Parliament Question: Greenfield Projects in Karnataka

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document details the status of greenfield highway projects in Karnataka as of July 31, 2025, in response to questions raised in Lok Sabha. It includes information on ongoing and completed projects, their lengths, costs, completion timelines, and specific challenges faced, such as land acquisition delays and inter-agency coordination. Key projects include the Bengaluru-Kadapa-Vijayawada Expressway, Bengaluru-Chennai Expressway, and Satellite Town Ring Road (STRR). Key Points / Main Content: Ongoing Greenfield Highway Projects: * Akkalkot-KNTS border section of NH 150C: 177 km, estimated completion by March 2026, cost of ₹5958 Cr, incorporates precast elements. * Belgaum-Hungund-Raichur section of NH748A: 273 km, estimated completion by March 2027, cost of ₹7940 Cr, incorporates advanced traffic management systems and solar-powered lighting. * Bangalore-TN Border to Hoskote: 21 km, estimated completion by September 2025, cost of ₹1021 Cr, part of Satellite Town Ring Road. * Mysore-Madikeri: 92 km, estimated completion by March 2027, cost of ₹4128 Cr, greenfield access-controlled highway. Completed Greenfield Highway Projects (Last Two Years): * Bangalore-Chennai Expressway Phase 1: 71.7 km, PCOD issued. * Satellite Town Ring Road STRR 02: 80 km, PCOD issued. * MHKN Border-Nimbal Village to KNTS Border-Singnodi Village in Raichur of NH150C: 40.6 km, PCOD issued. Bengaluru-Kadapa-Vijayawada Expressway Status: * The project is divided into 14 packages with varying lengths and physical progress. * Scheduled completion dates range from February 2026 to August 2026, with one package expected to be completed by February 2027. Bengaluru-Chennai Expressway Status: * Phase I (Packages 1, 2, and 3): 71.7km, PCOD issued. * Remaining packages have scheduled completion dates ranging from December 2025 to March 2026. Satellite Town Ring Road (STRR) Status: * Total length is approximately 288 km (243 km in Karnataka, 45 km in Tamil Nadu). * Dobaspet to Doddaballapura Bypass and Doddaballapur to Hoskote sections are completed. * Other sections have varying completion timelines, with some still awaiting approval. Challenges in Execution: * Delays in land acquisition due to slow disbursement, inflated land awards, missed valuations, arbitration delays, and public resistance. * Delays in approvals for canal crossings, shifting of EHT lines, and ROB (rail overbridge) GAD by relevant authorities. Impact Analysis: NHAI (National Highways Authority of India): * Impact: Responsible for overseeing the execution and timely completion of the greenfield highway projects in Karnataka. * Action Required: Address the challenges related to land acquisition, inter-agency coordination, and ensure adherence to project timelines. Contractors: * Impact: Responsible for the construction and delivery of the highway projects within the stipulated timelines and budget. * Action Required: Expedite construction activities, coordinate with relevant authorities to resolve pending issues, and adopt efficient construction methodologies. Government of Karnataka (GoK): * Impact: Responsible for facilitating land acquisition, providing necessary approvals, and ensuring inter-agency coordination. * Action Required: Expedite land acquisition processes, provide timely approvals for canal crossings and other infrastructure-related clearances, and offer necessary support to NHAI and contractors. Local Communities: * Impact: Directly affected by the construction of highways through their land, potential displacement, and changes in accessibility. * Action Required: Cooperate with land acquisition processes, address concerns regarding compensation and rehabilitation, and engage in constructive dialogue with project authorities.

Key Entities Referenced

Karnataka: State in India where the greenfield highway projects are being undertaken. Ministry of Road Transport and Highways: The Indian government ministry responsible for the development of road transport infrastructure. SHRI NITIN JAIRAM GADKARI: The Minister of Road Transport and Highways. SHRI TEJASVI SURYA: Member of Parliament who asked the question regarding greenfield projects. Bengaluru Kadapa Vijayawada Expressway: A Greenfield Expressway project passing through multiple states. Bengaluru Chennai Expressway: A Greenfield Expressway project between Bengaluru in Karnataka and Chennai in Tamil Nadu. Satellite Town Ring Road: A ring road project around Bengaluru spanning across Karnataka and Tamil Nadu. Surat Chennai Corridor: A highway corridor project that includes Akkalkot KNTS Border section of NH 150C
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 1897 ANSWERED ON 31ST JULY, 2025 GREENFIELD PROJECTS IN KARNATAKA 1897. SHRI TEJASVI SURYA: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार् ग मंत्री be pleased to state: (a) the number of Greenfield Highway projects currently being undertaken in Karnataka along with their total length in kilometres; (b) the estimated cost, timeline for completion and any special features or technologies being incorporated in these projects; (c) the number of Greenfield Highway Projects completed during the last two years in Karnataka; (d) the present status of Bengaluru–Kadapa–Vijayawada Expressway, Bengaluru–Chennai Expressway and Satellite Town Ring Road; and (e) the timeline for completion of these projects and the major challenges or issues being faced in their execution including land acquisition and inter- agency coordination? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) and (b) Details of greenfield highways including cost, timelines for completion and special features incorporated is annexed.(c) The details of Greenfield Projects completed in the last two years in Karnataka are mentioned below: Total Sr. Name of the Project Length Remarks No. (km) Provision Completion Bangalore-Chennai Expressway Phase- 1 71.7 Certificate(PCOD) I NE-07 (03 Pkgs) issued Satellite Town Ring Road (STRR) (02 2 80 PCOD issued Pkgs) 3 6L of MH/KN Border (Nimbal Village) to 40.6 PCOD issued KN/TS Border (Singnodi Village) in Raichur of NH-150C (Pkg-IV) as a part of Surat Chennai Corridor Total 192.3 (d) and (e) The status is Annexed.ANNEXURE REFERRED TO IN REPLY TO PART (a) AND (b) OF LOK SABHA UNSTARRED QUESTION NO. 1897 ANSWERED ON 31ST JULY, 2025 ASKED BY SHRI TEJASVI SURYA REGARDING ‘GREENFIELD PROJECTS IN KARNATAKA’. The details of Greenfield Highway Projects being undertaken in Karnataka under the Jurisdiction of NHAI are as under: Sr. Project Name Length Total Scheduled Technology Being No. (In Project Revised Date Incorporated Kms) Cost of Completion (In Cr) 1 Akkalkot - KN/TS 177 5958 March 2026 (i) Precast Border section of NH- Elements such as 150C as part of Surat girders, culvert Chennai Corridor (03 segments, and Pkgs) crash barriers. 2 Belgaum – Hungund – 273 7940 March 2027 (ii) Advanced Raichur Section of Traffic NH-748A (06 Pkgs, Management part of Panji to Systems (ATMS). Hyderabad Corridor) (iii) Solar-powered 3 Bangalore/TN Border 21 1021 September lighting systems to Hoskote (part of 2025 etc. Satellite Town Ring Road) 4 Mysore – Madikeri 92 4128 March 2027 Greenfield Access Controlled Highway (04 Pkgs) Total 634 23492ANNEXURE REFERRED TO IN REPLY TO PART (d) AND (e) OF LOK SABHA UNSTARRED QUESTION NO. 1897 ANSWERED ON 31ST JULY, 2025 ASKED BY SHRI TEJASVI SURYA REGARDING ‘GREENFIELD PROJECTS IN KARNATAKA’. The Status of Projects is as under: 1. Bengaluru – Kadapa – Vijayawada Expressway Sr. Project Name Length Physical Scheduled No. (In Progress Revised Date of Km) (%) Completion 1 Kodur to Vanavolu (Km 0 – Km 24.3) 24.3 59.7 February, 2026 of NH-544G (Package-1) 2 Vanavolu to Vankarakunta (Km 24.3 21.4 50.8 March, 2026 – Km 45+700) of NH-544G (Package-2) 3 Vankarakunta to Odulapalle (Km 26.3 47.2 March, 2026 45.7 - Km. 72.0 of NH-544G (Package-3) Odulapalle to Nallacheruvu-palli 24.3 47.6 February, 2026 4 (Km 72.0 – Km 96.3) of NH-544G (Package-4) 5 Nallacheruvu palli to Yerragudipadu 32.7 23.2 November, 2026 (Km 96.3- Km 129.0) of NH-544G (Package-5) 6 Yerragudipadu to Audireddipalle 31 8.9 November, 2026 (Km 129.0 – Km 160.0) of NH – 544G (Package-6) 7 Audireddipalle to Mallapalle (Km 16 43.1 March, 2026 160.0 – Km 176.000) of NH-544G (Package-07) 8 Mallapalle to Kavulakuntla (Km 20 23.4 November, 2026 176.0 - Km 196.0) of NH-544G (Package-08) 9 Kavulakuntla to Narayanampet (Km 7.5 3.5 February, 2027 196.0 - Km 203.5) of NH-544(G) (Package-09) 10 Narayanampet to 24.5 26 June, 2026 Chandrasekharapuram (Km 203.5-Km 228.0) of NH-544(G) (Package- 10) 11 Chandrasekharapuram to 32 22.4 August, 2026 Polavaram (Km 228.0- Km 260.0) of NH-544(G) (Package-11) 12 Polavaram to Marripudi (Km 260.0- 25.5 33.8 May, 2026 Km 285.5) of NH-544(G) (Package- 12) 13 Marripudi to Somavaappadu (Km 29.1 44.1 February, 2026 285.5 – Km 314.6 of NH-544(G) (Package-13) 14 Somavarappadu to 28.64 17.8 August, 2026 Muppavaram (Km 314.6- Km 343.240 of NH-544(G) (Package-14) Total 343.24 2. Bengaluru – Chennai Expressway Sr. Project Name Length Physical Scheduled No. (In Km) Progress Revised Date of (%) Completion 1 Bangalore-Chennai Expressway 27.1 98.9% PCOD issued Phase-I Pkg-1 of NE-07 2 Bangalore-Chennai Expressway 27.1 99.8% PCOD issued Phase-I Pkg-2 of NE-07 3 Bangalore-Chennai Expressway 17.5 100% PCOD issued Phase-I Pkg-3 of NE-07 4 Bethamngala in Karnataka to 25 85.9 December, 2025 Byreddypalli Section in AP (Km 71.0 - Km.96.0) of NE-7 (Phase- II, Pkg-I) 5 Byreddypalli to Bangarupalem 31 64.5 June, 2026 (Km 96.0 - Km.127.0) of NE-7 Section in AP (Phase-II, Pkg-II) 6 Bangarupalem to Gudipala (Km 29 97.4 March, 2026 127.0 to Km 156.0 of NE- 7 Section in AP (Phase-II, Pkg- III) 7 Gudipala to Walajahpet (Km 24 86.2 October, 2025 156.0 - Km 180.0) (Phase-III,Pkg-I) 9 Walajahpet to Arakkonam (Km 24.5 91.26 October, 2025 180.0 - Km 204.50) (Phase- III, Pkg-II) 10 Arakkonam to Kancheepuram 25.5 53.56 March, 2026 (Km 204.5 - Km 230.0) (Phase- III, Pkg-III) 11 Kancheepuram to 31.7 78.11 December, 2025 Sriperumbudur Section (Km 230.0 - Km 261.705 (Phase- III, Pkg-IV) Total 190.7 3. The project of Satellite Town Ring Road (STRR) in Bengaluru is approx. 288km (243Kms in Karnataka and 45km in Tamil Nadu State) and is considered under 6 packages. The status is mentioned below:- Sr. Project Name Length Physical Scheduled No. Progress Revised Date (In (%) of Completion Km) 1 4 laning of Dobaspet to 42 100 Completed Doddaballapura Bypass Section of NH-648 2 4 laning of Doddaballapur to Hoskote 38 100 Completed Section of NH-648 3 Construction of 4-lane Green field 21 83.3 September highway from TN/KA Border as a part 2025 of Bangalore Ring Road of NH-648 Bangalore Ring Road (STRR) – Tamil 35.76 62.2 May 2026 Nadu Portion - NH-948 A – Phase-III 4 of Package-I- Belagondapalli to TN/KNT border (Greenfield) in Tamilnadu State 5 Construction of STRR, NH948A, 79 Project yet NA Phase -I in Karnataka to be (from Obalapura to Kunagal) approved6 Construction of STRR, NH948A, 65.25 Project yet NA Phase-II (Kunagal to S. to be Mudugadapalli) in Karnataka &Tamil approved Nadu 7 Overlapped Portion in Bangalore – 7 100 Completed Chennai Expressway Project Total 288 Major Challenges or issues being faced in the execution are:- (i) Delay in Land Acquisition due to slow disbursement, Inflated land Awards, missed out valuation of trees / affected structures during preparation of Awards, delay in disposal of land arbitration cases & insufficient Police protection for possession of land, Public Resistance for demand for additional structures and Service Road. (ii) Delay in approval of General Arrangement Drawing (GAD) for Canal Crossing by Irrigation Authorities of GoK . (iii) Delay in fixation of compensation for Right of Way (ROW) affected due to shifting of EHT Lines . (iv) Delay in approval of GAD of ROB by Railway Authorities. *****