GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2985
TO BE ANSWERED ON 05.08.2026
GUWAHATI–TEZPUR/TEZPUR–SILGHAT RAILWAY LINE IN ASSAM
2985. SHRI RANJIT DUTTA:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the present status and expected timeline for completion
of the proposed Guwahati–Tezpur and Tezpur–Silghat railway line
projects in Assam;
(b) the details of the steps taken to upgrade rail infrastructure, modernize
stations and improve passenger amenities in Tezpur district; and
(c) whether the Government proposes to enhance rail connectivity,
passenger services, and undertake additional initiatives to strengthen
the railway network and promote economic development in Tezpur and
adjoining areas and if so, the details thereof and if not, the reasons
therefor?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): Detailed Project Report (DPR) for Agthori (Guwahati) - Dekargaon
(Tezpur) New Line Project (130 Km) and Dekargaon (Tezpur) - Silghat New
Line Project (28 Km) have been prepared.
After preparation of Detailed Project Report (DPR), sanctioning of project
requires consultation with various stake-holders including State
Governments and necessary approvals viz. appraisal of NITI Aayog,
Ministry of Finance etc. As sanctioning of projects is a continuous and
dynamic process, exact timelines depend upon appraisals and approvals by
various stakeholders.
§ Page 1 of 6Train Services
At present, Dekargaon, which is the serving station for Tezpur, is being
served by 06 pairs of trains, as listed below:
S.No. Train Number and Name
1 15813/15814 Dekargaon - Murkongselek Express
2 15815/15816 Guwahati - Dekargaon Intercity Express
3 55821/55822 Rangiya - Dekargaon Passenger
4 55823/55824 Rangapara North - Dekargaon Passenger
5 55819/55820 Dekargaon - Bhalukpong Passenger
6 55861/55862 Rangiya - Dekargaon Passenger
Besides, introduction of new train services, on any route/section, is an on-
going process, which depends on various factors including:
● Capacity of that section
● Availability of path
● Availability of required rolling stock
● Availability of matching infrastructure for rolling stock
● Maintenance requirement of railway tracks and other assets
● Occupancy and the traffic requirement of the section
Station Redevelopment
Ministry of Railways has identified Rangapara North Junction station of
Sonitpur district (Headquarter at Tezpur), located in Assam for
redevelopment under Amrit Bharat Station Scheme.
Page 2 of 6At Rangapara North Junction station, the works of improvement of
platform shelter and extension of platform no. 5 have been completed. The
works of 12 m wide foot over bridge, new station building at main entry,
new station building at second entry, improvement of circulating area at
main entry, improvement of platform surface, entrance porch, installation
of Coach Indication Board and Train Indication Board have been taken up.
Amrit Bharat Station scheme involves preparation of master plans and their
implementation in phases to improve the stations of Indian Railways. The
master planning, keeping in view the necessity of each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
Page 3 of 6So far, 1340 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 50 stations are located in Assam. The
names of stations identified for development under Amrit Bharat Station
Scheme in Assam are as following:
State No. of Names of Stations
Stations
Assam 50 Amguri, Arunachal, Chaparmukh, Dhemaji, Dhubri,
Dibrugarh, Diphu, Duliajan, Fakiragram Jn.,
Gauripur, Gohpur, Golaghat, Gosai gaon hat,
Guwahati, Haibargaon, Harmuti, Hojai, Jagi Road,
Jorhat Town, Kamakhya Jn, Kokrajhar, Lanka, Ledo,
Lumding Jn, Majbat, Makum Jn, Margherita, Mariani
Jn, Murkongselek, Naharkatiya, Nalbari, Namrup,
Narangi, New Bongaigaon Jn, New Haflong, New
Karimganj Jn, New Tinsukia Jn, North Lakhimpur,
Pathshala, Rangapara North Jn, Rangiya Jn,
Sarupathar, Sibsagar Town, Silapathar, Silchar,
Simaluguri, Tangla, Tinsukia, Udalguri, Viswanath
Chariali
Completed Stations in Assam:
Development works at railway stations under Amrit Bharat Station Scheme
in Assam have been taken up at a good pace. Details of stations completed
in Assam are as under:
No. of
State Name of Stations
Stations
Assam 2 Haibargaon, Majbat
Page 4 of 6At Haibargaon station, the development works have been completed, which
includes new station building block, entrance porch, improvement of
circulating area, new waiting room, parking, toilet block, improvement of
platform surface and platform shelter.
At Majbat station, the development works have been completed which
includes new station building, entrance porch, improvement of circulating
area, platform shelter, platform surface, new waiting hall, parking, toilet
and lifts.
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Dhubri station: The works of new station building, porch, new high
level platform no. 2 & 3, improvement of existing station building,
circulating area, platform shelter, toilet, boundary wall, 12m wide foot
over bridge and installation of Coach Indication Board have been
completed. The work of lift has been taken up.
Narangi station: The works of new station building blocks, porch, new
waiting hall, improvement of existing station building, circulating
area, entry/exit gate, boundary wall and platform surface at platform
no.1 have been completed. The works of extension of platform no.1,
one 12 m wide foot over bridge, lifts and amenities for Divyangjan
have been taken up.
Simaluguri station: The work of improvement of waiting hall has been
completed. The works of entry/exit gate, improvement of circulating
area, 12m wide foot over bridge, tactile tiles for Divyangjan and Pay &
Use toilet have been taken up.
Page 5 of 6 Viswanath Chariali station: The works of new station building, porch,
improvement of circulating area, approach road, toilet block, platform
shelter, extension of platform no.1, installation of Coach Indication
Board and Train Indication Board have been completed. The work of
lift has been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of passenger amenities is a
continuous and ongoing process and works in this regard are undertaken
as per requirement, subject to inter-se priority and availability of funds.
Development / redevelopment / upgradation / modernisation of a station is
carried out based on category of station/condition/traffic handled etc.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not station-wise or state-
wise. Assam is covered under the jurisdiction of one railway zone, namely,
Northeast Frontier Railway. For this zone, an allocation of ₹431 crore has
been made for the financial year 2026-27, out of which an expenditure (up
to June, 2026) of ₹179 crore has been incurred so far.
*****