Tamil Nadu.
******