Home India Ministry of Railways Parliament Question: Lack of Rail Connectivity in Shravasti,...
Date: 2026-07-29 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Lack of Rail Connectivity in Shravasti, Uttar Pradesh

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 1658 TO BE ANSWERED ON 29.07.2026 LACK OF RAIL CONNECTIVITY IN SHRAVASTI, UTTAR PRADESH †1658. SHRI RAM SHIROMANI VERMA: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government is aware that due to lack of rail connectivity in Shravasti, an aspirational district of Uttar Pradesh the expected development in the sector such as tourism, trade, agriculture and employment sectors has not taken place so far; (b) if so, the steps taken/being taken by the Government in this regard; (c) whether any work has been done by the Government for modernisation of railway stations, expansion of passenger facilities and development of railway infrastructure in Shravasti Lok Sabha Constituency during the last five years and if so, the details thereof, year-wise; (d) whether any proposals regarding new railway lines, doubling of railway tracks, electrification or introduction of new rail services related to said Lok Sabha Constituency are under consideration of the Government and if so, the details thereof; (e) whether the Government is formulating any time-bound action plan for the early implementation of the said projects; and (f) if so, the details thereof and the time by which it is likely to be finalised? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (f): Railway projects are surveyed/sanctioned/executed Zonal Railway- wise and not State-wise/Region-wise/Constituency-wise as the Railway projects may span across State boundaries. § Page 1 of 14Bahraich-Khalilabad new line project (240 Km) passing through Shravasti district has been sanctioned at a cost of ₹4,940 crore. An expenditure of ₹1,525 crore has been incurred upto March 2026 and an outlay of ₹686 crore has been provided for this project for the year 2026-27. The project has been notified as “Special Railway Project” for acquisition of land through State Government. Major section-wise progress is as under: Section Status of works Khalilabad-Bansi (54 Km) Land acquisition: 246.81 Ha. out of 254.44 Ha. land acquired and balance acquisition taken up. Earth Work: 37.03L Cum. out of 61.71L Cum. earth work completed and further work taken up. Major bridge: Work taken up in all 26 major bridges. RUB: 27 out of 56 RUBs completed and work taken up in balance. ROB: Work taken up in all 4 ROBs. Station building: Work taken up in all 7 station buildings. Bansi-Ikauna (120 Km) Land acquisition: 48.02 Ha. out of 568.22 Ha. land acquired and balance acquisition taken up. Ikauna-Bahraich (66 Km) Land acquisition: 274.17 Ha. out of 329.60 Ha. land acquired and balance acquisition taken up. Page 2 of 14Uttar Pradesh Railway Budget: Budget allocation for infrastructure projects and safety works, falling fully/partly in the State of Uttar Pradesh is as under: Period Outlay 2009-14 ₹1,109 crore/year 2026-27 ₹20,012 crore (More than 18 times) Track construction: The details of constructing new tracks falling fully/partly in the State of Uttar Pradesh are as under: Period New Track Average Commissioning of Commissioned new tracks 2009-14 996 Km 199 Km per year 2014-26 5,499 Km 458 Km per year (More than 2 times) Projects sanctioned: As on 01.04.2026, 49 projects (09 New Line, 01 Gauge Conversion and 39 Doubling) of 3,691 Km length, costing ₹62,417 crore falling fully/partly in the State of Uttar Pradesh are sanctioned. The summary is as under:- Category No of Total Length Exp Projects Length Commissioned upto Mar'26 (Km) (Km) (₹ in Cr.) New Line 09 1,200 365 11,885 Gauge Conversion 01 11 0 27 Doubling/ 39 2,480 985 21,631 Multitracking Total 49 3,691 1,350 33,543 Page 3 of 14Recently completed projects: Details of some of the recently completed projects falling fully/partly in the State of Uttar Pradesh are as under: SN. Project Cost (₹ in Cr.) 1 Meerut-Muzaffarnagar Doubling (55 Km) 430 2 Bahraich-Nepal Ganj Gauge Conversion (56 Km) 342 3 Ballia-Ghazipur City Doubling (65 Km) 650 4 Ghazipur City-Tarighat New Line (17 Km) 1,766 5 Gonda-Gorakhpur Loop Gauge Conversion 863 (260 Km) 6 Gonda-Bahraich Gauge Conversion (60 Km) 318 7 Barabanki-Akbarpur Doubling (161 Km) 1,700 8 Kaptanganj- Chhapra Gauge Conversion (234 Km) 819 9 Pilibhit-Shahjahanpur Gauge Conversion (83 Km) 589 10 Indara-Dohrighat Gauge Conversion (34 Km) 213 11 Lucknow-Pilibhit Gauge Conversion (263 Km) 1,634 12 Bhadoi-Janghai Doubling (31 Km) 168 13 Lahota-Bhadoi Doubling (39 Km) 184 14 Etawah-Mainpuri New Line (58 Km) 313 15 Phaphamau-Prayagraj Doubling (14 Km) 212 16 Muzaffarnagar-Tapri Doubling (52 Km) 525 17 Utretia-Raibareilly Doubling (66 Km) 662 18 Raibareilly-Amethi Doubling (60 Km) 668 19 Alamnagar-Utretia Doubling (20 Km) 358 20 Bhimsen-Jhansi Doubling (206 Km) 2,620 21 Domingarh-Kusumhi 3rd Line and Gorakhpur- 508 Nakaha Jungle Doubling (21 Km) 22 Malhaur-Daliganj Doubling (13 Km) 183 23 Ruma Chakeri-Chandari 3rd Line (13 Km) 177 24 Bareilly-Tanakpur Gauge Conversion (102 Km) 313 25 Rosa- Burhwal Doubling (181 Km) 2,094 26 Jaunpur- Akbarpur Doubling (77 Km) 676 27 Ramna-Singrauli Doubling (160 Km) 2,436 28 Janghai-Phaphamau Doubling (47 Km) 414 29 Varanasi-Prayagraj Doubling (120 Km) 2,018 30 Karaila Road-Shaktinagar Doubling (32 Km) 763 Page 4 of 1431 Deoband-Roorkee New Line (27 Km) 1,289 32 Agra-Etawah New Line(110 Km) 427 33 Phephna-Indara, Mau-Shahganj Doubling (150 Km) 1,778 34 Janghai-Pratapgarh-Amethi Doubling (87 km) 1,429 35 Burhwal-Gonda 3rd Line (62 Km) 1,308 Ongoing projects: Some of the projects falling fully/partly in the State of Uttar Pradesh which have been taken up are as under: SN Project Cost (₹ in Cr.) 1 Barabanki-Burhwal 3rd Line (27 Km) 426 2 Burhwal-Gonda Kacheri 4th line (56 Km) 796 3 Bahraich-Khalilabad New Line (240 Km) 4,940 4 Katra-Ayodhya Dham Doubling (10 Km) 466 5 Pt. Deen Dayal Upadhyaya-Prayagraj 3rd Line 2,649 (150 Km) 6 Billi-Chunar Doubling (102 Km) 1,424 7 Chhapra-Ballia Doubling (65 Km) 1,046 8 Etah-Kasganj New Line ( 29 Km) 389 9 Gorakhpur-Valmikinagar Doubling (96 Km) 1,121 10 Varanasi-Pt. Deen Dayal Upadhyaya 3rd and 4th Line 2,464 (15 Km) 11 Jhansi- Manikpur & Khairar-Bhimsen Doubling 4,330 (431 Km) 12 Sahjanwa-Dohrighat New Line (81 Km) 1,320 13 Prayagraj (Iradatganj)-Manikpur 3rd Line (84 Km) 1,508 14 Bhatni-Aunrihar Doubling (117 Km) 2,529 15 Mathura-Jhansi 3rd line (274 Km) 5,961 16 Agra Fort-Bandikui Doubling (150 Km) 988 17 Barabanki-Malhaur 3rd & 4th Line (33 Km) 450 18 Phaphamau-Unchahar Doubling (72 Km) 899 19 Aunrihar-Varanasi City 3rd Line (31 Km) 497 20 Ghaziabad-Sitapur 3rd & 4th line (403 Km) 14,926 21 Nagda-Mathura 3rd & 4th line (568 Km) 16,403 22 Burhwal-Sitapur City 3rd & 4th line (103 Km) 2,276 Page 5 of 14Completion of Railway project/s depends on various factors which include the following:  Land acquisition  Forest clearance  Shifting of infringing utilities  Statutory clearances from various authorities  Geological and topographical conditions of area  Law and order situation in the area of project site  Number of working months in a year for particular project site etc. Electrification: Electrification of railway network on Indian Railways has been taken up in mission mode. So far, about 99.6% of Broad Gauge (BG) network has been electrified. The electrification in remaining network has been taken up. Electrification carried out during 2014-26 and before 2014 is as under: Period Route Kilometer Before 2014 (about 60 years) 21,801 2014-2026 48,072 In Uttar Pradesh, entire existing BG network has been electrified. Further, all new line/multi-tracking projects are being sanctioned and constructed with electrification. Train Services: Indian Railways (IR) constantly endeavours to improve connectivity and facilitate travelling passengers and to this end the following have been undertaken during 2025-26 and 2026-27 (upto June, 2026) which inter alia caters to the needs of passengers of Balrampur, Tulsipur, Kauwapur and Gainsari: 1. Introduction of 55061/55062 Nakaha Jungle-Aishbagh Passenger w.e.f. 26.05.2026 with stoppages at Balrampur, Tulsipur, Kauwapur and Gainsari. Page 6 of 142. Introduction of 14663/14664 New Jalpaiguri-Amritsar Amrit Bharat Express w.e.f. 14.05.2026 with stoppage at Balrampur. In addition, it has been decided to introduce 14045/14046 Gorakhpur-Delhi Amrit Bharat Express with stoppage at Balrampur and to extend 13507/13508 Asansol-Gorakhpur Express upto Balrampur with stoppage at Tulsipur. At present, Balrampur which is a major station located in Shravasti Lok Sabha Constituency is served by 26 train services providing connectivity inter alia to destinations like Delhi, Mumbai, Lucknow, Gorakhpur, Amritsar, etc. Similarly, Tulsipur, Kauwapur and Gainsari stations are served by 22 train services, 08 train services and 08 train services respectively. Lists of trains serving these stations are as under: Trains Serving Balrampur station: SN Train No. and Name 1 14663 New Jalpaiguri-Amritsar Amrit Bharat Express 2 14664 Amritsar-New Jalpaiguri Amrit Bharat Express 3 11079 Lokmanya Tilak (T)-Gorakhpur Express 4 11080 Gorakhpur-Lokmanya Tilak (T) Express 5 12571 Gorakhpur-Anand Vihar (T) Express 6 12572 Anand Vihar (T)-Gorakhpur Express 7 15009 Gorakhpur-Izzatnagar Express 8 15010 Izzatnagar-Gorakhpur Express 9 15065 Gorakhpur-Panvel Express 10 15066 Panvel-Gorakhpur Express 11 15067 Gorakhpur-Bandra (T) Express 12 15068 Bandra (T)-Gorakhpur Express 13 15069 Gorakhpur-Aishbagh Express 14 15070 Aishbagh-Gorakhpur Express 15 15081 Gorakhpur-Gomti Nagar Express 16 15082 Gomti Nagar-Gorakhpur Express 17 15705 Katihar-Delhi Express 18 15706 Delhi Jn.-Katihar Express 19 22199 Gwalior-Balrampur Express Page 7 of 1420 22200 Balrampur-Gwalior Express 21 22921 Bandra (T)-Gorakhpur Express 22 22922 Gorakhpur-Bandra (T) Express 23 55061 Nakaha Jungle-Aishbagh Passenger 24 55062 Aishbagh-Nakaha Jungle Passenger 25 75107 Nakaha Jungle-Gonda DEMU 26 75108 Gonda-Nakaha Jungle DEMU Trains serving Tulsipur station: SN Train No. and Name 1 11079 Lokmanya Tilak (T)-Gorakhpur Express 2 11080 Gorakhpur-Lokmanya Tilak (T) Express 3 12571 Gorakhpur -Anand Vihar (T) Express 4 12572 Anand Vihar (T)-Gorakhpur Express 5 15009 Gorakhpur-Izzatnagar Express 6 15010 Izzatnagar-Gorakhpur Express 7 15065 Gorakhpur-Panvel Express 8 15066 Panvel-Gorakhpur Express 9 15067 Gorakhpur-Bandra (T) Express 10 15068 Bandra (T)-Gorakhpur Express 11 15069 Gorakhpur-Aishbagh Express 12 15070 Aishbagh-Gorakhpur Express 13 15081 Gorakhpur-Gomti Nagar Express 14 15082 Gomti Nagar-Gorakhpur Express 15 15705 Katihar-Delhi Express 16 15706 Delhi-Katihar Express 17 22921 Bandra (T)-Gorakhpur Express 18 22922 Gorakhpur-Bandra (T) Express 19 75107 Nakaha Jungle-Gonda DEMU 20 75108 Gonda-Nakaha Jungle DEMU 21 55061 Nakaha Jungle-Aishbagh Passenger 22 55062 Aishbagh-Nakaha Jungle Passenger Trains serving Kauwapur station: SN Train No. and Name 1 11079 Lokmanya Tilak (T)-Gorakhpur Express 2 11080 Gorakhpur-Lokmanya Tilak (T) Express 3 15067 Gorakhpur-Bandra (T) Express 4 15068 Bandra (T)-Gorakhpur Express 5 55061 Nakaha Jungle-Aishbagh Passenger 6 55062 Aishbagh-Nakaha Jungle Passenger 7 75107 Nakaha Jungle-Gonda DEMU 8 75108 Gonda-Nakaha Jungle DEMU Page 8 of 14Trains serving Gainsari station: SN Train No. and Name 1 11079 Lokmanya Tilak (T)-Gorakhpur Express 2 11080 Gorakhpur-Lokmanya Tilak (T) Express 3 15067 Gorakhpur-Bandra (T) Express 4 15068 Bandra (T)-Gorakhpur Express 5 75107 Nakaha Jungle-Gonda DEMU 6 75108 Gonda-Nakaha Jungle DEMU 7 55061 Nakaha Jungle-Aishbagh Passenger 8 55062 Aishbagh-Nakaha Jungle Passenger Besides, introduction of new train services, which is an on-going process, depends on various factors which include-  Capacity of that section  Availability of path  Availability of required rolling stock  Availability of matching infrastructure for rolling stock  Maintenance requirement of railway tracks and other assets.  Occupancy and the traffic requirement of the section. Amrit Bharat Stations: Ministry of Railways has launched Amrit Bharat Station Scheme for redevelopment of stations with a long-term approach. The scheme involves preparation of master plans and their implementation in phases to improve the stations of Indian Railways. The master planning, keeping in view the necessity of each station, includes:  Improvement of access to station and circulating areas  Integration of station with both sides of city  Improvement of station building  Improvement of waiting halls, toilets, sitting arrangement, water booths  Provision of wider foot over bridge/subway to commensurate with passenger traffic Page 9 of 14 Provision of lifts/escalators/ramps  Improvement of platform surface/ provision of platform shelter  Provision of kiosks for local products through schemes like ‘One Station One Product’  Parking development  Amenities for Divyangjans  Better passenger information systems  Provision of air concourse, executive lounges, Multimodal integration, landscaping, etc. The scheme also envisages sustainable and environment friendly solutions etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. So far, 1,340 stations have been identified for development under this scheme, out of which 157 stations, including Balrampur and Tulsipur stations of Shravasti Lok Sabha Constituency, are located in Uttar Pradesh. The names of stations identified for development under Amrit Bharat Station Scheme in Uttar Pradesh are as following: No. of Name of Stations State Stations Uttar 157 Achnera, Agra Cantt., Agra Fort, Aishbagh Jn, Pradesh Akbarpur Jn, Aligarh, Amethi, Amroha, Anand Nagar Jn., Aonla, Ayodhya Dham Junction, Azamgarh, Babatpur, Bachhrawan, Badaun, Badshahnagar, Badshahpur, Baheri, Bahraich, Balamau Jn., Ballia, Balrampur, Banaras, Banda, Barabanki Jn, Bareilly, Bareilly City, Barhni, Basti, Belthara Road, Bhadohi, Bharatkund, Bhatni, Bhuteshwar, Bijnor, Bulandsahar, Chandauli Majhwar, Chandausi, Chilbila, Chitrakut dham karwi, Chopan, Chunar Jn., Daliganj, Darshannagar, Deoria Sadar, Dhampur, Dildarnagar, Etawah Jn., Farrukhabad, Fatehabad, Fatehpur, Fatehpur Page 10 of 14No. of Name of Stations State Stations Sikri, Firozabad, Gajraula, Garhmuktesar, Gauriganj, Ghatampur, Ghaziabad, Ghazipur City, Gola Gokarnath, Gomtinagar, Gonda, Gorakhpur, Govardhan, Govindpuri, Gursahaiganj, Haidergarh, Hapur, Hardoi, Hathras City, Idgah Agra Jn, Izzatnagar, Janghai Jn, Jaunpur City, Jaunpur Jn, Kannauj, Kanpur Anwarganj, Kanpur Bridge Left Bank, Kanpur Central, Kaptanganj Jn, Kasganj Jn, Kashi, Khalilabad, Khorason road, Khurja Jn., Kosi Kalan, Kunda Harnamganj, Lakhimpur, Lalganj, Lalitpur Jn, Lambhua, Lohta, Lucknow (Charbagh) NR, Lucknow city, Lucknow Jn. (NER), Maa Belha Devi Pratapgarh Junction, Maghar, Maharaja Bijli Pasi, Mahoba Jn, Mailani Jn, Mainpuri Jn, Malhaur, Manak Nagar, Manikpur Jn, Mariahu, Mathura Jn, Mau Jn, Meerut City Jn, Mirzapur, Modinagar, Mohanlalganj, Moradabad Jn, Muzaffarnagar, Nagina, Najibabad Jn, Orai, Panki Dham, Phaphamau Jn, Phulpur, Pilibhit Jn, Pokhrayan, Prayag Jn, Prayagraj Jn, Pt. Deen Dayal Upadhyay Jn , Rae Bareli Jn, Raja Ki Mandi, Ramghat Halt, Rampur Jn, Renukoot, Saharanpur Jn., Salempur, Seohara, Shahganj Jn, Shahjahanpur, Shamli, Shikohabad Jn., Shivpur, Siddharth nagar, Sitapur Jn., Sonbhadra, Sri Krishna Nagar, Sultanpur Jn, Suraimanpur, Swaminarayan Chappia, Takia, Tulsipur, Tundla Jn., Ujhani, Unchahar, Unnao Jn, Utraitia Jn, Varanasi Cantt., Varanasi City, Vindhyachal, Virangana Lakshmibai Jhansi, Vyasnagar, Zafarabad Page 11 of 14Completed Stations: Development works at railway stations under Amrit Bharat Station Scheme in Uttar Pradesh have been taken up at a good pace. Details of stations completed in Uttar Pradesh are as under: State No. of Name of stations stations Uttar 38 Aishbagh Junction, Ayodhya Dham Junction, Pradesh Bachhrawan, Baheri, Balrampur, Bareilly City, Bijnor, Chunar Junction, Daliganj, Dhampur, Fatehabad, Fatehpur, Gauriganj, Gola Gokarnath, Gomtinagar, Govardhan, Govindpuri, Hathras City, Idgah Agra Junction, Izzatnagar, Khalilabad, Mailani Junction, Modinagar, Mohanlalganj, Orai, Panki Dham, Phaphamau Junction, Pokhrayan, Prayag Junction, Ramghat Halt, Saharanpur Junction, Salempur, Shamli, Siddharth Nagar, Suraimanpur, Swaminarayan Chappia, Ujhani, Vindhyachal Shravasti Lok Sabha Constituency: The activities for development of stations under Amrit Bharat Station Scheme in Shravasti Lok Sabha Constituency have been taken up at good pace and the progress of the stations is as given below:  Balrampur station: The development works have been completed.  Tulsipur station: The works of improvement of station building, entrance porch, improvement of circulating area, parking area, improvement of waiting room, toilet, platform shelter and signages have been completed. The work of amenities for Divyangjan has been taken up. The activities for development at other stations have also been taken up at good pace and progress of some of the stations is as given below: Page 12 of 14 Lucknow (Charbagh) NR station: The structural work of new station building at second entry has been completed. The finishing work of new station building, concourse,10 m wide foot over bridge, development of circulating area at second entry and improvement of circulating area at main entry have been taken up.  Gorakhpur station: The structural works of multi level car parking, commercial block, new laundry and electrical substation have been completed. The structural works of main station building, second entry station building and foot over bridge, finishing works for multi-level car parking, commercial block, new laundry and electrical substation have been taken up.  Deoria Sadar station: The works for improvement of waiting hall, retiring room, dormitory, parking, improvement of circulating area, entry/ exit gates and platform shelters have been completed. The works of new station building, entrance porch, 12 m wide foot over bridge, lift, escalator, improvement of Pay & Use toilet and amenities for Divyangjan have been taken up.  Bhatni station: The works of improvement of station building, entrance porch, improvement of circulating area and parking have been completed. The works of improvement of platform surface, platform shelter and amenities for Divyangjan have been taken up.  Basti station: The works for improvement of station building, improvement of circulating area, parking, waiting hall, toilets, improvement of platform surface, platform shelters, new entrance porch, new Pay & Use toilet block and landscaping have been completed. The works of lighting and signages have been taken up. Further, development / redevelopment / upgradation / modernisation of stations on Indian Railways, is a continuous and ongoing process and works in this regard are undertaken as per requirement, subject to inter-se Page 13 of 14priority and availability of funds. Development / redevelopment / upgradation/modernisation of a station is carried out based on category of station/condition/traffic handled etc. Development/Upgradation of railway stations is a complex in nature involving safety of passengers & trains and requires various statutory clearances such as tree cutting, heritage, fire clearance, airport clearance etc. These stations are in operation since long, so brownfield work challenges are being faced, such as shifting of utilities (involving water/sewage lines, optical fibre cables, gas pipelines, power/signal cables, etc.), infringements, operation of trains without hindering passenger movement, speed restrictions due to works carried out in close proximity of the tracks and near to high voltage power lines, etc. and these factors affect the progress of work and completion time. Development/upgradation/modernisation of stations including under Amrit Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer Amenities’. The details of allocation and expenditure under Plan Head-53 are maintained Zonal Railway-wise and not station-wise or state-wise. Uttar Pradesh is covered under the jurisdiction of five railway zones, namely, East Central Railway, North Central Railway, Northern Railway, North Eastern Railway, and West Central Railway. For these zones, an allocation of ₹17,973 crore has been made for the last five financial years and current year, out of which an expenditure (up to June, 2026) of ₹13,624 crore has been incurred so far. ***** Page 14 of 14

Continue your research