Official TranscriptGOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2839 TO BE ANSWERED ON 17.12.2025 INSTALLATION OF KAVACH 4.0 ON DELHI-MUMBAI AND DELHI- KOLKATA ROUTES 2839. DR MALLU RAVI: Will the Minister of RAILWAYS be pleased to state: (a) the specific reasons for the revised deadline of December 2025 for the installation of 'Kavach' 4.0 on the high-density Delhi- Mumbai and...
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2839 TO BE ANSWERED ON 17.12.2025 INSTALLATION OF KAVACH 4.0 ON DELHI-MUMBAI AND DELHI- KOLKATA ROUTES
2839. DR MALLU RAVI:
Will the Minister of RAILWAYS be pleased to state:
(a) the specific reasons for the revised deadline of December 2025 for the installation of 'Kavach' 4.0 on the high-density Delhi- Mumbai and Delhi-Kolkata routes and the percentage of this work completed as of November 1, 2025;
(b) the total fund utilised (out of the Rs. 1,950 crore spent so far), route-wise; and
(c) the steps taken by the Government to approve more vendors and scale up manufacturing capacity given the recent industry statements (in November 2025) that the five year national rollout target is impossible with the current three approved OEMs? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW)
(a) to (c)1. Kavach is an indigenously developed Automatic Train Protection (ATP) system. Kavach is a highly technology intensive system, which requires safety certification of highest order (SIL-
4).
2. Kavach aids the Loco Pilot in running of trains within specified speed limits by automatic application of brakes in case Loco Pilot fails to do so and also helps the trains to run safely during --2/--2- inclement weather.
3. The first field trials on the passenger trains were started in February 2016. Based on the experience gained and Independent Safety Assessment of the system by Independent Safety Assessor (ISA), three firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July 2020.
5. Implementation of Kavach System involves following Key
Activities: i. Installation of Station Kavach at each and every station, block
section. ii. Installation of RFID Tags throughout the track length. iii. Installation of telecom Towers throughout the section. iv. Laying of Optical Fibre Cable along the track. v. Provision of Loco Kavach on each and every Locomotive running on Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version
4.0 was approved by RDSO on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the diverse railway network. This is a significant milestone in safety for Indian Railways. Within a short period, IR has developed, tested and started deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location Accuracy, Improved Information of Signal Aspects in bigger yards, Station to Station Kavach interface on OFC and Direct Interface to existing Electronic Interlocking System. With these improvements, Kavach Ver.4.0. is planned for large scale deployment over Indian Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 738 Route km on Palwal โ --3/--3- Mathura- Nagda section (633 Rkm) on Delhi โ Mumbai route and HowrahโBardhaman section (105 Rkm) Delhi โ Howrah route.
Kavach implementation has been taken up in balance sections of Delhi โ Mumbai & Delhi โ Howrah corridors.
10. Progress of key items of Kavach on High density routes including Delhiโ Mumbai & Delhiโ Howrah corridors are as under:
SN Item Progress i Laying of Optical Fibre Cable 7129 Km ii Installation of Telecom Towers 860 nos iii Station Data Centre 767 Stns iv Installation of Track side equipment 5672 RKm v Provision of Kavach on Locos 4,154
11. Further, track side Kavach implementation work has been taken up on 15,512 RKm covering all GQ, GD, HDN and identified sections of Indian Railways.
12. Bids have been invited for equipping another 9,069 locomotives with Kavach version 4.0. Kavach is being provided progressively in a phased manner in locomotives.
13. Specialized training programmes on Kavach are being conducted at centralized training institutes of Indian Railways to impart training to all concerned officials. By now more than 40,000 technicians, operators and engineers have been trained on Kavach technology. This includes 33,000 Loco Pilots & Assistant Loco Pilots. Courses have been designed in collaboration with IRISET.
14. The funds utilized on Kavach works so far up to Oct'25 is Rs.
2,354.36 Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19 Crores. Requisite funds are made available as per the progress of works. *****