Parliament Question: Maintenance and Repair of National Highways

Issued by ROAD TRANSPORT AND HIGHWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO - 6221 ANSWERED ON 02TH APRIL 2026 MAINTENANCE AND REPAIR OF NATIONAL HIGHWAYS 6221. DR. KIRSAN NAMDEO: SMT. JYOTSNA CHARANDAS MAHANT: SHRI KISHORI LAL: SHRI BENNY BEHANAN: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the length of National Highways constructed since financial year 2018-19, along with total construction expenditure and the amount spent on their maintenance and repair during the five years of completion, year-wise and State-wise; (b) the number of accidents and fatalities on National Highways since 2021 where potholes, surface defects or incomplete construction were recorded as contributing factors, year-wise and State-wise; (c) whether any contractor has been penalised or blacklisted due to premature road deterioration or poor-quality construction and if so, the details thereof, State-wise; (d) the details of National Highways passing through or constructed in Amethi district of Uttar Pradesh since financial year 2018-19, including the length constructed or upgraded, funds allocated and utilised, maintenance expenditure and the number of accidents reported on these stretches during the said period; and (e) whether the Government has reviewed cost escalations in Bharatmala projects due to delays in land acquisition and the extent of such escalations, project-wise and if so, the details thereof?ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The State / Union Territory (UT)-wise and year-wise details of length of National Highways (NHs) constructed since financial year 2018-19 and expenditure incurred towards development & maintenance of NHs during the last five years is at Annexure-I and Annexure-II respectively. (b) The Government publishes report on “Road Accidents in India” based on data received from States / UTs. As per the report, total number of road accidents on NHs due to all kinds of causes are as follows: - Year Total No. of Road Tota No. of Road Accidents on NHs fatalities on NHs 2021 1,28,825 56,007 2022 1,51,997 61,038 2023 1,50,177 63,112 2024 1,50,958 64,772 (c) The Government in the Ministry of Road Transport and Highways is primarily responsible for development and maintenance of NHs. As per information provided by the executing agencies of the NHs, major deficiencies in NH stretches during the last three years and the current year have been reported for 67 projects / stretches. The State / UT wise details of major deficiencies in NH stretches during the last three years and the current year along with status of its rectification works and action taken against contractors/ concessionaires’ consultants are at Annexure-III. Actions against defaulting agencies are taken up as per the provisions of the Contract/ Concession agreement in cases of deficiencies / damages, such as termination of contract agreement, levying of penalties/ liquidated damages, debarment / blacklisting, declaring as non-performers etc. (d) 377 km length of NHs passing through Amethi district of Uttar Pradesh has been developed / upgraded since FY 2018–19 through various projects. Allocation of funds for development and maintenance of NHs are made State / Agency wise and not projectwise. State-wise & year-wise details of expenditure incurred towards development & maintenance of NHs during last five years is given at Annexure-II. 344 road accidents have been reported on NHs passing through Amethi district since 2021 (data based on electronic Detailed Accident Report is implemented since 2021). (e) As per the latest available information, 85 under construction NHs projects including projects under Bharatmala Pariyojana are delayed by more than three years, attributable to various issues such as, bottlenecks relating to land acquisition, statutory clearances / permissions, utility shifting, encroachment removal, law & order issues, financial crunch affecting implementation capacity of concessionaire / contractor, poor performance of contractor / concessionaire, and Force Majeure events, such as, Covid-19 pandemic, Change of Law, etc. The Government has undertaken various initiatives to prevent recurrence of delays and cost escalations. These include streamlining and expediting land acquisition and compensation using “BhoomiRashi” portal integrated with Public Finance Management System (PFMS) and GIS-based Land Acquisition Plan, revamping “Parivesh” Portal, to facilitate faster forest and environmental clearances, enabling online approval of General Arrangement of Drawings (GAD) of Road Over Bridge/ Road Under Bridge (ROB/ RUB), and leveraging the mechanism of review and resolution of bottlenecks / hindrances in ongoing projects, in active collaboration with the State Governments and other stakeholders. Government has also launched a web portal for Railway related clearances with defined timelines for various approvals. The Government has put in place a strong framework using multiple mechanisms for monitoring project progress. Regular review meetings are conducted at various levels with stakeholders to assess project progress, and critical projects, such as those delayed by more than three years or pending for award/ appointment. Cost escalation is not incurred in all delayed projects. If delay is not attributable to the Contractor, escalation is paid as per contract conditions, which may or may not result in additional cost, depending upon final value of price escalation determined on actual completion of project. If delay is attributable to theContractor, damages are imposed and there is no additional cost due to delay. Many State Governments conduct coordination meetings led by the Chief Secretary to resolve issues affecting project execution. Projects where issues remain unresolved are escalated for further review through the Project Monitoring Group. As a result of the above, no. of projects delayed by more than 3 years has come down from 152 in April 2024 to 79 in March 2026.ANNEXURE-I ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 6221 ANSWERED ON 02.04.2026 ASKED BY DR. KIRSAN NAMDEO, SMT. JYOTSNA CHARANDAS MAHANT, SHRI KISHORI LAL AND SHRI BENNY BEHANAN REGARDING MAINTENANCE AND REPAIR OF NATIONAL HIGHWAYS The State/UT wise details of length (km) of NHs constructed since financial year 2018-19 2025- Sr. 2018- 2019- 2020- 2021- 2022- 2023- 2024- State/UT 26 (till No. 19 20 21 22 23 24 25 feb) Andhra 1 438 587 515 347 438 799 757 665 Pradesh Arunachal 2 157 94 135 206 320 262 152 58 Pradesh 3 Assam 323 247 567 318 310 272 344 244 4 Bihar 333 197 691 576 488 497 465 249 5 Chhattisgarh 397 198 247 320 243 251 308 233 6 Goa 11 30 49 65 16 11 27 6 7 Gujarat 303 292 361 249 658 622 500 420 8 Haryana 226 220 406 290 358 300 287 75 Himachal 9 157 76 89 146 139 251 166 121 Pradesh 10 Jharkhand 287 298 358 298 245 248 202 125 11 Karnataka 779 500 425 419 393 741 477 348 12 Kerala 121 186 344 76 171 282 193 54 Madhya 13 829 714 877 871 667 792 894 674 Pradesh 14 Maharashtra 2293 2422 2870 1534 1087 1463 1203 937 15 Manipur 318 304 224 221 269 202 216 68 16 Meghalaya 13 0 36 26 98 162 154 47 17 Mizoram 59 42 169 239 205 209 126 44 18 Nagaland 34 68 197 254 236 159 230 108 19 Odisha 534 441 683 544 410 357 330 223 20 Punjab 209 344 188 150 274 409 227 186 21 Rajasthan 728 1018 825 722 715 868 794 5822025- Sr. 2018- 2019- 2020- 2021- 2022- 2023- 2024- State/UT 26 (till No. 19 20 21 22 23 24 25 feb) 22 Sikkim 83 29 39 45 49 78 58 6 23 Tamil Nadu 356 204 447 470 690 814 613 390 24 Telangana 370 340 227 236 172 513 416 185 25 Tripura 41 5 78 181 204 47 51 21 Uttar 26 882 694 917 824 642 939 906 855 Pradesh 27 Uttarakhand 237 357 577 354 219 216 148 80 28 West Bengal 127 174 400 169 284 190 121 47 Andaman & 29 Nicobar 61 65 113 39 25 11 18 10 Islands Dadra & Nagar Haveli 30 0 0 3 0 0 0 0 6 and Daman & Diu 31 Delhi 42 38 20 5 43 53 10 6 Jammu & 32 95 46 234 263 217 243 214 124 Kashmir 33 Ladakh 0 4 7 0 51 81 50 17 34 Puducherry 12 3 7 0 0 11 0 0ANNEXURE-II ANNEXURE REFERRED TO IN REPLY TO PART (a) & (d) OF LOK SABHA UNSTARRED QUESTION NO. 6221 ANSWERED ON 02.04.2026 ASKED BY DR. KIRSAN NAMDEO, SMT. JYOTSNA CHARANDAS MAHANT, SHRI KISHORI LAL AND SHRI BENNY BEHANAN REGARDING MAINTENANCE AND REPAIR OF NATIONAL HIGHWAYS The State / UT - wise details of expenditure incurred towards development and maintenance of NHs during the last five years (Amount in ₹ Crore) Sr. State/UT 2020-21 2021-22 2022-23 2023-24 2024-25 No. 1 Andhra Pradesh 4,281 5,890 6,957 11,440 11,756 Arunachal 2 2,512 2,718 3,140 2,649 3,599 Pradesh 3 Assam 3,753 3,150 4,557 9,137 7,207 4 Bihar 6,716 9,174 9,347 10,749 8,840 5 Chhattisgarh 2,224 1,936 2,468 4,255 2,280 6 Goa 734 615 673 620 651 7 Gujarat 7,533 10,710 9,831 10,900 8,091 8 Haryana 10,651 7,203 3,924 6,062 4,344 Himachal 9 2,033 3,164 4,534 5,175 3,994 Pradesh 10 Jharkhand 2,627 2,853 3,127 4,599 5,169 11 Karnataka 5,838 7,681 6,763 12,695 10,819 12 Kerala 12,831 10,136 3,994 10,419 5,082 Madhya 13 8,250 9,006 6,210 7,447 7,799 Pradesh 14 Maharashtra 20,844 18,655 18,355 19,867 18,512 15 Manipur 978 2,142 2,737 2,598 2,011 16 Meghalaya 861 819 684 1,803 1,697 17 Mizoram 1,238 2,054 3,218 2,189 2,091 18 Nagaland 2,382 1,943 1,666 1,414 1,600 19 Odisha 5,336 4,510 4,643 5,948 5,786 20 Punjab 3,301 7,179 10,093 12,419 7,898 21 Rajasthan 7,340 11,353 9,719 8,874 6,301Sr. State/UT 2020-21 2021-22 2022-23 2023-24 2024-25 No. 22 Sikkim 1,053 811 1,008 684 441 23 Tamil Nadu 4,868 4,305 8,230 9,925 9,068 24 Telangana 2,907 3,458 3,622 6,117 7,496 25 Tripura 1,026 1,085 1,156 1,546 767 26 Uttar Pradesh 18,768 13,944 21,453 28,114 20,665 27 Uttarakhand 2,800 2,112 3,219 4,545 3,835 28 West Bengal 2,658 3,642 3,053 3,543 2,240 Andaman & 29 349 246 143 96 204 Nicobar Islands 30 Chandigarh 2 6 1 0 0 Dadra & Nagar 31 Haveli and 43 30 26 2 46 Daman & Diu Delhi / 32 -1,482 3,961 7,164 3,223 2,840 Headquarters Jammu & 33 2,932 6,817 7,370 10,528 10,204 Kashmir 34 Ladakh 24 352 574 658 768 35 Puducherry 21 1 61 35 23 [Negative figure against State/UT during the year indicates transfer of project/expenditure from that State/UT to other State/UT]ANNEXURE-III ANNEXURE REFERRED TO IN REPLY TO PART (c) OF LOK SABHA UNSTARRED QUESTION NO. 6221 ANSWERED ON 02.04.2026 ASKED BY DR. KIRSAN NAMDEO, SMT. JYOTSNA CHARANDAS MAHANT, SHRI KISHORI LAL AND SHRI BENNY BEHANAN REGARDING MAINTENANCE AND REPAIR OF NATIONAL HIGHWAYS The State / Union Territory (UT) – wise details of major deficiencies in NH stretches in the last three years and current year along with status of its rectification works and action taken against contractors / concessionaires / consultants Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Permanent solution to Slip Zones on Papu – Yupia – Hoj – Potin section of NH-713A & NH- Rectification of 13 at Km 31.000 defective work (Hoj Market), initiated by the Arunach Km 38.300 RE wall Contractor. al 1 (Yabi Village), 2024 Collapsed Penalty of 5% of Pradesh Km 39.000 contract value (Waterfall), Km imposed on 39.700 (Appa Contractor. Crusher) and Km 40.300 (Crusher Point) in the state of Arunachal PradeshYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Six-laning of Vijayawada bypass from Chinna Autupalli Concessionaire (Design commenced the Ch.0+000) to rectification work Gollapudi based on (Design Ch. Defects in the recommendation 30+000) in 2 2024 construction of /suggestion of RE Vijayawada – RE wall. wall Expert. Gundugolanu Rs.10,99,235/- Section of NH- was recovered as 16 in the State damages from of Andhra Concessionaire. Pradesh under Andhra Bharatmala Pradesh Pariyojana on Hybrid Annuity Mode 6 laning of existing 4-lane road from Contractor Kalaparru rectified defects (Design Km at his own cost. 1050.680) to Defects in the Chinna Show-cause 3 2025 construction of Avutupalli notices issued to RE wall. (Design Km Contractor as per 1076.480) of Contractual NH-5 including provisions. 6-lane Hanuman Junction Bypass fromYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects (Existing Km 1055.680 to Km 1060.800) (Design Ch.0.000 to Ch.6.720) (Total Design Length: 27.40 Km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC Mode (Package-2) Four Laning of Simaria- Khagaria Section of NH- 31 from Km. Issues reported 206.050 to Km. by CRRI in Repair works 266.282 (Design quality of taken up by 4 Chainage) and 2023 Concrete of Contractor as Bihar (Existing superstructure recommended in Chainage Km. in bridge at Km CRRI report 209.945 to Km. 264.946 270.000 of NH- 31) in the State of Bihar on EPC Mode Varanasi - Major Damages of INR 5 2023 Mohania deficiencies in 25 Cr imposed onYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects (GTRIP/5; structural Contractor Package - IV A): elements 4L of existing 2L section from km. 65 to km. 317 of NH-2 in UP and Bihar on NH-2 Project Manager Falling of & Bridge concrete from Engineer of the the deck slab of Chhapra-Hajipur Concessionaire Major Bridge at Section of NH- were suspended. km 145+280 6 2023 19 (New NH-31) Reconstruction and Falling of completed by Concrete from concessionaire at the Deck Slab their own cost. of ROB at Ch 157+860. Chief Project Umagaon- Manager & Saharsa PKG-IV A girder Engineer collapsed (Launching) of 7 (Kosi Bridge & 2024 during Contractor approach Road) construction. suspended. 4-Laning of Simga-Sargaon Cracks in Rectifications Section of NH- Chhattisg Cement initiated at cost 8 200 (New NH- 2024 arh Concrete of EPC 130) from Km Panels Contractor. 48+580 to Km 91+026Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Rehabilitation & Upgradation 2- lane with paved shoulders configuration of Bilaspur Urdawal section The work is in in km 241.553 Defect Liability to 312.60 = Damage in slab 9 2025 Period and taken 71.0476 km of Minor bridge up by Contractor (Masanialala to at his own cost. Rengapali) on NH 200 (New NH 49) (Package- III)(Borai river MNB at km 217.358) Arbitration notice Some portion of issued to deck slab fallen Contractor for Flyover and down with recovery of underpass at settlement of 10 2024 damages. Hero Honda the bituminous Process of Chowk NH 48 surface (MCW- Rectification and 01) on RHS at Haryana repair works Ch. 36+350 initiated. Authority has imposed Delhi-Vadodara damages 11 Expressway 2024 Rutting amounting to Pkg. 2 Rs.48,61,243/- on the contractor forYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects delayed maintenance. Rectification of rutting has been taken up by Contractor and majority of the rutted portion has been rectified. Authority has imposed damages amounting to Rs. 42,95,049/- on the contractor for Delhi-Vadodara delayed 202 12 Expressway Rutting maintenance. 4 Pkg. 3 Rectification of rutting has been taken up by Contractor and majority of the rutted portion has been rectified. Ruts, cracks Penalty of ₹2.8 and surface crore has been deformation/ imposed on the Sanchore- Distress was Contractor along Gujarat 13 Santalpur 2025 observed with a Package-4 recently after recommendation rains in June for debarment up month 2025, to one year orYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects severe rutting until successful at some rectification, locations. whichever is later. Contractor has taken up repair/ restoration works. The Project Director of NHAI was suspended. Four Laning of Mahulia- Baharagora- JH/WB Border Section of NH- 33 (from Km.277+ 500 to Km.333+500) & Cracked PQC Rs. 1.55 Cr Jharkhan NH-06 (from 14 2024 panels, penalty imposed d Km.199+200 to Potholes on Contractor. Km.183+587) (Length of 71.61Km) in the State of Jharkhand on EPC Pattern under NHDP Phase –III.Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Concessionaire Two/Four has taken up Laning of BRT Km 337+670 to repair/ Tiger Reserve Km337+680 RE restoration works 15 Boundary to 2025 Block of length as per Bengalore 10 mts recommendation Section of NH- collapsed of report 948 submitted by IISC Bangalore. Karnatak a Four laning of 2024 Goa-Karnataka Incident of Border to collapse of Kundapur three spans of Contractor section of NH- Kaali Bridge. debarred for 1 16 66 (formerly NH- Inadequate month on Aug 17) from Km. slope stability 2024. 93.700 to Km. works. 283.300 in the State of Karnataka NH Connectivity Distress in pile to ICTT at foundation was Penalty of Rs. Vallarpdam observed at 30.74 Cr was 17 from 2025 Bridge no. 07 & imposed on Kalamassery to 08 Ch. 7+960 Kerala Contractor Vallarpadam NH and Ch. 9+067 966A (BHS) Concessionaire Damages in the debarred for 1 Kodugallur to pile foundation year. 18 Edappally NH 2025 Ch. 398+400 Rectification 66 and 398+989 works taken up (RHS) at cost ofYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Sub-standard contractor. work (Minor Bridge works, backfill material for RS Wall, Poor safety precautions, delayed grouting of girders, bulging of bearing) or poor quality (Defective RE Panels) Authority has suspended the Concessionaire and its promoter Soil nailing from future collapsed Chengala- bidding for 01- incident Neeleshwaram month period. occurred at Ch. 19 2025 Section of NH- Debarment also 58+035 to Ch. 66 issued to 58+100 (RHS) Concessionaire. on 16.06.2025 Senior Bridge with no Engineer of AE casualties. removed from site. Neeleshwaram- Unprotected Rectification Thaliparambha soil slip in the work carried out 20 2025 Section of NH- cut section and traffic 66 with debris restored withYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects deposition on precautionary carriageways. barricading in median portion. NHAI - Six laning from start of Valanchery Debarment of bypass to Contractor and Kappirikkad Independent section of NH – Engineering firm 66 (old NH-17) from participating from Design Ch. in ongoing/future 298+500 (Ex. RE wall bidding for 01 21 km 304.250) to collapsed month period or 2025 Design completion of Chainage investigation by 335+850 (Ex. the expert km 349.260) in Committee the state of whichever is Kerala on later. Hybrid Annuity Mode under Bharatmala Pariyojana Penalty of Rs. Collapse of 4 15.35 Lakhs Thuravoor- PSC Girders imposed. Bridge 22 2025 paravoor during Engineer & Team constructions Leader of AE were Terminated. Six Laning of Failure/Collapse Penalty of Rs. 23 2025 Start of Kollam of scaffolding of 9.55 lakhs Bypass to Minor Bridge imposed onYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Kadambattukon (under Concessionaire am from construction) at Km.486+000 to Km.Ch. Km.517+800 of 497+370(RHS) NH-47 (New NH- 66) in the State Failure of RE of Kerala on Rectification Wall Ch. Hybrid Annuity 24 2025 initiated by 504+400 to Mode under Concessionaire. 504+500(LHS) BharatmalaPari yojna Toppling of two PSC girders at span P-202-P- 203 6L Elevated Corridor along with Failure on part development of Contractor and of AE to review existing 4 lane AE debarred from 25 2025 efficacy of road at ground future bidding for material being level from Aroor 1 month. used in to Thuravoor launching and Thekku section not ensuring of NH 66 application of approved launching scheme. Soil nailing collapse At Rectification Azhiyur- 26 2024 Km:191(LHS) initiated by Vengalam and Concessionaire. Km:193(RHSYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Rectification Ramanattukara- Defects in RE works initiated by 27 2025 Valanchery wall Contractor at his own cost. Retaining wall Damaged portion sliding and dismantled and Thaliparamba- defects in 28 2026 rectification Muzhapilangadu ground works initiated by improvement Concessionaire. works. Penalty of Rs. 119 Cr imposed 4-laning of Premature on Contractor. Madhya Bhopal-Bioara 29 2025 failure of Rectification Pradesh section of NH- pavement. work initiated at 46 the cost of Contractor. Balance work for 4-laning of Panel cracking, Contractor has Panvel to poor riding taken up 30 Indapur section 2024 quality, bumps, rectification from km.0.0 to poor diversions works. km.42.3 of NH- etc. Maharash 66 - EPC tra The Performance BG of Contractor Mehkar-Ajispur is forfeited. 31 2024 Cracked panels Road Process initiated for rectification of damages.Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Contractor has initiated actions 32 Bhokar-Sarsam 2024 Cracked panels for rectification of damages. Contractor has initiated actions 33 Sillod-Fardapur 2024 Cracked panels for rectification of damages. Rehabilitation and upgradation & NH-66 (Erstwhile NH- 17) form km 241+300 to 281+300 Contractor has (Arawali to Depression & initiated actions 34 Kante Section) cracks in PQC for rectification 2025 to four lane of damages. with paved shoulder in the state of Maharashtra under NHDP-IV on Hybrid Annuity Mode. Rehabilitation & Upgradation of NH-66 (Old Contractor has 202 PQC cracks and NH17) from Km 35 replaced cracked 4 settlement. 281+300 to Km panels. 332+200 (Kante to Waked section) to fourYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects lanes in the state of Maharashtra under NHDP-IV on Hybrid Annuity Mode. Rehabilitation and up- gradation of NH- 66 (Old NH-17) form km 332/200 to km Contractor has Full 367/200 (Watul initiated actions 36 2024 depth Cracks i to Talgaon for rectification n PQC Section) to four of damages. lanes in the State of Maharashtra under NHDP-IV on EPC Mode. Rehabilitatyion & up gradation for Talere Gaganbawada Kolhapur Road Contractor has (NH-166G) initiated actions 37 2025 Cracks in PQC stretches start for rectification from Ch. 6/00 of damages. Km. to Ch. 11/00 Km. and Ch. 19/300 Km. (Start of Karul Ghat) to 35/300Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Km. (End of Gaganbawada) of NH-166G to 2 lane paved shoulder/2 lane configuration lane, length 21.00 Km. in the state of Mahrashtra on EPC Mode. Rehabilitation and Up- gradation to Two lanes with Rectification of paved shoulder damages taken from Karad to 38 2024 Cracked panels up at risk and Tasgaon NH cost of 266 from Km. Contractor. 0/00 to 58/830 in the State of Maharashtra on EPC mode Upgradation to Post IIT Bombay has two lane with construction d been appointed paved shoulder efects are for Technical from Salaikhur observed in the Investigation of d to Tiroda Km Rigid Pavement 39 2024 defects and 120/100 i.e. formation of suggestion of to 163/200 Longitudinal & remedial (Design Km Lateral cracks, measures. 44/00 to Opening of 87/00) of NH Central Joints,Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects 753 on EPC Settlement of Mode in the Panels etc. state of Maharashtra Penalty imposed on each contractor amounting to Rs. 50 Lakhs for non- Delhi Vadodara rectification of 40 Expressway NE- 2024 defects in the 4 Pkg.06 stipulated time frame as per provision of Rutting, contract Raincuts, agreement. potholes & Rajastha settlement n Delhi Vadodara 41 Expressway NE- 2024 4 Pkg.07 Delhi Vadodara 42 Expressway NE- 2024 4 Pkg.08 Delhi Vadodara 43 Expressway NE- 2024 4 Pkg.09 Construction of Deficiencies in (i) Damage of Rs. 6-lane access- riding quality 50.00 Lakhs 44 2024 controlled and settlement imposed upon the Greenfield at some Contractor.Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects highway from locations (ii) Two key km 28+70 to observed personnel of Km. 53+0 of Authority Sangariya (near Engineer team Chautala)- were terminated Rasisar (near due to poor Bikaner) supervision. section of NH- 754K as a part of Amritsar- Jamnagar Economic Corridor in the State of Rajasthan under Bharatmala Pariyojana - Phase-I (AJ/SR- Package-2) Construction of Penalty of Rs. 6-lane access 1.00 Cr. imposed controlled and warning for Greenfield debarment action highway from Failure of the for any future km 53+000 to nose structure instances upon Km. while launching the Contractor 45 2024 88+000 of San of 83 mtr single was issued. gariya (near span truss Debarment of Chautala)- bridge fabrication team Rasisar (near and Designer Bikaner) team issued for section of NH- the period of 02 754K as a part years in NHAI of Amritsar-Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Jamnagar works. Economic Penalty of Rs. 20 Corridor in the Lakhs and State of warning for Rajasthan under debarment action Bharatmala for any future Pariyojana- instances upon Phase-I (AJ/SR- the Authority Package-3) Engineer. Debarment of Senior bridge Engineer deployed by the Authority Engineer issued for a period of 2 years in NHAI works. Damages amounting to Rs. 1.06 Cr. imposed for delayed maintenance. Delhi-Vadodara Rutting & Also, IIT 46 Expressway 2024 settlement of Kharagpur has Pkg. 4 approach been engaged for detailed study for permanent rectification of defects.Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Damages amounting to Rs. 88.32 lakhs imposed for delayed maintenance. Bulging of RE wall has been Rutting, rectified as per Delhi-Vadodara settlement of suggestions of 47 Expressway 2024 approach & CRRI. Majority of Pkg. 5 bulging of RE the rutting has wall been rectified. Further, in addition to above, IIT Kharagpur has been engaged for detailed study for permanent rectification of defects. Delhi-Vadodara Greenfield Stretch is Alignment (NH- operational 148N) (Pkg-16) w.e.f. (Ch. 427.300 to 30.11.2023 and EPC Contractor Ch.452.420) at some 48 2024 has rectified [Major bridge locations the damages. R over Takli river settlements near Nayagaon observed in Jageer village approaches of to Rajasthan/MP structure Border]Year Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Construction of proposed 2-lane Post- ROB and its completion, Contract has approaches in structural been lieu of existing defects have terminated. ⁠ ⁠Deba level crossing been observed rment of 49 no. C-64 at km. 2024 in the deck slab contractor taken 172.990 on of the ROB due up. Bid for Jodhpur–Ajmer to rectification Road on NH-65 honeycombing works invited. in District caused by poor Nagaur workmanship. Rajasthan The RE wall blocks portion 4-laning of of the A2 Sethiyathope - (Thanjavur) side Cholpauram The rectification 50 2025 approach (LHS section from work completed side) have been Km 65.960 to by the disconnected Km 116.440 Concessionaire from the geo at their own cost. grid and fallen down. The RE wall panel portion of Based on report 4-laning of the A1 of Expert Thanjavur - (Thanjavur) side Committee, 51 Trichy section 2023 approach (LHS restoration work from Km 80.000 side) have been using soil nailing to Km 136.490 disconnected completed by from the geo Contractor. grid and fallenYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects down. Construction of 4 lane green The project is field highway Cracks under from km 35.00 observed over construction, the to 49.155 of NH- DBM due to repair and 52 731A with 2025 percolation of rectification work paved shoulder rain water in taken up by the Uttar on Hybrid some stretches. concessionaire at Pradesh Annuity Mode in its own cost. the State of Uttar Pradesh. Contractor has Cracks in PQC Lucknow Ring initiated process 53 2024 Panel in length Road Pkg-3A for rectification of 2.886 Km. of damages. Uttar Contractor has Pradesh 4L of Haridwar- PQC panel initiated process & 54 Nagina section 2023 cracks for rectification Uttarakh of NH-74 of damages. and Construction, Rectification Operation and measures taken Collapse at Maintenance of up by the EPC Uttarakh cavity in under 2-Lane Bi- contractors at its 55 2023 and construction Directional own cost. Silkyara Tunnel. Silkyara Bend Barkot Tunnel with escape Actions as perYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects passage the Investigation including Committee approaches on Report initiated. Dharasu– Yamunotri section between Ch. 25.400 Km and Ch. 51.000 Km falling along NH-134 (OLD NH-94) in the state of Uttarakhand i) Rectification Construction of works initiated by 4-Laning of Contractor. Puruliya Bypass Amount of Rs. Section from Cracks have 20.00 Lakh Km. 84.030 to developed in withheld from 56 Km. 94.345 of 2025 the newly Contractor's bill. NH-32 (length constructed 10.315 Km) in PQC. ii) Key personal West the State of of AE has been Bengal West Bengal on debarred for a EPC Mode period of one year. Four laning with Rectification paved shoulders Cracks in PQC works completed of NH-6 from 57 2023 panels at cost of EPC Chichra to Contractor. Kharagpur Km 185.150 to KmYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects 134.400 including rehabilitation of existing four lane from Km 134.400 to Km 129.600 in the state of West Bengal Failure of membrane pad of Pot – PTFE bearing on P2 of Ahiron Bridge (Ch. 257+440 LHS MJB-truss). Also, a level Rs. 26.19 lacs Four laning of difference up to penalty imposed Berhampore – 90mm had been on 58 Farakka Section 2024 observed Concessionaire. of NH-12 (old between Rectification NH-34) expansion joint work completed. of deck-I and deck-II along with missing of some anchoring bolts of connecting gusset plates. Four laning of Crack at the Rectification Farakka – bottom of the 59 2024 work initiated by Raiganj Section deck slab at km Concessionaire. of NH-12 (old 325+060 of theYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects NH-34) Mahananda Bridge (LHS). The crack was located under the fast lane between span P1 & P2 (PSC Girder). At RHS Pier 4 of MJB at 325+223, piles are exposed and heavy reinforcement were exposed. Exposed reinforcement were corroded. Four laning of Rectification Rutting, Berhampore – initiated by 60 2025 Potholes, Farakka Section Concessionaire Cracks of NH-12 (old at his own cost. NH-34) Six Laning of National Toll has been Corridor NH-19 suspended. 2 key from Palsit to Collapse of RE personnel of IE 61 2026 Dankuni (up to Wall and NH-6 Concessionaire Connector) from suspended. km 588.870 to km 652.700 inYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects the state of West Bengal under Bharatmala Pariyojana to be executed on BOT (Toll) basis. 1. Faulty Design 1. For Faulty in Bridge at km. Design at Km 96+326: 96+326, penalty imposed of Rs.30 Lakhs on the 2. Bridge at km. Concessionaire 79+614: and Rs.5 Lakhs on the The span A1-P1 Independent had dislodged Engineer. Team from the pier P2 Leader of IE and Chandikhole- due to breaking Key Personnel of Bhadrak of the Odisha 62 2023 Concessionaire Section of NH- cantilever suspended. 16 Portion of the pier cap and had fallen on 2. For Bridge at the ground. km. 79+614: Penalty of Rs.5 crore imposed on Appearance of the Contractor wide cracks (up and Penalty of to 3-4mm) in Rs.20 lakh the pier cap on imposed on the grid “P2”. SupervisionYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects Consultant. Damages of deck slab and Debarment of girders of the DPR Consultant dislodged span. for 1 year. The cost of entire remedial measures / reconstruction recovered from the Concessionaire. Construction of 6-lane Standalone Flyovers at Bongaigaon, Chapaguri, Falling of one Pathsala, PSC Girder at Penalty imposed Simlaguri Baihata Flyover on Contractor. Chowk and Assam 63 2024 (Span P1-P2), Contractor Baihata resulting in the debarred for 4 Junctions on death of one months. stretches of NH- person. 31 & NH-31C [new NH-27 (EW)] in the State of Assam under Bharatmala Pariyojana onYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects EPC basis Two Lane with paved shoulders configuration in Jowai- Penalty of Rs. Meghalaya Slippage of 20,00,000/- Assam Border Bituminous imposed on Section of NH - Meghalay concrete for a Contractor and 64 2025 44 from Km a length of rectification work 69.200 to Km approximate carried out by 173.200 (design 10-15 mtrs Contractor at his Ch 171.455 ) in own cost. the state of Meghalaya Construction of Dwarka Expressway Package-1, from P8-P9 of flyover Shiv Murti part of Shiv Remedial Intersection at Murti measures Km 20 of NH-8 Delhi 65 2023 interchange on completed by till road under Dwarka Contractor. Bridge (RUB) Expressway near Dwarka toppled. Sector-21(From Km -0.600 to 5.300) in the state of DelhiYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects on EPC mode Rehabilitation of km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Distress, Intermediate sinking of Lane with hard Rectification 66 2024 pavement at shoulder in the works completed. various union Territory locations. of Andaman & Nicobar islands (Total length Andaman 25.00 km) on & EPC Mode” Nicobar (Package-VII) Islands Construction of The EPC 4 Nos. of Minor Punching in contractor has Bridges at Km Deck Slab (LHS) carried out the 21.717, Km of the minor necessary 23.150, Km bridge across rectifications at 88.300, Km BD Nallah at their own 67 2024 92.100 of NH- Km 88+300 and expense 223 (New NH-4) other quality including connecting issues including replacement of South Andaman bad slab as and Baratang workmanship. recommended by Island in the CRRI-CSIR report. Union TerritoryYear Details of S. State/ Name of the of Major Action Taken No UT Project incid damages / . ent defects of Andaman & Nicobar Islands on EPC mode. *****

Continue your research