See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 1658
TO BE ANSWERED ON 29.07.2026
LACK OF RAIL CONNECTIVITY IN SHRAVASTI, UTTAR PRADESH
†1658. SHRI RAM SHIROMANI VERMA:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government is aware that due to lack of rail connectivity
in Shravasti, an aspirational district of Uttar Pradesh the expected
development in the sector such as tourism, trade, agriculture and
employment sectors has not taken place so far;
(b) if so, the steps taken/being taken by the Government in this regard;
(c) whether any work has been done by the Government for
modernisation of railway stations, expansion of passenger facilities
and development of railway infrastructure in Shravasti Lok Sabha
Constituency during the last five years and if so, the details thereof,
year-wise;
(d) whether any proposals regarding new railway lines, doubling of
railway tracks, electrification or introduction of new rail services
related to said Lok Sabha Constituency are under consideration of the
Government and if so, the details thereof;
(e) whether the Government is formulating any time-bound action plan for
the early implementation of the said projects; and
(f) if so, the details thereof and the time by which it is likely to be
finalised?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): Railway projects are surveyed/sanctioned/executed Zonal Railway-
wise and not State-wise/Region-wise/Constituency-wise as the Railway
projects may span across State boundaries.
§ Page 1 of 14Bahraich-Khalilabad new line project (240 Km) passing through Shravasti
district has been sanctioned at a cost of ₹4,940 crore. An expenditure of
₹1,525 crore has been incurred upto March 2026 and an outlay of ₹686 crore
has been provided for this project for the year 2026-27.
The project has been notified as “Special Railway Project” for acquisition of
land through State Government. Major section-wise progress is as under:
Section Status of works
Khalilabad-Bansi (54 Km) Land acquisition: 246.81 Ha. out of 254.44
Ha. land acquired and balance acquisition
taken up.
Earth Work: 37.03L Cum. out of 61.71L
Cum. earth work completed and further
work taken up.
Major bridge: Work taken up in all 26
major bridges.
RUB: 27 out of 56 RUBs completed and
work taken up in balance.
ROB: Work taken up in all 4 ROBs.
Station building: Work taken up in all 7
station buildings.
Bansi-Ikauna (120 Km) Land acquisition: 48.02 Ha. out of 568.22
Ha. land acquired and balance acquisition
taken up.
Ikauna-Bahraich (66 Km) Land acquisition: 274.17 Ha. out of 329.60
Ha. land acquired and balance acquisition
taken up.
Page 2 of 14Uttar Pradesh
Railway Budget:
Budget allocation for infrastructure projects and safety works, falling
fully/partly in the State of Uttar Pradesh is as under:
Period Outlay
2009-14 ₹1,109 crore/year
2026-27 ₹20,012 crore (More than 18 times)
Track construction:
The details of constructing new tracks falling fully/partly in the State of Uttar
Pradesh are as under:
Period New Track Average Commissioning of
Commissioned new tracks
2009-14 996 Km 199 Km per year
2014-26 5,499 Km 458 Km per year
(More than 2 times)
Projects sanctioned:
As on 01.04.2026, 49 projects (09 New Line, 01 Gauge Conversion and 39
Doubling) of 3,691 Km length, costing ₹62,417 crore falling fully/partly in the
State of Uttar Pradesh are sanctioned. The summary is as under:-
Category No of Total Length Exp
Projects Length Commissioned upto Mar'26
(Km) (Km) (₹ in Cr.)
New Line 09 1,200 365 11,885
Gauge Conversion 01 11 0 27
Doubling/ 39 2,480 985 21,631
Multitracking
Total 49 3,691 1,350 33,543
Page 3 of 14Recently completed projects:
Details of some of the recently completed projects falling fully/partly in the
State of Uttar Pradesh are as under:
SN. Project Cost
(₹ in Cr.)
1 Meerut-Muzaffarnagar Doubling (55 Km) 430
2 Bahraich-Nepal Ganj Gauge Conversion (56 Km) 342
3 Ballia-Ghazipur City Doubling (65 Km) 650
4 Ghazipur City-Tarighat New Line (17 Km) 1,766
5 Gonda-Gorakhpur Loop Gauge Conversion 863
(260 Km)
6 Gonda-Bahraich Gauge Conversion (60 Km) 318
7 Barabanki-Akbarpur Doubling (161 Km) 1,700
8 Kaptanganj- Chhapra Gauge Conversion (234 Km) 819
9 Pilibhit-Shahjahanpur Gauge Conversion (83 Km) 589
10 Indara-Dohrighat Gauge Conversion (34 Km) 213
11 Lucknow-Pilibhit Gauge Conversion (263 Km) 1,634
12 Bhadoi-Janghai Doubling (31 Km) 168
13 Lahota-Bhadoi Doubling (39 Km) 184
14 Etawah-Mainpuri New Line (58 Km) 313
15 Phaphamau-Prayagraj Doubling (14 Km) 212
16 Muzaffarnagar-Tapri Doubling (52 Km) 525
17 Utretia-Raibareilly Doubling (66 Km) 662
18 Raibareilly-Amethi Doubling (60 Km) 668
19 Alamnagar-Utretia Doubling (20 Km) 358
20 Bhimsen-Jhansi Doubling (206 Km) 2,620
21 Domingarh-Kusumhi 3rd Line and Gorakhpur- 508
Nakaha Jungle Doubling (21 Km)
22 Malhaur-Daliganj Doubling (13 Km) 183
23 Ruma Chakeri-Chandari 3rd Line (13 Km) 177
24 Bareilly-Tanakpur Gauge Conversion (102 Km) 313
25 Rosa- Burhwal Doubling (181 Km) 2,094
26 Jaunpur- Akbarpur Doubling (77 Km) 676
27 Ramna-Singrauli Doubling (160 Km) 2,436
28 Janghai-Phaphamau Doubling (47 Km) 414
29 Varanasi-Prayagraj Doubling (120 Km) 2,018
30 Karaila Road-Shaktinagar Doubling (32 Km) 763
Page 4 of 1431 Deoband-Roorkee New Line (27 Km) 1,289
32 Agra-Etawah New Line(110 Km) 427
33 Phephna-Indara, Mau-Shahganj Doubling (150 Km) 1,778
34 Janghai-Pratapgarh-Amethi Doubling (87 km) 1,429
35 Burhwal-Gonda 3rd Line (62 Km) 1,308
Ongoing projects:
Some of the projects falling fully/partly in the State of Uttar Pradesh which
have been taken up are as under:
SN Project Cost
(₹ in Cr.)
1 Barabanki-Burhwal 3rd Line (27 Km) 426
2 Burhwal-Gonda Kacheri 4th line (56 Km) 796
3 Bahraich-Khalilabad New Line (240 Km) 4,940
4 Katra-Ayodhya Dham Doubling (10 Km) 466
5 Pt. Deen Dayal Upadhyaya-Prayagraj 3rd Line 2,649
(150 Km)
6 Billi-Chunar Doubling (102 Km) 1,424
7 Chhapra-Ballia Doubling (65 Km) 1,046
8 Etah-Kasganj New Line ( 29 Km) 389
9 Gorakhpur-Valmikinagar Doubling (96 Km) 1,121
10 Varanasi-Pt. Deen Dayal Upadhyaya 3rd and 4th Line 2,464
(15 Km)
11 Jhansi- Manikpur & Khairar-Bhimsen Doubling 4,330
(431 Km)
12 Sahjanwa-Dohrighat New Line (81 Km) 1,320
13 Prayagraj (Iradatganj)-Manikpur 3rd Line (84 Km) 1,508
14 Bhatni-Aunrihar Doubling (117 Km) 2,529
15 Mathura-Jhansi 3rd line (274 Km) 5,961
16 Agra Fort-Bandikui Doubling (150 Km) 988
17 Barabanki-Malhaur 3rd & 4th Line (33 Km) 450
18 Phaphamau-Unchahar Doubling (72 Km) 899
19 Aunrihar-Varanasi City 3rd Line (31 Km) 497
20 Ghaziabad-Sitapur 3rd & 4th line (403 Km) 14,926
21 Nagda-Mathura 3rd & 4th line (568 Km) 16,403
22 Burhwal-Sitapur City 3rd & 4th line (103 Km) 2,276
Page 5 of 14Completion of Railway project/s depends on various factors which include the
following:
Land acquisition
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
Electrification:
Electrification of railway network on Indian Railways has been taken up in
mission mode. So far, about 99.6% of Broad Gauge (BG) network has been
electrified. The electrification in remaining network has been taken up.
Electrification carried out during 2014-26 and before 2014 is as under:
Period Route Kilometer
Before 2014 (about 60 years) 21,801
2014-2026 48,072
In Uttar Pradesh, entire existing BG network has been electrified. Further, all
new line/multi-tracking projects are being sanctioned and constructed with
electrification.
Train Services:
Indian Railways (IR) constantly endeavours to improve connectivity and
facilitate travelling passengers and to this end the following have been
undertaken during 2025-26 and 2026-27 (upto June, 2026) which inter alia
caters to the needs of passengers of Balrampur, Tulsipur, Kauwapur and
Gainsari:
1. Introduction of 55061/55062 Nakaha Jungle-Aishbagh Passenger w.e.f.
26.05.2026 with stoppages at Balrampur, Tulsipur, Kauwapur and
Gainsari.
Page 6 of 142. Introduction of 14663/14664 New Jalpaiguri-Amritsar Amrit Bharat
Express w.e.f. 14.05.2026 with stoppage at Balrampur.
In addition, it has been decided to introduce 14045/14046 Gorakhpur-Delhi
Amrit Bharat Express with stoppage at Balrampur and to extend 13507/13508
Asansol-Gorakhpur Express upto Balrampur with stoppage at Tulsipur.
At present, Balrampur which is a major station located in Shravasti Lok Sabha
Constituency is served by 26 train services providing connectivity inter alia to
destinations like Delhi, Mumbai, Lucknow, Gorakhpur, Amritsar, etc.
Similarly, Tulsipur, Kauwapur and Gainsari stations are served by 22 train
services, 08 train services and 08 train services respectively. Lists of trains
serving these stations are as under:
Trains Serving Balrampur station:
SN Train No. and Name
1 14663 New Jalpaiguri-Amritsar Amrit Bharat Express
2 14664 Amritsar-New Jalpaiguri Amrit Bharat Express
3 11079 Lokmanya Tilak (T)-Gorakhpur Express
4 11080 Gorakhpur-Lokmanya Tilak (T) Express
5 12571 Gorakhpur-Anand Vihar (T) Express
6 12572 Anand Vihar (T)-Gorakhpur Express
7 15009 Gorakhpur-Izzatnagar Express
8 15010 Izzatnagar-Gorakhpur Express
9 15065 Gorakhpur-Panvel Express
10 15066 Panvel-Gorakhpur Express
11 15067 Gorakhpur-Bandra (T) Express
12 15068 Bandra (T)-Gorakhpur Express
13 15069 Gorakhpur-Aishbagh Express
14 15070 Aishbagh-Gorakhpur Express
15 15081 Gorakhpur-Gomti Nagar Express
16 15082 Gomti Nagar-Gorakhpur Express
17 15705 Katihar-Delhi Express
18 15706 Delhi Jn.-Katihar Express
19 22199 Gwalior-Balrampur Express
Page 7 of 1420 22200 Balrampur-Gwalior Express
21 22921 Bandra (T)-Gorakhpur Express
22 22922 Gorakhpur-Bandra (T) Express
23 55061 Nakaha Jungle-Aishbagh Passenger
24 55062 Aishbagh-Nakaha Jungle Passenger
25 75107 Nakaha Jungle-Gonda DEMU
26 75108 Gonda-Nakaha Jungle DEMU
Trains serving Tulsipur station:
SN Train No. and Name
1 11079 Lokmanya Tilak (T)-Gorakhpur Express
2 11080 Gorakhpur-Lokmanya Tilak (T) Express
3 12571 Gorakhpur -Anand Vihar (T) Express
4 12572 Anand Vihar (T)-Gorakhpur Express
5 15009 Gorakhpur-Izzatnagar Express
6 15010 Izzatnagar-Gorakhpur Express
7 15065 Gorakhpur-Panvel Express
8 15066 Panvel-Gorakhpur Express
9 15067 Gorakhpur-Bandra (T) Express
10 15068 Bandra (T)-Gorakhpur Express
11 15069 Gorakhpur-Aishbagh Express
12 15070 Aishbagh-Gorakhpur Express
13 15081 Gorakhpur-Gomti Nagar Express
14 15082 Gomti Nagar-Gorakhpur Express
15 15705 Katihar-Delhi Express
16 15706 Delhi-Katihar Express
17 22921 Bandra (T)-Gorakhpur Express
18 22922 Gorakhpur-Bandra (T) Express
19 75107 Nakaha Jungle-Gonda DEMU
20 75108 Gonda-Nakaha Jungle DEMU
21 55061 Nakaha Jungle-Aishbagh Passenger
22 55062 Aishbagh-Nakaha Jungle Passenger
Trains serving Kauwapur station:
SN Train No. and Name
1 11079 Lokmanya Tilak (T)-Gorakhpur Express
2 11080 Gorakhpur-Lokmanya Tilak (T) Express
3 15067 Gorakhpur-Bandra (T) Express
4 15068 Bandra (T)-Gorakhpur Express
5 55061 Nakaha Jungle-Aishbagh Passenger
6 55062 Aishbagh-Nakaha Jungle Passenger
7 75107 Nakaha Jungle-Gonda DEMU
8 75108 Gonda-Nakaha Jungle DEMU
Page 8 of 14Trains serving Gainsari station:
SN Train No. and Name
1 11079 Lokmanya Tilak (T)-Gorakhpur Express
2 11080 Gorakhpur-Lokmanya Tilak (T) Express
3 15067 Gorakhpur-Bandra (T) Express
4 15068 Bandra (T)-Gorakhpur Express
5 75107 Nakaha Jungle-Gonda DEMU
6 75108 Gonda-Nakaha Jungle DEMU
7 55061 Nakaha Jungle-Aishbagh Passenger
8 55062 Aishbagh-Nakaha Jungle Passenger
Besides, introduction of new train services, which is an on-going process,
depends on various factors which include-
Capacity of that section
Availability of path
Availability of required rolling stock
Availability of matching infrastructure for rolling stock
Maintenance requirement of railway tracks and other assets.
Occupancy and the traffic requirement of the section.
Amrit Bharat Stations:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations of Indian Railways. The master planning,
keeping in view the necessity of each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Page 9 of 14 Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One Station
One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at the
station in the long term.
So far, 1,340 stations have been identified for development under this
scheme, out of which 157 stations, including Balrampur and Tulsipur
stations of Shravasti Lok Sabha Constituency, are located in Uttar
Pradesh. The names of stations identified for development under Amrit
Bharat Station Scheme in Uttar Pradesh are as following:
No. of Name of Stations
State
Stations
Uttar 157 Achnera, Agra Cantt., Agra Fort, Aishbagh Jn,
Pradesh Akbarpur Jn, Aligarh, Amethi, Amroha, Anand
Nagar Jn., Aonla, Ayodhya Dham Junction,
Azamgarh, Babatpur, Bachhrawan, Badaun,
Badshahnagar, Badshahpur, Baheri, Bahraich,
Balamau Jn., Ballia, Balrampur, Banaras,
Banda, Barabanki Jn, Bareilly, Bareilly City,
Barhni, Basti, Belthara Road, Bhadohi,
Bharatkund, Bhatni, Bhuteshwar, Bijnor,
Bulandsahar, Chandauli Majhwar, Chandausi,
Chilbila, Chitrakut dham karwi, Chopan,
Chunar Jn., Daliganj, Darshannagar, Deoria
Sadar, Dhampur, Dildarnagar, Etawah Jn.,
Farrukhabad, Fatehabad, Fatehpur, Fatehpur
Page 10 of 14No. of Name of Stations
State
Stations
Sikri, Firozabad, Gajraula, Garhmuktesar,
Gauriganj, Ghatampur, Ghaziabad, Ghazipur
City, Gola Gokarnath, Gomtinagar, Gonda,
Gorakhpur, Govardhan, Govindpuri,
Gursahaiganj, Haidergarh, Hapur, Hardoi,
Hathras City, Idgah Agra Jn, Izzatnagar,
Janghai Jn, Jaunpur City, Jaunpur Jn,
Kannauj, Kanpur Anwarganj, Kanpur Bridge
Left Bank, Kanpur Central, Kaptanganj Jn,
Kasganj Jn, Kashi, Khalilabad, Khorason
road, Khurja Jn., Kosi Kalan, Kunda
Harnamganj, Lakhimpur, Lalganj, Lalitpur Jn,
Lambhua, Lohta, Lucknow (Charbagh) NR,
Lucknow city, Lucknow Jn. (NER), Maa Belha
Devi Pratapgarh Junction, Maghar, Maharaja
Bijli Pasi, Mahoba Jn, Mailani Jn, Mainpuri Jn,
Malhaur, Manak Nagar, Manikpur Jn, Mariahu,
Mathura Jn, Mau Jn, Meerut City Jn,
Mirzapur, Modinagar, Mohanlalganj,
Moradabad Jn, Muzaffarnagar, Nagina,
Najibabad Jn, Orai, Panki Dham, Phaphamau
Jn, Phulpur, Pilibhit Jn, Pokhrayan, Prayag
Jn, Prayagraj Jn, Pt. Deen Dayal Upadhyay Jn
, Rae Bareli Jn, Raja Ki Mandi, Ramghat Halt,
Rampur Jn, Renukoot, Saharanpur Jn.,
Salempur, Seohara, Shahganj Jn,
Shahjahanpur, Shamli, Shikohabad Jn.,
Shivpur, Siddharth nagar, Sitapur Jn.,
Sonbhadra, Sri Krishna Nagar, Sultanpur Jn,
Suraimanpur, Swaminarayan Chappia, Takia,
Tulsipur, Tundla Jn., Ujhani, Unchahar, Unnao
Jn, Utraitia Jn, Varanasi Cantt., Varanasi
City, Vindhyachal, Virangana Lakshmibai
Jhansi, Vyasnagar, Zafarabad
Page 11 of 14Completed Stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Uttar Pradesh have been taken up at a good pace. Details of stations
completed in Uttar Pradesh are as under:
State No. of Name of stations
stations
Uttar 38 Aishbagh Junction, Ayodhya Dham Junction,
Pradesh Bachhrawan, Baheri, Balrampur, Bareilly City,
Bijnor, Chunar Junction, Daliganj, Dhampur,
Fatehabad, Fatehpur, Gauriganj, Gola
Gokarnath, Gomtinagar, Govardhan, Govindpuri,
Hathras City, Idgah Agra Junction, Izzatnagar,
Khalilabad, Mailani Junction, Modinagar,
Mohanlalganj, Orai, Panki Dham, Phaphamau
Junction, Pokhrayan, Prayag Junction, Ramghat
Halt, Saharanpur Junction, Salempur, Shamli,
Siddharth Nagar, Suraimanpur, Swaminarayan
Chappia, Ujhani, Vindhyachal
Shravasti Lok Sabha Constituency:
The activities for development of stations under Amrit Bharat Station
Scheme in Shravasti Lok Sabha Constituency have been taken up at good
pace and the progress of the stations is as given below:
Balrampur station: The development works have been completed.
Tulsipur station: The works of improvement of station building,
entrance porch, improvement of circulating area, parking area,
improvement of waiting room, toilet, platform shelter and signages
have been completed. The work of amenities for Divyangjan has been
taken up.
The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Page 12 of 14 Lucknow (Charbagh) NR station: The structural work of new station
building at second entry has been completed. The finishing work of
new station building, concourse,10 m wide foot over bridge,
development of circulating area at second entry and improvement of
circulating area at main entry have been taken up.
Gorakhpur station: The structural works of multi level car parking,
commercial block, new laundry and electrical substation have been
completed. The structural works of main station building, second
entry station building and foot over bridge, finishing works for
multi-level car parking, commercial block, new laundry and electrical
substation have been taken up.
Deoria Sadar station: The works for improvement of waiting hall,
retiring room, dormitory, parking, improvement of circulating area,
entry/ exit gates and platform shelters have been completed. The
works of new station building, entrance porch, 12 m wide foot over
bridge, lift, escalator, improvement of Pay & Use toilet and amenities
for Divyangjan have been taken up.
Bhatni station: The works of improvement of station building,
entrance porch, improvement of circulating area and parking have
been completed. The works of improvement of platform surface,
platform shelter and amenities for Divyangjan have been taken up.
Basti station: The works for improvement of station building,
improvement of circulating area, parking, waiting hall, toilets,
improvement of platform surface, platform shelters, new entrance
porch, new Pay & Use toilet block and landscaping have been
completed. The works of lighting and signages have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways, is a continuous and ongoing process and
works in this regard are undertaken as per requirement, subject to inter-se
Page 13 of 14priority and availability of funds. Development / redevelopment /
upgradation/modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
Development/Upgradation of railway stations is a complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as tree cutting, heritage, fire clearance, airport clearance
etc. These stations are in operation since long, so brownfield work
challenges are being faced, such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipelines, power/signal
cables, etc.), infringements, operation of trains without hindering
passenger movement, speed restrictions due to works carried out in close
proximity of the tracks and near to high voltage power lines, etc. and these
factors affect the progress of work and completion time.
Development/upgradation/modernisation of stations including under Amrit
Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer
Amenities’. The details of allocation and expenditure under Plan Head-53
are maintained Zonal Railway-wise and not station-wise or state-wise.
Uttar Pradesh is covered under the jurisdiction of five railway zones,
namely, East Central Railway, North Central Railway, Northern Railway,
North Eastern Railway, and West Central Railway. For these zones, an
allocation of ₹17,973 crore has been made for the last five financial years
and current year, out of which an expenditure (up to June, 2026) of
₹13,624 crore has been incurred so far.
*****
Page 14 of 14