Home India Ministry of Railways Parliament Question: Implementation of Kavach System...
Date: 2025-07-30 Category: Not Applicable State: Union Government Country: India

Parliament Question: Implementation of Kavach System

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: The Ministry of Railways addresses railway passenger safety and the implementation of the Kavach system. Safety is a top priority, with efforts to reduce accidents through various measures, including the phased implementation of Kavach. Kavach, an Automatic Train Protection (ATP) system, is being deployed across Indian Railways, with ongoing projects on key routes and further expansion planned. Key Points / Main Content: Safety Measures and Accident Reduction: * Indian Railways prioritizes safety, leading to a significant reduction in consequential train accidents, from 135 in 2014-15 to 31 in 2024-25. Accidents per million train kilometers decreased from 0.11 in 2014-15 to 0.03 in 2024-25. * Expenditure on safety-related activities has increased, with allocations for maintenance, track renewals, and safety enhancements. * Various technological improvements and maintenance practices have been implemented, including electronic interlocking systems, track circuiting, and modernized track structures. Kavach Implementation: * Kavach, an indigenously developed ATP system, was adopted as the National ATP system in July 2020. * Kavach deployment is underway, with 1548 RKm already covered on South Central Railway and North Central Railway. Work is in progress on Delhi-Mumbai and Delhi-Howrah corridors (approximately 3000 RKm), with track side works completed on about 2200 RKm as of June 30, 2025. * Key activities for Kavach implementation include installing Station Kavach, RFID tags, telecom towers, laying optical fiber cable, and providing Loco Kavach. * Kavach version 4.0, approved on July 16, 2024, includes improvements such as increased location accuracy and better signal information. * The Mathura-Kota section (324 kms) is approved for commissioning with Kavach version 4.0. * The next phase involves equipping 10,000 locomotives and track side works for approximately 15,000 RKm. * Track side including station equipment of Kavach costs approximately Rs. 50 Lakhs/Km, and locomotive equipment costs approximately Rs. 80 Lakh/Loco. * Funds utilized on Kavach works up to June 2025 is Rs. 2015 Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19 Crores. * Railway routes in Maharashtra and Madhya Pradesh are included in the Kavach implementation plan. Training: * Specialized training programs on Kavach are being conducted, with over 30,000 technicians, operators, and engineers trained. Impact Analysis: Railway Passengers: * Impact: Enhanced safety due to reduced risk of accidents through ATP and improved infrastructure. * Action Required: Be aware of safety guidelines and cooperate with railway staff. Loco Pilots: * Impact: Assistance in train operation within speed limits, especially during inclement weather, and increased alertness through Vigilance Control Devices (VCD). * Action Required: Participate in Kavach training programs and utilize the system effectively. Railway Staff (Engineers, Technicians, Operators): * Impact: Need to implement and maintain Kavach system components. * Action Required: Participate in specialized training programs on Kavach and adhere to safety protocols. Ministry of Railways: * Impact: Overseeing and funding the implementation of Kavach and other safety measures. * Action Required: Ensure adequate funding and resources for the timely and effective implementation of Kavach. Railway Equipment Suppliers: * Impact: Supplying equipment for Kavach, such as station Kavach, RFID tags and telecom towers. * Action Required: Meet the key requirements of Indian Railways, ensuring product quality and standards.

Key Entities Referenced

Kavach System: An indigenously developed Automatic Train Protection (ATP) system adopted as the National ATP system. It aids Loco Pilots by automatically applying brakes and helps trains run safely during inclement weather. Indian Railways: The national railway system of India, responsible for implementing safety measures like the Kavach system. Maharashtra: A state in India where the Kavach system implementation is being addressed, with specific railway routes mentioned including Mumbai-Pune and others. Madhya Pradesh: A state in India where Kavach system implementation is being addressed, with specific railway routes mentioned including Narker-Jujharpur and others. South Central Railway: A zone of Indian Railways where Kavach has already been deployed on 1548 RKm. North Central Railway: A zone of Indian Railways where Kavach has already been deployed on 1548 RKm. RDSO: Stands for Research Designs and Standards Organisation. The organisation approved Kavach specification version 4.0 on 16.07.2024 Automatic Train Protection ATP: A safety system designed to prevent train accidents, with Kavach being the national ATP system adopted by Indian Railways.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO. 146 TO BE ANSWERED ON 30.07.2025 IMPLEMENTATION OF KAVACH SYSTEM *146. SHRI BHUMARE SANDIPANRAO ASARAM: DR. SHIVAJI BANDAPPA KALGE: Will the Minister of RAILWAYS be pleased to state: (a) the various steps taken by the Government to enhance the level of railway passengers safety in the country; (b) whether the Kavach System has been implemented in all the zones of Railways as on 30.06.2025; (c) if so, the details thereof and if not, the reasons therefor particularly for Maharashtra; (d) the manner in which the Government proposes to implement the Kavach System in the entire country particularly in Maharashtra; (e) the time likely to be taken/required for completion/installation along with the estimated cost of implementation of the said system in the entire country; (f) whether implementation of the said system has started in Maharashtra and Madhya Pradesh; and (g) if so, the details thereof and if not, the reasons therefor? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (g): A Statement is laid on the Table of the House. *****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (g) OF LOK SABHA STARRED QUESTION NO. 146 TO BE ANSWERED ON 30.07.2025. (a) to (g): Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents. Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 as shown in the graph below. The causes of these accidents broadly include track defects, loco/coach defects, equipment failures, human errors etc. It may be noted that the Consequential Train Accidents during the period 2004-14 was 1711 (average 171 per annum), which has declined to 31 in 2024-25 and further to 3 in 2025-26 (upto June, 2025). Another important index showing improved safety in train operations is Accidents Per Million Train Kilometer (APMTKM) which has reduced from 0.11 in 2014-15 to 0.03 in 2024-25, indicating an improvement of approx. 73% during the said period. The number of consequential train accidents during the last five years are depicted in the Graph below. 234 s t n e d ic 165 c A n 135 ia r T la it n e u 55 48 q e s 35 40 31 n o 22 C 3 f o .o N 2005- 2009- 2014- 2019- 2020- 2021- 2022- 2023- 2024- 2025-26 06 10 15 20 21 22 23 24 25 (up to Covid yearCovid year Jun'25)The various safety measures taken to enhance safety in train operations are as under:- 1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under:- Expenditure on Safety related activities (Rs. in Cr.) 2013-14 2022-23 2023-24 RE BE (Act.) (Act.) (Act.) 2024-25 2025-26 Maintenance of 9,172 18,115 20,322 21,800 23,316 Permanent Way & Works Maintenance of 14,796 27,086 30,864 31,540 30,666 Motive Power and Rolling Stock Maintenance of 5,406 9,828 10,772 12,112 12,880 Machines Road Safety 1,986 5,347 6,662 8,184 7,706 LCs and ROBs/ RUBs Track 4,985 16,326 17,850 22,669 22,800 Renewals Bridge Works 390 1,050 1,907 2,130 2,169 Signal & 905 2,456 3,751 6,006 6,800 Telecom Works Workshops 1,823 7,119 9,523 9,581 10,134 Incl. PUs and Misc. expenditure on Safety Total 39,463 87,327 1,01,651 1,14,022 1,16,470 2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,635 stations up to 30.06.2025 to reduce accident due to human failure.3. Interlocking of Level Crossing (LC) Gates has been provided at 11,096 level Crossing Gates up to 30.06.2025 for enhancing safety at LC gates. 4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,640 stations up to 30.06.2025. 5. Kavach is a highly technology intensive system, which requires safety certification of highest order. Kavach was adopted as a National ATP system in July 2020. Kavach is provided progressively in phased manner. Kavach has already been deployed on 1548 RKm on South Central Railway and North Central Railway. Presently, the work is in progress on Delhi- Mumbai and Delhi-Howrah corridors (approximately 3000 RKm). Track side works on these routes have been completed on about 2200 RKm as on 30.06.2025. 6. Detailed instructions on issues related with safety of Signalling, e.g. mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued. 7. System of disconnection and reconnection for S&T equipment as per protocol has been re-emphasized. 8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots. 9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to alert the crew about the signal ahead when visibility is low due to foggy weather. 10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates, etc. 11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals. 12. Mechanization of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to reduce human errors.13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety. 14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails. 15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better welding technology for rails i.e., Flash Butt Welding. 16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars). 17. Patrolling of railway tracks to look out for weld/rail fractures. 18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works. 19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices. 20. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs. 21. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block, worksite safety, monsoon precautions, etc. have been issued. 22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations. 23. Replacement of conventional ICF design coaches with LHB design coaches is being done. 24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019. 25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these inspections. 26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc.27. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner. 28. Regular counselling and training of staff is undertaken. 29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan. The details of the Safety related works related to better maintenance practices, technological improvements, better infrastructure and rolling stock etc. undertaken by Railways are tabulated below:- 2014-15 to 2004-05 to 2014-25 Vs. SN Item 2024-25 2013-14 2004-14 (till March 25) Technological improvements 1. Use of high- 57,450 Km 1.43 Lakh Km More than 2 quality rails (60 times Kg) (Km) 2. Longer Rail 9,917 Km 77,522 Km Nearly 8 Panels (260m) times (Km) 3. Electronic 837 Stations 3,691 More than 4 Interlocking Stations times (Stations) 4. Fog Pass Safety As on As on 288 times Devices (Nos.) 31.03.14: 31.03.25: 90 Nos. 25,939 5. Thick Web Nil 28,301 Nos. Switches (Nos.) Better maintenance practices 1. Primary Rail 32,260 Km 49,941 Km 1.5 times Renewal (Track Km)2. USFD (Ultra 79.43 Lakh 2 Crore More than 2 Sonic Flaw times detection) Testing of Welds (Nos.) 3. Weld failures In 2013-14: In 2024-25: 90 % (Nos.) 3699 Nos. 370 Nos. reduction 4. Rail fractures In 2013-14: In 2024-25: More than (Nos.) 2548 Nos. 289 Nos. 88% reduction Better infrastructure and Rolling stock 1. New Track KM 14,985 Nos. 34,428 Km More than 2 added (Track km) times 2. Flyovers (RoBs)/ 4,148 Nos. 13,808 Nos. More than 3 Underpasses times (RUBs) (Nos.) 3. Unmanned Level As on As on Removed crossings 31.03.14: 31.03.24: (nos.) on BG 8948 Nil (All eliminated by 31.01.19) 4. Manufacture of 2,337 Nos. 42,677 More than LHB Coaches 18 times (Nos.) Further, Indian Railways has also gone for implementation of advance technology system “Kavach” as an Automatic Train Protection (ATP) system. i. Kavach is an indigenously developed Automatic Train Protection (ATP) system. Kavach is a highly technology intensive system, which requires safety certification of highest order (SIL-4). ii. Kavach aids the Loco Pilot in running of trains within specified speed limits by automatic application of brakes in case Loco Pilot fails to do so and also helps the trains to run safely during inclement weather.iii. The first field trials on the passenger trains were started in February 2016. Based on the experience gained and Independent Safety Assessment of the system by Independent Safety Assessor (ISA), three firms were approved in 2018-19, for supply of Kavach Ver 3.2. iv. Kavach was adopted as National ATP system in July 2020. v. Implementation of Kavach System involves following Key Activities: a. Installation of Station Kavach at each and every station, block section. b. Installation of RFID Tags throughout the track length. c. Installation of telecom Towers throughout the section. d. Laying of Optical Fibre Cable along the track. e. Provision of Loco Kavach on each and every Locomotive running on Indian Railways. vi. Based on deployment of Kavach version 3.2 on 1465 RKm on south central Railway, a lot of experience was gained. Using that further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024. vii. Kavach version 4.0 covers all the major features required for the diverse railway network. This is a significant milestone in safety for Indian Railways. Within a short period, IR has developed, tested and started deploying Automatic Train Protection System. viii. Major improvement in Version 4.0 includes increased Location Accuracy, Improved Information of Signal Aspects in bigger yards, Station to Station Kavach interface on OFC and Direct Interface to existing Electronic Interlocking System. With these improvements, Kavach Ver.4.0. is planned for large scale deployment over Indian Railways. ix. After extensive and elaborate trials in 324 kms of Mathura-Kota section for advance version of Kavach 4.0, the section is approved by Independent Safety Assessor (ISA) and the section is ready for commissioning. This is also the first section to be approved by ISA for Kavach version 4.0.x. Progress of Key items comprising Kavach system on Indian Railways upto 14.07.25 is as under:- SN Items Progress i. Laying of Optical Fibre Cable 5856 Km ii. Installation of Telecom Towers 619 Nos. iii. Provision of Kavach at Stations 708 Nos. iv. Provision of Kavach in Loco 1107 Locos v. Installation of Track side equipment 4001 Rkm xi. Next phase of Kavach implementation is planned as under:- a. Project for equipping 10,000 Locomotives has been finalized. 69 number of loco sheds have been prepared for equipping with Kavach. b. Bids for track side Works of Kavach for approximately 15,000 RKm have been invited covering all GQ, GD, HDN and identified sections of Indian Railways, out of which works of 14847 RKm have been awarded. xii. The sections mentioned above also includes the railway routes in states of Maharashtra & Madhya Pradesh as summarised below: State Railway Routes Route Km Maharashtra Mumbai-Pune, Mumbai-Bhusawal Including 3856 Mumbai Area, Igatpuri-Badnera-Nagpur- Narkher, Balharshah, Lonavla-Pune-Daund- Baramati, Ankai-Pune-Miraj-Kolhapur, Kurdwadi-Latur, Purna-Akola, Including branch lines Madhya Narker-Jujharpur, Amla-Parasia-Chindwara, 1219 Pradesh Wagoda-Khandwa, Dhaulpur-Agasod, Itarsi- Bina, Ratlam-Jawad, Nagda-Bhopal xiii. Specialized training programmes on Kavach are being conducted at centralized training institutes of Indian Railwaysto impart training to all concerned officials. By now more than 30,000 technicians, operators and engineers have been trained on Kavach technology. Courses have been designed in collaboration with IRISET. xiv. The cost for provision of Track Side including Station equipment of Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco. xv. The funds utilized on Kavach works so far up to June'25 is Rs. 2015 Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19 Crores. Requisite funds are made available as per the progress of works. *****

Continue your research