Home India Ministry of Petroleum and Natural Gas Parliament Question: Gas Leak Incident in Assam...
Date: 2025-07-24 Category: Not Applicable State: Union Government Country: India

Parliament Question: Gas Leak Incident in Assam

Issued by Ministry of Petroleum and Natural Gas · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary:** On July 24, 2025, the Minister of Petroleum and Natural Gas addressed Lok Sabha Starred Question No. 64 regarding a gas leak incident at ONGC's Rudrasagar Oil Field in Assam on June 12, 2025. The statement details the incident response, findings of the formal inquiry, relief measures, and steps taken to ensure public safety and infrastructure upgrades, with the well being safely capped on June 27, 2025. **Key Points / Main Content:** * **Incident and Response:** * A gas release incident occurred at ONGC's Well RDS147A in Rudrasagar Oil Field, Sivasagar district, Assam, on June 12, 2025. * ONGC activated specialized teams, coordinated with the District Administration, and employed international well control experts. * The well was safely brought under control on June 27, 2025, with no reported injuries, fatalities, fire, or toxic emissions. * **Inquiry Findings and Environmental Impact:** * The Oil Industry Safety Directorate (OISD) initiated a formal inquiry. * The released gas was primarily non-toxic methane (97.5%) with no hydrogen sulfide or liquid hydrocarbons. * Environmental parameters remained within Central Pollution Control Board (CPCB) limits, with no impact on drinking water or agriculture. * The Dikhow River embankment, temporarily used, was fully restored. * **Relief and Rehabilitation Measures:** * Approximately 1,500 individuals (350 families) were temporarily relocated to nine relief camps by the District Administration. * The State Government provided meals, water, sanitation, and medical support in the camps. * ₹25,000 was disbursed to each of the 357 affected families under the Chief Minister's Relief Fund (CMRF). * ONGC provided essential items, medical support, and contributed to embankment restoration. * All relocated families have returned home, and LPG and electricity use has resumed. * Over 3,000 safety masks and earplugs were distributed. * **Long-Term Safety and Infrastructure Measures:** * Regular safety audits and inspections by OISD are conducted. * Compliance with technical standards and disaster management plans is enforced. * Over the past five years, nine major infrastructure projects have been completed with an investment of ₹8,416 crore. * Ongoing and completed projects in Assam include pipeline network projects (PNP), new flare systems, and gas compression plants. **Impact Analysis** * **Affected Residents:** * *Impact:* Temporary displacement, concerns about safety, potential health impacts (addressed by medical support and safety measures). * *Action Required:* Resume normal activities, use provided safety measures (masks, earplugs), and engage with local officials and ONGC personnel to address apprehensions. * **ONGC:** * *Impact:* Responsible for immediate incident response, providing relief and support to affected families, and conducting infrastructure upgrades. * *Action Required:* Continue implementing safety protocols, conduct regular safety audits, and execute infrastructure modernization projects. * **Government (Ministry of Petroleum and Natural Gas, OISD, PCBA):** * *Impact:* Overseeing the inquiry, ensuring compliance with safety standards, providing relief funds, and monitoring environmental impact. * *Action Required:* Continue regular safety audits, update safety guidelines, and monitor environmental parameters.

Key Entities Referenced

ONGC: Oil and Natural Gas Corporation, the company where the gas leak incident occurred. Rudrasagar Oil Field: The specific oil field in Sivasagar district, Assam, where the gas leak incident took place. Sivasagar district, Assam: The district and state where the Rudrasagar Oil Field is located and the gas leak incident occurred. Minister of Petroleum and Natural Gas: The government ministry responsible for petroleum and natural gas matters. Hardeep Singh Puri: The Minister of Petroleum and Natural Gas. Oil Industry Safety Directorate OISD: The directorate under the Ministry of Petroleum and Natural Gas responsible for safety in the oil industry, which initiated a formal inquiry into the incident. Chief Ministers Relief Fund CMRF: A fund used by the state government to provide financial relief to affected families. Pollution Control Board of Assam PCBA: The state agency responsible for monitoring environmental parameters during and after the gas leak incident.
Official Source Record View Original Source →
See Full Document Text
LOK SABHA STARRED QUESTION NO. 64 TO BE ANSWERED ON 24.07.2025 Gas Leak Incident in Assam *64. SHRI GAURAV GOGOI: SHRI PRADYUT BORDOLOI: प(cid:282)े ो(cid:871)लयम और (cid:292)ाकृ(cid:467)तक गैस म(cid:287)ं ी Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state: (a) whether the Government has ordered a formal inquiry into the recent gas leak incident reported at ONGC Rudrasagar Oil field in Sivasagar district of Assam which has forced hundreds of residents to seek shelter in relief camps and if so, the details thereof; (b) the preliminary findings, if any, regarding the cause of the leak and the role of the oil and gas companies operating in the affected area; (c) whether any compensation has been announced or funds are being disbursed by the Government to the affected families including those who have been displaced or suffered health impacts and if so, the details thereof along with the other disaster relief and long-term rehabilitation measures taken in this regard; (d) the steps being taken by the Government to address the fears of residents who have reportedly stopped using LPG cylinders due to safety concerns; (e) whether any long-term measures have been taken by the Government to ensure stricter monitoring, emergency preparedness and public safety in areas with oil and gas infrastructure and if so, the details thereof; (f) the details regarding last upgradation of infrastructure facility and the steps being taken to upgrade other such facilities across the country; and (g) whether the Government has commissioned a health and environmental study to assess the impact of the blowout on the area's ecosystem and residents and if so, the details thereof? ANSWER प(cid:282)े ो(cid:871)लयम एव ं (cid:292)ाकृ(cid:467)तक गैस म(cid:287)ं ी ((cid:302)ी हरद(cid:547)प (cid:871)सहं परु (cid:547)) MINISTER OF PETROLEUM AND NATURAL GAS (SHRI HARDEEP SINGH PURI) (a) to (g): A statement is laid on the Table of the House.Statement referred to in reply to parts (a) to (g) in respect of Lok Sabha Starred Question No. 64 for reply on 24.07.2025 regarding ‘Gas Leak Incident in Assam’ asked by Shri Gaurav Gogoi and Shri Pradyut Bordoloi (a) to (g) :On 12 June 2025, a gas release incident was reported at ONGC’s Well RDS-147A in the Rudrasagar Oil Field, located in Sivasagar district, Assam. Responding swiftly and in full compliance with established safety procedures, ONGC activated its specialized teams to handle the incident. Working in close coordination with the District Administration and supported by international well control experts, a technically demanding and time-bound response was executed. The well was safely brought under control on 27 June 2025. The structured handling of the incident, adherence to safety protocols, and continuous on-ground coordination ensured that there were no injuries, fatalities, fire, or toxic emissions — underscoring the effectiveness of the incident preparedness mechanisms in place. In line with its mandate, the Oil Industry Safety Directorate (OISD) under the Ministry of Petroleum and Natural Gas initiated a formal enquiry into the incident. The preliminary findings confirmed that the event caused no injuries, fatalities, fire, or toxic gas emissions. Gas analysis revealed the release of non-toxic methane (97.5%), with no presence of hydrogen sulphide or liquid hydrocarbons. Environmental parameters, including air and noise levels, were monitored by the Pollution Control Board of Assam (PCBA) and ONGC throughout the response period. All values remained within the limits prescribed by the Central Pollution Control Board (CPCB). There was no reported impact on drinking water or agriculture. The Dikhow River embankment, which had been temporarily used during the emergency response, was fully restored following the operation. Concurrently the District Administration, as a preventive measure, activated disaster management protocols. Approximately 350 families — around 1,500 individuals — were temporarily relocated to nine fully equipped relief camps. The State Government ensured the provision of meals, safe drinking water, sanitation, and medical support in these camps. To provide immediate financial relief, ₹25,000 was disbursed to each of 357 affected families under the Chief Minister’s Relief Fund (CMRF). ONGC actively supported these efforts by supplying essential items, meals, and drinking water, deploying its medical teams and doctors, organizing mobile health camps, and providing ambulance services. The company also coordinated logistics with the respective stakeholders and contributed to the restoration of flood-damaged embankments. After the well was safely capped, ONGC advised the residents that it was safe to return home. Accordingly, all relocated families have returned to their homes. The use of LPG and electricity has been resumed. Local officials and ONGC personnel engaged directly with communities to dispel apprehensions and facilitate resettlement. Over 3,000 safety masks and earplugs were distributed to mitigate discomfort due to odour or noise. In parallel with immediate response and relief, Government continues to implement a comprehensive framework for public safety and operational resilience in the oil and gas sector. This includes regular safety audits and inspections by OISD, compliance with rigorous technical standards for well construction and emergency preparedness, periodic updates of safety guidelines in line with global best practices, andmandatory disaster management plans with on-ground simulations. These measures are particularly crucial in high-sensitivity operational zones like Assam. Complementing these safety mechanisms, ONGC has undertaken significant infrastructure modernization efforts across the country. Over the past five years, nine major projects have been completed with a cumulative investment of ₹8,416 crore. In Assam, key projects either completed or in progress include: • Pipeline Network Project (PNP), Geleky – ₹277 crore (completed), • New Flare Systems at Rudrasagar and Geleky – ₹76 crore, • Gas Compression Plants at Lakwa (₹119 crore, commissioned) and Geleky (₹164 crore, under progress), • PNP Rudrasagar – ₹344 crore (ongoing), • PNP Laiplingoan – ₹64 crore (initiated), • New Gas Compressor Plant (GCP) at Geleky – ₹164 crore (in progress). These upgrades reflect the Government’s long-term commitment to safe, efficient, and environmentally responsible hydrocarbon operations in the state of Assam. The Government remains focused on leveraging the resource potential in the region, including from the resources connected through this capped well, in a safe, sustainable, and technically sound manner, ensuring that economic opportunity is balanced with environmental stewardship and public welfare. ***

Continue your research