**Executive Summary** This document is a response to a parliamentary question regarding the increasing demand for electricity in India. It outlines the government's strategies to meet this demand, including generation and storage planning, transmission planning, and promotion of renewable energy. The document provides details on installed and planned capacity additions, including thermal, hydro, nuclear, and renewable energy projects. **Key Points / Main Content** * **Electricity Consumption:** * Electricity consumption in India increased by approximately 12.4% between the financial years 2022-23 and 2024-25. * **Generation and Storage Planning:** * As per the National Electricity Plan (NEP), the installed generation capacity in 2031-32 is projected to be 874 GW. * States, in consultation with the Central Electricity Authority (CEA), have prepared 10-year "Resource Adequacy Plans (RAPs)." * Government has initiated capacity addition program * Estimated thermal (coal and lignite) capacity requirement by 2034-35 is approximately 3,07,000 MW. * 17,360 MW of thermal capacity commissioned between April 2023 and January 20, 2026. * 39,545 MW of thermal capacity is currently under construction. * 12,973.5 MW of Hydro Electric Projects are under construction * 6,600 MW of Nuclear Capacity is under construction * 1,57,800 MW Renewable Capacity including 67,280 MW of Solar, 6,500 MW of Wind and 60,040 MW Hybrid power is under construction. * 11,620 MW/69,720 MWh Pumped Storage Projects (PSPs) are under construction. * **Transmission Planning:** * Approximately 1,91,474 ckm of transmission lines and 1,274 GVA of transformation capacity planned for addition from 2022-23 to 2031-32. * **Promotion of Renewable Energy Generation:** * 100% Inter State Transmission System (ISTS) charges are waived for interstate sale of solar and wind power for projects commissioned by June 30, 2025, with tapering waivers until June 2028. * Standard Bidding Guidelines have been issued for power procurement from various renewable energy sources. * Foreign Direct Investment (FDI) is permitted up to 100 percent under the automatic route. * Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme * Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30. * **Annexure Information:** * Annexure-I: All India Power Supply Position in terms of Energy for the last three financial years and the current financial year 2025-26. * Annexure-II: State-wise details of actual Power Supply Position for the last three financial years and the current financial year 2025-26. * Annexure-III: Details of under-construction thermal power plants, hydro power plants, nuclear power plants, and hydro pumped storage projects in Maharashtra. **Impact Analysis** **States:** * **Impact:** Affected by the government's plans to meet the increasing demand for electricity, including resource adequacy planning and new power projects. * **Action Required:** States need to prepare and implement their Resource Adequacy Plans (RAPs) in consultation with the CEA. **Power Generating Companies:** * **Impact:** Impacted by the government's efforts to increase power generation capacity, including the approval of new power projects. * **Action Required:** Generating companies may establish, operate, and maintain generating stations without a license if they comply with technical standards for grid connectivity. **Renewable Energy Developers:** * **Impact:** Beneficiaries of government initiatives to promote renewable energy generation, including waivers of ISTS charges and support for solar parks. * **Action Required:** Developers can participate in tariff-based competitive bidding processes for renewable energy projects. **Consumers (Designated):** * **Impact:** Obligated to meet Renewable Purchase Obligations (RPO) and Renewable Consumption Obligations (RCO). * **Action Required:** Designated consumers must comply with RCO trajectories until 2029-30, with penalties for non-compliance.

Key Entities Referenced

Electricity Act, 2003: Referenced in the context of generating companies establishing and operating generating stations without requiring a license, under Section 7 if they comply with technical standards relating to connectivity with the grid. National Electricity Plan (NEP): Referenced in the context of ensuring adequate generation capacity in consultation with CEA Ministry of Power: Primary government body answering questions related to electricity demand and supply. Maharashtra: Specifically mentioned as a state for which power supply position details are given, and where under-construction hydro pumped projects are taking place. Resource Adequacy Plans (RAPs): 10-year rolling plans prepared by all States, in consultation with CEA, to ensure generation capacity remains ahead of projected peak demand.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.1119 ANSWERED ON 05.02.2026 INCREASING DEMAND OF ELECTRICITY 1119. SHRI ANIL YESHWANT DESAI: Will the Minister of POWER be pleased to state: (a) whether consumption of electricity has increased across the country during the last three years and the current year and if so, the details thereof; (b) whether the present generation of electricity is sufficient to meet the demand in the various States of the country and if so, the details thereof, including Maharashtra and if not, the reasons therefor; (c) the steps taken/being taken by the Government to meet the increasing demand for electricity including generation of sources from new and renewable electricity; and (d) whether the Government has approved new power projects in the country, particularly in Maharashtra and if so, the details thereof? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a) & (b): The consumption of electricity has consistently increased by approximately 12.4 % in the country during the last three financial years i.e. from 2022- 23 to 2024-25. The details of all India Power Supply Position in the country in terms of Energy during the last three financial years and current financial year 2025-26 (up to December, 2025) are given at Annexure-I. The State-wise details of actual Power Supply Position including Maharashtra for last three financial years and the current financial year i.e. 2025-26 (up to December, 2025) is given at Annexure-II. These details indicate that ‘Energy Supplied’ has been commensurate to the ‘Energy Requirement’ with only a marginal gap which is generally on account of constraints in the State transmission/ Distribution network. Hence, there is no impact of shortage on the economy and industrial growth. (c) : The Government have taken the following steps to meet the increasing demand of electricity in the country: 1. Generation and Storage Planning: (i) As per National Electricity Plan (NEP), installed generation capacity in 2031- 32 is likely to be 874 GW. With a view to ensure generation capacity remains ahead of projected peak demand, all the States, in consultation with CEA, have prepared their “Resource Adequacy Plans (RAPs)”, which are dynamic 10-year rolling plans and includes power generation as well as power procurement planning.(ii) All the States were advised to initiate process for creating/ contracting generation capacities; from all generation sources, as per their Resource Adequacy Plans. (iii) In order to augment the power generation capacity, the Government of India has initiated following capacity addition programme: (A) The projected thermal (coal and lignite) capacity requirement by the year 2034–35 is estimated at approximately 3,07,000 MW as against the 2,11,855 MW installed capacity as on 31.03.2023. To meet this requirement, Ministry of Power has envisaged to set up an additional minimum 97,000 MW coal and lignite based thermal capacity. To meet this requirement, several initiatives have already been undertaken. Thermal capacities of around 17,360 MW have already been commissioned since April 2023 till 20.01.2026. In addition, 39,545 MW of thermal capacity (including 4,845 MW of stressed thermal power projects) is currently under construction. The contracts of 22,920 MW have been awarded and is due for construction. Further, 24,020 MW of coal and lignite-based candidate capacity has been identified which is at various stages of planning in the country. (B) 12,973.5 MW of Hydro Electric Projects are under construction. Further, 4,274 MW of Hydro Electric Projects are under various stage of planning and targeted to be completed by 2031-32. (C) 6,600 MW of Nuclear Capacity is under construction and targeted to be completed by 2029-30. 7,000 MW of Nuclear Capacity is under various stages of planning and approval. (D) 1,57,800 MW Renewable Capacity including 67,280 MW of Solar, 6,500 MW of Wind and 60,040 MW Hybrid power is under construction while 48,720 MW of Renewable Capacity including 35,440 MW of Solar and 11,480 MW Hybrid Power is at various stages of planning and targeted to be completed by 2029-30. (E) In energy storage systems, 11,620 MW/69,720 MWh Pumped Storage Projects (PSPs) are under construction. Further, a total of 6,580 MW/39,480 MWh capacity of Pumped Storage Projects (PSPs) are concurred and yet to be taken up for construction. Currently, 9,653.94 MW/ 26,729.32 MWh Battery Energy Storage System (BESS) capacity are under construction and 19,797.65 MW/ 61,013.40 MWh BESS capacity are under tendering stage 2. Transmission Planning: Inter and Intra-State Transmission System has been planned and implementation of the same is taken up in matching time frame of generation capacity addition. As per the National Electricity Plan, about 1,91,474 ckm of transmission lines and 1,274 GVA of transformation capacity is planned to be added (at 220 kV and above voltage level) during the ten year period from 2022-23 to 2031-32. 3. Promotion of Renewable Energy Generation: (i) 100% Inter State Transmission System (ISTS) charges have been waived for inter-state sale of solar and wind power for projects to be commissioned by 30th June 2025 (with waiver tapering off 25% annually till June 2028), for co-located BESS projects commissioned by June 2028, for Hydro PSP projects where construction work awarded by June 2028, for GreenHydrogen Projects commissioned till December 2030 and for offshore wind projects commissioned till December 2032. (ii) Standard Bidding Guidelines for tariff based competitive bidding process for procurement of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable RE (FDRE) projects have been issued. (iii) Renewable Energy Implementing Agencies (REIAs) are regularly inviting bids for procurement of RE power. (iv) Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic route. (v) To augment transmission infrastructure needed for steep RE trajectory, transmission plan has been prepared till 2032. (vi) Laying of new intrastate transmission lines and creating new sub-station capacity has been supported under the Green Energy Corridor Scheme for evacuation of renewable power. (vii) Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being implemented to provide land and transmission to RE developers for installation of RE projects at large scale (viii) Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages) under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission, Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been launched (ix) To encourage RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which is applicable to all designated consumers under the Energy Conservation Act, 2001 will attract penalties on non-compliance. (x) “Strategy for Establishment of Offshore Wind Energy Projects” has been issued. (xi) Green Term Ahead Market (GTAM) has been launched to facilitate sale of Renewable Energy Power through exchanges. (xii) Production Linked Incentive (PLI) scheme has been launched to achieve the objective of localization of supply chain for solar PV Modules. (d) : As per Section 7 of Electricity Act, 2003, any generating company may establish, operate and maintain a generating station without requiring a license under Electricity Act, 2003 if it complies with the technical standards relating to connectivity with the grid. Details of under construction power plant in the country including under construction Hydro pumped projects in Maharashtra are given at Annexure-III. *************ANNEXURE-I ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 1119 ANSWERED IN THE LOK SABHA ON 05.02.2026 ************* The details of all India Power Supply Position in the country in terms of Energy during the last three financial years and current financial year 2025-26 Energy Not Energy Requirement Energy Supplied Supplied Financial Year % % (MU) (MU) (MU) (%) Growth Growth 2022-23 1,513,497 - 1,505,914 - 7,583 0.5 2023-24 1,626,132 7.4 1,622,020 7.7 4,112 0.3 2024-25 1,693,959 4.2 1,692,369 4.3 1,590 0.1 2024-25 (upto 1,280,037 - 1,278,565 - 1,472 0.1 December, 2024) 2025-26 (upto 12,85,913 0.5 12,85,553 0.5 360 0.0 December, 2025) **************ANNEXURE-II ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO. 1119 ANSWERED IN THE LOK SABHA ON 05.02.2026 ************* The State-wise details of actual Power Supply Position for last three financial years and the current financial year i.e. 2025-26 (upto December, 2025) (Figures in MU) State/ April, 2022 - March, 2023 April, 2023 - March, 2024 Energy Energy Energy not Energy Energy Energy not System / Requirement Supplied Supplied Requirement Supplied Supplied ( MU ( MU ( % Region ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ) ) ) Chandigarh 1,788 1,788 0 0.0 1,789 1,789 0 0.0 Delhi 35,143 35,133 10 0.0 35,501 35,496 5 0.0 Haryana 61,451 60,945 506 0.8 63,983 63,636 348 0.5 Himachal 12,649 12,542 107 0.8 12,805 12,767 38 0.3 Pradesh Jammu & 19,639 19,322 317 1.6 20,040 19,763 277 1.4 Kashmir Punjab 69,522 69,220 302 0.4 69,533 69,528 5 0.0 Rajasthan 1,01,801 1,00,057 1,745 1.7 1,07,422 1,06,806 616 0.6 Uttar Pradesh 1,44,251 1,43,050 1,201 0.8 1,48,791 1,48,287 504 0.3 Uttarakhand 15,647 15,386 261 1.7 15,644 15,532 112 0.7 Northern Region 4,63,088 4,58,640 4,449 1.0 4,76,852 4,74,946 1,906 0.4 Chhattisgarh 37,446 37,374 72 0.2 39,930 39,872 58 0.1 Gujarat 1,39,043 1,38,999 44 0.0 1,45,768 1,45,740 28 0.0 Madhya Pradesh 92,683 92,325 358 0.4 99,301 99,150 151 0.2 Maharashtra 1,87,309 1,87,197 111 0.1 2,07,108 2,06,931 176 0.1 Dadra & Nagar Haveli and 10,018 10,018 0 0.0 10,164 10,164 0 0.0 Daman & Diu Goa 4,669 4,669 0 0.0 5,111 5,111 0 0.0 Western Region 4,77,393 4,76,808 586 0.1 5,17,714 5,17,301 413 0.1 Andhra Pradesh 72,302 71,893 410 0.6 80,209 80,151 57 0.1 Telangana 77,832 77,799 34 0.0 84,623 84,613 9 0.0 Karnataka 75,688 75,663 26 0.0 94,088 93,934 154 0.2 Kerala 27,747 27,726 21 0.1 30,943 30,938 5 0.0 Tamil Nadu 1,14,798 1,14,722 77 0.1 1,26,163 1,26,151 12 0.0 Puducherry 3,051 3,050 1 0.0 3,456 3,455 1 0.0 Lakshadweep 64 64 0 0.0 64 64 0 0.0 Southern Region 3,71,467 3,70,900 567 0.2 4,19,531 4,19,293 238 0.1 Bihar 39,545 38,762 783 2.0 41,514 40,918 596 1.4 DVC 26,339 26,330 9 0.0 26,560 26,552 8 0.0 Jharkhand 13,278 12,288 990 7.5 14,408 13,858 550 3.8 Odisha 42,631 42,584 47 0.1 41,358 41,333 25 0.1 West Bengal 60,348 60,274 74 0.1 67,576 67,490 86 0.1 Sikkim 587 587 0 0.0 544 543 0 0.0 Andaman- 348 348 0 0.12914 386 374 12 3.2 Nicobar Eastern Region 1,82,791 1,80,888 1,903 1.0 1,92,013 1,90,747 1,266 0.7 Arunachal 915 892 24 2.6 1,014 1,014 0 0.0 Pradesh Assam 11,465 11,465 0 0.0 12,445 12,341 104 0.8 Manipur 1,014 1,014 0 0.0 1,023 1,008 15 1.5 Meghalaya 2,237 2,237 0 0.0 2,236 2,066 170 7.6 Mizoram 645 645 0 0.0 684 684 0 0.0 Nagaland 926 873 54 5.8 921 921 0 0.0 Tripura 1,547 1,547 0 0.0 1,691 1,691 0 0.0 North-Eastern 18,758 18,680 78 0.4 20,022 19,733 289 1.4 Region All India 15,13,497 15,05,914 7,583 0.5 16,26,132 16,22,020 4,112 0.3The State-wise details of actual Power Supply Position for last three financial years and the current financial year i.e. 2025-26 (upto December, 2025) ( Figures in MU ) State/ April, 2024 - March, 2025 April, 2025 - December, 2025 Energy Energy Energy not Energy Energy Energy not System / Requirement Supplied Supplied Requirement Supplied Supplied ( MU ( MU Region ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( % ) ) ) Chandigarh 1,952 1,952 0 0.0 1,509 1,382 127 8.4 Delhi 38,255 38,243 12 0.0 31,006 30,999 7 0.0 Haryana 70,149 70,120 30 0.0 55,932 55,867 65 0.1 Himachal 13,566 13,526 40 0.3 10,329 10,294 36 0.3 Pradesh Jammu & 20,374 20,283 90 0.4 14,874 14,862 12 0.1 Kashmir Punjab 77,423 77,423 0 0.0 60,827 60,786 41 0.1 Rajasthan 1,13,833 1,13,529 304 0.3 82,763 82,763 0 0.0 Uttar Pradesh 1,65,090 1,64,786 304 0.2 1,29,329 1,29,304 26 0.0 Uttarakhand 16,770 16,727 43 0.3 12,630 12,582 49 0.4 Northern Region 5,18,869 5,17,917 952 0.2 4,00,413 4,00,176 236 0.1 Chhattisgarh 43,208 43,180 28 0.1 31,502 31,494 8 0.0 Gujarat 1,51,878 1,51,875 3 0.0 1,17,364 1,17,364 0 0.0 Madhya Pradesh 1,04,445 1,04,312 133 0.1 75,081 75,073 8 0.0 Maharashtra 2,01,816 2,01,757 59 0.0 1,48,848 1,48,839 9 0.0 Dadra & Nagar Haveli and 10,852 10,852 0 0.0 8,439 8,439 0 0.0 Daman & Diu Goa 5,411 5,411 0 0.0 4,086 4,086 0 0.0 Western Region 5,28,924 5,28,701 223 0.0 3,95,551 3,95,526 25 0.0 Andhra Pradesh 79,028 79,025 3 0.0 59,543 59,537 6 0.0 Telangana 88,262 88,258 4 0.0 61,062 61,055 7 0.0 Karnataka 92,450 92,446 4 0.0 67,547 67,538 9 0.0 Kerala 31,624 31,616 8 0.0 22,949 22,946 2 0.0 Tamil Nadu 1,30,413 1,30,408 5 0.0 99,901 99,892 10 0.0 Puducherry 3,549 3,549 0 0.0 2,691 2,688 3 0.1 Lakshadweep 68 68 0 0.0 54 54 0 0.0 Southern Region 4,25,373 4,25,349 24 0.0 3,13,730 3,13,692 38 0.0 Bihar 44,393 44,217 176 0.4 37,294 34,102 3,191 8.6 DVC 25,891 25,888 3 0.0 18,595 18,592 3 0.0 Jharkhand 15,203 15,126 77 0.5 11,735 11,731 5 0.0 Odisha 42,882 42,858 24 0.1 34,064 34,059 5 0.0 West Bengal 71,180 71,085 95 0.1 56,878 56,846 32 0.1 Sikkim 574 574 0 0.0 382 382 0 0.0 Andaman- 425 413 12 2.9 318 301 17 5.5 Nicobar Eastern Region 2,00,180 1,99,806 374 0.2 1,58,993 1,58,935 58 0.0 Arunachal 1,050 1,050 0 0.0 909 909 0 0.0 Pradesh Assam 12,843 12,837 6 0.0 10,973 10,973 1 0.0 Manipur 1,079 1,068 10 0.9 863 861 3 0.3 Meghalaya 2,046 2,046 0 0.0 1,542 1,542 0 0.0 Mizoram 709 709 0 0.0 559 559 0 0.0 Nagaland 938 938 0 0.0 772 772 0 0.0 Tripura 1,939 1,939 0 0.0 1,523 1,523 0 0.0 North-Eastern 20,613 20,596 16 0.1 17,228 17,224 3 0.0 Region All India 16,93,959 16,92,369 1,590 0.1 12,85,913 12,85,553 360 0.0 **************ANNEXURE-III ANNEXURE REFERRED IN REPLY TO PART (d) OF UNSTARRED QUESTION NO. 1119 ANSWERED IN THE LOK SABHA ON 05.02.2026 ************* (i) Details of Under Construction Thermal Power Plant: Sl. Project Name / State Sector Unit Capacity No Implementing Agency No. (MW) 1 Buxar TPP (SJVN) CENTRAL U-2 660 2 CENTRAL U-4 800 Bihar 3 CENTRAL U-5 800 Nabinagar STPP, St-II (NTPC) 4 CENTRAL U-6 800 5 PRIVATE U-3 660 Korba TPP, Ph-II (Lanco Amarkantak TPP),M/s 6 Adani Power PRIVATE U-4 660 7 Singhitarai TPP, (M/s Vedanta) PRIVATE U-2 600 8 CENTRAL U-3 800 Lara STPP St-II (NTPC) 9 CENTRAL U-4 800 10 PRIVATE U-3 800 Raipur Ext TPP, Ph-II /Adani Power 11 PRIVATE U-4 800 12 PRIVATE U-2 800 Raigarh USCTPP, St-II/ Adani Power 13 PRIVATE U-3 800 Chhattisgarh 14 STATE U-1 660 Korba(W) SCTPP ( CSPGCL) 15 STATE U-2 660 16 Sipat STPP, St-III (NTPC) CENTRAL U-1 800 17 PRIVATE U-4 600 18 PRIVATE U-5 600 Akaltara TPP, JSW Energy 19 PRIVATE U-6 600 20 PRIVATE U-3 300 Binjkote TPP, M/s Sarda Energy Mineral 21 PRIVATE U-4 300 22 Ukai TPP/GSECL Gujarat STATE U-7 800 23 DCR TPP Ext., /HPGCL Haryana STATE U-1 800 24 CENTRAL U-2 800 Patratu STPP (PVUNL) Jharkhand 25 CENTRAL U-3 80026 CENTRAL U-1 800 Koderma TPS, St-II/ DVC 27 CENTRAL U-2 800 28 CENTRAL U-3 800 Gadarwara STPP, Ph-II(NTPC) 29 CENTRAL U-4 800 30 PRIVATE U-3 800 Madhya Mahan STPP,St-II (Mahan Energen) 31 Pradesh PRIVATE U-4 800 32 PRIVATE U-5 800 Mahan STPP,St-III (Mahan Energen) 33 PRIVATE U-6 800 34 STATE U-11 660 Koradi TPS,St-V ( MSPGCL) Maharashtra 35 STATE U-12 660 36 Malibrahmani TPP, M/s Jindal Power PRIVATE U-2 525 37 CENTRAL U-1 660 Talcher TPP St-III (NTPC) 38 CENTRAL U-2 660 Odisha 39 CENTRAL U-1 800 40 CENTRAL U-2 800 NLC TALABIRA TPP (NLC) 41 CENTRAL U-3 800 42 North Chennai TPP, St-III (TNPGCL) STATE U-6 660 43 STATE U-1 660 Udangudi STPP St-I (TNPGCL) 44 STATE U-2 660 Tamil Nadu 45 STATE U-1 660 Ennore SCTPP (TNPGCL) 46 STATE U-2 660 47 STATE U-4 800 48 STATE U-3 800 Yadadri TPS (TGGENCO) Telangana 49 STATE U-5 800 50 Singareni TPP,Ph-II/SCCL STATE U-3 800 51 Ghatampur TPP (NUPPL) CENTRAL U-3 660 52 CENTRAL U-8 800 Uttar Pradesh Singrauli STPP, St-III (NTPC) 53 CENTRAL U-9 800 54 CENTRAL U-3 660 Raghunathpur TPS, Ph-II/DVC 55 CENTRAL U-4 660 West Bengal 56 Sagardighi TPP St-III (WBPDCL) STATE U-5 660 Total 39,545(ii) Details of Under Construction Hydro Power Plant: Sl. Name of the Project Installed Capacity C a p . Under State / UT No. (Executing Agency) ( No. X MW.) Execution (MW) NHPC 1 Subansiri Lower (NHPC) Arunachal 8x250 1,750.00 Pradesh/Assam 2 Dibang Multipurpose Arunachal 12x240 2,880.00 Project (NHPC) Pradesh 3 Teesta St. VI NHPC Sikkim 4x125 500.00 4 Rangit-IV (NHPC) Sikkim 3x40 120.00 5 Ratle (RHEPPL / NHPC) UT of Jammu & 4x205 + 1x30 850.00 Kashmir CVPPL 6 Pakal Dul (CVPPL) UT of Jammu & 4x250 1,000.00 Kashmir 7 Kiru (CVPPL) UT of Jammu & 4x156 624.00 Kashmir 8 Kwar (CVPPPL) UT of Jammu & 4x135 540.00 Kashmir SJVN 9 Luhri-I (SJVN) Himachal 2x80+2x25 210.00 Pradesh 10 Dhaulasidh (SJVN) Himachal 2x33 66.00 Pradesh 11 Sunni Dam (SJVN) Himachal 4x73+1x73+1x17 382.00 Pradesh THDC 12 Vishnugad Pipalkoti (THDC) Uttarakhand 4x111 444.00 NTPC 13 Tapovan Vishnugad (NTPC) Uttarakhand 4x130 520.00 14 Rammam-III (NTPC) West Bengal 3x40 120.00 NEEPCO 15 HEO Arunachal 3x80 240.00 Pradesh 16 Tato-I Arunachal 3x62 186.00 PradeshAPGENCO 17 Polavaram (APGENCO/ A n d h ra Pradesh 12x80 960.00 Irrigation Dept., A.P.) 18 Lower Sileru Extension Andhra Pradesh 2x115 230.00 (APGENCO) HPPCL 19 Shongtong Karcham Himachal 3x150 450.00 (HPPCL) Pradesh 20 Chanju-III (HPPCL) Himachal 3x16 48.00 Pradesh KSEB 21 Mankulam (KSEB) Kerala 2x20 40.00 APGCL 22 Lower Kopli (APGCL) Assam 2x55+2x2.5+1x5 120.00 JKSPDC 23 Parnai (JKSPDC) UT of Jammu & 3x12.5 37.50 Kashmir PSPCL 24 Shahpurkandi (PSPCL/ Punjab 3x33+3x33+1x8 206.00 Irrigation Deptt., Pb.) UJVNL 25 Lakhwar Multipurpose Uttarakhand 3x100 300.00 Project (UJVNL) Statkraft 26 Tidong-I (Statkraft Himachal 3x50 150.00 IPL) Pradesh Total: 12,973.00 (iii) Details of Nuclear Power Plants Under construction and planned Sr No. Project Site Project-Unit Capacity (MW) 1 Rawatbhata, Rajasthan RAPP-8 1 x 700 2 Kudankulam, Tamil Nadu KKNPP-3 1 x 1000 3 Kudankulam, Tamil Nadu KKNPP-4 1 x 1000 4 Kalpakkam Tamil Nadu PFBR 1x 500 5 Kudankulam, Tamil Nadu KKNPP-5&6 2 x 1000 6 Gorakhpur, Haryana GHAVP-1 1 x 700 7 Gorakhpur, Haryana GHAVP-2 1 x 700 Total 6,600(iv) Hydro Pumped Storage Projects in the state of Maharashtra Installed S. No Name of Scheme Sector State/UT Developer Capacity (MW) Shirawta Pumped Tata Power 1 Private Maharashtra 1,800 Storage project Company Ltd Pane Pumped 2 Private Maharashtra JSW Energy PSP 7L 1,500 Storage project Tarali Pumped Adani Renewable 3 Private Maharashtra 1,500 Storage project Energy One Ltd Saidongar-I Torrent Energy 4 Karjat Pumped Private Maharashtra Storage Solution 3,000 Storage project pvt ltd. Total 7,800 ***************