Executive Summary & Key Takeaways

**Executive Summary** This document is a response to Unstarred Question No. 119 in Lok Sabha concerning the Jal Jeevan Mission (JJM) in Rajasthan, answered on January 29, 2026. It details the progress of JJM in providing tap water connections to rural households, including those in Jaipur, Rajasthan since August 2019. The response also mentions the continuation of the JJM with an enhanced total outlay until December 2028, and that the plan is under consideration. **Key Points / Main Content** * **Jal Jeevan Mission (JJM) Overview:** * The JJM aims to provide potable tap water supply to every rural household across the country, including Rajasthan, at a service level of 55 litres per capita per day (lpcd) of prescribed quality (BIS:10500). * Implemented in partnership with states since August 2019. * **Progress in Rajasthan:** * As of January 24, 2026, more than 50.86 lakh additional rural households in Rajasthan have been provided with tap water connections under JJM. * Total of 62.60 lakh (58.11%) households in the state have tap water supply out of 1.07 crore rural households. * At the start of the mission 11.74 lakh (10.90%) rural households were reported to have tap water connections * **Progress in Jaipur District:** * As of January 24, 2026, around 2.52 lakh rural households in Jaipur district have been provided with tap water connections under JJM. * Total of 3.33 lakh (64.94%) households in the district have tap water supply out of 5.13 lakh rural households. * At the start of the mission, around 0.80 lakh (15.72%) rural households were reported to have tap water connections. * **Addressing Water Shortage in Jaipur:** * Surveys and assessments conducted in Jaipur identified declining groundwater levels and heavy dependence on limited surface sources. * The state government has taken and is taking steps such as augmentation of surface water supply, expansion of bulk transmission and distribution networks, water quality monitoring, recharge measures and planning of sustainable drinking water solution. * **Funding:** * No amount has been allocated to any State/ UT, including Rajasthan, in 2025-26. * Proposal for continuation of JJM till December 2028 with enhanced total outlay is still under consideration. * **Data Availability:** * State/ UT, district & village-wise status of tap water connection in rural households is in public domain and available on JJM dashboard at: https://ejalshakti.gov.in/jjmreport/JJMIndia.aspx. **Impact Analysis** **State Governments (including Rajasthan):** * **Impact:** Responsible for planning, designing, approving, and implementing drinking water supply schemes. Receive technical and financial assistance from the Government of India. * **Action Required:** Continue working with the central government to achieve the JJM goals, ensuring the effective implementation of water supply schemes, and providing data for the JJM dashboard. **Rural Households in Rajasthan (including Jaipur):** * **Impact:** Increased access to potable tap water supply, improving the quality of life and health outcomes. * **Action Required:** Households must maintain their tap connections and use water responsibly. **Central Government (Ministry of Jal Shakti):** * **Impact:** Responsible for supplementing the efforts of the states through technical and financial assistance. * **Action Required:** Review the proposal for continuation of JJM till December 2028 with enhanced total outlay. Continue monitoring progress, providing support, and ensuring the transparency of the JJM through the public dashboard.

Key Entities Referenced

Jal Jeevan Mission (JJM): A government scheme to provide tap water supply to every rural household across the country by 2024, implemented in partnership with states. Rajasthan: Indian state where the JJM scheme is being implemented and data on progress is being reported. Ministry of Jal Shakti: The ministry responsible for the Jal Jeevan Mission. Jaipur: City in Rajasthan specifically mentioned regarding acute shortage of drinking water and actions being taken.
Official Source Record View Original Source โ†’
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF DRINKING WATER AND SANITATION LOK SABHA UNSTARRED QUESTION NO. 119 ANSWERED ON 29.01.2026 JJM IN RAJASTHAN โ€ 119. SMT. MANJU SHARMA: Will the Minister of JAL SHAKTI be pleased to state: (a) the salient features of the Jal Jeevan Mission (JJM); (b) the number of districts covered under JJM in Rajasthan including Jaipur; (c) the number of households in Rajasthan including in Jaipur that have been provided with new tap water connections under JJM; (d) whether the Government has conducted any survey in Jaipur where there is acute shortage of drinking water and if so, the details thereof along with the steps taken/being taken by the Government in this regard; and (e) whether the Government has sanctioned any funds to Rajasthan under JJM during the current year and if so, the details thereof? ANSWER THE MINISTER OF STATE FOR JAL SHAKTI (SHRI V. SOMANNA) (a) to (d) To make provision of tap water supply to every rural household across the country, including Rajasthan, Government of India, in partnership with states, is implementing Jal Jeevan Mission (JJM), since August 2019. The key features of the JJM is to make provision of potable water to every rural household through tap connection at a service level of 55 litre per capita per day (lpcd), of prescribed quality (BIS:10500), on regular and long-term basis. At the start the Mission, only 11.74 lakh (10.90%) rural households were reported to have tap water connections in Rajasthan. So far, as reported by state as on 24.01.2026, under JJM, more than 50.86 lakh additional rural households have been provided with tap water connections. Thus, as on 24.01.2026, out of 1.07 crore rural households in the state, more than 62.60 lakh (58.11%) households are reported to have tap water supply in their homes. Page 1 of 2Similarly, at the start of the Mission, around 0.80 lakh (15.72%) rural households were reported to have tap water connections in Jaipur district of Rajasthan. So far, as reported by the State, around 2.52 lakh rural households have been provided with tap water connections under JJM. Thus, as on 24.01.2026, out of 5.13 lakh rural households in the district, around 3.33 lakh (64.94%) households are reported to have tap water supply in their homes. The State/ UT, district & village-wise status of tap water connection in rural households etc. as reported by States/ UTs is in public domain and available on JJM dashboard at: https://ejalshakti.gov.in/jjmreport/JJMIndia.aspx. Drinking Water being a state subject, it is states, who plan, design, approve and implement drinking water supply schemes. Government of India supplements the efforts of the States by providing technical and financial assistance under this mission. As informed by the state of Rajasthan, surveys and assessments have been conducted in Jaipur to address the issue of drinking water shortage. These include groundwater and source assessments by the Central Ground Water Board and infrastructure and supply reviews by the State PHED, which have identified declining groundwater levels and heavy dependence on limited surface sources. State has further informed that based on these findings, the state government has taken and is taking steps such as augmentation of surface water supply (including strengthening of Bisalpur-based systems), expansion of bulk transmission and distribution networks, water quality monitoring, recharge measures and planning of sustainable drinking water solution to improve availability and sustainability of drinking water in Jaipur. (e) Under JJM, no amount has been allocated to any State/ UT, including Rajasthan, in 2025-26 as proposal for continuation of JJM till December 2028 with enhanced total outlay is still under consideration. ***** Page 2 of 2