GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 630
TO BE ANSWERED ON 22.07.2026
FUND ALLOCATION FOR RAILWAY PROJECT IN KARNATAKA
630. SHRI GOVIND MAKTHAPPA KARJOL:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of new railway lines, doubling, gauge conversion,
electrification, station redevelopment and other railway infrastructure
projects and under implementation in the country particularly in
Karnataka during each of the last five years, project-wise and district-
wise;
(b) the details of funds allocated, released and utilised for these projects
during the said period, year and project-wise;
(c) the present status of each project including the physical and financial
progress expected date of completion and reasons for delay, if any;
(d) the details of projects completed and dedicated to the public during the
last five years, district-wise; and
(e) the steps taken by the Government to expedite pending railway projects
and enhance rail connectivity, passenger amenities and freight
infrastructure in Karnataka?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e): Railway projects are surveyed /sanctioned/executed Zonal
Railway wise and not State-wise /District wise as the Railway projects
may span across State/district boundaries.
The details of commissioning/laying of new track across Indian Railways is
given below:-
§ Page 1 of 16New track
Period Average commissioning of new tracks
Commissioned
2009-14 7,599 Km 4.2 Km/day
2014-26 36,429 Km 8.32 Km/day (nearly 2 times)
Projects sanctioned:
As on 01.04.2026, across Indian Railways, 514 Railway infrastructure
projects (169 New Line, 29 Gauge Conversion and 316 Doubling) of total
length 40,000 Km, costing approx. Rs. 8.31 lakh crore are sanctioned. The
summary is as under:-
Category No of Total Length Length Total Exp upto
Projects NL/GC/DL Commissioned Mar'26
(km) till Mar'26 (Rs. in Crore)
(Km)
New lines 169 16,634 3,361 1,57,572
Gauge 29 3987 3,045 24,227
conversion
Doubling 316 19,379 6,177 1,23,454
TOTAL 514 40,000 12,583 3,05,253
Zone-wise/year-wise details of all Railway projects are made available in
public domain on Indian Railway’s website.
Karnataka:
Railway Budget:
Budget allocation in the recent years has increased significantly. Budget
allocation for infrastructure projects and safety works, falling fully/partly in
the State of Karnataka is as under:
Page 2 of 16Period Outlay
2009-14 ₹835 crore/year
2026-27 ₹7,748 crore (more than 9 times)
Projects sanctioned:
As on 01.04.2026, 25 projects (15 new lines and 10 doubling) of 2,935 km
length, costing ₹ 49,272 crore falling fully/partly in Karnataka are
sanctioned. The summary is as under:-
Category No of Total Length Exp
sanctioned Length Commissioned upto Mar'26
Projects (in km) upto Mar'26 (km) (₹ in cr.)
New Line 15 2,034 445 8,836
Doubling/ 901 301 4,562
10
Multitracking
Total 25 2,935 746 13,398
Recently Completed Projects:
Details of some of the recently completed projects falling fully/partly in
Karnataka are as under:
S N Project Cost
(₹ in Crores)
1 Kottur-Harihar new line (65 km) 468
2 Hassan-Bangalore new line (167 km) 1,290
3 Bidar-Gulbarga new line (110 km) 1,543
4 Shivani - Hosadurga Road doubling (10 km) 50
5 Shivani-Birur Doubling (29 km) 143
6 Hosadurga-Chikjajur doubling (29 km) 260
7 Ramanagram - Mysore patch doubling (94 km) 998
8 Yelahanka – Chennasadra doubling (13 km) 108
Page 3 of 16S N Project Cost
(₹ in Crores)
9 Yeshwantpur - Yelahanka doubling(12 km) 95
10 Netrawati - Mangalore Central doubling (2 km) 28
11 Kankanadi - Panambur doubling (19 km) 350
12 Arsikere-Tumkur doubling (96 km) 758
13 Yelahanka - Penukonda doubling (123 km) 1,104
14 Daund-Gulbarga doubling (225 km) 3,182
15 Hubli-Chikjajur doubling (190 km) 1,850
16 Hotgi-Gadag doubling (284 Km) 2,459
17 Pune-Miraj-Londa doubling (466 Km) 6,464
18 Jokkate-Thokur doubling (2 Km) 102
Ongoing Projects:
Details of some of the projects falling fully/partly in Karnataka which have
been taken up are as under:
Cost
S N Project (₹ in
Crores)
1. Munirabad-Mahabubnagar new line (247 Km) 3,978
2. Kadur - Chickmagalur - Sakleshpur new line (93 km.) 908
3. Rayadurg - Tumkur via Kalyandurg new line (207 km.) 4,565
4. Bagalkot - Kudachi new line (142 km.) 1,694
5. Tumkur - Chitradurg- Devangere new line (182 km.) 2,142
6. Marikuppam - Kuppam new line (24 Km.) 518
7. Gadag - Wadi new line (257 km) 3,668
8. Shimoga - Shikaripura - Ranebennur new line (96 km.) 994
9. Hassan - Belur new line (32 km.) 749
10. Dharwad to Belgaum via Kittur new line (73 Km.) 927
Page 4 of 16Cost
S N Project (₹ in
Crores)
11. Hospet - Hubli - Londa - Tinaighat - Vasco - de - Gama 4,730
doubling (312 km)
12. Baiyyapanahalli to Hosur doubling (48 km) 1,160
13. Yeshwanthpur to Channasandra doubling (22 km) 684
14. Ballari-Chikjajur doubling (185 Km) 3,342
15. Secunderabad (Sanathnagar) - Wadi 3rd & 4th line (173 5,012
Km)
16. Bellary - Hosapete 3rd & 4th line (65 Km) 2,372
17. Guntakal-Wadi 3rd & 4th line (230 Km) 4,758
Details of some major projects which are delayed due to land acquisition
are as under:-
Total Land Balance Land
S Land acquir to be
Project
N required ed (in acquired (in
(in ha) ha) ha)
1 Shimoga – Rannebennur new line
559 283 276
(96 km)
2 Belgaum – Dharwad new line (73
581 0 581
km)
3 Shimoga – Harihar new line (79 km) 488 0 488
4 Whitefield-Kolar new line (53 km) 337 0 337
5 Hassan-Belur new line (32 km) 206 0 206
Summary of the status of land acquisition in Karnataka is as under:-
Total Land required for Projects in Karnataka 10,123 ha
Land Acquired 6,134 ha (61%)
Balance Land to be acquired 3,989 ha (39%)
Page 5 of 16Government of India is geared up to execute projects, however success
depends upon the support of Government of Karnataka.
Completion of Railway project/s depends on various factors which include
the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the projects.
Various steps taken by the Government for effective and speedy
implementation of rail projects include:
Substantial increase in allocation of funds.
Delegation of powers at field level.
Close monitoring of progress of project at various levels.
Regular follow up with State Governments and concerned authorities
for expeditious land acquisition, forestry and Wildlife clearances and
for resolving other issues pertaining to projects.
Railway Electrification:
Electrification of railway network on Indian Railways has been taken up in
mission mode. So far, about 99.6% of Broad Gauge (BG) network has been
electrified. The electrification in remaining network has been taken up.
Electrification carried out during 2014-26 and before 2014 is as under:
Page 6 of 16Period Route Kilometer
Before 2014 (about 60 years) 21,801
2014-26 48,072
So far, about 96.8% of Broad Gauge (BG) lines in Karnataka have been
electrified. The electrification work in the balance section has been taken
up.
Station Redevelopment:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations of Indian Railways.
The master planning, keeping in view the necessity of each station,
includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Page 7 of 16 Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1,340 stations have been identified for development under this
scheme, out of which 61 stations, are located in Karnataka. The names of
stations identified for development under Amrit Bharat Station Scheme in
Karnataka are as following:
State No. of Names of Stations
Stations
Karnataka 61 Almatti, Alnavar, Arsikere Junction, Badami,
Bagalkot, Ballary, Bangalore Cantt., Bangarpet,
Bantawala, Belagavi, Bidar, Chamaraja Nagar,
Channapatna, Channasandra, Chikkamagaluru,
Chikodi Road, Chitradurga, Davangere,
Dharwad, Dodballapur, Gadag, Gangapur Road,
Gangavathi, Ghataprabha, Gokak Road, Gubbi,
Harihar, Hassan, Hosapete, Kalaburagi Jn.,
Kengeri, Koppal, KrantiviraSangolli Rayanna
(Bengaluru Station), Krishnarajapuram,
Malleswaram, Malur, Mandya, Mangalore
Central, Mangalore Jn, Munirabad, Mysuru Jn
(Mysore), Raichur Jn, Ramanagaram,
Ranibennur, Raybag, Sagar Jambagaru,
Page 8 of 16State No. of Names of Stations
Stations
Sakleshpur, Shahabad, Shivamogga Town,
Shravanabelgola, Shree Siddharoodha Swamiji
Hubballi Jn, Subramanya Road, Talguppa,
Tiptur, Tumakuru, Udupi, Vijayapura, Wadi,
Whitefield, Yadgir, Yesvantpur
Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Karnataka have been taken up at a good pace. Details of stations
completed in Karnataka are as under:
State No. of Name of Stations
Stations
Karnataka 12 Alnavar, Badami, Bagalkot, Bantawala,
Dharwad, Gadag, Gokak Road, Hosapete,
Koppal, Munirabad, Ranibennur,
Subramanya Road
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Bangalore Cantonment station: The works of new diversion road at
South side, new electrical sub station and new 5 m wide foot over
bridge have been completed. The works of new station building,
improvement of platform surface, air concourse, 12 m wide foot over
bridge, new basement at South side, new overhead tank at North and
South side have been taken up.
Yesvantpur station: The works of new elevated road at East side, new
arrival and departure plaza at East side, new Multi Level Car Parking
Page 9 of 16(MLCP) at East side, new electrical sub station, new overhead tank
and new sewage treatment plant at East side have been completed.
The works of new station building at West side, new air concourse,
platform shelter, lift, escalator, new elevated road at West side, new
arrival and departure plaza at West side have been taken up.
Sakleshpur station: The works of extension of station building at main
entry, new entrance porch at main entry, platform shelter, new
waiting hall, new toilet, new booking office, improvement of
circulating area at main entry and parking at main entry have been
completed. The works of improvement of platform surface, signages,
amenities for Divyangjan and lift have been taken up.
Chitradurga station: The works of new station building at main entry,
new entrance porch at main entry, new waiting hall, new toilet, new
booking office, improvement of circulating area at main entry, parking
and amenities for Divyangjan have been taken up.
Davangere station: The works of platform shelter, improvement of
platform surface, new toilet, parking at main entry and amenities for
Divyangjan have been completed. The works of lift, escalator and 12
m wide foot over bridge have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
Page 10 of 16Development / Upgradation of railway stations is a complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as tree cutting, heritage, fire clearance, airport clearance
etc. These stations are in operation since long, so brownfield work
challenges are being faced, such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipelines, power/signal
cables, etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in close
proximity of the tracks and near to high voltage power lines, etc. and these
factors affect the progress of work and completion time.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not station-wise or state-
wise. Karnataka is covered under the jurisdiction of five railway zones,
namely, Central Railway, South Coast Railway Southern Railway, South
Central Railway, and South Western Railway. For these zones, an allocation
of ₹ 15,640 crore has been made for the last five financial years and
current financial year, out of which an expenditure (up to June, 2026) of ₹
13,402 crore has been incurred so far.
Train Services:
As the Railway network straddles across State/district boundaries, trains
are operated and stoppages are provided as per network requirements,
across such boundaries.
However, during the period 2021-22 to 2026-27 (upto June, 2026), to cater
to the needs of stations located in the State of Karnataka, Indian Railways,
Page 11 of 16on originating/terminating basis, have introduced 66 pairs (132 train
services). These are listed below:
S N Train No. and Name
1 10109/10110 Madgaon - Karwar Express
2 11085/11086 SMVT Bengaluru - Gwalior Express
3 13433/13434 SMVT Bengaluru - Malda Town Amrit Bharat Express
4 16223/16224 SMVT Bengaluru - Radhikapur Express
5 16313/16314 Thiruvananthapuram North - Mangaluru Jn. Antyodaya
Express
6 16329/16330 Nagercoil - Mangaluru Jn. Amrit Bharat Express
7 16523/16524 SMVT Bengaluru - Balurghat Express
8 16539/16540 Yesvantpur - Mangaluru Jn. Express
9 16547/16548 Yesvantpur - Vijayapura Express
10 16553/16554 SMVT Bengaluru - Lokmanya Tilak (T) Express
11 16555/16556 Yesvantpur - Talguppa Express
12 16559/16560 SMVT Bengaluru - Bidar Express
13 16563/16564 Bengaluru Cantt. - Kalaburagi Express
14 16577/16578 Yesvantpur - Bidar Express
15 16597/16598 SMVT Bengaluru - Alipurduar Amrit Bharat Express
16 16621/16622 Rameswaram - Mangaluru Central Express
17 16707/16708 Mangaluru Jn - Tirunelveli Express
18 17071/17072 Hyderabad - Belagavi Express
19 17073/17074 Secunderabad - Belagavi Express
20 17075/17076 Charlapalli - Belagavi Express
21 17289/17290 Kakinada Town - Mysuru Express
Page 12 of 16S N Train No. and Name
22 17327/17328 Hubballi - Kushtagi Express
23 17377/17378 Vijayapura - Mangaluru Central Express
24 17423/17424 Tirupati - Chikkamagaluru Express
25 18063/18064 Santragachi - Yelahanka Express
26 18509/18510 Vishakapatnam - SMVT Bengaluru Express
27 19057/19058 Surat - Mangaluru Jn. Express
28 20607/20608 MGR Chennai Central - Mysuru Vande Bharat Express
29 20641/20642 Bengaluru Cantt.- Coimbatore Vande Bharat Express
30 20645/20646 Madgaon - Mangaluru Central Vande Bharat Express
31 20657/20658 SSS Hubballi - Hazrat Nizamuddin Express
32 20661/20662 KSR Bengaluru - Dharwad Vande Bharat Express
33 20663/20664 Mysuru - MGR Chennai Central Vande Bharat Express
34 20669/20670 Hubballi - Pune Vande Bharat Express
35 20671/20672 Madurai - Bengaluru Cantt. Vande Bharat Express
36 20687/20688 Hubballi - KSR Bengaluru Express
37 20703/20704 Kacheguda - Yesvantpur Vande Bharat Express
38 22231/22232 Kalaburagi - SMVT Bengaluru Vande Bharat Express
39 22305/22306 SMVT Bengaluru - Jasidih Express
40 26651/26652 KSR Bengaluru - Ernakulam Jn. Vande Bharat Express
41 26751/26752 Belagavi - KSR Bengaluru Vande Bharat Express
42 51461/51462 Belagavi - Miraj Passenger
43 51463/51464 Belagavi - Miraj Passenger
44 56229/56230 KSR Bengaluru - Channapatna Passenger
Page 13 of 16S N Train No. and Name
45 56231/56232 Mysuru - SMVT Bengaluru Passenger
46 56531/56532 Yesvantpur - Hindupur Passenger
47 56919/56920 Hubballi - Vijayapura Passenger
48 66501/66502 Hubballi - Vijayapura MEMU
49 66525/66526 KSR Bengaluru - Hassan MEMU
50 66537/66538 Bangarapet - SMVT Bengaluru MEMU
51 66539/66540 KSR Bengaluru - Ashokapuram MEMU
52 66559/66560 Yesvantpur - Sri Sathya Sai Prashanthi Nilayam MEMU
53 66561/66562 Tumakuru - Yesvantpur MEMU
54 66563/66564 Yesvantpur- Hosur MEMU
55 66565/66566 Banaswadi - Tumakuru MEMU
56 66575/66576 (Old No. 76511/76512) Banaswadi - Tumkuru DEMU
57 66577/66578 (Old No. 76509/76510) Tumakuru - Arsikere DEMU
58 66595/66596 Yesvantpur - Hosur MEMU
59 66597/66598 KSR Bengaluru - Ashokapuram MEMU
60 67787/67788 Kacheguda - Raichur MEMU
61 76501/76502 Alnavar - Dandeli DEMU
62 76503/76504 Alnavar - Dandeli DEMU
63 76505/76506 Alnavar - Dandeli DEMU
64 76507/76508 Hosapete - Hubballi DEMU
65 76509/76510 Ballari - Davangere DEMU
66 76511/76512 Hosapete - Ballari DEMU
Page 14 of 16Besides, introduction of new train services, which is an on-going process,
depends on various factors which include-
● Capacity of that section
● Availability of path
● Availability of required rolling stock
● Availability of matching infrastructure for rolling stock
● Maintenance requirement of railway tracks and other assets.
● Occupancy and the traffic requirement of the section.
GatiShakti Cargo Terminals:
The details of GCTs commissioned and additional In-Principle Approvals
(IPAs) given in the State of Karnataka are as under:-
S.No. State Name GCTs commissioned Additional In-principle Approvals
so far (IPAs) given
1 Karnataka 04 18
The Gati Shakti Cargo Terminals cater to a wide range of commodities
including cement, steel, foodgrains, fertilizers, coal, fly ash, minerals,
containers, automobiles, agricultural produce and other bulk as well as non-
bulk commodities. The policy has benefited key sectors such as cement,
steel, power, mining, agriculture, logistics and manufacturing by providing
improved rail connectivity and modern cargo handling infrastructure. The
development of GCTs has enhanced rail freight movement through faster and
more efficient loading/unloading, reduced first-mile and last-mile logistics
costs, improved wagon turnaround, and facilitated modal shift of freight
from road to rail, thereby improving the overall efficiency and
competitiveness of rail-based logistics.
Page 15 of 16The Gati Shakti Cargo Terminal (GCT) Policy has facilitated the development
of modern multimodal cargo terminals closer to production and consumption
centres, thereby improving rail connectivity for local industries, agricultural
produce and other commodities. The policy has enabled creation of
warehousing, silos, cold storage and other value-added logistics facilities.
This has enhanced the competitiveness of local industries and farmers while
generating employment and promoting regional economic development.
*****
Page 16 of 16