**Executive Summary:**
The Ministry of Railways addresses a Lok Sabha question regarding passenger deaths on the Mumbai Suburban Railway from 2022-2024. While law and order are state subjects, the Ministry outlines measures taken to prevent accidents, including infrastructure projects, technological upgrades, and increased safety expenditure. There has been a decrease in the number of incidents reported of unnatural deaths in Mumbai Suburban Railway network during the year 2024 as compared to 2023. Safety is accorded the highest priority on Indian Railways.
**Key Points / Main Content:**
* **Unnatural Death Statistics (Mumbai Suburban Railway):**
* 2022: 1764 incidents in block sections, 662 at stations.
* 2023: 1880 incidents in block sections, 656 at stations.
* 2024: 1692 incidents in block sections, 781 at stations.
* Causes include falling from trains, trespassing, and other reasons.
* **Infrastructure Projects (Mumbai Suburban Railway):**
* Sanctioned projects include additional lines, corridor extensions, and elevated links.
* Projects aim to improve services and reduce overcrowding.
* AC local trains with automatic doors have been introduced to enhance commuter safety.
* **Amrit Bharat Station Scheme:**
* Long-term station development plan to improve amenities.
* Includes station access, waiting halls, cleanliness, WiFi, and local product kiosks.
* 1337 stations identified, including 132 in Maharashtra.
* **Safety Measures (Indian Railways):**
* Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 and further to 3 in 2025-26 upto June.
* Accidents Per Million Train Kilometer (APMTKM) reduced from 0.11 in 2014-15 to 0.03 in 2024-25.
* Expenditure on Safety related activities has increased over the years.
* **Technological Interventions:**
* Electrical/Electronic Interlocking Systems at 6,635 stations.
* Interlocking of Level Crossing Gates at 11,096 locations.
* Complete Track Circuiting at 6,640 stations.
* Kavach deployment on 1548 RKm. Work in progress on Delhi-Mumbai and Delhi-Howrah corridors (3000 RKm).
* Vigilance Control Devices (VCD) in locomotives.
* GPS based Fog Safety Device (FSD) for loco pilots.
* **Track and Rolling Stock Improvements:**
* Modern track structure with 60kg/90 UTS rails.
* Mechanized track laying.
* Longer rail panels to minimize welding.
* Ultrasonic Flaw Detection (USFD) testing of rails.
* Replacement of ICF coaches with LHB coaches.
* **Commuter Safety Initiatives (Mumbai Suburban Railway):**
* Awareness campaigns via social media and announcements.
* Cautionary flex boards at trespassing locations.
* RPF deployment to prevent trespassing.
* Legal action against rooftop/footboard travel.
**Impact Analysis:**
* **Passengers:**
* *Impact:* Benefit from improved safety, reduced accidents, enhanced station amenities, and safer train travel.
* *Action Required:* Heed safety announcements, avoid trespassing, and refrain from traveling on footboards or rooftops.
* **Railway Authorities (Ministry of Railways, GRP, RPF):**
* *Impact:* Responsible for implementing and maintaining safety measures, infrastructure projects, and law enforcement on the railways.
* *Action Required:* Continue infrastructure development, deploy safety technologies, conduct awareness campaigns, and enforce regulations to prevent accidents.
* **State Governments:**
* *Impact:* Responsible for maintaining law and order on Railways through their law enforcement agencies viz. Government Railway Police GRPDistrict Police.
* *Action Required:* Prevention, detection, registration and investigation of crime.
Key Entities Referenced
Mumbai Suburban Railway: A suburban rail system serving the city of Mumbai, Maharashtra. It is the focus of safety and infrastructure improvement measures.
SHRI ASHWINI VAISHNAW: The Minister of Railways, Information Broadcasting and Electronics Information Technology, responsible for answering the Lok Sabha question.
Government Railway Police (GRP): A law enforcement agency responsible for maintaining law and order on railways. They register and investigate cases of unnatural death.
Railway Protection Force (RPF): A force that supplements the efforts of the GRP and District Police to provide better protection and security to railway property, passenger area, and passengers.
Amrit Bharat Station Scheme: A scheme launched by the Ministry of Railways for the development of railway stations on a continuous basis, including improvement of amenities and integration with the city.
Kavach: A highly technology intensive system adopted as a National ATP (Automatic Train Protection) system in July 2020 to prevent train accidents.
South Central Railway: One of the railway zones in India where Kavach has already been deployed.
North Central Railway: One of the railway zones in India where Kavach has already been deployed.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2877
TO BE ANSWERED ON 06.08.2025
MUMBAI SUBURBAN RAILWAY NETWORK
2877. SHRI K C VENUGOPAL:
Will the Minister of RAILWAYS be pleased to state:
(a) the details of the number of passenger deaths reported on the
Mumbai Suburban Railway system each year from 2022 to 2024, line
and station-wise;
(b) the number of deaths and their main causes including deaths due to
overcrowding, falling from trains, track crossing, category-wise; and
(c) the measures taken/being taken to prevent these accidents on the
Mumbai Suburban Railway and the reason for fatalities continuing to
remain high despite previous interventions?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): ‘Police’ and ‘Public Order’ are State subjects under the Seventh
Schedule to the Constitution of India and therefore, State Governments are
responsible for prevention, detection, registration, and investigation of
crime and maintenance of law and order on Railways through their law-2-
enforcement agencies viz. Government Railway Police (GRP)/District Police.
The cases of unnatural death are registered by GRP/District Police and
investigated. Railway Protection Force (RPF) supplements the efforts of
GRP/ District Police to provide better protection and security to railway
property, passenger area and passengers and for matters connected
therewith.
There is decrease in the number of incidents reported of unnatural deaths in
Mumbai Suburban Railway network during the year 2024 as compared to
2023.
As per information received from GRP, 1764, 1880 & 1692 incidents of
unnatural deaths in block sections and 662, 656 & 781 incidents of
unnatural deaths at stations have been registered in the year 2022, 2023 &
2024 respectively. These figure include the deaths due to falling from trains,
trespassing (crossing track unauthorisedly), and various other reasons such
as Pole hitting etc.
The introduction of AC local trains equipped with automatic doors in
Mumbai has been a welcome initiative to enhance commuters’ safety and
reduce incidents related to overcrowding. The automatic doors prevent
passengers from hanging on footboards or boarding moving trains which is a
major cause of fatal accidents. These doors remain closed while the train is
in motion and open only at stations when the train is stationary, thereby
significantly reducing the risk of falls.
To improve the infrastructure in Mumbai suburban railway services,
--3/--3-
following projects have been sanctioned:
SN Name of Project Length Cost
(km) (in Cr.)
1 CSMT-Kurla 5th& 6thLine (MUTP-II) 17.5 891
2 Mumbai Central-Borivali 6thLine (MUTP-II) 30 919
Extension of Harbour Line from Goregaon-Borivali
3 7 826
(MUTP-IIIA)
4 Borivali-Virar 5th& 6thLine (MUTP-IIIA) 26 2,184
5 Virar-Dahanu Road 3rd& 4thLine (MUTP-III) 64 3,587
6 Panvel-Karjat Suburban Corridor (MUTP-III) 29.6 2,782
Airoli-Kalwa (elevated) Suburban Corridor link
7 3.3 476
(MUTP-III)
8 Kalyan-Asangaon 4thLine (MUTP-IIIA) 32 1,759
9 Kalyan-Badlapur 3rd& 4th line (MUTP-IIIA) 14 1,510
10 Kalyan-Kasara 3rdLine 67 793
11 Naigaon-Juichandra double chord Line 6 176
12 Nilaje-Kopar double chord Line 5 338
Ministry of Railways has launched Amrit Bharat Station Scheme. It
envisages development of stations on a continuous basis with a long-term
approach. It involves preparation of master plans and their implementation
in phases to improve the amenities at the stations like improvement of
station access, circulating areas, waiting halls, toilets, lift/escalators as
necessary, platform surfacing and cover over platform, cleanliness, free
--4/--4-
Wi-Fi, kiosks for local products through schemes like ‘One Station One
Product’, better passenger information systems, executive lounges,
nominated spaces for business meetings, landscaping, etc. keeping in view
the necessity at each station.
The scheme also envisages improvement of building, integrating the station
with both sides of the city, multimodal integration, amenities for
Divyangjans, sustainable and environment friendly solutions, provision of
ballastless tracks, etc. as per necessity, phasing and feasibility and
creation of city centre at the station in the long term.
So far, 1337 stations including 132 stations in the state of Maharashtra
have been identified for development under this scheme.
Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents. Consequential Train
Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 as shown in
the graph below.
It may be noted that the Consequential Train Accidents during the period
2004-14 was 1711 (average 171 per annum), which has declined to 31 in
2024-25 and further to 3 in 2025-26 (upto June).
Another important index showing improved safety in train operations is
Accidents Per Million Train Kilometer (APMTKM) which has reduced from
0.11 in 2014-15 to 0.03 in 2024-25, indicating an improvement of approx.
73% during the said period.
--5/--5-
234
165
135
55
48
40
35 31
22
3
2005- 2009- 2014- 2019- 2020- 2021- 2022- 2023- 2024- 2025-26
06 10 15 20 21 22 23 24 25 (up to
Covid Covid Jun'25)
year year
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure on Safety related activities (Rs. in Cr.)
2013-14 2022- 2023-24 RE BE
(Act.) 23 (Act.) 2024- 2025-
(Act.) 25 26
Maintenance of 9,172 18,115 20,322 21,800 23,316
Permanent Way
& Works
Maintenance of 14,796 27,086 30,864 31,540 30,666
Motive Power
and Rolling
Stock
Maintenance of 5,406 9,828 10,772 12,112 12,880
Machines
--6/-
stnediccA
niarT
laitneuqesnoC
fo
.oN-6-
Road Safety 1,986 5,347 6,662 8,184 7,706
LCs and ROBs/
RUBs
Track 4,985 16,326 17,850 22,669 22,800
Renewals
Bridge Works 390 1,050 1,907 2,130 2,169
Signal & 905 2,456 3,751 6,006 6,800
Telecom Works
Workshops Incl. 1,823 7,119 9,523 9,581 10,134
PUs and Misc.
expenditure on
Safety
Total 39,463 87,327 1,01,651 1,14,022 1,16,470
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,635 stations up to
30.06.2025 to reduce accident due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 11,096
level Crossing Gates up to 30.06.2025 for enhancing safety at LC gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,640
stations up to 30.06.2025.
5. Kavach is a highly technology intensive system, which requires safety
certification of highest order. Kavach was adopted as a National ATP
system in July 2020. Kavach is provided progressively in phased
manner. Kavach has already been deployed on 1548 RKm on South
Central Railway and North Central Railway. Presently, the work is in
progress on Delhi-Mumbai and Delhi-Howrah corridors (approximately
3000 RKm). Kavach has been successfully commissioned over Kota–
--7/--7-
Mathura section (Delhi – Mumbai route) covering 324 Route Kilometers
on 30.07.2025.
6. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories to
alert the crew about the signal ahead when visibility is low due to foggy
weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base
sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
while carrying out primary track renewals.
12. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
--8/--8-
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.
18. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
19. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
20. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
21. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon precautions,
etc. have been issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
--/9--9-
based upon the conditions assessed during these inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying
any inflammable material, explosives, prohibition of smoking inside the
coaches, penalties etc.
27. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in
a phased manner.
28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
planned up to 52 weeks in advance on rolling basis and executed as per
plan.
The details of the Safety related works related to better maintenance
practices, Technologicalimprovements, better infrastructureand rolling
stock etc. undertaken by Railways are tabulated below:-
2014-15 to
2004-05 to 2014-25 Vs.
S.N. Item 2024-25
2013-14 2004-14
(till March 25)
Technological improvements
--10/--10-
1. Use of high-quality 57,450 Km 1.43 Lakh Km More than 2
rails (60 Kg) (Km) times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8 times
(260m) (Km)
3. Electronic 837 3,691 Stations More than 4
Interlocking Stations times
(Stations)
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better maintenance practices
1. Primary Rail 32,260 Km 49,941 Km 1.5 times
Renewal (Track
Km)
2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than 2
Flaw detection) times
Testing of Welds
(Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % reduction
3699 Nos. 370 Nos.
4. Rail fractures In 2013-14: In 2024-25: More than 88%
(Nos.) 2548 Nos. 289 Nos. reduction
Better infrastructure and Rolling stock
1. New Track KM 14,985 34,428 Km More than 2
added (Track km) Nos. times
2. Flyovers (RoBs)/ 4,148 Nos. 13,808 Nos. More than 3
Underpasses times
(RUBs) (Nos.)
--11/--11-
3. Unmanned Level As on As on Removed
crossings 31.03.14: 31.03.24:
(nos.) on BG 8948 Nil
(All
eliminated
by 31.01.19)
4. Manufacture of 2,337 Nos. 42,677 More than 18
LHB Coaches times
(Nos.)
The following steps are also being taken for Commuters safety in Mumbai
Suburban Railway network:-
1. Various awareness and sensitization campaigns are conducted by
railways using social media, digital & print media.
2. Frequent announcement is made at railway stations using Loud Hailers
as well as through Public Announcement systems cautioning
passengers against crossing tracks, boarding moving trains and
travelling on footboards.
3. Short videos for passenger awareness are also displayed in Rail Display
Network at railway station.
4. Flex boards in both Hindi& Marathi languages have been installed at
vulnerable locations of trespassing to caution the passengers/public
against crossing railway tracks.
5. RPF staff is deployed at vulnerable locations to prevent trespassing and
trespassers are prosecuted.
6. Legal action is taken against persons travelling on train rooftops,