GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 1872
ANSWERED ON 30TH JULY, 2026
FOUR LANING OF TUMKUR–SHIVAMOGGA SECTION OF NH-69
1872. SHRI B Y RAGHAVENDRA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार् ग मंत्री
be pleased to state:
(a) the details of the four-laning project for the Tumkur–Shivamogga
section of National Highway (NH)-69 (old NH-206), including the total
length, the package-wise break-up, the mode of implementation and
the sanctioned cost thereof;
(b) the present status of implementation of the project, package-wise;
(c) the extent of land required for the project and the extent of
encumbrance-free land acquired and handed over to the implementing
agency, package-wise;
(d) whether the implementation of the project has been constrained by
any factors and if so, the details thereof; and
(e) the steps taken by the Government for expeditious completion of
the project?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)(a) to (c) Tumakuru - Shivamogga section of National Highway (NH) -
69 has been taken up for 4-laning in 04 packages. The details are
annexed.
(d) & (e) The primary reasons for delay in National Highway (NH)
projects are issues / bottlenecks relating to land acquisition, delay in
getting statutory clearances, utility shifting, encroachment removal,
law & order, non-availability of construction material / minerals, poor
performance of Contractor / Concessionaire, and Force Majeure events
like Covid-19 pandemic etc.
To expedite project execution, various initiatives have been
undertaken including streamlining the land acquisition process
through Bhoomi Rashi portal, revamping the Parivesh Portal through
Ministry of Environment, Forests & Climate Change to expedite forest
and environmental clearances, enabling online approval of General
Arrangement Drawings (GAD) for Road over Bridges (ROBs) and Road
under Bridges (RUBs) from the Railways, and conducting review
meetings at various levels with all stakeholders, including State
Governments. Government is taking all efforts to ensure timely
completion of the projects.ANNEXURE REFERRED TO IN REPLY TO PART (a) to (c) OF LOK SABHA
UNSTARRED QUESTION NO. 1872 ANSWERED ON 30TH JULY, 2026
ASKED BY SHRI B Y RAGHAVENDRA REGARDING “FOUR LANING OF
TUMKUR–SHIVAMOGGA SECTION OF NH-69”.
San
Poss
ctio
Lengt Total ar essio Physi Schedul
S ned Tota Dat
h Com ea requi n han cal P ed Revis
l. Cos l Le e o
Project Name pleted red for ded o rogre ed Date
N t ngth f St
(in Km Project ver ss (% of compl
o. (In (km) art
s) (in Ha) (in H ) etion
Crs.
a)
)
15-
4-laning of Mallasandra to Karad
136 52.8 10- Complet
1 i Section of NH-206 on HAM (Pa 50.56 296.49 296.4 100
4 9 20 ed
ckage - I)
19
15-
4-laning of Karadi to Ban Substan
150 56.7 350.7 10-
2 avara section on HAM (Packag 53.19 350.75 99.98 tially Co
5 0 1 20
e - II) mpleted
19
4-laning of Banavara to Bettada
15-
halli section of NH- 206 on HA Substan
144 48.5 302.2 03-
3 M under Bharatmala Pariyojana 47.56 302.25 98 tially Co
4 1 5 20
in the state of Karnataka (Pack mpleted
21
age - III)
20-
4-laning of Bettadahalli - Shivam
208 56.3 318.9 10- 31-03-20
4 ogga section of NH - 206 on HA 46.11 321.92 83.78
3 3 7 20 27
M (Package - IV)
21
*****