See Full Document Text
LOK SABHA
UNSTARRED QUESTION NO. 6311
TO BE ANSWERED ON 2ND APRIL, 2026
KG BASIN PROJECTS AND STRATEGIC PETROLEUM RESERVES
6311. DR. PRABHA MALLIKARJUN:
पेट(cid:332)ोिलयम एवं (cid:366)ाकृ ितक गैस मं(cid:361)ी
Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state:
(a) the current status of all ongoing oil and natural gas extraction projects in the Krishna-
Godavari (KG) Basin, including production capacities, operational progress, timelines and
revenue generated;
(b) the economic, employment and energy security benefits derived so far from the KG
Basin projects, including State/UT-wise contributions and local development initiatives;
(c) the current capacity, storage and utilisation status of the country's Strategic Petroleum
Reserves (SPR) and the role of production from the KG Basin in supplementing these
reserves;
(d) the measures taken to ensure optimal integration of domestic hydrocarbon production
with SPR planning including contingency preparedness for supply disruptions; and
(e) the steps being adopted to ensure environmental sustainability, safety compliance and
efficient utilisation of resources in both KG Basin hydrocarbon projects and Strategic
Petroleum Reserves?
ANSWER
पेट(cid:332)ोिलयम एवं (cid:366)ाकृ ितक गैस मं(cid:361)ालय म(cid:336) रा(cid:475)मं(cid:361)ी
((cid:373)ी सुरेश गोपी)
MINISTER OF STATE IN THE MINISTRY OF PETROLEUM AND NATURAL GAS
(SHRI SURESH GOPI)
(a) A consolidated statement giving details of offshore oil and gas exploration and
development projects under implementation in the Krishna-Godavari Basin and other
offshore areas of Andhra Pradesh is placed at Annexure-I.
(b) The KG Basin projects have delivered substantial economic, employment, and energy
security benefits, primarily concentrated in Andhra Pradesh leading to injection of massive
capital investment across major developments, generating significant revenue streams,fostering infrastructure spending, supply chain activation, creation of diverse job
opportunities in specialized areas, onshore facility management, boosting both skilled and
unskilled employment in the KG regionand multiplier effects from oil and gas
monetization.The basin also strengthens India's domestic hydrocarbon production, reducing
import dependence with vast reserves of natural gas and crude oil that enhance energy
reliability and fuel national growth.
(c) & (d) Government, through a Special Purpose Vehicle, called Indian Strategic
Petroleum Reserves Limited (ISPRL), has established Strategic petroleum Reserves (SPR)
facilities with total capacity of 5.33 Million Metric Tonnes (MMT) of crude oil. Government
have also approved two additional commercial-cum-strategic petroleum reserves
facilities.The Government ensures the optimal integration of domestic hydrocarbon
production with the Strategic Petroleum Reserve (SPR), enhancing preparedness for
unforeseen supply disruptions through a multi-pronged approach which includes coordinated
planning, contingency preparedness, infrastructure optimization, industry coordination and
continuous monitoring.
(e) Ministry of Environment, Forest and Climate Change is the nodal authority for grant
of statutory Environmental and other requisite clearances, based on a comprehensive
assessment of potential environmental impacts and the adequacy of proposed mitigation
measures. All activities are undertaken strictly in compliance with all statutory environmental
clearances and prescribed safety standards, including those of OISD, with regular monitoring,
audits and adherence to contractual and regulatory requirements.
*****Annexure 1
ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 6311 TO BE ANSWERED ON
02.04.2026 REGARDING KG BASIN PROJECTS AND STRATEGIC PETROLEUM RESERVES.
Regi Contract State / Operator Area Investm Investm Timeline for No No. of Pipeli Offshore Onshore Facility
me Area Locati (Sq ent ent Commencem of Offsh ne Facility
on km) committ during ent of well ore (km)
SN ed Last 5 Production s Platfo
(MMUSD years drill rm
) (MMUS ed Install
D) ed
A Bridge
Two Onshore
Connected
terminals established
Offshore
1.Onshore Terminal
Central
at Odalarevu- Gas
Process
processing, Custody
KG- KG Platform
already in transfer meter, MEG
1 NELP DWN- offshor ONGC 2392 5794.28 3318.94 6 1 400 (CPP) and
production Regeneration plant,
98/2 e Living
effluent treatment
Quarters
plantg etc.
along with
2. Onshore Terminal
Utilities
at Mallavaram-
(LQUP) is
Custody transfer,
installed
2743 1610
(Global) incurred
KG- KG
979.7 1103 till 2024-
2 NELP DWN- offshor RIL Jun-28 NIL NIL NIL NIL NIL
5 (increme 25 on
98/3 e
ntal for global
RFDP) basis
Pre Easter VEDANTA already in
3 Ravva 311 100 95 5 NIL NIL NIL NIL
NELP n LIMITED production
OffshoRegi Contract State / Operator Area Investm Investm Timeline for No No. of Pipeli Offshore Onshore Facility
me Area Locati (Sq ent ent Commencem of Offsh ne Facility
on km) committ during ent of well ore (km)
SN ed Last 5 Production s Platfo
(MMUSD years drill rm
) (MMUS ed Install
D) ed
re
AVR Oil &
KG/OSD KG
Gas
4 DSF SF/GSK Offsho 24.2 14.9 2.33 Q3 2027-28 NIL NIL NIL NIL NIL
Private
V1/2016 re
Limited
KG/OSD KG
Oil India 93.90
5 DSF SF/GSK Offsho 102.5 8.93 Q1 2028-29 NIL NIL NIL NIL NIL
Limited 2
W/2018 re
KG/OSD KG IMC
111.0
6 DSF SF/GS21 Offsho INFRASTR 45 0.7 Q2 2026-27 NIL NIL NIL NIL NIL
7
/2021 re UCTURE
KG/OSD KG
148.2
7 DSF SF/GS49 Offsho ONGC 70.92 2.48 Q2 2029-30 NIL NIL NIL NIL NIL
7
/2021 re
KG/OSD
KG
SF/CHA 697.0
8 DSF Offsho ONGC 434.06 4.93 Q2 2029-30 NIL NIL NIL NIL NIL
NDRIKA/ 3
re
2021
KG- KG
OAL Vedanta 6574. In exploration
9 DWHP- Offsho 20.51 0 NIL NIL NIL NIL
P Limited 26 phase
2017/1 re 0.075Regi Contract State / Operator Area Investm Investm Timeline for No No. of Pipeli Offshore Onshore Facility
me Area Locati (Sq ent ent Commencem of Offsh ne Facility
on km) committ during ent of well ore (km)
SN ed Last 5 Production s Platfo
(MMUSD years drill rm
) (MMUS ed Install
D) ed
KG- KG
OAL Vedanta 177.3 In exploration
10 OSHP- Offsho 6.43 6 NIL NIL NIL NIL
P Limited 7 phase
2017/1 re 41.343
KG- KG
OAL 1513. 78.8153 In exploration
11 UDWHP- Offsho RIL-BP 2 NIL NIL NIL NIL
P 9 15 phase
2018/1 re 32.02085
KG- KG
OAL 1199. In exploration
12 UDWHP- Offsho RIL-BP 3.66 4 NIL NIL NIL NIL
P 64 phase
2022/1 re 52.79946
KG- KG
OAL Oil India 9495. In exploration
13 UDWHP- Offsho 0 NIL NIL NIL NIL
P Limited 16 phase
2023/1 re 18.0634 -
KG- KG
OAL Oil India 9223. In exploration
14 UDWHP- Offsho 23.75531 0 NIL NIL NIL NIL
P Limited 22 phase
2023/2 re 7 -