Home India Ministry of Railways Parliament Question: Mumbai Suburban Railway Network...
Date: 2025-08-06 Category: Not Applicable State: Union Government Country: India

Parliament Question: Mumbai Suburban Railway Network

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary:** The Ministry of Railways addresses a Lok Sabha question regarding passenger deaths on the Mumbai Suburban Railway from 2022-2024. While law and order are state subjects, the Ministry outlines measures taken to prevent accidents, including infrastructure projects, technological upgrades, and increased safety expenditure. There has been a decrease in the number of incidents reported of unnatural deaths in Mumbai Suburban Railway network during the year 2024 as compared to 2023. Safety is accorded the highest priority on Indian Railways. **Key Points / Main Content:** * **Unnatural Death Statistics (Mumbai Suburban Railway):** * 2022: 1764 incidents in block sections, 662 at stations. * 2023: 1880 incidents in block sections, 656 at stations. * 2024: 1692 incidents in block sections, 781 at stations. * Causes include falling from trains, trespassing, and other reasons. * **Infrastructure Projects (Mumbai Suburban Railway):** * Sanctioned projects include additional lines, corridor extensions, and elevated links. * Projects aim to improve services and reduce overcrowding. * AC local trains with automatic doors have been introduced to enhance commuter safety. * **Amrit Bharat Station Scheme:** * Long-term station development plan to improve amenities. * Includes station access, waiting halls, cleanliness, WiFi, and local product kiosks. * 1337 stations identified, including 132 in Maharashtra. * **Safety Measures (Indian Railways):** * Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 and further to 3 in 2025-26 upto June. * Accidents Per Million Train Kilometer (APMTKM) reduced from 0.11 in 2014-15 to 0.03 in 2024-25. * Expenditure on Safety related activities has increased over the years. * **Technological Interventions:** * Electrical/Electronic Interlocking Systems at 6,635 stations. * Interlocking of Level Crossing Gates at 11,096 locations. * Complete Track Circuiting at 6,640 stations. * Kavach deployment on 1548 RKm. Work in progress on Delhi-Mumbai and Delhi-Howrah corridors (3000 RKm). * Vigilance Control Devices (VCD) in locomotives. * GPS based Fog Safety Device (FSD) for loco pilots. * **Track and Rolling Stock Improvements:** * Modern track structure with 60kg/90 UTS rails. * Mechanized track laying. * Longer rail panels to minimize welding. * Ultrasonic Flaw Detection (USFD) testing of rails. * Replacement of ICF coaches with LHB coaches. * **Commuter Safety Initiatives (Mumbai Suburban Railway):** * Awareness campaigns via social media and announcements. * Cautionary flex boards at trespassing locations. * RPF deployment to prevent trespassing. * Legal action against rooftop/footboard travel. **Impact Analysis:** * **Passengers:** * *Impact:* Benefit from improved safety, reduced accidents, enhanced station amenities, and safer train travel. * *Action Required:* Heed safety announcements, avoid trespassing, and refrain from traveling on footboards or rooftops. * **Railway Authorities (Ministry of Railways, GRP, RPF):** * *Impact:* Responsible for implementing and maintaining safety measures, infrastructure projects, and law enforcement on the railways. * *Action Required:* Continue infrastructure development, deploy safety technologies, conduct awareness campaigns, and enforce regulations to prevent accidents. * **State Governments:** * *Impact:* Responsible for maintaining law and order on Railways through their law enforcement agencies viz. Government Railway Police GRPDistrict Police. * *Action Required:* Prevention, detection, registration and investigation of crime.

Key Entities Referenced

Mumbai Suburban Railway: A suburban rail system serving the city of Mumbai, Maharashtra. It is the focus of safety and infrastructure improvement measures. SHRI ASHWINI VAISHNAW: The Minister of Railways, Information Broadcasting and Electronics Information Technology, responsible for answering the Lok Sabha question. Government Railway Police (GRP): A law enforcement agency responsible for maintaining law and order on railways. They register and investigate cases of unnatural death. Railway Protection Force (RPF): A force that supplements the efforts of the GRP and District Police to provide better protection and security to railway property, passenger area, and passengers. Amrit Bharat Station Scheme: A scheme launched by the Ministry of Railways for the development of railway stations on a continuous basis, including improvement of amenities and integration with the city. Kavach: A highly technology intensive system adopted as a National ATP (Automatic Train Protection) system in July 2020 to prevent train accidents. South Central Railway: One of the railway zones in India where Kavach has already been deployed. North Central Railway: One of the railway zones in India where Kavach has already been deployed.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 2877 TO BE ANSWERED ON 06.08.2025 MUMBAI SUBURBAN RAILWAY NETWORK 2877. SHRI K C VENUGOPAL: Will the Minister of RAILWAYS be pleased to state: (a) the details of the number of passenger deaths reported on the Mumbai Suburban Railway system each year from 2022 to 2024, line and station-wise; (b) the number of deaths and their main causes including deaths due to overcrowding, falling from trains, track crossing, category-wise; and (c) the measures taken/being taken to prevent these accidents on the Mumbai Suburban Railway and the reason for fatalities continuing to remain high despite previous interventions? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (c): ‘Police’ and ‘Public Order’ are State subjects under the Seventh Schedule to the Constitution of India and therefore, State Governments are responsible for prevention, detection, registration, and investigation of crime and maintenance of law and order on Railways through their law-2- enforcement agencies viz. Government Railway Police (GRP)/District Police. The cases of unnatural death are registered by GRP/District Police and investigated. Railway Protection Force (RPF) supplements the efforts of GRP/ District Police to provide better protection and security to railway property, passenger area and passengers and for matters connected therewith. There is decrease in the number of incidents reported of unnatural deaths in Mumbai Suburban Railway network during the year 2024 as compared to 2023. As per information received from GRP, 1764, 1880 & 1692 incidents of unnatural deaths in block sections and 662, 656 & 781 incidents of unnatural deaths at stations have been registered in the year 2022, 2023 & 2024 respectively. These figure include the deaths due to falling from trains, trespassing (crossing track unauthorisedly), and various other reasons such as Pole hitting etc. The introduction of AC local trains equipped with automatic doors in Mumbai has been a welcome initiative to enhance commuters’ safety and reduce incidents related to overcrowding. The automatic doors prevent passengers from hanging on footboards or boarding moving trains which is a major cause of fatal accidents. These doors remain closed while the train is in motion and open only at stations when the train is stationary, thereby significantly reducing the risk of falls. To improve the infrastructure in Mumbai suburban railway services, --3/--3- following projects have been sanctioned: SN Name of Project Length Cost (km) (in Cr.) 1 CSMT-Kurla 5th& 6thLine (MUTP-II) 17.5 891 2 Mumbai Central-Borivali 6thLine (MUTP-II) 30 919 Extension of Harbour Line from Goregaon-Borivali 3 7 826 (MUTP-IIIA) 4 Borivali-Virar 5th& 6thLine (MUTP-IIIA) 26 2,184 5 Virar-Dahanu Road 3rd& 4thLine (MUTP-III) 64 3,587 6 Panvel-Karjat Suburban Corridor (MUTP-III) 29.6 2,782 Airoli-Kalwa (elevated) Suburban Corridor link 7 3.3 476 (MUTP-III) 8 Kalyan-Asangaon 4thLine (MUTP-IIIA) 32 1,759 9 Kalyan-Badlapur 3rd& 4th line (MUTP-IIIA) 14 1,510 10 Kalyan-Kasara 3rdLine 67 793 11 Naigaon-Juichandra double chord Line 6 176 12 Nilaje-Kopar double chord Line 5 338 Ministry of Railways has launched Amrit Bharat Station Scheme. It envisages development of stations on a continuous basis with a long-term approach. It involves preparation of master plans and their implementation in phases to improve the amenities at the stations like improvement of station access, circulating areas, waiting halls, toilets, lift/escalators as necessary, platform surfacing and cover over platform, cleanliness, free --4/--4- Wi-Fi, kiosks for local products through schemes like ‘One Station One Product’, better passenger information systems, executive lounges, nominated spaces for business meetings, landscaping, etc. keeping in view the necessity at each station. The scheme also envisages improvement of building, integrating the station with both sides of the city, multimodal integration, amenities for Divyangjans, sustainable and environment friendly solutions, provision of ballastless tracks, etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term. So far, 1337 stations including 132 stations in the state of Maharashtra have been identified for development under this scheme. Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents. Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 as shown in the graph below. It may be noted that the Consequential Train Accidents during the period 2004-14 was 1711 (average 171 per annum), which has declined to 31 in 2024-25 and further to 3 in 2025-26 (upto June). Another important index showing improved safety in train operations is Accidents Per Million Train Kilometer (APMTKM) which has reduced from 0.11 in 2014-15 to 0.03 in 2024-25, indicating an improvement of approx. 73% during the said period. --5/--5- 234 165 135 55 48 40 35 31 22 3 2005- 2009- 2014- 2019- 2020- 2021- 2022- 2023- 2024- 2025-26 06 10 15 20 21 22 23 24 25 (up to Covid Covid Jun'25) year year 1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under:- Expenditure on Safety related activities (Rs. in Cr.) 2013-14 2022- 2023-24 RE BE (Act.) 23 (Act.) 2024- 2025- (Act.) 25 26 Maintenance of 9,172 18,115 20,322 21,800 23,316 Permanent Way & Works Maintenance of 14,796 27,086 30,864 31,540 30,666 Motive Power and Rolling Stock Maintenance of 5,406 9,828 10,772 12,112 12,880 Machines --6/- stnediccA niarT laitneuqesnoC fo .oN-6- Road Safety 1,986 5,347 6,662 8,184 7,706 LCs and ROBs/ RUBs Track 4,985 16,326 17,850 22,669 22,800 Renewals Bridge Works 390 1,050 1,907 2,130 2,169 Signal & 905 2,456 3,751 6,006 6,800 Telecom Works Workshops Incl. 1,823 7,119 9,523 9,581 10,134 PUs and Misc. expenditure on Safety Total 39,463 87,327 1,01,651 1,14,022 1,16,470 2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,635 stations up to 30.06.2025 to reduce accident due to human failure. 3. Interlocking of Level Crossing (LC) Gates has been provided at 11,096 level Crossing Gates up to 30.06.2025 for enhancing safety at LC gates. 4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,640 stations up to 30.06.2025. 5. Kavach is a highly technology intensive system, which requires safety certification of highest order. Kavach was adopted as a National ATP system in July 2020. Kavach is provided progressively in phased manner. Kavach has already been deployed on 1548 RKm on South Central Railway and North Central Railway. Presently, the work is in progress on Delhi-Mumbai and Delhi-Howrah corridors (approximately 3000 RKm). Kavach has been successfully commissioned over Kota– --7/--7- Mathura section (Delhi – Mumbai route) covering 324 Route Kilometers on 30.07.2025. 6. Detailed instructions on issues related with safety of Signalling, e.g. mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued. 7. System of disconnection and reconnection for S&T equipment as per protocol has been re-emphasized. 8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots. 9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to alert the crew about the signal ahead when visibility is low due to foggy weather. 10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates, etc. 11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals. 12. Mechanisation of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to reduce human errors. 13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety. --8/--8- 14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails. 15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better welding technology for rails i.e., Flash Butt Welding. 16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars). 17. Patrolling of railway tracks to look out for weld/rail fractures. 18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works. 19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices. 20. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs. 21. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block, worksite safety, monsoon precautions, etc. have been issued. 22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations. 23. Replacement of conventional ICF design coaches with LHB design coaches is being done. 24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019. 25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up --/9--9- based upon the conditions assessed during these inspections. 26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc. 27. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner. 28. Regular counselling and training of staff is undertaken. 29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan. The details of the Safety related works related to better maintenance practices, Technologicalimprovements, better infrastructureand rolling stock etc. undertaken by Railways are tabulated below:- 2014-15 to 2004-05 to 2014-25 Vs. S.N. Item 2024-25 2013-14 2004-14 (till March 25) Technological improvements --10/--10- 1. Use of high-quality 57,450 Km 1.43 Lakh Km More than 2 rails (60 Kg) (Km) times 2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8 times (260m) (Km) 3. Electronic 837 3,691 Stations More than 4 Interlocking Stations times (Stations) 4. Fog Pass Safety As on As on 31.03.25: 288 times Devices (Nos.) 31.03.14: 25,939 90 Nos. 5. Thick Web Switches Nil 28,301 Nos. (Nos.) Better maintenance practices 1. Primary Rail 32,260 Km 49,941 Km 1.5 times Renewal (Track Km) 2. USFD (Ultra Sonic 79.43 Lakh 2 Crore More than 2 Flaw detection) times Testing of Welds (Nos.) 3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % reduction 3699 Nos. 370 Nos. 4. Rail fractures In 2013-14: In 2024-25: More than 88% (Nos.) 2548 Nos. 289 Nos. reduction Better infrastructure and Rolling stock 1. New Track KM 14,985 34,428 Km More than 2 added (Track km) Nos. times 2. Flyovers (RoBs)/ 4,148 Nos. 13,808 Nos. More than 3 Underpasses times (RUBs) (Nos.) --11/--11- 3. Unmanned Level As on As on Removed crossings 31.03.14: 31.03.24: (nos.) on BG 8948 Nil (All eliminated by 31.01.19) 4. Manufacture of 2,337 Nos. 42,677 More than 18 LHB Coaches times (Nos.) The following steps are also being taken for Commuters safety in Mumbai Suburban Railway network:- 1. Various awareness and sensitization campaigns are conducted by railways using social media, digital & print media. 2. Frequent announcement is made at railway stations using Loud Hailers as well as through Public Announcement systems cautioning passengers against crossing tracks, boarding moving trains and travelling on footboards. 3. Short videos for passenger awareness are also displayed in Rail Display Network at railway station. 4. Flex boards in both Hindi& Marathi languages have been installed at vulnerable locations of trespassing to caution the passengers/public against crossing railway tracks. 5. RPF staff is deployed at vulnerable locations to prevent trespassing and trespassers are prosecuted. 6. Legal action is taken against persons travelling on train rooftops, footboards and other restricted places of the train formation. *****

Continue your research