Government of India
Ministry of Development of North Eastern Region
RAJYA SABHA
STARRED QUESTION NO. 62
To be answered on
Thursday, February 05, 2026/ 16 Magha, 1947 (Saka)
QUESTION
“INFRASTRUCTURE DEVELOPMENT IN NER”
62. SHRI HARSH VARDHAN SHRINGLA
Will the Minister of DEVELOPMENT OF NORTH EASTERN REGION be pleased to
state:
(a) the details of progress achieved in infrastructure projects in the North Eastern Region;
(b) the details of allocation and utilization of funds under the central schemes;
(c) the details of coordination with State Governments and local agencies; and
(d) how focused development is improving connectivity, livelihoods and regional integration?
ANSWER
THE MINISTER OF STATE OF THE MINISTRY OF DEVELOPMENT OF NORTH
EASTERN REGION
[Dr. SUKANTA MAJUMDAR]
(a) to (d): A statement is laid on the Table of the House.STATEMENT REFERRED TO IN REPLY TO PARTS (A) TO (D) IN RESPECT TO
RAJYA SABHA STARRED QUESTION NO. 62 FOR REPLY ON 05th FEBRUARY
2026 REGARDING INFRASTRUCTURE DEVELOPMENT IN NER
a) Under the various schemes of Government of India several infrastructure projects have
been completed under the following sectors:- Road, Railways connectivity, Civil Aviation,
Telecom etc.
i) Road Connectivity:
The length of National Highways (NH) in NER has increased from 10,905 km in 2014 to
16,207 km as on 31.03.2025. Flagship NH projects completed during the period in NER are
tabulated below:
S. Project Name State Length Cost Status Significance
No. (km) (₹ in
Cr.)
1 Connectivity to Bangladesh- Tripura 1.89 129 Completed Connectivity from NE
Feni Bridge Project (Maitri Region to Chittagong
Bridge –I) portion Bangladesh
2 Construction of bridge Assam 28.51 1,989 Completed Direct inter-state
between Dhola and Sadia connectivity between
ghats in Assam Assam and Arunachal
Pradesh
3 Atal Setu Viaduct Bengalon Sikkim 1.1 133 Completed Enhance connectivity
NH 10, Sikkim for defense forces to
the border region
4 Shillong - Nongstoin– Meghalaya 261 2,320 Completed Reduce travel time
Rongjeng- Tura in Meghalaya between Shillong and
Tura from 12 hrs to 6
hrs
5 Dibang-Lohit River Bridge Arunachal 29.64 1,508 Completed Bridged Gap between
(NH-13), Arunachal Pradesh Pradesh Digaru to Chowkham
reducing travel
timeii) Railway Connectivity:
The Ministry of Railways have informed that the budget allocation during the last five years has
increased significantly in the North Eastern Region. Budget allocation for infrastructure projects
and safety works, falling fully/partly in North Eastern Region (NER) is as under:-
Period Outlay
2009-14 ₹2,122 crore/year
2025-26 ₹10,440 crore (about 5 times)
The details of commissioning/laying of new track falling fully/partly in North Eastern Region
(NER) during 2009-14 and 2014-2025 is as under:-
Period New track Commissioned Average commissioning of new tracks
2009-14 333 Km 66.6 Km/year
2014-25 1,840 Km 167.27 Km/year (about 2.5 times)
As on 01.04.2025, 12 Railway projects (08 New Lines, 04 Doubling), of a total length of 777
Km, costing ₹69,342 crore falling fully/partly in North Eastern Region (NER) have been
sanctioned. The summary is as under:-
Category No. of Total Length Exp. upto
sanctioned Length Commissioned Mar’25
projects (in Km) upto Mar’25 (in (₹ in Cr.)
Km)
New Lines 08 448 113 38,078
Doubling/Multitracking 04 329 165 3,598
Total 12 777 278 41,676
Projects commissioned falling fully/partly in North Eastern Region since 2014, are as under:S. No. Project Cost
(₹ in crore)
1 Bhairabi-Sairang New Line (51 Km) 8,071
2 Agartala-Sabroom New Line(112 Km) 3,170
3 Agartala-Akhaura New Line (5 Km) 865
4 Rangiya-Murkongselek Gauge Conversion (510 Km) 3,019
5 Kumarghat-Agartala Gauge Conversion (109 Km) 1,242
6 Katakhal-Bharabi Gauge Conversion (84 Km) 348
7 Lumding-Badarpur-Silchar & Badarpur-Kumarghat Gauge Conversion 6500
(412 Km)
8 Lumding-Hojai Doubling (45 Km) 410
9 Digaru-Hojai Doubling (102 Km) 1,873
10 New Bongaigaon-Agthori Doubling (143 Km) 2,048
11 Bogibeel Bridge (92 Km) 5,820
Some of the main projects falling fully/partly in the North Eastern Region which have been
taken up are as under:-
S.No. Name of the project Cost
(₹ In crore)
1 Jiribam-Imphal New Line (111 Km) 22,275
2 Dimapur-Kohima New Line (82 Km) 6,663
3 Murkongselek-Pasighat New Line (27 Km) 1,265
4 New Bongaigaon-Goalpara-Kamakhaya Doubling (176 Km) 4,961
5 Agthori – Kamakhya including Rail cum Road Bridge at Saraighat 1,474
Doubling (7 Km)
Further, during the last three years i.e. 2022-23, 2023-24, 2024-25 and the current financial
year 2025-26, 20 surveys (14 New Line, and 6 Doubling) of total length 2,575 Km falling
fully/ partly in North Eastern Region including the projects in the State of Assam and Barak
Valley Region, have been sanctioned.
iii) Telecom Connectivity:
As of Dec, 2025, 6355 Gram Panchayats have been made service ready for providing high
speed internet services in North Eastern Region. Till Dec-2025, 3718 mobile towers havebeen commissioned in NER covering 5366 villages/locations under various Government
funded mobile projects. The details of Fund disbursed for North Eastern Region during FY
2014-15 to 2025-26 upto 31.12.2025 under various projects in the North Eastern Region is
tabulated below:
(Rs. in crores)
Sl. Name of Name of Tota Assa *NE-I *NE-II Sikk DO Tota
No. Scheme Projects l m (Meghal (Aruna im T l
Proj aya, chal HQ
ect Mizora Prades
Cost m and h,
Tripura Manip
) ur and
Nagala
nd)
Project-wise Fund disbursement
1 Compens Bharat Net 1880 333. 288.07 480.57 90.1 1192
ation to 41 25 1 .00
2 Service 4G 130. 150.28 655.80 6.10 200. 1142
3062
Providers Saturation 14 16 .48
0
for Project
3 creation BOP/BIP 26.2 26.2
737
and 0 0
4 augmenta Mobile 135. 179.70 315.
tion of Services in 43 13
Telecom Arunachal
667
Infrastruc Pradesh and
ture 2 District of
Assam
5 Mobile 240.57 240.
Services in 398 57
Meghalaya
6 Mobile 373. 148.09 437.69 4.32 5.71 968.
1122
Services in 06 87NER
(NESA)
7 10 Gbps 17 17.6 17.6
Internationa 5 5
l Bandwidth
for Internet
Connectivit
y to
Agartala
from
BSCCL
8 25000 Wi- 3.61 0.68 1.23 5.52 11.0
Fi at Rural 4
Exchanges
of BSNL
9 Shared 3.87 2.08 5.95 11.9
Mobile 0
Infrastructur
e Scheme
10 Village 0.37 0.84 0.81 2.02 4.05
Public
Telephone
11 OFC Assam 37.5 37.5 75.0
2 2 5
12 OFC NE-I 18.42 18.4 36.8
2 4
13 OFC NE-II 13.04 13.0 26.0
4 8
14 Solar 0.00 0.03 0.03 0.06
Mobile
Charging
Facilities
(SMCF)
15 Setting up 1.39 0.97 0.14 2.49 4.99
of Wi-Fi byRailtel at
Railway
Stations
16 Rural 2.26 1.09 1.62 4.97 9.93
Wireline
Broadband
Total 2216 1017 852.91 1772.67 100. 339. 4082
02 .03 53 68 .83
Major Completed Projects: The project for providing 2G mobile connectivity in uncovered
villages and along National Highways across Arunachal Pradesh, Assam, Manipur, Mizoram,
Nagaland, Sikkim and Tripura was undertaken at a cost of ₹1,655.66 crore (excluding taxes)
and was completed in March 2021.
iv) Air Connectivity:
The Ministry of Civil Aviation (MoCA) launched the Regional Connectivity Scheme (UDAN)
on 21st October, 2016. UDAN is a market-driven initiative where the development of regional
air connectivity routes is determined by market forces. Airlines assess the demand and supply
needs for specific routes and lead the process under the scheme. Airlines are selected through
a transparent bidding process.
The following airports and heliports have been identified for development and operation of
RCS flights in the NE states under the UDAN scheme:
AIRPORTS
Passighat, Tezu, Hollongi, Jorhat, Lilabari, Rupsi, Tezpur, Dimapur, Shillong and Pakyong
HELIPORTS
• Arunachal Pradesh: Ziro, Walong, Itanagar (Naharlagun), Tuting, Yinghiong,
Daparizo, Miao & Vijaynagar
• Assam : Geleki & Nagaon
• Meghalaya: Tura & Shillong (H)
• Manipur: Tamenglong, Jiribam, Thanlon, Parbung, Moreh & Churachandpur
• Nagaland: Phek, Kohima, Zunheboto, Tuensang, Mokokchung
• Sikkim: Gangtok East, Pelling West & Namchi SouthAll the above-mentioned 10 airports in the North-Eastern States have been operationalized
under the UDAN scheme and are currently operational, except Pakyong Airport.
In addition, two heliports, namely Jiribam and Tamenglong, have also been operationalized
under Non-Scheduled Operator Permit (NSOP) operations.
2004-2014 2014-2025
S. No State Amount Amount
No. of Projects No. of Projects
(₹ in cr.) (₹ in cr.)
Arunachal
1 1 96 4 884.9
Pradesh
2 Assam 10 271.89 18 413.48
3 Manipur 2 26.08 14 207.66
4 Meghalaya 2 40.63 4 66.15
5 Mizoram 0 0 0 0
6 Nagaland 1 12.96 1 48.37
7 Sikkim 0 0 1 553.53
8 Tripura 2 37.89 11 745.21
Total 18 485.45 52 2919.30
Major Initiatives:
1. Construction of Greenfield Airport at Hollongi, Itanagar, Arunachal Pradesh
2. Development and Operationalization of Tezu Airport in Lohit District of Arunachal
Pradesh
3. Construction of New Integrated Terminal Building and allied works at Agartala
Airport, Tripura
4. Construction of New Integrated Terminal Building and allied works at Imphal
Airport, Manipur
5. Construction of Hangars at Agartala Airport, Guwahati Airport and Dibrugarh
Airport.
6. Construction of Greenfield Airport at Doloo, Silchar, Assam.
7. Development of New Civil Enclave at Jorhat, Assam
8. Construction of Greenfield Airport at Pakyong, Sikkim
9. Operationalization of Baljek Airport, Tura, Meghalaya10. Development of Barapani (Shillong) Airport (Extension of Runway and Terminal
Building), Meghalaya.
11. Development & Upgradation of Lengpui Airport, Mizoram
v) Power:
A number of Hydro Electric Projects with a total installed capacity of 5796 MW have been
taken up in NER. The major projects include Subansiri Lower (1750 MW), Dibang Multi-
Purpose project (2880 MW), Teesta Stage VI (500 MW) etc. Under the NER Power System
Improvement Project for Six States (Assam, Manipur, Meghalaya, Mizoram, Tripura and
Nagaland) for strengthening of the Intra-State Transmission and Distribution Systems (33kV
and above) at an estimated cost of ₹6700 crore. The comprehensive scheme for Strengthening
of Transmission and Distribution System in Arunachal Pradesh and Sikkim at an estimated cost
of ₹9129.32 crore has been sanctioned.
vi) Inland Waterways
The number of National Waterways in the NER has increased from 1 to 20 and ₹1,040 cr have
been spent on various Waterways Projects in NER.
b) Under the 10% Gross Budgetary Support mechanism, since 2014-2015 to 2024-2025
Accumulative expenditure (AE) of ₹ 6.11 lakh cr has been made against the cumulative
allocation of ₹ 6.02 lakh cr (RE) by the non-exempted Ministries/Departments for development
of NER. The details is tabulated below:
FY RE (₹ in cr.) AE (₹in cr.)
2004-05 to 2013-14 1,57,856.47 1,39,661.12
2014-15 27,359.17 24,819.18
2015-16 29,669.22 28,673.73
2016-17 32,180.08 29,367.90
2017-18 40,971.69 39,753.44
2018-19 47,087.95 46,054.80
2019-20 53,374.19 48,533.80
2020-21 51,270.90 48,563.82
2021-22 68,440.26 70,874.32
2022-23 72,540.28 82,690.37
2023-24 91,802.00 1,02,749.002024-25 87735.96 89734.37
2014-15 to 2024-25 6,02,431.70 6,11,814.73
c) To coordinate with State Governments and local agencies, and to monitor the progress
of various activities in the North Eastern Region, a dedicated monitoring mechanism has been
established. Under this framework, Project Quality Monitors / Third Party Technical Inspectors
(PQM/TPTI) serve as external monitors to inspect project implementation. Field-level
Technical Support Units provide assistance to State Governments in project execution and
inspections. In addition, several review meetings are conducted at the level of the Union
Minister with Chief Ministers and concerned State Ministers. Regular review meetings are also
held by the Secretary and senior officers of MDoNER with Chief Secretaries and senior State
officials. Furthermore, Central Nodal Officers (CNOs) and Nodal Officers (NOs) continuously
monitor the progress of projects in their respective assigned States.
d) Focused development is improving connectivity, livelihoods, and regional integration
in the North Eastern Region (NER) through coordinated policy interventions and targeted
sectoral initiatives such as.
i. Ashtalakshmi Mahotsav
Ashtalakshmi Mahotsav was organized by MDoNER from 6-8th December 2024 with an aim
to offer a dynamic stage for showcasing North east India’s vibrant textile sector, tourism
opportunities, traditional craftsmanship and distinctive GI tagged products. Mahotsav was
having all the 8 NE state Pavilion, Eri silk, Muga silk and GI pavilion. Also B2 G sessions
wherein project proposals of about ₹ 2500 crore were received. Cultural programme and
Fashion show were organised to showcase the cultural vibrancy and the vibrant textile sector
of NER.
Memorandum of Understanding (MoUs) were signed between (i) Ministry of Development of
North Eastern Region (MDoNER) & Ministry of Foreign Affairs of the Kingdom of Thailand
and (ii) North Eastern Handicrafts and Handloom Development Corporation Ltd. (NEHHDC)
& Creative Economy Agency (CEA) of Government of Kingdom of Thailand on 3rd April,
2025 to institutionalize and increase bilateral cooperation in the handloom and handicraft
sector.ii. North-East Bankers Conclave 2024
MDoNER organized a North East Bankers’ Conclave in New Delhi on 28 April 2023
and the North East Bankers’ Conclave 2.0 in Agartala, Tripura on 21 December 2024, during
which in-depth deliberations were held on the current banking landscape in the NER with the
objective of providing a roadmap to meet the present and future financial resource needs of the
region. As a result of these initiatives, 131 bank branches and 126 ATMs were opened in the
NER during the period from December 2024 to November 2025, and to date, banking services
have been extended to 6,774 villages etc.
iii. Rising Northeast Investors Summit 2025:
Ministry of Development of North Eastern Region (MDoNER) organized "Rising North
East"-Investors Summit 2025 on 23rd and 24th May, 2025 in New Delhi, which was
inaugurated by Hon’ble Prime Minister. The Summit was intended to promote trade and
investment in the North Eastern Region and provide a platform for an immersive dialogue
between select embassies, the business community, financial institutions, and relevant
government stakeholders for forging mutually beneficial partnerships. The event has
brought about an Investment interest from various private investors and PSUs to the tune
of ₹ 4.48 lakh crore.
iv. Model Tourism Circuits
The Ministry of Development of North Eastern Region (MDoNER), in coordination with the
Governments of the eight North Eastern States, has launched an initiative for the development
Model Tourist Circuit with the objective of positioning the North East as a sustainable,
inclusive, and high-value tourism corridor. The initiative is aligned with the national vision of
tourism-led economic growth, cultural preservation, and enhanced national and global
visibility of the North Eastern Region.
S. No. State Model Tourist Circuit
1. Arunachal Pradesh Itanagar-Chullyu-Ziro
2. Assam Jorhat- Kaziranga- Tezpur
3. Manipur Imphal- Moriang- Imphal
4. Meghalaya Guwahati- Shillong- Sohra- Nongriat
5. Mizoram Lengpui – Aizawl – Thenzawl6. Nagaland Dimapur – Kohima – Kisama– Dzukou
7. Sikkim Namchi- Temi- Ravangla
Agartala - Sepahijala Wildlife Sanctuary – Tripura
8. Tripura Sundari Temple – Gunabati Temples – Neermahal -
Chabimura
v. USP
To embed the North Eastern Region (NER) firmly within India’s growth discourse, the
Ministry of Development of North Eastern Region (MDoNER) is adopting a USP-driven
branding strategy for all eight states. These USPs have been chosen after a detailed
Comparative and Competitive analysis of all 8 States vis-à-vis each other and vis-a-vis other
States and neighbouring countries
S. No. State USP
1. Arunachal Pradesh Kiwi
2. Assam Muga Silk
3. Manipur Polo
4. Meghalaya Lakadong Turmeric
5. Mizoram Ginger
6. Nagaland Coffee
7. Sikkim Organic Farming
8. Tripura Queen Pineapple
vi. Agarwood:
It is one of the highest valued non-timber forest product, grows in abundance in North East.As
per the Botanical Survey of India in an assessment made in 2024, north east statesaccount for
about 96.6% of India’s agarwood tree base in India. Due to its high export potential,
Government on the basis of its recommendationof an Inter-Ministerial Task Force in
2023approved a roadmap in 2024to guide sustainable cultivation, processing and trade. The
NE States have been advised to prepare area-expansion plans, supported by geospatial mapping
in Tripura and Assam, while export promotion has been significantly strengthened through
enhancement of annual export quotas under CITES Convention to 1,51,080 kg for chips and7,050 kg for oil. To streamline exports, processing of application for export of agarwood
products has been integrated on the DGFT portal. GI tagging has also been taken up by North
Eastern Region Agricultural Marketing Corporation (NERAMAC) Ltd in collaboration with
NABARD.Proof of Concept (PoC) has also been approved for development of two Agarwood
clusters at Kadamtala (Tripura) and Golaghat (Assam). Collectively, these interventions aim to
expand cultivation, strengthen value chains, and boost formal, traceable agarwood exports from
the North Eastern Region.
vii. Bamboo:
A total 25 projects worth ₹ 236.53 crore for strengthening bamboo sector in NER have been
sanctioned by NEC. North East Cane and Bamboo Development Council (NECBDC) has
trained a total of 5068 bamboo artisans and officials during the last three years. Ministry of
DoNER has sanctioned two Projects with a total outlay of ₹ 82.50 crore for strengthening of
traditional bamboo artisan clusters by enhancing market access, modernizing products, and
linking them with digital and retail ecosystem; as well as for promotion of engineered bamboo
products through cluster strengthening and export facilitation in NER.
viii. High Level Task Force
Focused development is improving connectivity, livelihoods, and regional integration in the
North Eastern Region (NER) through coordinated policy interventions and targeted sectoral
initiatives. The Ministry of Development of North Eastern Region (MDoNER) has constituted
eight High-Level Task Forces (HLTFs) for accelerating sectoral growth in the region, each
chaired by a Chief Minister of a North Eastern State, with the Union Minister (MDoNER) and
three other Chief Ministers as members. These Task Forces have been formed on the subject
such as, (1) Promotion of Sports in NER, (2) North East Economic Corridor, (3) Investment
Promotion in NER, (4) Handlooms and Handicrafts in NER, (5) Tourism in NER, (6)
Infrastructure and Connectivity in NER, (7) Agriculture & Horticulture for addressing gaps in
value chain and market, and (8) Attaining Self-reliance in milk, eggs, fish and meat production
in NER.
*****