GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 1925
ANSWERED ON 30TH JULY, 2026
MAINTENANCE OF NHs
1925. SHRI ARVIND GANPAT SAWANT:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार् ग मंत्री
be pleased to state:
(a) the current status and condition of National Highways (NHs)
across the country particularly regarding pending maintenance,
widening projects and structural safety;
(b) the total budgetary allocation made and utilized for the repair,
resurfacing and maintenance of NHs during the last three years,
State-wise and Union Territory-wise;
(c) whether the Government has received representations regarding
deteriorating road quality, severe waterlogging, potholes and lack of
adequate drainage infrastructure on critical highway corridors,
particularly during the monsoon seasons, if so, the details thereof
and the corrective measures taken thereon;
(d) the step-by-step mechanisms established by the Ministry to
monitor the performance of concessionaires and private contractors
under Public-Private Partnership (PPP) models and the number of
contractors penalized for poor construction quality during the last
two years; and
(e) the target timeline set by the Government to ensure zero-pothole
corridors and to achieve world-class connectivity and safety
standards on all busy national transit routes?ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) Development and maintenance of National Highways (NHs) is
a continuous process.
Out of total 1.46 Lakh km length of NH network in the country,
about 36,000 km length is under development, 58,000 km length
under DLP / Concession Period, and 41,000 km length under
maintenance primarily through Short Term Maintenance Contract
(STMC) and Performance Based Maintenance Contract (PBMC)
works and also including 4,000 km length maintained
departmentally through BRO. Government has decided to take up
maintenance in 20,000 km during 2026-27 as part of plan for full
transition towards the target of 100% NH network coverage under
maintenance.
(b) State / Union Territory (UT) – wise details of funds allocated
and expenditure incurred towards M&R of NHs during each of the
last three years are at Annexure-I.
(c) Representations are received through various modes including
Public Grievance Portal, mobile based Rajmarg Yatra app and
various social media platforms for various issues related to NHs
including deteriorating road quality, severe waterlogging, potholes
and lack of adequate drainage infrastructure on critical highway
corridors.
Aspects of rainfall, high flood level, climate, type of terrain,
soil category etc. are invariably taken into consideration during
preparation of Detailed Project Report (DPR) for all NH development
/ upgradation projects. Accordingly, construction of roadside lined /
unlined drains, Cross Drainage structures viz., Culverts, Minor &
Major bridges across natural streams / drainage etc., are carried out
as per scope of contract for the project by the Contractor /Concessionaire as per standard specifications and Indian Roads
Congress (IRC) codes.
The Government has set up an internal mechanism to take
cognizance of various complaints / grievances / representations
regarding NHs through web portal towards ensuring that necessary
corrective actions are taken up by the Officials / Concessionaires /
Contractors for the NHs projects.
Poor / damaged condition of NHs, has been reported for about
11,500 km length during the last three years and current year,
which have been attended for immediate maintenance.
(d) The Government in Ministry of Road Transport and Highways
has finalized the rating framework of Contractors / Concessionaires
including Concessionaires and Private Contractors under Public-
Private Partnership (PPP) models based on their past performance.
Provisional rating has also been published for 66 Contractors in
Category 1 (>₹1,000 Cr) and 164 Contractors in Category 2 (₹ 300 -
1,000 Cr) for comments.
Action against defaulting agencies has been taken as per the
provisions of the Contract / Concession Agreement in case of
deficiencies / damages, such as termination of Contract Agreement,
levying of penalties / liquidated damages, debarment / blacklisting,
declaring as non-performers etc. 21 Concessionaires / Contractors
have been blacklisted / penalized during the last two years for poor
quality work execution or other tender violation.
(e) Government has prioritized the maintenance of existing NH
network and inter-alia evolved a mechanism to ensure Maintenance
and Repair (M&R) of all NHs sections through accountable
maintenance agency.
The M&R of stretches of NHs, where development works have
commenced or Operation, Maintenance and Transfer (OMT)
Concessions/ Operation and Maintenance (O&M) Contracts have
been awarded, are the responsibility of the concerned
Concessionaires/ Contractors till the end of the Defect LiabilityPeriod (DLP)/ the Concession Period. Similarly, for NHs stretches
undertaken under TOT (Toll Operate and Transfer) and InvIT
(Infrastructure Investment Trust), M&R responsibility lies with
concerned Concessionaire till the end of the Concession Period.
For all remaining sections of NHs stretches, Government has
taken a policy decision to undertake maintenance works through
Performance based Maintenance Contract (PBMC) or Short Term
Maintenance Contract (STMC).
The Government has also initiated monitoring of the quality
including defect rectification in NHs projects through mobile based
application. This facilitates efficient highway project management
by the internal stakeholders (Field officers / Engineers / Contractors
/ Concessionaires) directly from onsite, through digital reporting of
daily and monthly defects, submission of geo-tagged and time-
stamped photos for inspections and digital uploading of test results.
The Government has also mandated assessments of road
conditions through Network Survey Vehicle (NSV) before start of
work, before issue of completion certificate and thereafter at
regular intervals of six months after completion of the work,
thereby enabling quality assessment of NHs at regular intervals for
(a) ensuring the maintenance during Concession period / DLP and
(b) prioritizing maintenance requirements to maintain NHs in traffic
worthy condition. NSV system for road condition assessment has
further been revamped using analytics for enforcement of
contractual provisions during Operation and Maintenance (O&M).
Additionally, Government has also initiated analysis of High-
Resolution Imagery collected from Drone Surveys in Drone Analytics
Monitoring System (DAMS) integrated with Artificial Intelligence /
Machine Learning algorithms for periodic evaluation of progress and
quality of ongoing NHs works from time to time.ANNEXURE-I
ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA
UNSTARRED QUESTION NO. 1925 ANSWERED ON 30TH JULY, 2026
ASKED BY SHRI ARVIND GANPAT SAWANT REGARDING
MAINTENANCE OF NHs.
State / UT – wise details of funds allocated and expenditure incurred
towards M&R of NHs during each of the last three years: -
Amount in ₹ Crore
2023-24 2024-25 2025-26
Sr. No. State/UT
Alloc. Expd. Alloc. Expd. Alloc. Expd.
1 Andhra Pradesh 414 414 301 280 588 558
2 Arunachal Pradesh 52 52 129 78 178 124
3 Assam 251 251 445 431 393 393
4 Bihar 162 162 231 231 457 457
5 Chhattisgarh 47 47 167 128 107 102
6 Goa 7 7 20 12 40 34
7 Gujarat 725 725 705 626 1,217 1,181
8 Haryana 162 162 242 229 286 283
9 Himachal Pradesh 172 172 165 161 320 307
10 Jharkhand 161 161 244 177 275 258
11 Karnataka 384 384 603 470 423 391
12 Kerala 7 7 217 204 131 112
13 Madhya Pradesh 297 297 425 414 537 531
14 Maharashtra 365 365 595 410 673 627
15 Manipur 26 26 91 90 50 50
16 Meghalaya 91 91 92 71 56 55
17 Mizoram 31 31 123 110 90 90
18 Nagaland 76 76 103 94 132 116
19 Odisha 118 118 243 196 289 289
20 Punjab 117 117 172 155 275 262
21 Rajasthan 619 619 1,281 1,252 965 946
22 Sikkim 30 30 36 36 59 59
23 Tamil Nadu 340 340 448 439 596 589
24 Telangana 142 142 165 97 350 297
25 Tripura 49 49 55 55 80 80
26 Uttar Pradesh 818 818 1,109 1,092 1,550 1,486
27 Uttarakhand 181 181 266 213 305 270
28 West Bengal 270 270 257 255 515 467
29 Andaman & Nicobar Islands 40 40 41 41 11 11
30 Delhi / Headquarters 24 24 81 81 109 109
31 Jammu & Kashmir 65 65 88 82 180 170
32 Ladakh 1 1 11 11 4 4
33 Puducherry 9 9 4 0 2 2
34 BRO 280 271 255 254 250 246
Alloc. – Allocation; Expd. - Expenditure
State wise Allocation / Expenditure not done for BRO
*****