See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF CONSUMER AFFAIRS, FOOD & PUBLIC DISTRIBUTION
DEPARTMENT OF FOOD AND PUBLIC DISTRIBUTION
LOK SABHA
UNSTARRED QUESTION NO. 596
TO BE ANSWERED ON 22ND JULY, 2026
MODERNISATION OF FOOD STORAGE INFRASTRUCTURE
596. SHRI ANUP SANJAY DHOTRE:
Will the Minister of CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION
be pleased to state:
(a): the details of initiatives undertaken by the Government during the last three years for
modernisation of foodgrain storage infrastructure including construction of modern silos,
warehouses and scientific storage facilities;
(b): the details of storage projects sanctioned and completed in Maharashtra particularly in
Akola district;
(c): whether the Government has undertaken any assessment regarding reduction in foodgrain
losses and improvement in storage efficiency through these initiatives;
(d): if so, whether there is any proposal to establish additional modern storage infrastructure in
major agricultural districts including Akola; and
(e): if so, the details thereof along with the expected timeline for implementation?
ANSWER
MINISTER OF STATE FOR MINISTRY OF CONSUMER AFFAIRS,
FOOD & PUBLIC DISTRIBUTION
(SHRIM ATI NIMUBEN JAYANTIBHAI BANIBHANIYA)
(a): in order to keep its storage infrastructure robust and updated, department is taking various
steps for Modernization as under:
(i) Construction of SILOs under PPP Mode: Steel Silo storage with bulk handling facility is
highly mechanized and modernized way of storing food grains in bulk. It ensures better
preservation of food grains and enhances its shelf life. If food grains are stored in Silos and
transported in bulk, losses due to theft, pilferage and transportation would be negligible compared
to food grains storage in bags in conventional warehouses. Steel Silos are constructed under Public
Private Partnership Mode.
Further, 21.75 LMT modern Silo capacity has been created upto FY 2026-27. The details are
attached at Annexure A(ii) SMART Warehouse Project: Under this project, traditional depots are converted into smart
warehouses which are equipped with different sensors like smoke sensors, fire sensors & gate
opening sensor etc. for monitoring key parameters such as CC)2, phosphine levels, fire hazards,
humidity, unauthorized entry and temperature on real time basis.
Smart warehouse ensures real-time visibility, timely intervention, data-driven decision-making &
standardized operations across all depots contributing to ensure safe, secure, and efficient food
grain storage and distribution. With respect to CWC’s food grain depots, Smart Warehousing
Systems have been installed and commissioned at 215 CWC food grain warehouses in a phased
rnarlner, comprISIng:
• CCTV-based surveillance with Al analytics
• loT sensors
• Gate and LWB (Live Weigh-Bridge) automation
• loT-enabled smart locks
(iii) Depot Darpan portal: The Depot Darpan Portal is a digital platform being implemented in
FCI and CWC, launched in May 2025, for enhanced monitoring, transparency, and efficiency of
food grain storage depots under PDS.
Key features and functionalities of the Portal are as under:
a. Enables depot/warehouse managers to upload geo-tagged data on infrastructure, operations,
and financial performance.
b. Depots assessed through a composite scoring framework covering infrastructure and
operational parameters, with star ratings assigned for objective performance evaluation.
C. Integrated with loT sensors, CCTV, real-time dashboards, and Al tools for monitoring
temperature, humidity, gas levels, security, and stock movement
d. Data reliability ensured through 100% supervisory verification and selective third-party
audits
A Mobile Application of the Portal has also been launched, providing senior officers with on-the-
go access to depot ratings and performance metrics, ensuring greater flexibility and accessibility.
(iv) Further, in order to modernize the infrastructure of Food Storage Godowns, the Ministry
initiated the 'Transformation of FCI' programme during the Financial Year 2023–24. The
initiative primarily focuses on the upgradation of existing godown infrastructure through
replacement of old and damaged Bituminous (BT) roads with Cement Concrete (CC) roads,
replacement of deteriorated Asbestos Cement (AC) sheet roofing with pre-painted colour-coated Gl
profile roof sheets, upgradation of illumination systems, and installation of Diesel Generator (DG)
sets as power backup at Food Storage Godowns across the country.
(b): As on 01.07.2026, FCI is having 19.05 LN4T storage capacity in Maharashtra which
includes owned and hired capacities.
CWC has created 514825 SQFT storage capacity in Maharashtra in last 3 years.
No storage projects have been sanctioned and completed by FCI in Akola district as of now.
However, FCI has hired two Food storage godowns from CWC in Akola district. The
details of the same is as under;
1. CWC Akola-I – 135721VIT and
2. CWC Akola – 11 – 19152 MT(c): Digital initiatives, including Depot Darpan, Integrated Information System for Foodgl'ains
Management Rapid Reporting Service and Anna Darpan, have been implemented to strengthen
inventory management and prevent leakage/diversion of foodgrains. Through Anna darpan, the
stock position is updated in real time, thereby preventing diversion and manipulation of stocks.
Further pilot depots have been selected under the SMART warehousing that aims to realise the
potential of Internet of Things (loT) technology to monitor and to track storage conditions and
enable timely corrective action.
(d) & (e): Department of Food & Public Distribution (DFPD) is augmenting its storage capacity
by creating capacities through Food Corporation of India (FCI).
FCI is modernising the foodgrain storage infrastructure in the State of Maharashtra through the
construction of modern steel silos in a phased manner.
Under Phase-I, a steel silo with a capacity of 1.25 LMT is under construction at FSD Borivali,
Maharashtra, and is likely to be completed by December 2026.
Under Phase-II, construction of steel silos with a total proposed capacity of 3.875 LVIT at six
locations in the State of Maharashtra has been planned. (List attached at Annexure-B).
8####Annexulre A
Annexure referred to in the reply to Part (a) ofUnstarred Question No. 596 in the Lok Sabha on
22.07.2026.
YEAR 1 S.N. State Location Capacity Year/Date of
LM completion
F Harvana PaniDat 0.50 25.05.2023
24 [2 Haryana Rohtak 0.50 18.06.2023
3 Gujarat Arnreli 0.50 13 . 1 0.2023
(Liliya)
4 Punjab Sangrur+ 1.00 0 1.12.2023
5 Bihar Darbhanga 0.50 28.02.2024
Total 3.00
FY 2024- 6 Punjab Sahne\val 0.50 01 .05.2024
25 7 Bihar Samastipur 0.50 09.05.2024
8 Guiarat Baroda 0.50 10.05.2024
M
9 Chhehretta 0.50 13.06.2024
10 Puniab Batala 0.50 14.06.2024
ma
11 Basti 0.50 24.09.2024
Pradesh
Total 3.00
FY 2025- 12 Bihar Buxar 0.50 23.04.2025
26 13 Rajasthan CAP Alwar 0.75 06.05.2025
14 mI Khagaria 0.50 02.06.2025
15 Uttar ma 0.75 10.06.2025
Pradesh
16 Punjab BG Malout 1.50 16.06.2025
17 West Balurghat 0.50 16.06.2025
Bengal
18 Bihar Katihar (I1) 0.50 18.06.2025
19 Uttar FSD 0.25 20.08.2025
Pradesh Dhamora
20 Uttar Harduaganj 0.50 15.09.2025
Pradesh
21 Uttar Fatehpur 0.50 05. 12.2025
Pradesh
22 Bihar Kaimur 0.50 15.12.2025
23 Uttar Lalpur 1.00 Dec-
Pradesh 2025/19.03.2026
24 Bihar Purnea 0.50 26. 12.2025
25 Haryana Palwal 0.25 Dec-
2025/3 1 .03.2026
26 Bihar Begusarai 0.50 12.03.2026
27 Uttar Lucknow 0.50 Feb-
Pradesh 2026/24.06.2026
28 Uttar l Mar-2026
Pradesh
29 West Mar-2026
L
Bengal
ma
30 a Mar-2026
31 Gujarat a Mar-
2026/07.04.202632 Uttar Pilibhit 0.50 Mar-2026
Pradesh
Uttar Sitapur 0.25 Mar-
Pradesh 2026/28.04.2026
Uttar Auraiya 0.25 Mar-2026
Pradesh
35 Haryana Assandh 0.25 Mar-2026
36 Haryana Gharundha 0.25 Mar-2026
37 Haryana Samalkhan 0.25 Mar-2026
38 Haryana Fatehabad 0.25––rMar-2026
39 Ma Safidon 0.25 Mar-2026
Total 14.00
FY 2026- 40 Uttar Lakh impur 0.50 May-2026
27 Pradesh
41 Uttar Unnao 0.25 May-
Pradesh 2026/09.06.2026
42 Uttar Amethi 0.25 May-
Pradesh 2026/09.06.2026
43 Uttar a May-2026
Pradesh Dehat
44 Uttar a May-2026
Pradesh
45 ma Bhuna 0.25 a
Total 1.75
88##8Annexul-e-B
Annexum referred to in the reply to Part (d) & (e) ofUnstarred Question No. 596 in the Lok Sabha
on 22.07.2026.
A. The details of Silos under construction in Maharashtra is as under(Phase-I):-
Capacity Likely date of completion of silo
State/Region Location
(in LMT) facility.
FSD Borival
Maharashtra Dec-26
B. Further, details of Silos proposed to constructed in Maharashtra is as under(Phase-II):-
t Mode Location Revenue District Capacity in 1,MT
0
a Spoke Pune Pune
a Spoke Jalgaon Jalgaon 0.75
a Spoke Palghar Palghar 0.5
DBFOO Maharashtra-2
t Mode Location Revenue District Capacity in LMT
0
Maharashtra Spoke Aurangabad Aurangabad
Maharashtra Spoke Nanded Nanded
Maharashtra Spoke Jalna Jalna 0.375
o
$8++8