GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2891
TO BE ANSWERED ON 05.08.2026
FIRE SAFETY PREPAREDNESS RAILWAY STATIONS OF GUJARAT
2891. SHRI PARSHOTTAMBHAI RUPALA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has proposes to take measures to modernise
firefighting systems at every railway stations in Gujarat including
periodic safety audits and specialised staff training and if so, the
details thereof;
(b) whether the Government has prepared a comprehensive, time-bound
action plan to effectively respond to fire incidents in moving passenger
and goods trains particularly in remote and inaccessible areas and if
so, the details thereof; and
(c) the details of the provision of on-board firefighting equipments,
emergency communication systems, standard operating procedures for
immediate response and joint mock drills, rapid response with local fire
services and district administrations?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
ยง Page 1 of 15234
165
135
55
16
31
2
2005-06 2009-10 2014-15 2019-20 2024-25 2025-26 2026-27
(upto June
2026)
Number of Consequential Train Accidents has reduced as shown in the table
below:-
Year Consequential Accidents
2014-15 135
2025-26 16 (88% lesser)
2026-27 ( upto June 2026) 2
Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2025-26 0.01 (91% lesser)
Page 2 of 15
stnediccA
niarT
laitneuqesnoC
fo
.oNThis index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
๐๐จ. ๐จ๐ ๐๐จ๐ง๐ฌ๐๐ช๐ฎ๐๐ง๐ญ๐ข๐๐ฅ ๐๐๐๐ข๐๐๐ง๐ญ๐ฌ
๐๐๐๐ข๐๐๐ง๐ญ ๐๐ง๐๐๐ฑ =
๐๐จ.๐จ๐ ๐ญ๐ซ๐๐ข๐ง๐ฌ ๐ ๐ฆ๐ข๐ฅ๐ฅ๐ข๐จ๐ง ๐ค๐ข๐ฅ๐จ๐ฆ๐๐ญ๐ซ๐๐ฌ ๐ซ๐ฎ๐ง
The various safety measures taken to enhance safety in train operations
are as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Year Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 39,200
2022-23 87,336
2023-24 1,01,662
2024-25 1,14,022
2025-26 1,17,693
2026-27 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation
of points and signals have been provided at 6,671 stations up to
30.06.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,395
Level Crossing Gates up to 30.06.2026 for enhancing safety at LC
Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,671
stations up to 30.06.2026.
Page 3 of 155. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
8. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories to
alert the crew about the signal ahead when visibility is low due to
foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide
base sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
while carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
Page 4 of 1515. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
19. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory โFire Noticesโ for widespread
passenger information in all coaches. Fire posters are provided in
every coach so as to educate and alert passengers regarding various
Doโs and Donโts to prevent fire. These include messages regarding not
carrying any inflammable material, explosives, prohibition of smoking
inside the coaches, penalties etc.
26. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
Page 5 of 15detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in
a phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as
per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-26 Vs.
S.No. Item
2013-14 2025-26 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.63 Lakh Km More than 2.8
rails times
(60 Kg) (Km)
2. Longer Rail Panels 9,917 Km 87,219 Km Nearly 9 times
(260m) (Km)
3. Electronic 837 Stations 3,691 Stations More than 4
Interlocking times
(Stations)
4. Fog Pass Safety As on As on 31.03.26: 352 times
Devices (Nos.) 31.03.14: 31,693 Nos.
90 Nos.
5. Thick Web Switches Nil 35,971 Nos.
(Nos.)
Page 6 of 15Better Maintenance Practices
1. Primary Rail 32,260 Km 57,583 Km 1.78 times
Renewal (Track Km)
2. USFD (Ultra Sonic 79.43 Lakh 2.25 Crore More than 2.8
Flaw detection) times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2025-26: 93 % reduction
3,699 Nos. 272 Nos.
4. Rail fractures (Nos.) In 2013-14: In 2025-26: 92% reduction
2,548 Nos. 208 Nos.
Better Infrastructure and Rolling Stock
1. New Track KM 14,985 Km 36,429 Km Almost 2.5
added (Track Km) times
2. Flyovers 4,148 Nos. 14,362 Nos. More than 3
(RoBs)/Underpasses times
(RUBs) (Nos.)
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.26:Nil
(Nos.) on BG 8,948 (All eliminated
by 31.01.19)
4. Manufacture of LHB 2,337 Nos. 49,366 Nos. More than 21
Coaches (Nos.) times
Implementation of Kavach:-
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which
requires safety certification of highest order (SIL-4).
Page 7 of 152. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do
so and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:-
a. Installation of Station Kavach at each and every station, block
section.
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running
on Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the
diverse railway network. This is a significant milestone in safety for
Indian Railways. Within a short period, IR has developed, tested and
started deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface to
existing Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
Page 8 of 159. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 2,633 Route Kilometres as on
31.07.2026, covering the high density Delhi- Mumbai and Delhi-Howrah
routes as below:-
S. Section Progress
N (RouteKm)
o.
(1) Delhi-Mumbai route: 1,423Rkm
I Tilak Bridge โ Junction cabin โ Palwal โ 1,327
Mathura โ Kota-Nagda-Ratlam โ Vadodraโ Virar
section
ii Vadodara โ Ahmedabad section 96
(2) Delhi โ Howrah route: 1,210 Rkm
i. Chipyana โ Tundlaโ Kanpur โ Subedarganj 563
section
ii. Kanpur โ Lucknow section 71
iii. Mirzapur โ DDU (Excluding) Section 64
iv. DDU(FOC) โBhabua Road section 50
v. Sasaram โ Pheser section 43
vi. Gaya โ Sarmatarn โ Nimiaghat section 159
vii Chota Ambana - Bardhaman โ Howrah section 260
10. In addition, track side Kavach implementation work has been taken up
on 21,794 RKM covering all GQ,GD,HDN and identified sections of
Indian Railways.
11. The total progress of key items of Kavach on Indian Railway sections
are as under:-
S. No. Item Progress
i Laying of Optical Fibre Cable 11,547 Km
ii Installation of Telecom Towers 1,721 Nos.
Page 9 of 15iii Station Data Centre 1,009 Station
iv Installation of Track side equipment 7,726 RKm
v Provision of Kavach in Loco 6,290 Nos.
12. In addition, work for installation of Kavach in 7,190 Locomotives and
1,200 EMU/MEMU has been taken up.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to
all concerned officials. By now more than 94,000 technicians,
operators and engineers have been trained on Kavach technology. This
includes about 57,000 Loco Pilots & Assistant Loco Pilots. Courses
have been designed in collaboration with IRISET.
14. The cost for provision of Track Side including Station equipment of
Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of
Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco.
15. The funds utilized on Kavach works so far up to Junโ26 is Rs.3,875
Crores. The allocation of funds during the year 2026-27 is Rs.2,066
Crores. Kavach work is going at good pace in the entire country.
Requisite funds are made available as per the progress of works.
Fire Safety Measures:-
Indian Railways is continuously engaged in mitigation, preparedness,
response and recovery for all foreseeable hazards including fire incidents
that might occur at railway stations and in trains due to some chance
combination of factors, across all its Zones, including those serving the
State of Gujarat as well as others.
The important fire safety measures taken by Indian Railways at its railway
stations are as follows:
Page 10 of 151. Railway stations are provided with portable fire extinguishers to be
used in case of fires.
2. Railway stations are also provided with fire buckets with sand and
water to be used in case of fires.
3. Indian Railways ensures that its frontline staff is always prepared to
address emergencies by giving them training on, Fire Fighting, First
Aid Skills and Disaster Management have been integrated into the
training modules for frontline staff such as Station Managers, Train
Manager (Guards), Commercial-cum-Ticket Clerks, Loco Pilots,
Assistant Loco Pilots etc.
4. Indian Railways Institute of Disaster Management (IRIDM), a
Specialized Training Institute, conducts regular courses in Fire
Fighting, First Aid, Trauma management, etc. to train first responders
i.e. Train crew and on-board staff, such as Train Ticket Examiners, AC
Coach Staff, and Escorting staff, who play a vital role in the 'Golden
Hourโ.
5. Proper communication protocols have been laid down for officials at
railway stations and control rooms to contact the nearest fire
brigade, police, medical facilities, ambulances, district
administration, National Disaster Response Force, State Disaster
Response Force, etc. Their contact numbers have been made
available to all concerned railway authorities.
6. Relay rooms and electronic interlocking rooms at larger railway
stations are being provided with automatic fire alarms.
7. Railway stations are equipped with control phones for the stations
masters to immediately disconnect power supply to the overhead
equipment (OHE) in case of fires from OHE.
8. Public address systems at railway stations can be used to guide the
public for evacuation in case of emergencies like fires.
Page 11 of 159. Announcements are made regularly to sensitize the passengers/
public regarding the importance of not carrying inflammable items
10. At larger railway stations, passenger luggage is scanned.
11. Drives are conducted during sensitive periods to prevent carriage of
inflammable materials by passengers
12. Electrical systems on stations are maintained regularly to prevent any
chance of fire due to electrical short-circuit. Miniature Circuit
Breakers and Moulded Case Circuit Breakers are used in electrical
panels. Emergency Lights are provided at stations.
13. Exits are well-marked at stations to aid the public in evacuation
during emergencies.
14. Adequate water storage is available at larger railway stations
equipped with coach watering facilities for use during fire
emergencies.
15. Flame based cooking is not allowed on railway station platforms.
16. Regular audit/safety drive of all electrical installations in and around
Railway stations and office buildings are being conducted.
Fire safety in trains of Indian Railways encompasses all phases of design,
manufacturing, maintenance and operation of trains in Indian Railways. To
ensure that incidents of fire do not occur on trains of Indian Railways, a
large number of steps have been taken, the more important of which are as
follows:
1. Provision of Minimum two Fire Extinguishers in all coaches over Indian
Railways.
2. Fire Detection & Suppression System has been provided in fire prone
areas of Power cars and Pantry cars, as mentioned before.
3. Fire and smoke Detection system has been provided in coaches as per
extant guidelines, as mentioned before.
Page 12 of 154. Water mist type fire extinguishers are being provided on pantry cars
and power cars in phased manner.
5. Provision of emergency windows in coaches for evacuation in case of
fire.
6. Use of fire-retardant material as per global fire-retardant norms in
coaches for seats/berths, panels, flooring, insulation, toilets etc
forimproved fire safety.
7. Use of fire-retardant E-beam cable in coaches.
8. Use of different levels of protection in the form of fuses, Miniature
Circuit breaker (MCBs) and Motor protection Circuit Breakers (MPCBs)
in the electrical circuits to prevent the damage from electrical
faults/surges.
9. Provision of Aerosol based fire suppression system in electrical
cabinets.
10. Further, up-gradation of material in line with global standards is
regularly being carried out with fitment of new generation material in
Amrit Bharat & Vande Bharat Sleeper trains.
11. Display of "Fire Notices" for widespread information in all coaches to
inform and alert passengers regarding various "Do's" and "Don'ts" to
prevent fire. These include messages regarding not to carry any
inflammable material, explosives, prohibition of smoking inside the
coaches and penalties etc., as mentioned before.
12. Prohibition of flame based cooking in coaches.
13. There is a provision of 4 Emergency Talk Back Units in every coach of
Vande Bharat. This facilitates communications of passenger with Train
Manager/Loco-pilots in case of exigencies. Passenger Emergency
Alarm Buttons have been provided in the Vande Bharat Train. Each
coach has been provisioned with 4 such push buttons for emergency
usage.
Page 13 of 1514. There is an integrated help line called Rail Madad which can be
accessed by users through the number 139 for seeking help during
emergencies.
While the above measures have helped Indian Railways to prevent the
occurrence of fire incidents in the first place, Indian Railways is always
prepared to effectively address emergencies like fires that can possibly be
caused by chance combination of factors.
Indian Railways is always prepared to respond in a quick and effective
manner in case of any unusual incident including fire. In case of such an
emergency, the first responders are the railway staffs who are trained in
handling such emergencies effectively. Immediately on receipt of
information regarding such emergencies, Indian Railways responds
immediately utilizing its own setup, equipment, doctors, and staff, also
coordinating with the state government and the district administration to
start carrying out rescue and relief immediately.
The initial focus is on saving lives, attending to the injured and providing
succour to stranded passengers.
Indian Railways has a network of 177 Accident Relief Trains (ARTs), 100
high capacity 140T Breakdown diesel-hydraulic cranes and 170 Accident
Relief Medical Equipment (ARME) Scale-I placed at identified locations
which cover the entire rail network. In addition, ARMEs Scale-II, Portable
Medical Kits for accidents have also been provided at identified locations
to render immediate medical support. ARMEs Scale-I are like hospital on
wheels that are rushed to the site, fully equipped with medical equipment
supplies and personnel.
Additional equipment like road vehicles, earthmovers, ambulances etc are
also requisitioned for attending to such accidents. Roles of every officer
Page 14 of 15and staff in case of such emergencies are laid down and they are
appropriately trained and empowered to discharge their duties.
At the same time, on the report of any major unusual incident, including
fire, Indian Railways immediately informs the local civil administration
including district authorities, fire brigade, medical facilities, the police
forces etc. as required, to assist in addressing the situation immediately
and effectively. Systems and protocols have been put in place all over
Indian Railways for coordinated response by both Railway as well as these
other agencies.
Procedures and guidelines for addressing emergency situations, including
cases like fires, have been laid down in Disaster Management Plans of
Zones and Divisions, General and Subsidiary Rules, Accident Manuals and
Operating Manuals. Railway stations maintain and display list of nearest
fire stations along with their telephone numbers as well as all Railway and
non railway medical institutions, private practitioners and first-aiders
available in the neighbourhood for immediate emergency response.
Indian Railways has a well-developed system of conducting regular mock
drills to ensure that its systems are fully prepared to handle any
emergencies. Full-scale mock drills are conducted by divisions involving all
rescue agencies from within Indian Railways as well as fire brigade, police,
district authorities, medical systems and facilities, and disaster response
forces. A total of 71 full scale mock drills were conducted during 2025-26
including four such drills in Ahmedabad, Vadodara, Rajkot and Bhavnagar
Divisions.
*****
Page 15 of 15