**Executive Summary**
This document is an answer to an unstarred question in Lok Sabha regarding the funds earmarked for the renovation of railway stations. It details the Amrit Bharat Station Scheme, fund allocation for 2025-26, and progress on Road Over Bridges (ROBs) and Road Under Bridges (RUBs). The question was to be answered on 03.12.2025.
**Key Points / Main Content**
* **Amrit Bharat Station Scheme:**
* Funds development, upgradation, and modernisation of stations under Plan Head-53 "Customer Amenities."
* Focuses on long-term redevelopment with master plans implemented in phases.
* Includes improvements to station access, integration with the city, station building, waiting areas, passenger amenities, and parking.
* Emphasizes sustainable and environment-friendly solutions.
* 1337 stations identified for development; 105 stations completed.
* **Fund Allocation:**
* ₹ 12,118 crore allocated for the financial year 2025-26 under Plan Head-53.
* Expenditure up to October 2025 totals ₹ 7,253 crore.
* Allocation details are maintained Zonal Railway-wise.
* **ROB/RUB Works:**
* Sanctioning of ROB/RUB works is a continuous process, prioritized by safety, mobility, and feasibility.
* 4,689 ROB/RUBs sanctioned as of 01.11.2025, at a cost of ₹ 1,11,583 crore.
* Initiatives to expedite ROB/RUB progress include joint surveys, periodic meetings, standardization of drawings, and single-entity execution by Railways when possible.
* Number of ROB/RUBs constructed in 2004-14: 4,148.
* Number of ROB/RUBs constructed in 2014-25 (Oct): 13,653.
**Impact Analysis**
**Ministry of Railways**
* **Impact:** Responsible for the implementation of the Amrit Bharat Station Scheme and ROB/RUB projects, adhering to fund allocations and prioritizing safety.
* **Action Required:** Continue the planning, execution, and monitoring of station development and infrastructure projects, while addressing challenges like statutory clearances and utility shifting.
**Passengers / Public**
* **Impact:** Will benefit from upgraded railway stations with improved amenities, accessibility, and overall travel experience. Enhanced safety and reduced congestion at railway crossings due to ROB/RUB projects.
* **Action Required:** To avail the improvements at stations through the usage of these facilities.
**State Governments/Road Owning Authorities**
* **Impact:** Collaborate with the Ministry of Railways on ROB/RUB projects through joint surveys and meetings.
* **Action Required:** Participate in joint surveys, engage in periodic meetings with the Ministry of Railways and potentially execute ROB/RUB works on a single entity basis, if desired.
Key Entities Referenced
Ministry of Railways: The primary government body responsible for the policy detailed in the document.
Amrit Bharat Station Scheme: A scheme for the redevelopment of railway stations with a long-term approach, involving master planning and phased implementation to improve station infrastructure and amenities.
Plan Head-53 ‘Customer Amenities': A specific budget allocation within the Indian Railways dedicated to funding customer-related amenities and improvements at railway stations.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 672
TO BE ANSWERED ON 03.12.2025
FUND EARMARKED FOR RENOVATION OF RAILWAY STATIONS
†672. SHRI HARIBHAI PATEL:
Will the Minister of RAILWAYS be pleased to state:
(a) the total amount of funds earmarked by the Government for the
renovation of railway stations for the year 2025-26, state-wise;
(b) the current status of renovations of existing railway station such as
station expansion, platform expansion and expansion of railway ticket
reservation centres, State-wise; and
(c) the current status of construction work of railway overbridges and
underpasses on existing railway lines, State-wise?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c) Development / Upgradation / Modernisation of stations
including under Amrit Bharat Station Scheme is generally funded
under Plan Head-53 ‘Customer Amenities’. The details of allocation
and expenditure under Plan Head-53 are maintained Zonal Railway-wise and not work-wise or station wise or state-wise. The fund
allocation of ₹ 12,118 crore has been made for the financial year
2025-26 under Plan Head–53 and expenditure (up to October, 2025) of
₹ 7,253 crore has been incurred so far.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement,
water booths
Provision of wider foot over bridge/air concourse
commensurate with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like
‘One Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity ateach station
The scheme also envisages sustainable and environment friendly
solutions, provision of ballastless tracks etc. as per necessity,
phasing and feasibility and creation of city centre at the station in
the long term.
So far, 1337 stations have been identified for development under this
scheme. Development works at railway stations under Amrit Bharat
Station Scheme have been taken up at a good pace. Till now, works
of 105 stations has been completed. Names of these stations are as
following:
Ambikapur, Amgaon, Ayodhya Dham, Bagalkot, Baijnath Paprola,
Balrampur, Bareilly City, Begumpet, Bhanupratappur, Bhilai, Bijnor,
Bundi, Chanda Fort, Chidambaram, Chinchpokli, Chirayinkeezh,
Cuttack, Dakor, Derol, Deshnoke, Devlali, Dharwad, Dhule,
Dongargarh, Fatehabad, Fatehpur Shekhawati, Gadag, Gogameri,
Gokak Road, Gola Gokarnath, Gomti Nagar, Govardhan, Govind Garh,
Govindpuri, Govindpur Road, Haibargaon, Hathras City, Hapa, Idgah
Agra Jn., Izzatnagar, Jam Jodhpur, Jam Wanthali, Joychandi Pahar,
Kalyani Ghoshpara, Kanalus Jn., Karamsad, Karimnagar, Katni South,
Kedgaon, Kosamba Jn., Kulitturai, Lasalgaon, Limbdi, Lonand Jn.,
Mahe, Mahuva, Mailani, Mandal Garh, MandawarMahwa Road, Mandi
Dabwali, Mannargudi, Matunga, Mithapur, Morbi, Munirabad,
Murtizapur Jn., Narmadapuram (Hoshangabad), Netaji Subhash
Chandra Bose Itwari Junction, Okha, Orchha, Palitana, Panagarh,
Parel, Pirpainti, Pokhrayan, Polur, Rajgarh, Rajmahal, Rajula Jn.,
Ramghat Halt, Saharanpur Jn., Samakhiyali, Samalpatti, Sankarpur,Savda, Seoni, Shahad, Shajapur, Shridham, Siddharth Nagar, Sihor
Jn., Srirangam, St.Thomas Mount, Sullurpeta, Suraimanpur,
Swaminarayan Chappia, Thawe, Tiruvannamalai, Ujhani, Urkura,
Utran, Vadakara, Vadala Road, Vriddhachalam Jn., Warangal.
The works at other stations have also been taken up at good pace and
progress of some of the stations is as given below:
Tirupati station:The structural framework of new main entry station
building on South side and 2 nos. air concourses have been
completed. The finishing works of new main entry station building on
South side and air concourses, structural work of station building on
North side, platform shelter works, lift, escalators etc. have been
taken up.
Nellore station:The structural frameworks, brickwork and plastering
of station buildings on both East and West sides and structural work
of air concourse have been completed. The finishing works of station
building on both East and West side and air concourse, extension
work of subway, water tanks, sewage treatment plant have been
taken up.
Yesvantpur station: The structural works of East side station
building, civil works of East side sub-station, East side elevated road
and Multi Level Car parking have been completed. The finishing
works of East side station building, East side elevated road and Multi
Level Car parking, sewage treatment plant, structural work of West
side station building and air concourse have been taken up.
Bangalore Cantt. station: The works of 24 m wide diversion road
on the South side, training centre, hostel on North side, structuralwork of South side station building have been completed. The
finishing work South side station building, structural work of
North side station building, Foot Over Bridge have been taken up.
Rameswaram station:The structural works of East/North terminal
building, departure forecourt, arrival forecourt, residential tower,
sub-station building, desalination plant and sewage treatment
plant have been completed. The masonry works of East terminal
building, finishing works of North terminal building, departure
forecourt, arrival forecourt, residential tower, platform
upgradation including platform shelter and revamping of existing
waiting hall have been taken up.
Safdarjung station: The work of signal building, station building,
plumbing and fire fighting, structural work of operational building up
to terrace floor slab, air concourse foundation and pedestals have
been completed. The station building electrical and low voltage work,
platform refurbishing work, finishing work of operational building,
overhead tank, air concourse have been taken up.
Further, development / redevelopment / upgradation / modernisation
of stations on Indian Railways is a continuous and ongoing process
and works in this regard are undertaken as per requirement, subject
to inter-se priority and availability of funds. The priority for
development / redevelopment / upgradation / modernisation of
stations is accorded to higher category of station over lower
category of station while sanctioning and executing the works.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutoryclearances such as fire clearance, heritage, tree cutting, airport
clearance etc. The progress also gets affected due to brownfield related
challenges such as shifting of utilities (involving water/sewage lines,
optical fibre cables, gas pipe lines, power/signal cables, etc.),
infringements, operation of trains without hindering passenger
movement, speed restrictions due to works carried out in close
proximity of tracks and high voltage power lines, etc. and these factors
affect the completion time. Therefore, no time frame can be indicated at
this stage.
ROB/RUB Works
Sanctioning of works of Road Over Bridges (ROBs) / Road Under Bridges
(RUBs) across railway tracks is a continuous and dynamic process of
Indian Railways. Such works are prioritized and taken up on the basis of
its impact on safety in train operations, mobility of trains and feasibility
etc.
Nos. of ROBs/ RUBs constructed on Indian Railways during the period
2004-14 vis-a-vis 2014-25 (Oct’25) is as under:
Period ROBs/ RUBs constructed (in
Nos.)
2004-14 4,148 Nos.
2014-25 13,653 Nos.
(Oct’25)As on 01.11.2025, 4,689 nos. ROBs/ RUBs are sanctioned at the cost of
Rs. 1,11,583 croreon Indian Railways which are at various stages of
planning and execution.
Further, Railways have taken following measures to expedite the
progress of ROB/RUB works:
(i) Joint survey with concerned State Government/Road Owning
Authority is done before finalizing the General Arrangement
Drawing (GAD) to ensure smooth execution.
(ii) Periodic meetings of Railway and State Government officials are
done to resolve various issues related to ROB/RUB works.
(iii) Standardization of superstructure drawings for various combinations
of span, skewness and width of road on Railway portion has been
done to avoid delays during the design approval. This has been
issued in the form of compendium, which can be directly adopted for
Road Over Bridge across Railway lines for expeditious planning.
(iv) ROB/RUB works are planned to be executed on a single entity basis
by Railway wherever possible. In case any Road Owning
Authority/State Government wants, then Railway may permit them to
execute the work on a single entity basis.
*****