PARLIAMENT QUESTION: EXPANSION OF NUCLEAR POWER CAPACITY

Issued by Department of Atomic Energy · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document addresses a parliamentary question regarding the expansion of nuclear power capacity in India, as of February 5th, 2026. It outlines the current installed capacity and the status of ongoing and planned nuclear power projects, with a focus on reactors under construction and pre-project activities, targeting completion by 2031-32. The document also mentions the importance of environmental clearance and ongoing safety reviews. **Key Points / Main Content** * **Current Installed Capacity:** * India's current installed nuclear power capacity is 8,780 MW, comprising 24 nuclear power plants (excluding RAPS-1 - 100 MW). * **Projects Under Implementation:** * 17 nuclear power reactors with a total capacity of 13,100 MW are under implementation. * This includes 7 reactors under construction and 10 reactors under pre-project activities. * These projects are expected to be completed progressively by 2031-32. * **BHAVINI Project:** * BHAVINI is currently commissioning a 500 MWe Prototype Fast Breeder Reactor (PFBR) project at Kalpakkam, Tamil Nadu. * Government has approved pre-project activities for 2 x 500 MWe twin unit of FBR 1&2 project at Kalpakkam, Tamil Nadu. * Financial sanction will be approached for FBR 1&2 projects after first criticality of PFBR is attained. * **Safety and Performance:** * Review of safety and performance of reactors and implementation of necessary upgrades measures to enhance their safety and performance to the state of the art is an ongoing exercise. * Major Renovation & Modernisation / Refurbishment work is in progress for 04 of the 24 operating reactors. * **Projects Under Construction/Commissioning:** * RAPP-8 (Rawatbhata, Rajasthan): 1 x 700 MW, 98.60% physical progress. * KKNPP-3&4 (Kudankulam, Tamil Nadu): 2 x 1000 MW, 80.51% physical progress. * KKNPP-5&6 (Kudankulam, Tamil Nadu): 2 x 1000 MW, 41.56% physical progress. * GHAVP-1&2 (Gorakhpur, Haryana): 2 x 700 MW, civil works in progress. * **Projects under pre-project Activities:** * Kaiga-5&6 (Kaiga, Karnataka): 2 x 700 MW, under pre-project activities at various stages. * GHAVP-3&4 (Gorakhpur, Haryana): 2 x 700 MW, under pre-project activities at various stages. * Chutka-1&2 (Chutka, Madhya Pradesh): 2 x 700 MW, under pre-project activities at various stages. * Mahi Banswara-1&2 (Mahi Banswara, Rajasthan): 2 x 700 MW, under pre-project activities at various stages. * Mahi Banswara-3&4 (Mahi Banswara, Rajasthan): 2 x 700 MW, under pre-project activities at various stages. * **Implementation by ASHVINI:** * Mahi Banswara-1&2 and Mahi Banswara-3&4 being implemented by ASHVINI, a Joint Venture of NPCIL and NTPC. * **Environmental Clearance:** * Comprehensive Environmental Impact Assessment (EIA) study in line with Terms of Reference (TOR) approved by the MoEF&CC is carried out. * Project construction commences only after obtaining Environmental Clearance from MoEF&CC. **Impact Analysis** **Stakeholder: Department of Atomic Energy** * **Impact:** Responsible for the expansion of nuclear power capacity and ensuring safety and performance. * **Action Required:** Continue implementing and overseeing nuclear power projects, conducting safety reviews, and securing financial sanctions for upcoming projects. **Stakeholder: Government of India** * **Impact:** Accountable for policy, financial sanctions and regulatory approvals related to nuclear power projects. * **Action Required:** Grant financial sanctions for FBR 1&2 projects after first criticality of PFBR. Ensure compliance with environmental regulations through MoEF&CC. **Stakeholder: BHAVINI** * **Impact:** Directly involved in the commissioning of the PFBR project. * **Action Required:** Continue commissioning of the 500 MWe Prototype Fast Breeder Reactor (PFBR) project at Kalpakkam. **Stakeholder: NPCIL and NTPC (via ASHVINI Joint Venture)** * **Impact:** Responsible for implementing Mahi Banswara-1&2 and Mahi Banswara-3&4 projects. * **Action Required:** Progress the Mahi Banswara projects under the ASHVINI joint venture. **Stakeholder: MoEF&CC** * **Impact:** Responsible for ensuring Environmental Clearance for the project. * **Action Required:** Review the EIA study and the prescribed process to provide Environmental Clearance for the project.

Key Entities Referenced

Nuclear Power Capacity Expansion: Expansion of nuclear power capacity by commissioning and constructing nuclear power reactors Department of Atomic Energy: Administrative department in charge of nuclear power capacity expansion Prototype Fast Breeder Reactor (PFBR): Currently commissioning 500 MWe PFBR project at Kalpakkam, Tamil Nadu Ministry of Environment, Forest and Climate Change (MoEF&CC): Ministry that approves the Terms of Reference (TOR) for Environmental Impact Assessment (EIA) study and prescribes process for Environmental Clearance for nuclear power projects. Kalpakkam, Tamil Nadu: Location of the Prototype Fast Breeder Reactor (PFBR) project.
Official Source Record View Original Source →
See Full Document Text
Department of Atomic Energy PARLIAMENT QUESTION: EXPANSION OF NUCLEAR POWER CAPACITY Posted On: 05 FEB 2026 3:49PM by PIB Delhi The present installed nuclear power capacity in the country is 8,780 MW comprising of 24 nuclear power plants (excluding RAPS-1 – 100 MW). In addition, 17 nuclear power reactors with a total capacity of 13100 MW are under implementation, comprising of 7 nuclear reactors under construction and 10 reactors under pre-project activities. These are expected to be completed progressively by 2031-32. Further, BHAVINI is currently commissioning a 500 MWe Prototype Fast Breeder Reactor (PFBR) project at Kalpakkam, Tamil Nadu. Government has accorded approval to carry out pre-project activities for 2 x 500 MWe twin unit of FBR 1&2 project at Kalpakkam, Tamil Nadu. On attaining first criticality of PFBR, Government will be approached for financial sanction of FBR 1 & 2 projects. Review of safety and performance of reactors and implementation of necessary upgrades measures to enhance their safety and performance to the state of the art is an ongoing exercise. Presently, major Renovation & Modernisation / Refurbishment work is in progress for 04 of the 24 operating reactors. The details of 17 reactors under implementation are as follows: Location Project Capacity Physical (MW) Progress Projects under Construction / Commissioning Rawatbhata Rajasthan RAPP- 8 1 X 700 98.60 Kudankulam, KKNPP-3&4 2 X 1000 80.51 Tamilnadu KKNPP-5&6 2 X 1000 41.56 Gorakhpur, Haryana GHAVP-1&2 2 X 700 Civil works in progress Projects under pre-project ActivitiesKaiga, Karnataka Kaiga-5&6 2 X 700 Under pre- project Gorakhpur, Haryana GHAVP– 3&4 2 X 700 activities at various stages Chutka, Madhya Chutka-1&2 2 X 700 Pradesh Mahi Banswara- 2 X 700 Mahi Banswara, 1&2* Rajasthan Mahi Banswara- 2 X 700 3&4* Mahi Banswara-1&2 and Mahi Banswara-3&4 being implemented by ASHVINI, a Joint Venture of NPCIL and NTPC. In respect of nuclear power plants, a comprehensive Environment Impact Assessment (EIA) study in line with the Terms of Reference (TOR) approved by the MoEF&CC is carried out and the prescribed process followed to obtain Environmental Clearance for the project from MoEF&CC. The project construction is commenced only after obtaining Environmental clearance. This information was given by the Minister of State for Personnel, Public Grievances & Pensions and Prime Minister’s Office Dr. Jitendra Singh in a written reply in the Rajya Sabha today. ***** NKR/NM (Release ID: 2223790) Visitor Counter : 237 Read this release in: Urdu , ही