GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3173
ANSWERED ON 06TH AUGUST, 2026
INCREASING ROAD ACCIDENTS ON NH 66 IN KERALA
3173. SHRI SHAFI PARAMBIL:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government has taken note of the increasing
number of road accidents, traffic congestion and public complaints
on various stretches of National Highway (NH)-66 in Kerala during
the ongoing widening and construction works;
(b) if so, the details thereof, including the number of accidents,
fatalities and injuries reported on NH-66 in Kerala during the last
three years, stretch-wise;
(c) whether the Government has conducted any safety audit of the
ongoing National Highway projects in Kerala, particularly with
regard to traffic diversion arrangements, signage, drainage,
pedestrian safety and construction standards;
(d) the corrective measures taken or proposed to ensure safe
movement of vehicles, timely completion of the projects and
effective monitoring of contractors; and
(e) the present status of all National Highway projects under
implementation in Kerala, indicating the original completion
schedule, revised timeline, project cost and reasons for delay, if
any?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)(a) and (b) Road accident data is being collected from the
States/Union Territories on a calendar year basis and publishes the
same in its annual publication, "Road Accidents in India". The
number of road accidents, persons killed and persons injured on all
National Highways in the State of Kerala, including on National
Highway (NH) 66, during the years 2022 to 2024, are as under:
Year Number of Number of Number of
accidents fatalities injuries
2022 17627 1197 17799
2023 10640 1056 12105
2024 9757 940 11060
2025* 9438 917 11556
*as per data available on eDAR portal as on 05.08.2026.
(c) Independent Road Safety Audits (RSAs) are conducted by
qualified independent auditors during the project implementation
stage as well as periodically during the Operation and Maintenance
(O&M) stage to identify and address potential road safety
deficiencies.
(d) National Highways (NHs) works are carried out as per standards,
guidelines, manual, code of practice of Indian Roads Congress as
well as specifications for Road and Bridge Works. Necessary road
safety measures inter-alia includes provision of crash barriers,
signage boards and safety markings, foot over bridges, etc. are
taken up during design, construction, operation and maintenance
stages. Road Safety Audit is carried out for the independent
assessment of newly constructed roads before opening of the
National Highways to commercial traffic. All identified road safety
issues, including those related to road signage and markings are
addressed before the road is opened to the public. Subsequently,
during the operation of the project highway, assessment is carried
out at regular intervals to identify safety issues that may have
emerged during operation stage and necessary remedial measures
are taken in a time-bound manner.
(e) The details of National Highway projects under implementation
in the State of Kerala are given at Annexure-I and II, respectively.Annexure - I
ANNEXURE REFERRED TO IN REPLY TO PART (e) OF LOK SABHA
UNSTARRED QUESTION NO. 3173 ANSWERED ON 06TH AUGUST,
2026 ASKED BY SHRI SHAFI PARAMBIL REGARDING INCREASING
ROAD ACCIDENTS ON NH 66 IN KERALA.
Details of National Highway projects being implemented by National
Highways Authority of India (NHAI) in the State of Kerala
Sr Project Stretch Total Total Schedule Physic Completi Completi
. lengtProjec d al on Date on Date
N h t Cost Completi progre (except For
o (Km) (Cr) on Date ss (%) Viaducts Viaducts,
) ROB etc.
1 6L of Chengala- 37.3 2538. 11.04.20 91 31.05.20 31.03.20
Neeleshwaram 06 24 26 27
2 6L of 40.1 3867. 11.04.20 87 31.05.20 31.03.20
Neeleshwaram- 66 24 26 27
Thalipparamba
3 6L of 29.9 3557. 84 31.03.20 30.04.20
Thalipparamba- 65 26.05.20 27 28
Muzhapilangadu 24
4 6L of Azhiyur- 40.8 3898. 31.05.20 68 31.03.20 30.03.20
Vengalam 46 25 27 28
5 6L of 33.2 4225. 26.01.20 95 30.06.20 30.06.20
Kappirikkad- 59 25 26 27
Thalikkulam
6 6L of 28.7 4302. 14.02.20 94 30.06.20 30.06.20
Thalikkulam- 06 25 26 27
Kodungallur
7 6L of 26 3606. 21.04.20 71 31.12.20 31.05.20
Kodungallur- 2 25 26 27
Edapally
8 6-lane Elevated 12.7 2382. 31.01.20 91 06.01.20 -----
Highway Aroor- 83 26 27
Thuravoor
9 6L of Thuravoor- 38.4 2638. 12.09.20 81 31.12.20 31.05.20
Paravoor 67 24 26 27
1 6L of Paravoor- 37.5 3273. 24.02.20 77 30.04.20 30.11.20
0 Kottukulangara 61 25 27 27
1 6L of 31.5 3680. 07.10.20 77 30.04.20 31.12.20
1 Kottukulangara- 49 24 27 27Start of Kollam
Bypass
1 6L of Start of 31.2 3023. 28.02.20 96 30.06.20 30.06.20
2 Kollam Bypass- 78 25 26 27
Kadambattukona
m
1 6L of 29.8 3451. 11.08.20 77 30.04.20 7.67 Km
3 Kadambattukona 76 25 27 Viaduct
m-Kazhakuttom descope
d.
1 Rectification of 4 2.4 130.5 21.08.25 41 ---- 31.07.20
4 Nos blackspots 5 27
in
Thiruvananthapu
ram bypass
section
1 Widening of 124. 1231. 25.06.25 64 ---- 31.03.20
5 Kochi – Munnar 6 74 27
to 2L/2L+PS.
1 Rectification of 12.1 510.2 28.07.26 57 ---- 31.01.20
6 11 Nos 8 27
blackspot from
Walayar to
Angamaly
1 Rectification of 17.3 678.4 13.03.28 2.5 ---- 13.03.20
7 17 Nos 0 28
blackspot from
Walayar to
Angamaly
1 Balance work of 1.9 125.9 05.03.20 62.5 ---- 30.12.20
8 widening of 4 6 26 26
nos existing 2
Lane major
Bridge of Six-
laning of
Kozhikode
Bypass
1 Construction of 1.1 40.40 20.05.20 65 ---- 31.05.20
9 an underpass at 26 27
km 184.850,
supply &
installation ofStreet lighting,
Construction of
Service roads
and other
miscellaneous
works in
Thalassery Mahe
bypassAnnexure - II
ANNEXURE REFERRED TO IN REPLY TO PART (e) OF LOK SABHA
UNSTARRED QUESTION NO. 3173 ANSWERED ON 06TH AUGUST,
2026 ASKED BY SHRI SHAFI PARAMBIL REGARDING INCREASING
ROAD ACCIDENTS ON NH 66 IN KERALA.
Details of National Highway projects being implemented by the
National Highways Wing of State Government of Kerala
Sl National Highway project original revised proje reasons for
N under implementation completion timeline ct delay
o schedule cost
1 Widening to 2 lane with 22.08.2019 EOT 294.2Due to
paved shoulders from km granted 6 protest
87/000 to km 133/720 upto from locals
(Nattukal to Thanau Jn in 30.05.2 and people
Palakkad) of NH 966(Old 025. representat
NH 213) on EPC mode ives, the
toll plaza
location
shifted
from
original
proposed
place to
another
location.
2 Geometrical 18/05/2026 18.02.2 37.16 Delay in
Improvements at Ghat 027 tree
section of Thamarassery cutting
Churam on NH766 at occurred
selected 3 locations due to
where forest land is made delay in
available and the getting
chainages (i) Hairpin bend permission
no.6(km 50+400 to from forest
50+620) (ii) Hairpin bend department
no.7(km 51+590 to .
51+680) (iii) Hairpin bendno.8(km 51+860 to
51+900) in the State of
Kerala under Annual plan
2024-25 on EPC mode
3 Short term improvement 28.10.2026 1.999
and routine maintenance 3
works on NH 185 for thr
stretches from km 15/500
(Pakuthipalam) to km
42/725 (Double cutting)
and from km
56/550(Vellayamkudi) to
km 61/000 (Vallakkadavu)
under short term
maintenance contract
(STMC) for the year 2025-
26
4 STMC from 106/700 to 11.11.2026 2.59
126/700 of NH 183 in the
state of Kerala
5 GENERAL - STMC 2025-26- 15.01.2027 4.999
Short term improvement 7
and routine maintenance
km 76/000 -117/000 of NH
766 in the state of Kerala
6 Short term improvement 18/05/2027 4.92
between km 160/000 to
215/450 (except km
172/700-185/500 and
205/180-210/000) of NH
183 in state of Kerala
7 Performance based 5 10.03
maintenance between Km year (11/09/ 83
89.10(Kanamala) to Km 2029)
103.20 (Erumely)of NH 183
A under PBMC mode
8 Performance based 28.07.2029 25.53
maintenance Contract of (Five year 64
NH 183A from maintenanc
Bharanikkavu (km 0/000)- e contract)
Nellimootilpadi (km
16/000), Adoor (km
17/200)- Kaipattoor (km27/300) and
Pathanamthitta Ring road
to Mylappra (900m stretch
in km32/940 to km 37/300)
in the State of Kerala-
PBMC 2023-24
9 Performance based 5 year ( 26.92
maintenance Contract 9.6.2031) 73
work between Plappally
km 72/390 to Kanamala
km 86/660 and Erumeli km
103.200 km to
Mundakkayam junction km
116.800 of NH 183A in
state of Kerala under
PBMC Maintenance Plan
2025-26.
1 Performance based 5 year ( 31.27
0 maintenance 6.5.2031)
Contract work from Km
72/700 to Km 74/700 and
Km 126/700 to 160/000 of
NH 183 under PBMC
Maintenance Plan 2025-26.
1 Black spot rectification 14/02/2025 12/05/202.419PBMC Work
1 work at 26 4 was
Cinimaparambu(Km ongoing in
1/900),Kadampanadu this stretch
(Km6/250(KL‐(04)04)), and only
Ne‖imukal(11/000),Vellakul after
angara(km 14/750), resurfacing
Pannivizha(Km 17/900(KL‐ in
(03)035)),Mankuzhy(km PBMC,this
26/800),Omalloor (km work was
29/000 (KL‐ (031‐ started
037)),Pathanamthitta
Stadium Jn.(Km
32/940(KL‐ 103)‐ 036))of
NH 183 A in the state of
Kerala in item rate mode
under Road safety Annual
plan 2023-241 Black spot rectification 14/01/2026 15/05/2010.20Labour
2 work in Manorama 26 51 shortage,
Junction (km107.2 to Force
108.2: KL-(03)- majure,
52,Plantation Junction Raw
(km 109.35 to 110.00: material
KL(03)-051),Annadivayal scarcity
junction (km 117.35 to
118: KL-(03)-047,
Nedumkuzhy/9th Mile (km
124/850-125/400:Kl-(03)-
050) in NH 183 the State
of Kerala in EPC mode
under Road Safety Annual
Plan 2023-24-Reg.
*****