Executive Summary & Key Takeaways

Executive Summary: This document presents the Indian government's response to questions regarding the National Electricity Plan 2032, addressing peak electricity demand, transmission system augmentation, interregional transfer capacity, green hydrogen/ammonia supply, power demand/supply details, and development in Madhya Pradesh. It includes projected electricity demands and planned infrastructure developments up to 2032, along with current power supply data up to June 2025. The plan aims to meet the projected power demand without shortages. Key Points / Main Content: Electricity Demand and Supply: * All India peak electricity demand is projected to be 388 GW by 2031-32. * The government is confident in meeting this demand without shortages. * Detailed state-wise power supply positions, including Maharashtra, are available from FY 2019-2020 up to June 2025 (Annexure III). Transmission System Augmentation: * Details of planned transmission systems (220 kV and above) until 2031-32 under Inter-State Transmission System (ISTS) and Intra-State Transmission System (InSTS) are provided (Annexure I). * Interregional transmission capacity is planned to increase from approximately 120 GW (June 2025) to 168 GW by 2031-32. Green Hydrogen/Ammonia Supply: * Estimated additional electricity demand for green hydrogen/ammonia production is around 70 GW by 2031-32. * Transmission systems are planned for power delivery to green hydrogen/ammonia manufacturing hubs in Gujarat, Odisha, West Bengal, Andhra Pradesh, Tamil Nadu, and Karnataka. * Implementation will be phased based on the establishment progress of these hubs. * Details of planned transmission systems for these hubs are provided (Annexure II). Madhya Pradesh Development: * In Madhya Pradesh, approximately 2,030 ckm of transmission lines and 27.5 GVA of transformation capacity (220 kV and above) are planned under ISTS during 2022-32. * Additionally, about 4,292 ckm of transmission lines and 16.54 GVA of transformation capacity are planned under InSTS during the same period. * Specific substation and ICT augmentations are planned near Dewas-Shajapur constituency by 2032 to meet electricity demand. Impact Analysis: Central and State Transmission System Operators: * Impact: Required to implement planned augmentations to meet electricity demand and increase interregional transfer capacity. * Action Required: Plan and execute the expansion of transmission infrastructure as per the timelines outlined in the National Electricity Plan. Green Hydrogen/Ammonia Manufacturing Hubs: * Impact: Will receive power supply through planned transmission systems, supporting their production activities. * Action Required: Coordinate with transmission system operators to ensure timely establishment and commissioning of power supply infrastructure. Madhya Pradesh (Specifically Dewas-Shajapur Constituency): * Impact: Enhanced electricity supply through new substations and ICT augmentations, boosting development. * Action Required: Monitor the progress of planned infrastructure projects and coordinate with relevant authorities to address any potential issues. State Utilities/Electricity Departments: * Impact: Must provide accurate and timely data on power supply positions to facilitate informed planning and decision-making. * Action Required: Ensure the timely submission of reliable power supply data for effective monitoring and evaluation of the National Electricity Plan.

Key Entities Referenced

National Electricity Plan: A plan by the Ministry of Power, Government of India, to address electricity demand and supply, including transmission infrastructure and green energy initiatives. Includes volumes on transmission (Volume II). 2032: The target year for addressing peak electricity demand, augmenting transmission systems, and increasing interregional transfer capacity under the National Electricity Plan. Maharashtra: A state in India, specifically mentioned in the context of power demand and supply details over the last five years. Madhya Pradesh: A state in India, with a focus on how the National Electric Plan 2032 will boost development, particularly in the DewasShajapur Lok Sabha Constituency. Includes specifics of ISTS and InSTS projects. Inter-State Transmission System (ISTS): A system for the transmission of electricity between states in India. Mentioned in the context of planned augmentation to meet power demand. Intra-State Transmission System (InSTS): A system for the transmission of electricity within a state in India. Mentioned in the context of planned augmentation to meet power demand. Green Hydrogen/Green Ammonia: A focus area within the National Electricity Plan to supply power to potential manufacturing hubs, especially in coastal regions of Gujarat, Odisha, West Bengal, Andhra Pradesh, Tamil Nadu and Karnataka. Gujarat: A state in India, identified as a location for green hydrogen and green ammonia manufacturing hubs, specifically in the Navinal Mundra and Kandla areas.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA UNSTARRED QUESTION NO.1867 ANSWERED ON 31.07.2025 NATIONAL ELECTRICITY PLAN †1867. SHRI DULU MAHATO: SHRI BIDYUT BARAN MAHATO: SMT. SHOBHANABEN MAHENDRASINH BARAIYA: SHRI DILIP SAIKIA: SHRI ANURAG SHARMA: SHRI CHHATRAPAL SINGH GANGWAR: SHRI DINESHBHAI MAKWANA: SHRI BHARTRUHARI MAHTAB: SHRI MUKESH RAJPUT: SHRI CHAVDA VINOD LAKHAMSHI: DR. HEMANT VISHNU SAVARA: SHRI JAGDAMBIKA PAL: SHRI MAHENDRA SINGH SOLANKY: SHRI RAVINDRA SHUKLA ALIAS RAVI KISHAN: Will the Minister of POWER be pleased to state: (a) the estimated peak electricity demand targeted to be addressed/met by the year 2032 under the National Electricity Plan; (b) the estimated augmentation in Central and State transmission systems to meet the above demand by the year 2032 under the said plan; (c) the estimated increase in inter-regional transfer capacity by the year 2032; (d) whether there are any provisions under the Plan to supply electricity to green hydrogen or green ammonia manufacturing potential hubs and if so, the details thereof; (e) the details of demand and supply of power during the last five years, State-wise specially in the State of Maharashtra; and (f) the manner in which the initiatives of the Government regarding the National Electric Plan 2032 is likely to help in boosting development in Madhya Pradesh especially in Dewas-Shajapur Lok Sabha Constituency? A N S W E R THE MINISTER OF STATE IN THE MINISTRY OF POWER (SHRI SHRIPAD NAIK) (a): As per National Electricity Plan (Transmission), for the period 2022-32, All India peak electricity demand is projected to be 388 GW by 2031-32. The Government of India is confident of meeting this projected power demand without any shortages. ………2.- 2 - (b) : The details of the transmission system (220 kV and above) planned till 2031-32 under Inter-State Transmission System (ISTS) and Intra-State Transmission System (InSTS) are given at Annexure-I. (c) : The inter-regional transmission capacity is planned to be increased from around 120 GW as on June 2025 to 168 GW by the year 2031-32. (d): As per initial estimates, the additional electricity demand on account of green hydrogen/green ammonia production is around 70 GW by the year 2031-32. Transmission system has been planned for delivery of power to green hydrogen/green ammonia manufacturing hubs in the coastal areas of Gujarat, Odisha, West Bengal, Andhra Pradesh, Tamil Nadu and Karnataka. The planned transmission system would be taken up for implementation in a phased manner commensurate with the progress of establishment of green hydrogen/green ammonia manufacturing hubs. The details of the transmission system planned for delivery of power to green hydrogen/green ammonia manufacturing hubs are given at Annexure-II. (e) : The details of power supply position of the country in terms of Energy for the last five year and the current year (upto June 2025) including the state of Maharashtra are given at Annexure-III. (f) : As per National Electricity Plan (Volume-II Transmission), in Madhya Pradesh, about, 2030 ckm of transmission lines and 27.5 GVA of transformation capacity (220 kV and above voltage levels) are planned to be added in ISTS during 2022-32. In addition, about 4,292 ckm of transmission lines and 16.54 GVA of transformation capacity in the substations (220 kV and above voltage levels) are planned to be added in Intra-State Transmission System (InSTS) during 2022-32. In the vicinity of Dewas-Shajapur constituency, following new substations/ ICT augmentations at existing substation have been planned under Inter-State Transmission System (ISTS) and InSTS by 2032 which would help in meeting the electricity demand of the constituency. (i) New 220/132 kV, 160 MVA Super Corridor (Indore) Substation(InSTS) (ii) ICT augmentation at 220/132 kV, 160 MVA Mangliya Substation (InSTS) (iii) ICT augmentation at 765/400 kV Indore Substation (ISTS) (iv) ICT augmentation at 400/200 kV Pachora SEZ PP (ISTS) (v) ICT augmentation at 400/220 kV Shujalpur (PG) Substation (ISTS) (vi) ICT augmentation at 400/220 kV Rajgarh Substation (ISTS) ************ANNEXURE-I ANNEXURE REFERRED IN REPLY TO PART (b) OF UNSTARRED QUESTION NO. 1867 ANSWERED IN THE LOK SABHA ON 31.07.2025 ************* The details of the transmission system (220 kV and above) planned till 2031- 32 under Inter-State Transmission System (ISTS) and Intra-State Transmission System (InSTS): As on Planned At the end Total 30.06.2025 addition of 2031-32 during July 2025 to (31.03.2032) March 2032 Transmission ISTS 2,14,677 79,868 2,94,545 6,48,190 lines (ckm) Intra- 2,80,728 72,917 3,53,645 State Transformatio ISTS 5,68,205 7,13,150 12,81,355 24,11,885 n Capacity Intra- 7,91,498 3,39,032 11,30,530 (MVA) State **************ANNEXURE-II ANNEXURE REFERRED IN REPLY TO PART (d) OF UNSTARRED QUESTION NO. 1867 ANSWERED IN THE LOK SABHA ON 31.07.2025 ************* Details of the transmission system planned for delivery of power to green hydrogen/green ammonia manufacturing hubs: (i) Network Expansion Scheme in Navinal (Mundra) area of Gujarat for drawal of power (under Phase-I Part A) (ii) Transmission System for supply of power to Green Hydrogen/Green Ammonia manufacturing hub potential in Mundra area of Gujarat under Phase-I: Part B scheme (iii) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub in Mundra, Gujarat, Phase-II (iv) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub in Mundra, Gujarat, under Phase-III (v) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub in Mundra, Gujarat, under Phase-IV (vi) Transmission System for supply of power to Green Hydrogen/Green Ammonia manufacturing hub in Kandla area of Gujarat (Phase-I) (vii) Transmission System for supply of power to Green Hydrogen/ Ammonia potential in Kandla area of Gujarat (Phase-II) (viii) Transmission System for supply of power to Green Hydrogen/ Ammonia potential in Kandla area of Gujarat (Phase-III) (ix) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Kakinada (x) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Pudimadka (Vizag) (xi) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Ramayapatnam (xii) Transmission system for meeting electricity demand of Green Hydrogen/Green Ammonia manufacturing hub at Tuticorin (xiii) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Mangalore (xiv) Eastern Region Expansion Scheme-XXXIV (ERES- XXXIV): for supply of power to Green Hydrogen/Green Ammonia manufacturing hub at Paradeep (xv) Eastern Region Expansion Scheme-XXXIX (ERES- XXXIX): for supply of power to Green Hydrogen/Green Ammonia manufacturing hub at Gopalpur (xvi) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Goplapur (xvii) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Paradeep and Kendrapada (xviii) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Malkangiri (xix) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Rayagada (xx) Transmission System for supply of power to Green Hydrogen/ Green Ammonia manufacturing hub at Shyama Prasad Mukherjee Port *************ANNEXURE-III ANNEXURE REFERRED IN REPLY TO PART (e) OF UNSTARRED QUESTION NO. 1867 ANSWERED IN THE LOK SABHA ON 31.07.2025 ************* Details of States/UTs/Regions-wise Power Supply Position of the Country including the Maharashtra in terms of Energy for the period from FY 2019-2020 to FY 2020-2021: State/ April, 2019 -March, 2020 April, 2020 - March, 2021 Energy Energy Energy Energy Energy not System / Requirement Supplied Energy not Supplied Requirement Supplied Supplied Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,732 1,732 0 0 1,523 1,523 0 0 Delhi 33,086 33,077 9 0 29,560 29,555 4 0 Haryana 54,505 54,492 13 0 53,161 53,108 53 0.1 Himachal Pradesh 10,424 10,353 71 0.7 10,186 10,130 56 0.5 Jammu & Kashmir 20,025 16,259 3,767 18.8 19,773 17,222 2,551 12.9 Punjab 56,776 56,770 6 0 58,445 58,377 67 0.1 Rajasthan 81,281 81,222 58 0.1 85,311 85,205 106 0.1 Uttar Pradesh 1,22,549 1,21,004 1,545 1.3 1,24,367 1,23,383 984 0.8 Uttarakhand 14,472 14,376 96 0.7 13,827 13,818 8 0.1 Northern Region 3,94,851 3,89,285 5,566 1.4 3,96,151 3,92,323 3,829 1 Chhattisgarh 30,111 30,107 4 0 30,472 30,449 22 0.1 Gujarat 1,13,940 1,13,939 1 0 1,11,622 1,11,622 0 0 Madhya Pradesh 76,172 76,172 0 0 83,437 83,437 0 0 Maharashtra 1,55,167 1,55,166 0 0 1,50,679 1,50,663 16 0 Daman & Diu 2,574 2,574 0 0 2,223 2,223 0 0 Dadra & Nagar Haveli 6,528 6,528 0 0 5,497 5,497 0 0 Goa 4,350 4,350 0 0 4,083 4,083 0 0 Western Region 3,88,841 3,88,836 5 0 3,88,013 3,87,975 38 0 Andhra Pradesh 65,452 65,414 38 0.1 62,080 62,076 4 0 Telangana 68,306 68,303 3 0 66,998 66,994 4 0 Karnataka 72,799 72,796 3 0 68,851 68,831 19 0 Kerala 26,315 26,265 50 0.2 25,118 25,102 16 0.1 Tamil Nadu 1,08,816 1,08,812 4 0 1,01,194 1,01,189 5 0 Puducherry 2,847 2,846 1 0 2,644 2,644 0 0 Lakshadweep (#) 46 46 0 0 56 56 0 0 Southern Region 3,44,535 3,44,436 99 0 3,26,885 3,26,836 48 0 Bihar 31,627 31,533 94 0.3 34,171 34,018 153 0.4 DVC 22,429 22,427 2 0 21,368 21,368 0 0 Jharkhand 8,941 8,872 69 0.8 9,953 9,675 278 2.8 Odisha 29,692 29,692 0 0 29,848 29,848 0 0 West Bengal 52,948 52,824 124 0.2 51,644 51,543 100 0.2 Sikkim 554 554 0 0 546 546 0 0 Andaman- Nicobar (#) 346 323 23 6.7 346 323 23 6.7 Eastern Region 1,46,191 1,45,902 289 0.2 1,47,530 1,46,999 531 0.4 Arunachal Pradesh 753 749 4 0.5 719 714 5 0.7 Assam 9,804 9,288 516 5.3 10,192 9,815 377 3.7 Manipur 924 917 6 0.7 974 969 5 0.5 Meghalaya 2,112 2,064 48 2.3 2,031 2,005 26 1.3 Mizoram 647 643 4 0.7 728 723 4 0.6 Nagaland 814 809 5 0.7 826 822 4 0.5 Tripura (*) 1,538 1,515 23 1.5 1,484 1,481 3 0.2 North-Eastern Region 16,591 15,984 607 3.7 16,955 16,531 424 2.5 All India 12,91,010 12,84,444 6,566 0.5 12,75,534 12,70,663 4,871 0.4 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place.Details of States/UTs/Regions-wise Power Supply Position of the country including the Maharashtra in terms of Energy for the period of FY 2021-22: State/ April, 2021 - March, 2022 System / Energy Requirement Energy Supplied Energy not Supplied Region ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,606 1,606 0 0 Delhi 31,128 31,122 6 0 Haryana 55,499 55,209 290 0.5 Himachal Pradesh 12,115 12,088 27 0.2 Jammu & Kashmir 19,957 18,434 1,524 7.6 Punjab 62,846 62,411 436 0.7 Rajasthan 89,814 89,310 504 0.6 Uttar Pradesh 1,29,448 1,28,310 1,138 0.9 Uttarakhand 15,521 15,426 94 0.6 Northern Region 4,17,934 4,13,915 4,019 1 Chhattisgarh 31,908 31,872 35 0.1 Gujarat 1,23,953 1,23,666 287 0.2 Madhya Pradesh 86,501 86,455 46 0.1 Maharashtra 1,72,823 1,72,809 14 0 Daman & Diu 2,594 2,594 0 0 Dadra & Nagar Haveli 6,839 6,839 0 0 Goa 4,448 4,448 0 0 Western Region 4,29,065 4,28,683 383 0.1 Andhra Pradesh 68,413 68,219 194 0.3 Telangana 70,539 70,523 16 0 Karnataka 72,437 72,417 20 0 Kerala 26,579 26,570 9 0 Tamil Nadu 1,09,816 1,09,798 18 0 Puducherry 2,894 2,893 1 0 Lakshadweep (#) 56 56 0 0 Southern Region 3,50,678 3,50,421 258 0.1 Bihar 36,216 35,761 455 1.3 DVC 23,741 23,736 4 0 Jharkhand 11,148 10,590 558 5 Odisha 38,339 38,332 7 0 West Bengal 54,001 53,945 57 0.1 Sikkim 610 609 0 0 Andaman- Nicobar (#) 335 327 8 2.3 Eastern Region 1,64,054 1,62,973 1,081 0.7 Arunachal Pradesh 875 874 1 0.1 Assam 10,844 10,825 19 0.2 Manipur 1,019 1,018 1 0.1 Meghalaya 2,256 2,243 13 0.6 Mizoram 656 644 12 1.8 Nagaland 852 851 1 0.1 Tripura (*) 1,578 1,578 0 0 North-Eastern Region 18,079 18,033 47 0.3 All India 13,79,812 13,74,024 5,787 0.4 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures have been rounded off to nearest unit place.Details of States/UTs/Regions-wise Power Supply Position of the country including Maharashtra in terms of Energy for the period from FY 2022-23 to FY 2023-24: State/ April, 2022 - March, 2023 April, 2023 - March, 2024 Energy Energy Energy Energy System / Requirement Supplied Energy not Supplied Requirement Supplied Energy not Supplied Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,788 1,788 0 0 1,789 1,789 0 0 Delhi 35,143 35,133 10 0 35,501 35,496 5 0 Haryana 61,451 60,945 506 0.8 63,983 63,636 348 0.5 Himachal Pradesh 12,649 12,542 107 0.8 12,805 12,767 38 0.3 Jammu & Kashmir 19,639 19,322 317 1.6 20,040 19,763 277 1.4 Punjab 69,522 69,220 302 0.4 69,533 69,528 5 0 Rajasthan 1,01,801 1,00,057 1,745 1.7 1,07,422 1,06,806 616 0.6 Uttar Pradesh 1,44,251 1,43,050 1,201 0.8 1,48,791 1,48,287 504 0.3 Uttarakhand 15,647 15,386 261 1.7 15,644 15,532 112 0.7 Northern Region 4,63,088 4,58,640 4,449 1 4,76,852 4,74,946 1,906 0.4 Chhattisgarh 37,446 37,374 72 0.2 39,930 39,872 58 0.1 Gujarat 1,39,043 1,38,999 44 0 1,45,768 1,45,740 28 0 Madhya Pradesh 92,683 92,325 358 0.4 99,301 99,150 151 0.2 Maharashtra 1,87,309 1,87,197 111 0.1 2,07,108 2,06,931 176 0.1 Dadra & Nagar Haveli and Daman & Diu 10,018 10,018 0 0 10,164 10,164 0 0 Goa 4,669 4,669 0 0 5,111 5,111 0 0 Western Region 4,77,393 4,76,808 586 0.1 5,17,714 5,17,301 413 0.1 Andhra Pradesh 72,302 71,893 410 0.6 80,209 80,151 57 0.1 Telangana 77,832 77,799 34 0 84,623 84,613 9 0 Karnataka 75,688 75,663 26 0 94,088 93,934 154 0.2 Kerala 27,747 27,726 21 0.1 30,943 30,938 5 0 Tamil Nadu 1,14,798 1,14,722 77 0.1 1,26,163 1,26,151 12 0 Puducherry 3,051 3,050 1 0 3,456 3,455 1 0 Lakshadweep (#) 64 64 0 0 64 64 0 0 Southern Region 3,71,467 3,70,900 567 0.2 4,19,531 4,19,293 238 0.1 Bihar 39,545 38,762 783 2 41,514 40,918 596 1.4 DVC 26,339 26,330 9 0 26,560 26,552 8 0 Jharkhand 13,278 12,288 990 7.5 14,408 13,858 550 3.8 Odisha 42,631 42,584 47 0.1 41,358 41,333 25 0.1 West Bengal 60,348 60,274 74 0.1 67,576 67,490 86 0.1 Sikkim 587 587 0 0 544 543 0 0 Andaman- Nicobar (#) 348 348 0 0.12914 386 374 12 3.18562 Eastern Region 1,82,791 1,80,888 1,903 1 1,92,013 1,90,747 1,266 0.7 Arunachal Pradesh 915 892 24 2.6 1,014 1,014 0 0 Assam 11,465 11,465 0 0 12,445 12,341 104 0.8 Manipur 1,014 1,014 0 0 1,023 1,008 15 1.5 Meghalaya 2,237 2,237 0 0 2,236 2,066 170 7.6 Mizoram 645 645 0 0 684 684 0 0 Nagaland 926 873 54 5.8 921 921 0 0 Tripura (*) 1,547 1,547 0 0 1,691 1,691 0 0 North-Eastern Region 18,758 18,680 78 0.4 20,022 19,733 289 1.4 All India 15,13,497 15,05,914 7,583 0.5 16,26,132 16,22,020 4,112 0.3 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place.Details of States/UTs/Regions-wise All India Power Supply Position of the country including Maharashtra in terms of Energy for the period from FY 2024-25 to FY 2025-26 (upto June, 2025) State/ April, 2024 - March, 2025 April, 2025 - June, 2025 Energy Energy Energy not Energy Energy Energy not System / Requirement Supplied Supplied Requirement Supplied Supplied Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) Chandigarh 1,952 1,952 0 0 555 555 0 0 Delhi 38,255 38,243 12 0 11,303 11,299 4 0 Haryana 70,149 70,120 30 0 18,816 18,757 59 0.3 Himachal Pradesh 13,566 13,526 40 0.3 3,387 3,375 11 0.3 Jammu & Kashmir 20,374 20,283 90 0.4 4,853 4,847 6 0.1 Punjab 77,423 77,423 0 0 20,885 20,860 25 0.1 Rajasthan 1,13,833 1,13,529 304 0.3 28,036 28,036 0 0 Uttar Pradesh 1,65,090 1,64,786 304 0.2 46,028 46,022 6 0 Uttarakhand 16,770 16,727 43 0.3 4,426 4,417 10 0.2 Northern Region 5,18,869 5,17,917 952 0.2 1,38,697 1,38,576 121 0.1 Chhattisgarh 43,208 43,180 28 0.1 11,474 11,472 2 0 Gujarat 1,51,878 1,51,875 3 0 41,752 41,752 0 0 Madhya Pradesh 1,04,445 1,04,312 133 0.1 25,168 25,166 2 0 Maharashtra 2,01,816 2,01,757 59 0 52,395 52,393 1 0 Dadra & Nagar Haveli and Daman & Diu 10,852 10,852 0 0 2,845 2,845 0 0 Goa 5,411 5,411 0 0 1,486 1,486 0 0 Western Region 5,28,924 5,28,701 223 0 1,38,472 1,38,466 6 0 Andhra Pradesh 79,028 79,025 3 0 20,471 20,471 0 0 Telangana 88,262 88,258 4 0 19,690 19,690 0 0 Karnataka 92,450 92,446 4 0 22,945 22,945 0 0 Kerala 31,624 31,616 8 0 8,015 8,015 0 0 Tamil Nadu 1,30,413 1,30,408 5 0 34,817 34,817 0 0 Puducherry 3,549 3,549 0 0 948 946 2 0.2 Lakshadweep (#) 68 68 0 0 20 20 0 0 Southern Region 4,25,373 4,25,349 24 0 1,06,899 1,06,897 2 0 Bihar 44,393 44,217 176 0.4 12,716 12,713 4 0 DVC 25,891 25,888 3 0 6,368 6,367 1 0 Jharkhand 15,203 15,126 77 0.5 3,931 3,930 1 0 Odisha 42,882 42,858 24 0.1 11,830 11,828 2 0 West Bengal 71,180 71,085 95 0.1 20,645 20,626 18 0.1 Sikkim 574 574 0 0 128 128 0 0 Andaman- Nicobar (#) 425 413 12 2.9 107 104 3 2.8 Eastern Region 2,00,180 1,99,806 374 0.2 55,637 55,611 26 0 Arunachal Pradesh 1,050 1,050 0 0 283 283 0 0 Assam 12,843 12,837 6 0 3,506 3,506 0 0 Manipur 1,079 1,068 10 0.9 274 272 2 0.9 Meghalaya 2,046 2,046 0 0 494 494 0 0 Mizoram 709 709 0 0 177 177 0 0 Nagaland 938 938 0 0 243 243 0 0 Tripura (*) 1,939 1,939 0 0 512 512 0 0 North-Eastern Region 20,613 20,596 16 0.1 5,492 5,490 2 0 All India 16,93,959 16,92,369 1,590 0.1 4,45,197 4,45,040 157 0 (#) Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these, does not form part of regional requirement and supply. (*) Excludes energy exported to Bangladesh. Note: Power Supply Position Report has been compiled based on the data furnished by State Utilities/ Electricity Departments. The MU figures has been rounded off to nearest unit place. *****************