Executive Summary:
The Ministry of Railways addressed Lok Sabha Starred Question No. 397 regarding railway safety, infrastructure augmentation, and passenger amenities, particularly concerning the Mumbai Suburban Railway. The response details measures taken to investigate accidents, improve safety, address demands for increased local trains and hazard rectification, and conduct safety audits. It also outlines infrastructure projects and expenditures on safety-related activities, along with initiatives for station modernization under the Amrit Bharat Station Scheme. The information provided is current up to July 2025, with some initiatives extending into 2026.
Key Points / Main Content:
Accident Inquiry and Safety Measures:
* A committee was formed to investigate the cause of the incident near Mumbra station.
* Safety is accorded the highest priority, and safety audits are regularly conducted.
* Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25.
* Accidents Per Million Train Kilometer (APMTKM) has reduced from 0.11 in 2014-15 to 0.03 in 2024-25.
Infrastructure Augmentation:
* The 5th and 6th lines between Thane and Diva (9.44 RKm) were completed and commissioned in February 2022 under MUTP II.
* Several projects have been sanctioned to improve Mumbai suburban railway services, including new lines, corridor extensions, and suburban corridors.
Expenditure on Safety Related Activities:
* Expenditure on safety-related activities has increased over the years, with a total of Rs. 1,16,470 crore allocated for 2025-26.
* Focus areas include maintenance of permanent way, motive power, rolling stock, road safety, level crossings, track renewals, bridge works, and signaling & telecom works.
Technological Improvements and Safety Enhancements:
* Electrical/Electronic Interlocking Systems are provided at 6,635 stations up to 30.06.2025.
* Interlocking of Level Crossing Gates has been provided at 11,096 level Crossing Gates up to 30.06.2025.
* Complete Track Circuiting of stations is provided at 6,640 stations up to 30.06.2025.
* Kavach has been deployed on 1548 RKm on South Central Railway and North Central Railway.
* Kavach has been successfully commissioned over Kota Mathura section Delhi Mumbai route covering 324 Route Kilometers on 30.07.2025.
* Various technologies and devices are being used to improve safety, including Vigilance Control Devices (VCD), GPS-based Fog Safety Devices (FSD), and Ultrasonic Flaw Detection (USFD) testing of rails.
Mumbai Suburban Services:
* Central Railway operates 1810 services (including 80 AC services), and Western Railway operates 1406 services (including 109 AC services).
* 12 new services have been introduced on Western Railway.
* The number of 15-Car MEMU services have been increased, in a phased manner, from 79 to 211 on Western Railway.
* 14 new suburban services have been introduced in Diva and 16 in Mumbra. Diva is served by 490 services and Mumbra by 440 services.
Commuter Safety Measures:
* Awareness campaigns are conducted using various media.
* Frequent announcements are made at railway stations to caution passengers.
* RPF staff is deployed to prevent trespassing, and legal action is taken against offenders.
Station Development and Amenities:
* Amrit Bharat Station Scheme is launched for long-term station redevelopment, focusing on improved access, integration with the city, and enhanced amenities.
* 1337 stations, including 132 in Maharashtra, have been identified for development under this scheme.
* Development works have been completed at 15 stations in Maharashtra under Phase I of the scheme.
Impact Analysis:
Railway Commuters:
* Impact: Enhanced safety through improved infrastructure, technology, and increased services; better amenities at stations under the Amrit Bharat Station Scheme.
* Action Required: Be aware of safety guidelines and utilize new facilities and services provided.
Ministry of Railways:
* Impact: Responsible for implementing safety measures, infrastructure projects, and station development schemes.
* Action Required: Continue to monitor safety parameters, execute sanctioned projects, and allocate funds for ongoing and new initiatives.
Railway Staff (Loco Pilots, Maintenance Staff, RPF):
* Impact: Responsible for ensuring safe operations, maintaining infrastructure, and preventing trespassing.
* Action Required: Adhere to safety protocols, undergo regular training, and enforce regulations to ensure commuter safety.
Residents of Mumbai Metropolitan Region (MMR):
* Impact: Benefit from improved suburban railway services, reduced accidents, and enhanced station facilities.
* Action Required: Provide feedback on the effectiveness of new services and amenities to aid in future improvements.
Key Entities Referenced
Mumbai Suburban Railway Network: A suburban rail system serving the Mumbai Metropolitan Region. The policy discusses safety audits, infrastructure augmentation, and commuter safety improvements.
Mumbra railway station: A railway station on the Mumbai Suburban Railway network, mentioned in relation to an accident inquiry and increased suburban services.
Diva: A location on the Mumbai Suburban Railway network, specifically in relation to the Mumbra-Diva section and increased suburban services.
Indian Railways: The national railway system of India, responsible for the operation and maintenance of the railway network, including safety measures and infrastructure development.
Kavach: A train collision avoidance system adopted as a National ATP system, being deployed on various railway routes to enhance safety.
Amrit Bharat Station Scheme: A scheme launched by Indian Railways for the redevelopment of railway stations with a long-term approach, focusing on improved amenities and integration with the city.
Maharashtra: A state in India where several railway station development projects are underway under the Amrit Bharat Station Scheme.
MUTP II & MUTP III: Mumbai Urban Transport Project, for infrastructure augmentation works in Mumbai suburban railway services
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 397
TO BE ANSWERED ON 20.08.2025
INQUIRY OF ACCIDENT ON MUMBAI SUBURBAN RAILWAY
*397. DR. KALYAN VAIJINATHRAO KALE:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has initiated any inquiry into the recent
accident near Mumbra railway station on the Mumbai Suburban
Railway Network and if so, the details thereof;
(b) whether the Government is aware of the long-pending demand for
increasing the number of local trains and rectifying the known
hazards in Mumbra-Diva section;
(c) if so, the steps taken to address these challenges;
(d) whether the Government has conducted any safety audit/socio
technical review of the Mumbai Suburban Railway Network during the
last three years; and
(e) if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e): A Statement is laid on the Table of the House.
*****-1-
STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF LOK SABHA
STARRED QUESTION NO. 397 TO BE ANSWERED ON 20.08.2025
(a) to (e): A committee has been constituted to investigate the cause of
incident near Mumbra station on the Mumbai Suburban Railway network.
Safety Measures
Safety is accorded the highest priority on Indian Railways and Safety Audits
are done regularly. As a consequence of various safety measures taken over
the years, there has been a steep decline in the number of accidents.
Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in
2024-25 as shown in the graph below.
It may be noted that the Consequential Train Accidents during the period
2004-14 was 1711 (average 171 per annum), which has declined to 31 in
2024-25 and further to 3 in 2025-26 (upto June).
Another important index showing improved safety in train operations is
Accidents Per Million Train Kilometer (APMTKM) which has reduced from
0.11 in 2014-15 to 0.03 in 2024-25, indicating an improvement of approx.
73% during the said period.
234
165
135
55 48
40
35 31
22
3
2005- 2009- 2014- 2019- 2020- 2021- 2022- 2023- 2024- 2025-26
06 10 15 20 21 … 22 … 23 24 25 (up to Jun'25)
--2/-
stnediccA
niarT
laitneuqesnoC
fo
.oN-2-
Infrastructure Augmentation Works
Under MUTP II, 5th and 6th line between Thane and Diva (9.44 RKm) was
completed and commissioned in February 2022. Further to improve the
infrastructure in Mumbai suburban railway services, following projects have
been sanctioned:
S.No. Name of Project Length Cost
(km)
(Rs. in
crore)
1 CSMT-Kurla 5th& 6th Line (MUTP-II) 17.5 891
2 Mumbai Central-Borivali 6th Line (MUTP-II) 30 919
Extension of Harbour Line from Goregaon-Borivali
3 7 826
(MUTP-IIIA)
4 Borivali-Virar 5th& 6th Line (MUTP-IIIA) 26 2,184
5 Virar-Dahanu Road 3rd& 4th Line (MUTP-III) 64 3,587
6 Panvel-Karjat Suburban Corridor (MUTP-III) 29.6 2,782
Airoli-Kalwa (elevated) Suburban Corridor link
7 3.3 476
(MUTP-III)
8 Kalyan-Asangaon 4th Line (MUTP-IIIA) 32 1,759
9 Kalyan-Badlapur 3rd& 4th line (MUTP-IIIA) 14 1,510
10 Kalyan-Kasara 3rd Line 67 792
11 Naigaon-Juichandra double chord Line 6 176
12 Nilaje-Kopar double chord Line 5 338
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
--3/--3-
Expenditure on Safety related activities (Rs. in Cr.)
2013-14 2022- 2023-24 RE BE
(Act.) 23 (Act.) 2024- 2025-
(Act.) 25 26
Maintenance of 9,172 18,115 20,322 21,800 23,316
Permanent Way
& Works
Maintenance of 14,796 27,086 30,864 31,540 30,666
Motive Power
and Rolling
Stock
Maintenance of 5,406 9,828 10,772 12,112 12,880
Machines
Road Safety 1,986 5,347 6,662 8,184 7,706
LCs and ROBs/
RUBs
Track 4,985 16,326 17,850 22,669 22,800
Renewals
Bridge Works 390 1,050 1,907 2,130 2,169
Signal & 905 2,456 3,751 6,006 6,800
Telecom Works
Workshops Incl. 1,823 7,119 9,523 9,581 10,134
PUs and Misc.
expenditure on
Safety
Total 39,463 87,327 1,01,651 1,14,022 1,16,470
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,635 stations up to
30.06.2025 to reduce accident due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 11,096
level Crossing Gates up to 30.06.2025 for enhancing safety at LC gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,640
--4/--4-
stations up to 30.06.2025.
5. Kavach is a highly technology intensive system, which requires safety
certification of highest order. Kavach was adopted as a National ATP
system in July 2020. Kavach is provided progressively in phased
manner. Kavach has already been deployed on 1548 RKm on South
Central Railway and North Central Railway. Presently, the work is in
progress on Delhi-Mumbai and Delhi-Howrah corridors (approximately
3000 RKm). Kavach has been successfully commissioned over Kota–
Mathura section (Delhi – Mumbai route) covering 324 Route Kilometers
on 30.07.2025.
6. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories to
alert the crew about the signal ahead when visibility is low due to foggy
weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base
sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
--5/--5-
while carrying out primary track renewals.
12. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
19. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
20. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
21. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon precautions,
etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
--6/--6-
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying
any inflammable material, explosives, prohibition of smoking inside the
coaches, penalties etc.
27. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in
a phased manner.
28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as per
plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
--7/--7-
2014-15 to
2004-05 to 2014-25 Vs.
S.N. Item 2024-25
2013-14 2004-14
(till March 25)
Technological improvements
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than 2
rails (60 Kg) (Km) times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8 times
(260m) (Km)
3. Electronic 837 3,691 Stations More than 4
Interlocking Stations times
(Stations)
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better maintenance practices
1. Primary Rail 32,260 Km 49,941 Km 1.5 times
Renewal (Track
Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than 2
Flaw detection) times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % reduction
3699 Nos. 370 Nos.
4. Rail fractures In 2013-14: In 2024-25: More than 88%
(Nos.) 2548 Nos. 289 Nos. reduction
Better infrastructure and Rolling stock
1. New Track KM 14,985 34,428 Km More than 2
added (Track km) Nos. times
2. Flyovers (RoBs)/ 4,148 Nos. 13,808 Nos. More than 3
Underpasses times
(RUBs) (Nos.)
--8/--8-
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:
(nos.) on BG 8948 Nil
(All
eliminated
by 31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than 18
Coaches (Nos.) times
Suburban Services in Mumbai
To cater to the needs of the commuters of Mumbai, Indian Railways is
operating Suburban services including AC-EMUs. At present, Central
Railway operates 1810 services including 80 AC services, while Western
Railway operates 1406 services including 109 AC services. On Western
Railway, 12 new services have been introduced and to provide additional
accommodation, the no. of 15-Car MEMU services have been increased, in a
phased manner, from 79 to 211.
The introduction of AC local trains equipped with automatic doors in
Mumbai has been a welcome initiative to enhance commuters’ safety and
reduce incidents related to overcrowding. The automatic doors prevent
passengers from hanging on footboards or boarding moving trains which is
one of the major causes of falling from running trains. These doors remain
closed while the train is in motion and open only at stations when the train
is stationary, thereby significantly reducing the risk of falls.
Further, to facilitate the passengers of Diva, Indian Railways, since October-
2024 has introduced 14 new suburban services while to cater the needs of
--9/--9-
Mumbra station, 16 new suburban services have been introduced.
Accordingly, at present, Diva is served by 490 services and Mumbra is
served by 440 services.
Besides, introduction of new train services is an on-going process on Indian
Railways subject to traffic justification, operational feasibility, resource
availability, etc.
The following steps are also being taken for Commuters safety in Mumbai
Suburban Railway network:-
1. Various awareness and sensitization campaigns are conducted by
railways using social media, digital & print media.
2. Frequent announcement is made at railway stations using Loud Hailers
as well as through Public Announcement systems cautioning
passengers against crossing tracks, boarding moving trains and
travelling on footboards.
3. Short videos for passenger awareness are also displayed in Rail Display
Network at railway station.
4. Flex boards in both Hindi & Marathi languages have been installed at
vulnerable locations of trespassing to caution the passengers/public
against crossing railway tracks.
5. RPF staff is deployed at vulnerable locations to prevent trespassing and
trespassers are prosecuted.
6. Legal action is taken against persons travelling on train rooftops,
footboards and other restricted places of the train formation.
Improvement of Passenger Amenities at Station / Station Redevelopment
Development / Redevelopment / Upgradation / Modernisation of stations on
--10/--10-
Indian Railways is a continuous and ongoing process and works in this
regard are undertaken as per requirement, subject to inter-se priority and
availability of funds. The priority for development / redevelopment /
upgradation / modernisation of stations is accorded to higher category of
station over lower category of station while sanctioning and executing the
works.
To enhance customer experience and provide better amenities, Indian
Railways has launched Amrit Bharat Station Scheme for redevelopment of
stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations. The master planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, Sitting arrangement, water
booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/Ramp
Improvement /Provision of platform surface and cover over platforms
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
--11/--11-
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
So far, 1337 stations including 132 stations in the state of Maharashtra
have been identified for development under this scheme.
Development works at railway stations under Amrit Bharat Station Scheme
in the state of Maharashtra have been taken up at a good pace. Till now,
phase-I worksof 15stations (Amgaon, Chanda Fort, Chinchpokli, Devlali,
Dhule, Kedgaon, Lasalgaon, Lonand Jn, Matunga, Murtizapur Jn, Netaji
Subhash Chandra Bose Itwari Junction, Parel, Savda, Shahad, Vadala Road)
in the state of Maharashtra have been completed under this scheme. The
works at other stations have also been taken up at good pace and progress
of some of the stations is as given below:
At Mumbra station, the works of platform flooring of platform no. 4,
improvement of seating arrangement of platform no. 3, flooring of
Foot Over Bridge, new toilet block, sewage treatment plant,
development of circulating area on East side, improvement of ticket
booking office and toilet block have been completed. The work of
escalators on platform no. 1 has been taken up.
At Diva station, the works of redevelopment of circulating area and
parking on East side, improvement to station building on East side,
new entry gate , improvement to Foot Over Bridge at East side,
--12/--12-
construction of new staircase for Foot Over Bridge at East side,
platform shelter of platform no. 7/8, platform raising and flooring of
platform no. 5/6 and 7/8, new toilet block and sewage treatment plant
on West side have been completed. The work new toilet block of
platform no. 7/8 and new 6 m Foot Over Bridge have been taken up.
Upgradation / development / redevelopment of Railway Stations is complex
in nature involving safety of passengers & trains and requires various
statutory clearances such as fire clearance, heritage, tree cutting, airport
clearance etc. The progress also gets affected due to brown field related
challenges such as shifting of utilities (involving water/sewage lines,
optical fibre cables, gas pipe lines, power/signal cables, etc.),
infringements, operation of trains without hindering passenger movement,
speed restrictions due to works carried out in close proximity of tracks and
high voltage power lines, etc. and these factors affect the completion time.
Therefore, no time frame can be indicated at this stage.
Development / Upgradation / Modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
‘Customer Amenities’. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not work-wise, or station
wise or state-wise. The state of Maharashtra is covered under the
jurisdiction of four railway zones, namely Central Railway, South Central
Railway, South East Central Railway and Western Railway. For these zones,
an allocation of ₹ 3,751 crore has been made for the financial year 2025-26,
out of which an expenditure (up to July, 2025) of ₹ 1,170 crore has been
incurred so far.
*****