Official TranscriptGOVERNMENT OF INDIA DEPARTMENT OF SPACE LOK SABHA UNSTARRED QUESTION NO. 2797 TO BE ANSWERED ON WEDNESDAY, AUGUST 05, 2026 HUMAN SPACEFLIGHT MISSION 2797. DR. BHOLA SINGH: Will the PRIME MINISTER be pleased to state: (a) the present status of the Gaganyaan Mission; (b) the progress made in crew training, test missions and human- rating of launch systems; (c) the timeline fixed for the first human...
GOVERNMENT OF INDIA DEPARTMENT OF SPACE LOK SABHA UNSTARRED QUESTION NO. 2797 TO BE ANSWERED ON WEDNESDAY, AUGUST 05, 2026 HUMAN SPACEFLIGHT MISSION
2797. DR. BHOLA SINGH:
Will the PRIME MINISTER be pleased to state:
(a) the present status of the Gaganyaan Mission;
(b) the progress made in crew training, test missions and human- rating of launch systems;
(c) the timeline fixed for the first human spaceflight mission;
(d) the progress made towards establishment of the Bharatiya Antariksh Station; and
(e) the measures taken to strengthen indigenous human spaceflight capabilities? ANSWER MINISTER OF STATE IN THE MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES & PENSIONS AND IN THE PRIME MINISTER’S OFFICE (DR. JITENDRA SINGH):
****
(a) The development activities of Gaganyaan mission validating
human rating aspects include the following: Human Rated Launch Vehicle (HLVM3): Development and ground testing of all propulsion stages and structures completed. Orbital Module: Propulsion systems for Crew Module and Service Module developed, tested and qualified. Engineering model for Environmental Control & Life Support System
(ECLSS) has been realized. Deceleration system, Crew Module Up-righting System, Thermal Protection System and end to end avionics have been developed and tested. Crew Escape System (CES): 5 types of motors developed and static tested. All the CES structures are realised and qualified.
Infrastructure established: Orbital Module Preparation Facility, Gaganyaan Control Centre, Gaganyaan Control facility, Crew training facility, Second Launch pad modifications have been realised. Test Missions: First Test Vehicle mission (TV-D1) for inflight validation of Crew Escape System (CES) has been successfully completed. Integrated Air Drop Test- 01 (IADT-
01) and Integrated Air Drop Test- 02 (IADT-02) with simulated Crew Module for validation of deceleration system have been completed successfully. Activities are in progress towards accomplishment of TV-D2 mission.
Flight Operations and Communication Network: Ground network configuration finalized. IDRSS-1 feeder stations and terrestrial links established. MoUs have been signed with other space agencies for cross supports. Crew Recovery Operations: Recovery assets finalized.
Recovery Plan worked out.
Parallelly, various ground qualification tests towards demonstrating new systems realized for Gaganyaan are progressing.
(b) Gaganyatris have completed generic training at Glavkosmos, Russia. Gaganyaan mission specific training is in progress at Astronaut Training facility, Bengaluru. The 1st test mission, TV-D1 is accomplished. Activities are in progress for 2nd test mission, TV-D2. Development and ground testing of all propulsion stages and structures completed for Human Rated Launch Vehicle
(HLVM3).
(c) 1st crewed mission is targeted in 2027.
(d) Operationalisation of Bharatiya Antariksh Station (BAS) is targeted by 2035. ISRO has worked out overall configuration of Bharatiya Antariksh Station comprising of five modules.
Government has approved the development and launch of 1st module of BAS-01. Overall system engineering of BAS-01 module and technology development activities of various subsystems is progressing in ISRO Centres/Units.
(e) Major critical technologies for human space programme have been identified including flight suit, view port, crew seat and docking technology. Govt of India has approved the indigenous development of these critical technologies. Design and development of proto hardware is in progress.
****