Parliament Question: Fund Allocation for Railway Project in Karnataka

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 630 TO BE ANSWERED ON 22.07.2026 FUND ALLOCATION FOR RAILWAY PROJECT IN KARNATAKA 630. SHRI GOVIND MAKTHAPPA KARJOL: Will the Minister of RAILWAYS be pleased to state: (a) the details of new railway lines, doubling, gauge conversion, electrification, station redevelopment and other railway infrastructure projects and under implementation in the country particularly in Karnataka during each of the last five years, project-wise and district- wise; (b) the details of funds allocated, released and utilised for these projects during the said period, year and project-wise; (c) the present status of each project including the physical and financial progress expected date of completion and reasons for delay, if any; (d) the details of projects completed and dedicated to the public during the last five years, district-wise; and (e) the steps taken by the Government to expedite pending railway projects and enhance rail connectivity, passenger amenities and freight infrastructure in Karnataka? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (e): Railway projects are surveyed /sanctioned/executed Zonal Railway wise and not State-wise /District wise as the Railway projects may span across State/district boundaries. The details of commissioning/laying of new track across Indian Railways is given below:- § Page 1 of 16New track Period Average commissioning of new tracks Commissioned 2009-14 7,599 Km 4.2 Km/day 2014-26 36,429 Km 8.32 Km/day (nearly 2 times) Projects sanctioned: As on 01.04.2026, across Indian Railways, 514 Railway infrastructure projects (169 New Line, 29 Gauge Conversion and 316 Doubling) of total length 40,000 Km, costing approx. Rs. 8.31 lakh crore are sanctioned. The summary is as under:- Category No of Total Length Length Total Exp upto Projects NL/GC/DL Commissioned Mar'26 (km) till Mar'26 (Rs. in Crore) (Km) New lines 169 16,634 3,361 1,57,572 Gauge 29 3987 3,045 24,227 conversion Doubling 316 19,379 6,177 1,23,454 TOTAL 514 40,000 12,583 3,05,253 Zone-wise/year-wise details of all Railway projects are made available in public domain on Indian Railway’s website. Karnataka: Railway Budget: Budget allocation in the recent years has increased significantly. Budget allocation for infrastructure projects and safety works, falling fully/partly in the State of Karnataka is as under: Page 2 of 16Period Outlay 2009-14 ₹835 crore/year 2026-27 ₹7,748 crore (more than 9 times) Projects sanctioned: As on 01.04.2026, 25 projects (15 new lines and 10 doubling) of 2,935 km length, costing ₹ 49,272 crore falling fully/partly in Karnataka are sanctioned. The summary is as under:- Category No of Total Length Exp sanctioned Length Commissioned upto Mar'26 Projects (in km) upto Mar'26 (km) (₹ in cr.) New Line 15 2,034 445 8,836 Doubling/ 901 301 4,562 10 Multitracking Total 25 2,935 746 13,398 Recently Completed Projects: Details of some of the recently completed projects falling fully/partly in Karnataka are as under: S N Project Cost (₹ in Crores) 1 Kottur-Harihar new line (65 km) 468 2 Hassan-Bangalore new line (167 km) 1,290 3 Bidar-Gulbarga new line (110 km) 1,543 4 Shivani - Hosadurga Road doubling (10 km) 50 5 Shivani-Birur Doubling (29 km) 143 6 Hosadurga-Chikjajur doubling (29 km) 260 7 Ramanagram - Mysore patch doubling (94 km) 998 8 Yelahanka – Chennasadra doubling (13 km) 108 Page 3 of 16S N Project Cost (₹ in Crores) 9 Yeshwantpur - Yelahanka doubling(12 km) 95 10 Netrawati - Mangalore Central doubling (2 km) 28 11 Kankanadi - Panambur doubling (19 km) 350 12 Arsikere-Tumkur doubling (96 km) 758 13 Yelahanka - Penukonda doubling (123 km) 1,104 14 Daund-Gulbarga doubling (225 km) 3,182 15 Hubli-Chikjajur doubling (190 km) 1,850 16 Hotgi-Gadag doubling (284 Km) 2,459 17 Pune-Miraj-Londa doubling (466 Km) 6,464 18 Jokkate-Thokur doubling (2 Km) 102 Ongoing Projects: Details of some of the projects falling fully/partly in Karnataka which have been taken up are as under: Cost S N Project (₹ in Crores) 1. Munirabad-Mahabubnagar new line (247 Km) 3,978 2. Kadur - Chickmagalur - Sakleshpur new line (93 km.) 908 3. Rayadurg - Tumkur via Kalyandurg new line (207 km.) 4,565 4. Bagalkot - Kudachi new line (142 km.) 1,694 5. Tumkur - Chitradurg- Devangere new line (182 km.) 2,142 6. Marikuppam - Kuppam new line (24 Km.) 518 7. Gadag - Wadi new line (257 km) 3,668 8. Shimoga - Shikaripura - Ranebennur new line (96 km.) 994 9. Hassan - Belur new line (32 km.) 749 10. Dharwad to Belgaum via Kittur new line (73 Km.) 927 Page 4 of 16Cost S N Project (₹ in Crores) 11. Hospet - Hubli - Londa - Tinaighat - Vasco - de - Gama 4,730 doubling (312 km) 12. Baiyyapanahalli to Hosur doubling (48 km) 1,160 13. Yeshwanthpur to Channasandra doubling (22 km) 684 14. Ballari-Chikjajur doubling (185 Km) 3,342 15. Secunderabad (Sanathnagar) - Wadi 3rd & 4th line (173 5,012 Km) 16. Bellary - Hosapete 3rd & 4th line (65 Km) 2,372 17. Guntakal-Wadi 3rd & 4th line (230 Km) 4,758 Details of some major projects which are delayed due to land acquisition are as under:- Total Land Balance Land S Land acquir to be Project N required ed (in acquired (in (in ha) ha) ha) 1 Shimoga – Rannebennur new line 559 283 276 (96 km) 2 Belgaum – Dharwad new line (73 581 0 581 km) 3 Shimoga – Harihar new line (79 km) 488 0 488 4 Whitefield-Kolar new line (53 km) 337 0 337 5 Hassan-Belur new line (32 km) 206 0 206 Summary of the status of land acquisition in Karnataka is as under:- Total Land required for Projects in Karnataka 10,123 ha Land Acquired 6,134 ha (61%) Balance Land to be acquired 3,989 ha (39%) Page 5 of 16Government of India is geared up to execute projects, however success depends upon the support of Government of Karnataka. Completion of Railway project/s depends on various factors which include the following:  Land acquisition by State Government  Forest clearance  Shifting of infringing utilities  Statutory clearances from various authorities  Geological and topographical conditions of area  Law and order situation in the area of project site  Number of working months in a year for particular project site etc. All these factors affect the completion time and cost of the projects. Various steps taken by the Government for effective and speedy implementation of rail projects include:  Substantial increase in allocation of funds.  Delegation of powers at field level.  Close monitoring of progress of project at various levels.  Regular follow up with State Governments and concerned authorities for expeditious land acquisition, forestry and Wildlife clearances and for resolving other issues pertaining to projects. Railway Electrification: Electrification of railway network on Indian Railways has been taken up in mission mode. So far, about 99.6% of Broad Gauge (BG) network has been electrified. The electrification in remaining network has been taken up. Electrification carried out during 2014-26 and before 2014 is as under: Page 6 of 16Period Route Kilometer Before 2014 (about 60 years) 21,801 2014-26 48,072 So far, about 96.8% of Broad Gauge (BG) lines in Karnataka have been electrified. The electrification work in the balance section has been taken up. Station Redevelopment: Ministry of Railways has launched Amrit Bharat Station Scheme for redevelopment of stations with a long-term approach. The scheme involves preparation of master plans and their implementation in phases to improve the stations of Indian Railways. The master planning, keeping in view the necessity of each station, includes:  Improvement of access to station and circulating areas  Integration of station with both sides of city  Improvement of station building  Improvement of waiting halls, toilets, sitting arrangement, water booths  Provision of wider foot over bridge/subway to commensurate with passenger traffic  Provision of lifts/escalators/ramps  Improvement of platform surface/ provision of platform shelter  Provision of kiosks for local products through schemes like ‘One Station One Product’ Page 7 of 16 Parking development  Amenities for Divyangjans  Better passenger information systems  Provision of air concourse, executive lounges, Multimodal integration, landscaping, etc. The scheme also envisages sustainable and environment friendly solutions etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. So far, 1,340 stations have been identified for development under this scheme, out of which 61 stations, are located in Karnataka. The names of stations identified for development under Amrit Bharat Station Scheme in Karnataka are as following: State No. of Names of Stations Stations Karnataka 61 Almatti, Alnavar, Arsikere Junction, Badami, Bagalkot, Ballary, Bangalore Cantt., Bangarpet, Bantawala, Belagavi, Bidar, Chamaraja Nagar, Channapatna, Channasandra, Chikkamagaluru, Chikodi Road, Chitradurga, Davangere, Dharwad, Dodballapur, Gadag, Gangapur Road, Gangavathi, Ghataprabha, Gokak Road, Gubbi, Harihar, Hassan, Hosapete, Kalaburagi Jn., Kengeri, Koppal, KrantiviraSangolli Rayanna (Bengaluru Station), Krishnarajapuram, Malleswaram, Malur, Mandya, Mangalore Central, Mangalore Jn, Munirabad, Mysuru Jn (Mysore), Raichur Jn, Ramanagaram, Ranibennur, Raybag, Sagar Jambagaru, Page 8 of 16State No. of Names of Stations Stations Sakleshpur, Shahabad, Shivamogga Town, Shravanabelgola, Shree Siddharoodha Swamiji Hubballi Jn, Subramanya Road, Talguppa, Tiptur, Tumakuru, Udupi, Vijayapura, Wadi, Whitefield, Yadgir, Yesvantpur Completed Stations: Development works at railway stations under Amrit Bharat Station Scheme in Karnataka have been taken up at a good pace. Details of stations completed in Karnataka are as under: State No. of Name of Stations Stations Karnataka 12 Alnavar, Badami, Bagalkot, Bantawala, Dharwad, Gadag, Gokak Road, Hosapete, Koppal, Munirabad, Ranibennur, Subramanya Road The activities for development at other stations have also been taken up at good pace and progress of some of the stations is as given below:  Bangalore Cantonment station: The works of new diversion road at South side, new electrical sub station and new 5 m wide foot over bridge have been completed. The works of new station building, improvement of platform surface, air concourse, 12 m wide foot over bridge, new basement at South side, new overhead tank at North and South side have been taken up.  Yesvantpur station: The works of new elevated road at East side, new arrival and departure plaza at East side, new Multi Level Car Parking Page 9 of 16(MLCP) at East side, new electrical sub station, new overhead tank and new sewage treatment plant at East side have been completed. The works of new station building at West side, new air concourse, platform shelter, lift, escalator, new elevated road at West side, new arrival and departure plaza at West side have been taken up.  Sakleshpur station: The works of extension of station building at main entry, new entrance porch at main entry, platform shelter, new waiting hall, new toilet, new booking office, improvement of circulating area at main entry and parking at main entry have been completed. The works of improvement of platform surface, signages, amenities for Divyangjan and lift have been taken up.  Chitradurga station: The works of new station building at main entry, new entrance porch at main entry, new waiting hall, new toilet, new booking office, improvement of circulating area at main entry, parking and amenities for Divyangjan have been taken up.  Davangere station: The works of platform shelter, improvement of platform surface, new toilet, parking at main entry and amenities for Divyangjan have been completed. The works of lift, escalator and 12 m wide foot over bridge have been taken up. Further, development / redevelopment / upgradation / modernisation of stations on Indian Railways is a continuous and ongoing process and works in this regard are undertaken as per requirement, subject to inter-se priority and availability of funds. Development / redevelopment / upgradation / modernisation of a station is carried out based on category of station/condition/traffic handled etc. Page 10 of 16Development / Upgradation of railway stations is a complex in nature involving safety of passengers & trains and requires various statutory clearances such as tree cutting, heritage, fire clearance, airport clearance etc. These stations are in operation since long, so brownfield work challenges are being faced, such as shifting of utilities (involving water/sewage lines, optical fibre cables, gas pipelines, power/signal cables, etc.), infringements, operation of trains without hindering passenger movement, speed restrictions due to works carried out in close proximity of the tracks and near to high voltage power lines, etc. and these factors affect the progress of work and completion time. Development / upgradation / modernisation of stations including under Amrit Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer Amenities’. The details of allocation and expenditure under Plan Head-53 are maintained Zonal Railway-wise and not station-wise or state- wise. Karnataka is covered under the jurisdiction of five railway zones, namely, Central Railway, South Coast Railway Southern Railway, South Central Railway, and South Western Railway. For these zones, an allocation of ₹ 15,640 crore has been made for the last five financial years and current financial year, out of which an expenditure (up to June, 2026) of ₹ 13,402 crore has been incurred so far. Train Services: As the Railway network straddles across State/district boundaries, trains are operated and stoppages are provided as per network requirements, across such boundaries. However, during the period 2021-22 to 2026-27 (upto June, 2026), to cater to the needs of stations located in the State of Karnataka, Indian Railways, Page 11 of 16on originating/terminating basis, have introduced 66 pairs (132 train services). These are listed below: S N Train No. and Name 1 10109/10110 Madgaon - Karwar Express 2 11085/11086 SMVT Bengaluru - Gwalior Express 3 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat Express 4 16223/16224 SMVT Bengaluru - Radhikapur Express 5 16313/16314 Thiruvananthapuram North - Mangaluru Jn. Antyodaya Express 6 16329/16330 Nagercoil - Mangaluru Jn. Amrit Bharat Express 7 16523/16524 SMVT Bengaluru - Balurghat Express 8 16539/16540 Yesvantpur - Mangaluru Jn. Express 9 16547/16548 Yesvantpur - Vijayapura Express 10 16553/16554 SMVT Bengaluru - Lokmanya Tilak (T) Express 11 16555/16556 Yesvantpur - Talguppa Express 12 16559/16560 SMVT Bengaluru - Bidar Express 13 16563/16564 Bengaluru Cantt. - Kalaburagi Express 14 16577/16578 Yesvantpur - Bidar Express 15 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat Express 16 16621/16622 Rameswaram - Mangaluru Central Express 17 16707/16708 Mangaluru Jn - Tirunelveli Express 18 17071/17072 Hyderabad - Belagavi Express 19 17073/17074 Secunderabad - Belagavi Express 20 17075/17076 Charlapalli - Belagavi Express 21 17289/17290 Kakinada Town - Mysuru Express Page 12 of 16S N Train No. and Name 22 17327/17328 Hubballi - Kushtagi Express 23 17377/17378 Vijayapura - Mangaluru Central Express 24 17423/17424 Tirupati - Chikkamagaluru Express 25 18063/18064 Santragachi - Yelahanka Express 26 18509/18510 Vishakapatnam - SMVT Bengaluru Express 27 19057/19058 Surat - Mangaluru Jn. Express 28 20607/20608 MGR Chennai Central - Mysuru Vande Bharat Express 29 20641/20642 Bengaluru Cantt.- Coimbatore Vande Bharat Express 30 20645/20646 Madgaon - Mangaluru Central Vande Bharat Express 31 20657/20658 SSS Hubballi - Hazrat Nizamuddin Express 32 20661/20662 KSR Bengaluru - Dharwad Vande Bharat Express 33 20663/20664 Mysuru - MGR Chennai Central Vande Bharat Express 34 20669/20670 Hubballi - Pune Vande Bharat Express 35 20671/20672 Madurai - Bengaluru Cantt. Vande Bharat Express 36 20687/20688 Hubballi - KSR Bengaluru Express 37 20703/20704 Kacheguda - Yesvantpur Vande Bharat Express 38 22231/22232 Kalaburagi - SMVT Bengaluru Vande Bharat Express 39 22305/22306 SMVT Bengaluru - Jasidih Express 40 26651/26652 KSR Bengaluru - Ernakulam Jn. Vande Bharat Express 41 26751/26752 Belagavi - KSR Bengaluru Vande Bharat Express 42 51461/51462 Belagavi - Miraj Passenger 43 51463/51464 Belagavi - Miraj Passenger 44 56229/56230 KSR Bengaluru - Channapatna Passenger Page 13 of 16S N Train No. and Name 45 56231/56232 Mysuru - SMVT Bengaluru Passenger 46 56531/56532 Yesvantpur - Hindupur Passenger 47 56919/56920 Hubballi - Vijayapura Passenger 48 66501/66502 Hubballi - Vijayapura MEMU 49 66525/66526 KSR Bengaluru - Hassan MEMU 50 66537/66538 Bangarapet - SMVT Bengaluru MEMU 51 66539/66540 KSR Bengaluru - Ashokapuram MEMU 52 66559/66560 Yesvantpur - Sri Sathya Sai Prashanthi Nilayam MEMU 53 66561/66562 Tumakuru - Yesvantpur MEMU 54 66563/66564 Yesvantpur- Hosur MEMU 55 66565/66566 Banaswadi - Tumakuru MEMU 56 66575/66576 (Old No. 76511/76512) Banaswadi - Tumkuru DEMU 57 66577/66578 (Old No. 76509/76510) Tumakuru - Arsikere DEMU 58 66595/66596 Yesvantpur - Hosur MEMU 59 66597/66598 KSR Bengaluru - Ashokapuram MEMU 60 67787/67788 Kacheguda - Raichur MEMU 61 76501/76502 Alnavar - Dandeli DEMU 62 76503/76504 Alnavar - Dandeli DEMU 63 76505/76506 Alnavar - Dandeli DEMU 64 76507/76508 Hosapete - Hubballi DEMU 65 76509/76510 Ballari - Davangere DEMU 66 76511/76512 Hosapete - Ballari DEMU Page 14 of 16Besides, introduction of new train services, which is an on-going process, depends on various factors which include- ● Capacity of that section ● Availability of path ● Availability of required rolling stock ● Availability of matching infrastructure for rolling stock ● Maintenance requirement of railway tracks and other assets. ● Occupancy and the traffic requirement of the section. GatiShakti Cargo Terminals: The details of GCTs commissioned and additional In-Principle Approvals (IPAs) given in the State of Karnataka are as under:- S.No. State Name GCTs commissioned Additional In-principle Approvals so far (IPAs) given 1 Karnataka 04 18 The Gati Shakti Cargo Terminals cater to a wide range of commodities including cement, steel, foodgrains, fertilizers, coal, fly ash, minerals, containers, automobiles, agricultural produce and other bulk as well as non- bulk commodities. The policy has benefited key sectors such as cement, steel, power, mining, agriculture, logistics and manufacturing by providing improved rail connectivity and modern cargo handling infrastructure. The development of GCTs has enhanced rail freight movement through faster and more efficient loading/unloading, reduced first-mile and last-mile logistics costs, improved wagon turnaround, and facilitated modal shift of freight from road to rail, thereby improving the overall efficiency and competitiveness of rail-based logistics. Page 15 of 16The Gati Shakti Cargo Terminal (GCT) Policy has facilitated the development of modern multimodal cargo terminals closer to production and consumption centres, thereby improving rail connectivity for local industries, agricultural produce and other commodities. The policy has enabled creation of warehousing, silos, cold storage and other value-added logistics facilities. This has enhanced the competitiveness of local industries and farmers while generating employment and promoting regional economic development. ***** Page 16 of 16

Continue your research