See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 271
TO BE ANSWERED ON 11.03.2026
LACK OF FOBS AT RAILWAY STATIONS UNDER EAST CENTRAL RAILWAY
†*271. SHRI SUDHAKAR SINGH:
Will the Minister of RAILWAYS be pleased to state:
(a) whether passengers are reportedly facing serious difficulties and risk of
accidents while crossing the platforms at Dumraon railway station
under Danapur division and Karmanasha and Mahmudganj railway
stations under Pandit Deen Dayal Upadhayaya Division of East Central
Railway in absence of Foot Over Bridges there and if so, the details
thereof;
(b) whether the arrangement of safe pedestrian crossing facilities is
extremely necessary considering the large daily footfall of rural
passengers, women, elderly people and students at the said railway
stations and if so, the details thereof;
(c) whether any survey has been conducted/proposal received and approval
accorded for the construction of Foot Over Bridges at the said three
stations;
(d) if so, the present status of the said proposals and the time by which
action is likely to be taken in this regard; and
(e) if not, the reasons for not including the said stations in the priority list
for the construction of FOBs?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF STARRED
QUESTION NO. 271 TO BE ANSWERED ON 11.03.2026 IN LOK SABHA
(a) to (e) Foot Over Bridges (FOBs) are available at Dumraon, Karamnasa
and Muhammad Ganj railway stations of East Central Railway. The details
are as under:
Station Details of FOB
Dumraon One FOB is existing and construction of one
additional FOB has been taken up.
Karamnasa One FOB is existing and one additional FOB has
been planned.
Muhammad One FOB is existing and construction of one
Ganj additional FOB has been taken up.
Dumraon station of Danapur division, East Central Railway, located in Bihar
and Muhammad Ganj station of Pandit Deen Dayal Upadhayay division, East
Central Railway, located in Jharkhand have been identified for development
under Amrit Bharat Station Scheme. Development works at Dumraon and
Muhammad Ganj stations have been taken up at good pace.
At Dumraon station, platform shelter, waiting hall, drinking water
arrangement, urinal, lavatory, seating arrangement, Foot Over Bridge etc.
amenities are available. The works of new station building, new platform,
circulating area, parking and additional Foot Over Bridge have been taken
up. Work has also been sanctioned for replacement of the existing Foot
Over Bridge.
At Muhammad Ganj station, high level platform, platform shelter, waiting
hall, drinking water arrangement, urinal, lavatory, seating arrangement,
Foot Over Bridge etc. amenities are available. The works completed at
Muhammad Ganj station includes:
New station building Raising and extension of platform no. 1, 2/3 and 4/5
Circulating area and parking at main entry side
Further, the works of canopy, platform shelter, platform surfacing, toilet
block, entry gate and additional Foot Over Bridge have been taken up.
At Karamnasa station of Pandit Deen Dayal Upadhayay division, East
Central Railway, located in Bihar, high level platform, platform shelter,
waiting hall, drinking water arrangement, urinal, lavatory, seating
arrangement, Foot Over Bridge, Divyangjan toilet etc. are available. One
additional Foot Over Bridge has also been planned.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of Foot Over Bridge is a
continuous and ongoing process and works in this regard are undertaken
as per requirement, subject to inter-se priority and availability of funds.
Development / redevelopment / upgradation / modernisation of a station is
carried out based on category of station/condition/traffic handled etc.
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach. So far, 1337 stations
have been identified for development under Amrit Bharat Station Scheme,
out of which 98 stations including Dumraon station of Danapur division,
East Central Railway, are located in Bihar and 57 stations including
Muhammad Ganj station of Pandit Deen Dayal Upadhayay division, East
Central Railway, are located in Jharkhand.
The division-wise names of stations identified for development under Amrit
Bharat Station Scheme in Bihar and Jharkhand are as following:
State Division No. of Name of Stations
Stations
Bihar Asansol 1 Simultala
Danapur 21 Ara, Bakhtiyarpur, Barahiya,State Division No. of Name of Stations
Stations
Barh, Bihar Sharif, Bihiya,
Buxar, Chausa, Dumraon,
Fatuha, Jamui, Jehanabad,
Luckeesarai Jn, Mokama,
Nawadah, Patliputra, Patna Jn,
Raghunathpur., Rajendra Nagar
Terminal (Patna), Rajgir,
Taregna
Dhanbad 1 Paharpur
Katihar 7 Arariya Court, Barsoi Jn,
Katihar Jn, Kishanganj, Labha,
Salmari, Thakurganj
Malda 9 Banka, Bhagalpur, Jamalpur
Jn, Kahalgaon, Munger
(Monghyr), Pirpainti, Sabaur,
Shivanarayanpur, Sultanganj
Pandit Deen 12 Anugraha Narayan Road,
Dayal Bhabua Road, Bikramganj,
Upadhyaya Dehri On Sone, Durgauti, Gaya,
Guraru, Kudra, Nabinagar
Road, Piro, Rafiganj, Sasaram
Samastipur 25 Banmankhi, Bapudham
Motihari, Bettiah, Chakia,
Darbhanga, Dauram
Madhepura, Dholi, Ghorasahan,
Janakpur Road, Jaynagar,
Jhanjharpur, Laheria Sarai,
Madhubani, Motipur,
Muzaffarpur Jn, NarkatiaganjState Division No. of Name of Stations
Stations
Jn, Raxaul, Sagauli, Saharsa,
Sakri, Salauna, Samastipur,
Simri Bakhtiyarpur, Sitamarhi,
Supaul
Sonpur 16 Barauni, Begusarai,
Bhagwanpur, Dalsingh Sarai,
Dighwara, Hajipur Jn,
Karhagola Road, Khagaria Jn,
Lakhminia, Maheshkhunt,
Mansi Jn, Naugachia, Ram
Dayalu Nagar, Sahibpur Kamal,
Shahpur Patoree, Sonpur Jn.
Varanasi 6 Chhapra, Ekma, Mairwa,
Masrakh, Siwan, Thawe
Jharkhand Adra 3 Bhaga, Bokaro Steel City,
Chandil
Asansol 10 Basukinath, Deoghar, Dumka,
Giridih, Jamtara, Jasidih Jn,
Kumardubi, Madhupur Jn,
Sankarpur, Vidyasagar
Chakradharpur 9 Barajamda Jn, Chaibasa,
Chakradharpur, Dangoaposi,
Gamharia, Manoharpur,
Rajkharswan, Sini, Tatanagar
Dhanbad 13 Barkakana, Chandrapura,
Daltonganj, Dhanbad, Garhwa
Road, Garhwa Town,
Hazaribagh Road, Katrasgarh,State Division No. of Name of Stations
Stations
Koderma Jn, Latehar, N.S.C.B.
Jn Gomoh, Nagar Untari,
Parasnath
Howrah 1 Pakur
Kharagpur 1 Ghatsila
Malda 3 Godda, Rajmahal, Sahibganj
Pandit Deen 3 Haidar Nagar, Japla,
Dayal Muhammad Ganj
Upadhyaya
Ranchi 14 Balsiring, Bano, Gangaghat,
Govindpur Road, Hatia,
Lohardaga, Muri Jn, Namkom,
Orga, Piska, Ramgarh Cantt,
Ranchi Jn, Silli, Tatisilwai
Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Bihar and Jharkhand have been taken up at a good pace and the works
have been completed at following stations in Bihar and Jharkhand:
Godda, Govindpur Road, Lohardaga, Madhupur Jn, Muri Jn, Pirpainti, Piska,
Rajmahal, Sahibganj, Sankarpur and Thawe.
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Bihar:
Chausa station: The structural work of new station building has been
completed. The works of circulating area, parking, lift, 6 m Foot OverBridge, brick work and plastering of new station building have been
taken up.
Durgauti station: The works of raising and extension of platform no. 1/2
& 3/4 and toilet block have been completed. The works of improvement
of station building, platform shelter, platform surfacing, improvement of
waiting hall, toilet block, circulating area, parking at main entry side,
landscaping, entry gate, tactile pathway for Divyangjan and 3 m Foot
Over Bridge have been taken up.
Raghunathpur station: The work of station building, circulating area, lift
and 6 m Foot Over Bridge have been taken up.
Barsoi Junction station: The works of dismantling of old quarters and
shifting of utilities have been completed. The works of station building,
circulating area and 12 m Foot Over Bridge have been taken up.
Kishanganj station: The works of platform surfacing at platform no. 1&2,
drinking water taps at platform no. 1&2, improvement of circulating
area, parking at second entry, approach road and boundary wall have
been completed. The works of horticulture and 12 m Foot Over Bridge
have been taken up.
Jharkhand:
Daltonganj station: The works of raising and surfacing of platform no. 1,
2 & 3 and toilet complex have been completed. The works of
improvement of station building, porch, platform shelter, circulating
area, 2-wheeler, 3-wheeler and 4-wheeler parking, approach road,
boundary wall and 12 m Foot Over Bridge have been taken up.
Garhwa Road station: The works of raising and surfacing of platform no.
1, 2 & 3 have been completed. The works of improvement of stationbuilding, porch, platform shelter, toilet complex, 2-wheeler, 3 and 4-
wheeler parking, approach road, boundary wall, entry/exit gate and 12
m Foot Over Bridge have been taken up.
Haidar Nagar station: The works of circulating area at main entry side
and landscaping have been completed. The works of improvement of
station building, platform shelter, platform surfacing, improvement of
waiting hall, toilet block, parking at main entry side, tactile pathway for
Divyangjan and 6 m Foot Over Bridge have been taken up.
Japla station: The works of new station building and landscaping have
been completed. The works of improvement of existing station building,
platform shelter, platform surfacing, improvement of waiting hall, toilet
block, circulating area, parking at main entry side, entry gate and 6 m
Foot Over Bridge have been taken up.
Nagar Untari station: The works of improvement of waiting hall,
platform shelter, platform surfacing, parking, approach road and 12 m
Foot Over Bridge have been taken up.
Amrit Bharat Station Scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master planning
includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water booths
Provision of wider foot over bridge/air concourse commensurate with
passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over platforms Provision of kiosks for local products through schemes like ‘One Station
One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at each
station.
The scheme also envisages sustainable and environment friendly solutions,
provision of ballastless tracks etc. as per necessity, phasing and feasibility
and creation of city centre at the station in the long term.
Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as fire clearance, heritage, tree cutting, airport clearance
etc. The progress also gets affected due to brownfield related challenges
such as shifting of utilities (involving water/sewage lines, optical fibre
cables, gas pipe lines, power/signal cables, etc.), infringements, operation
of trains without hindering passenger movement, speed restrictions due to
works carried out in close proximity of tracks and high voltage power lines,
etc. and these factors affect the completion time.
Proposals / Requests / Suggestions / Representations, both formal and
informal for Railway projects/ works across the country are received on the
basis of demands raised by State Governments, Members of Parliament,
Ministries of Central Government, elected representatives, Railways' own
requirements, organizations / rail users etc., at various levels including
Railway Board, Zonal Railways, Division Office etc. Receipt of such
proposals / requests / suggestions / representations is a continuous and
dynamic process and these are examined and action as found feasible and
justified is taken from time to time.Development / Upgradation / Modernization of stations including Amrit
Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer
Amenities’. The details of allocation and expenditure under Plan Head-53
are maintained Zonal Railway-wise and not work-wise or station-wise or
state-wise.
Bihar is covered under the jurisdiction of four railway zones, namely,
Eastern Railway, East Central Railway, Northeast Frontier Railway and
North Eastern Railway. For these zones, an allocation of ₹ 1,828 crore has
been made for the financial year 2025-26, out of which an expenditure (up
to January, 2026) of ₹ 1,584 crore has been incurred so far.
Jharkhand is covered under the jurisdiction of three railway zones, namely,
Eastern Railway, East Central Railway and South Eastern Railway. For
these zones, an allocation of ₹ 1,469 crore has been made for the financial
year 2025-26, out of which an expenditure (up to January, 2026) of ₹ 1,292
crore has been incurred so far.
*****