**Executive Summary**
This document presents the answer to Unstarred Question No. 723 in Lok Sabha, regarding National Highway projects in North Bengal. Minister of Road Transport and Highways provides details on sanctioned, completed, and ongoing projects since 2019, as of December 4th, 2025. The document also lists details of projects in Darjeeling, Kalimpong, Jalpaiguri, and Alipurduar.
**Key Points / Main Content**
* **National Highway Projects in West Bengal (Since 2019):**
* A table shows the number of sanctioned, completed, and under-implementation projects year-wise, along with the sanctioned cost and expenditure in Crore Rupees.
* A total of 126 projects were sanctioned, 84 completed, and 42 under implementation.
* **National Highway Projects in North Bengal Districts (Darjeeling, Kalimpong, Jalpaiguri, Alipurduar):**
* An annexure details specific projects including name, date of sanction, total project cost, expenditure, district involved and present status (Completed, Ongoing or Sanctioned).
* Details include I.R.Q.P works, construction, repairs, slope protection, and widening of roads and culverts on various NH numbers.
* Numerous projects are listed with varying completion status and costs. The listed projects are primarily EPC mode (Engineering, Procurement, and Construction).
* Project deadlines extend into 2025.
**Impact Analysis**
**Stakeholder: Ministry of Road Transport and Highways**
* **Impact**: Responsible for providing information and overseeing the progress of National Highway projects in West Bengal and North Bengal.
* **Action Required**: Ensure continued monitoring and management of ongoing and sanctioned projects to meet deadlines and budget constraints.
**Stakeholder: Residents and Commuters of North Bengal**
* **Impact**: Improved road infrastructure and connectivity, potentially leading to increased economic activity and ease of travel.
* **Action Required**: Utilize and adhere to new safety measures on improved roads, and be aware of the status of ongoing projects that may cause temporary disruptions.
**Stakeholder: Contractors and Construction Companies**
* **Impact**: Opportunities for new projects and continued involvement in existing projects.
* **Action Required**: Adhere to project timelines and specifications to ensure successful project completion.
**Stakeholder: Local Administration (Darjeeling, Kalimpong, Jalpaiguri, Alipurduar District Administrations)**
* **Impact**: Monitoring of Project Progress and Coordination with the Ministry and Contractors.
* **Action Required**: Coordinate with the Ministry and contractors to ensure seamless execution and address any local issues that arise.
Key Entities Referenced
National Highway Projects: The primary subject of the document, specifically projects related to national highways.
North Bengal: Geographical location that constrains the scope of the highway projects discussed.
Ministry of Road Transport and Highways: Government ministry responsible for the described National Highway projects.
Darjeeling: District in North Bengal where some of the mentioned National Highway projects are located.
Kalimpong: District in North Bengal where some of the mentioned National Highway projects are located.
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 723
ANSWERED ON 4th DECEMBER, 2025
National Highway Projects in North Bengal
723. SHRI RAJU BISTA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the total number of National Highway projects sanctioned,
completed and under implementation in West Bengal since 2019, year
wise;
(b) the details and status of such projects in North Bengal districts
including Darjeeling, Kalimpong, Jalpaiguri and Alipurduar; and
(c) the total funds allocated, released and utilized for these projects
during the said period?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) The total number of National Highway projects sanctioned,
completed and under implementation in West Bengal since 2019, year
wise are as follows:
Sr. Financial Sanctioned Completed Under Sanctioned Expenditure
No. Year Projects Projects impleme Cost (Rs. in Cr.)
(No.) (No.) ntation (Rs. in Cr.)
projects
(No.)
11 2019-20 27 26 1 428.64 320.39
2 2020-21 14 12 2 907.28 839.47
3 2021-22 12 12 0 1126.06 730.04
4 2022-23 31 26 5 2042.41 705.17
5 2023-24 13 6 7 1087.8 77.00
6 2024-25 22 2 20 3004.24 192.91
7 2025-26 7 0 7 207.87 0.00
(Till
30.11.2025)
Total 126 84 42 8804.3 2864.98
(b) & (c) Details and status of projects sanctioned in North Bengal
districts including Darjeeling, Kalimpong, Jalpaiguri and Alipurduar, since
2019 are annexed.
2ANNEXURE
ANNEXURE REFERRED IN REPLY TO PART (b) & (c) OF LOK SABHA
UNSTARRED QUESTION NO. 723 FOR 04-12-2025 ASKED BY SHRI RAJU
BISTA REGARDING NATIONAL HIGHWAY PROJECTS IN NORTH BENGAL
Total
Project
Sr. Date of Expenditure District Present
Name of the Project Cost
No. Sanction (Rs. in Cr.) Involved Status
(Rs. in
Cr.)
I.R.Q.P Work from km 2
0.00 to km 30.00 of N.H.
-55 under N.H Division N
o.IX, P.W.(Roads) Direct
1 15-02-2019 10.17 11.69 Darjeeling Completed
orate in the District of D
arjeeling, West Bengal d
uring the 2018-19 on EP
C mode (Job-434)
I.R.Q.P Work from km 1
1.00 to km 20.00 of N.H.
-55 under N.H Division N
o.IX, P.W.(Roads) Direct
2 15-02-2019 9.75 10.93 Darjeeling Completed
orate in the District of D
arjeeling, West Bengal d
uring the 2018-19 on EP
C mode (Job-435)
I.R.Q.P Work from km
654.00 to km 670.00 of
N.H.-31 under N.H Divisi
on No.IX, P.W.(Roads) D
3 15-02-2019 14.47 13.41 Jalpaiguri Completed
irectorate in the District
of Jalpaiguri, West Ben
gal during the 2018-19 o
n EPC mode (Job-437)
Construction/up-gradati
on of existing road to 2-
lane with paved shoulde
r (from Km 40.000 to K
4 m 61.100) Kafer to Lava 25-06-2020 273.78 257.86 Kalimpong Ongoing
More section of NH-717
A on EPC basis in state
of West Bengal.Package
V A (NH(O)-NE)
3Construction and Upgra
dation of Existing Road
to 2- Lane with Paved S
houlders including geo
metric improvement of
section (from km 79+70
5 29-06-2020 395.59 364.9 Kalimpong Ongoing
0 to km 96+254) Pedong
bypass to Reshi border
of NH- 717A on EPC bas
is in the State of West B
engal Package V B (NH(
O)-NE)
Stage strengthening Wo
rk from km 57.00 to km
77.00 of NH- 55 in the Di
strict of Darjeeling unde
6 r NH Division-IX, West B 11-06-2020 20.62 20.84 Darjeeling Completed
engal, during the year 2
020-21 on EPC mode (Jo
b No. 055-WB-2020-21/4
71)
Replacement of damage
d drops and guide of 17
culverts no. 396, 373, 3
67, 365, 350, 348, 309,
286, 268, 265, 261, 231,
230, 226, 211, 210 and
200 at km 20.40, km 22.
90, km 23.50, km 23.70,
km 25.25, km 25.50, km
28.90, km 31.49, km 33.
7 24-08-2020 4.54 4.24 Darjeeling Completed
15, km 33.45, km 33.90,
km 36.10 , km 36.20 , k
m 36.35, km 37.68, km
37.90, km 38.35 respect
ively in between km 20.
00 to km 40.00 of NH-55
under NH division-IX on
item rate mode using S
BD (Job No. 55-WB-2020
-21/474)
Replacement of damage
d drops and guides of 1
0 culverts in between k
m 0.00 to km 20.00 of N
8 18-08-2020 3.05 3.08 Darjeeling Completed
H-55 in the District of D
arjeeling during the yea
r 2019-20" (Job No. 055-
WB-2020-21/473)
4Improvement of black s
pot from km 12.35 to k
m 12.50 [WB-(02)-592],
km 29.60 to km 30.00 [
WB-(02)-385], km 35.05
to km 35.45 [WB-(02)-66
0], km 37.20 to km 37.5
9 22-03-2021 3.57 3.39 Kalimpong Completed
0 [WB-(02)-661] of NH-1
0 under NH division-IX, i
n the district of Kalimpo
ng, during the year 2020
-21 in the State of West
Bengal (Job No. 010-WB
-2020-21/475)
Stage strengthening wo
rk on road for stretch fr
om 670.00 km to 674.17
5 km of NH-31 (New NH
717) in the district of Ja
10 lpaiguri, West Bengal, d 22-03-2021 4.47 3.54 Jalpaiguri Completed
uring the year 2020-21 u
nder Annual Plan 2020-2
1 in the State of West B
engal (Job No. 031-WB-
2020-21/478)
Development to 4/6-lann
ing of NH-31 (New NH-1
0) with both side servic
e roads from km 569.25
8 to km 581.030 (end of
AH-02 project on NH- 31
Darjeeling
near Shivmandir to Sev
11 16-03-2022 995.04 487.63 & Kalimpo Ongoing
oke Army Cantonment) i
ng
n districts of Darjeeling
and Jalpaiguri in the sta
te of West Bengal on EP
C Mode (Job No. 10/WB
2021-22/490)
Restoration work of rain
damage valley side fro
m km 22.10 to km 22.60
of NH 10, under NH Divi
sion-IX, in the district of
12 05-10-2021 2.05 2.01 Kalimpong Completed
Kalimpong, during the y
ear 2021-22 on item rat
e mode using SBD (Job
No. 010-WB-2021-22/482
])
5Road safety works in dif
ferent stretches (km 18.
50 ,km 19.20, km 19.50,
km 20.50 & km 21.30) f
or improvement of shar
p turning & narrow road
bench of NH-10 (old NH-
31A) including provision
of Thrie Metal Beam Cra
13 31-03-2022 10.51 11.33 Kalimpong Completed
sh Barrier from km 18.0
0 to km 35.00 of NH-10 (
old NH-31A) under NH D
ivision-IX in the District
of Kalimpong under Roa
d Safety Annual Plan 20
21-22 (Job No.NH-10(Ol
d NH-31A)/WB/RSCE/202
1-22/28)
Reconstruction and wid
ening of 08 nos. narrow
culvert at km 22.445, k
m 22.450, km 22.840, k
m 27.565, km 29.000 ( h
alf portion), km 29.500,
km 30.650, km 38.290 &
spot improvement from
km 22.397 to km 22.442
, km 22.445 to km 22.45
0, km 22.453 to km 22.4
93, km 26.855 to km 26.
935, km 27.125 to km 2
7.175, km 27.492 to km
27.562, km 27.565 to k
14 m 27.710, km 29.487 to 04-01-2023 13.49 4.52 Darjeeling Ongoing
km 29.502, km 29.506 t
o km 29.513, km 32.710
to km 32.750, km 32.88
5 to km 32.910, km 38.1
85 to km 38.285, km 38.
290 to km 38.330 & rep
air of old parapets, cons
truction of new parapet,
road signage such as M
edian Marker, Road Mar
king etc. in selected str
etches from km 20.00 t
o km 40.00 of NH-110 (
Old NH-55) in the distric
t of Darjeeling under An
6nual Plan 2022-23
Balance Work of Streng
thening of road stretche
s along with provision f
or retaining walls, Brea
st walls & hill side drain
s from km 0.00 to km 4.
15 15-09-2022 14.79 14.93 Darjeeling Completed
40 & km 14.00 to km 28
.00 of NH-10 (old NH-31
A) in Darjeeling district
in the state of West Ben
gal in EPC mode [Job N
o. 10/WB/2022-23/496]
Tender based estimate
for Restoration work for
distressed span of Bala
son Bridge at km 569.60
0 of NH-31 (new NH-10)
16 in Darjeeling district in t 26-09-2022 2.1 2.05 Darjeeling Completed
he State of West Bengal
on Item rate mode unde
r Annual Plan 2022-23 [
Job No. 10/WB/2022-23/
499]
Rehabilitation work of S
ukhajhora Bridge over ri
ver Sukhajhora at km 6
23.830 on NH-17 (old N
H 31) under NH Division
17 IX in the district of Jalp 28-12-2022 0.91 0.9 Jalpaiguri Completed
aiguri, West Bengal duri
ng the year 2022-2023 o
n item rate mode using
SBD. [(Job No.NH-17/WB
/2022-23/501]
Improvement of Spots fr
om km 8.400 to km 8.48
0, km 16.225 to km 16.3
50 & km 16.370 to km 1
6.510 & widening of cul
vert at km 16.318 and k
18 02-02-2023 4.87 2.8 Darjeeling Completed
m 16.470 respectively i
n between km 0 to km 2
0 of NH-110 (Old NH-55)
in the District of Darjeel
ing under Annual Plan 2
022-23 on item rate mo
7de using SBD (Job No.1
10/KOL/2022-23/508
Widening of 2 culverts a
t 9.09 and 9.12 km & Re
placement of damaged
drops and guides of cul
verts at km 2.36, km 3.3
7, km 3.65, km 4.38, km
7.95, km 10.50, km 10.9
0, km 11.24, km 14.57,
km 17.20, km 18.21 & i
19 02-02-2023 4.75 4.89 Darjeeling Completed
mprovement of spot fro
m km 9.035 to 9.200 res
pectively in between k
m 0 to km 20 in the Dist
rict of Darjeeling under
Annual Plan 2022- 23 on
item rate mode using S
BD(JobNo.-110/KOL/202
2-23/507)
Reconstruction of culve
rt at km 9.50 and Widen
ing of 2 nos. narrow cul
vert at km 8.30 & km 13
.52 respectively & spot
improvement from km 8
.266 to km 8.289 & km
8.299 to km 8.372, km 9
20 02-02-2023 4.7 4.91 Darjeeling Completed
.443 to km 9.523 & km
13.462 to km 13.662 res
pectively from km 0.00 t
o km 20.00 of NH-110 (O
ld NH-55) in the District
of Darjeeling under Ann
ual Plan 2022-23 (JobNo
.-110/KOL/2022-23/506)
Repair of old parapets,
construction of new par
apets, road signage , M
edian Marker, road mar
king, etc within km 0.00
to 20.00 Km of N.H.55 (
21 02-02-2023 1.81 1.75 Darjeeling Completed
except the chainages b
etween Km 8.266 to Km
8.286 & Km 8.284 to K
m 8.372 , Km 8.400 to K
m 8.480, Km 9.035 to K
m 9.200 , Km 9.443 to K
8m 9.523, Km 13.462 to
Km 13.562, Km 16.225 t
o Km 16.350, Km 16.37
0 to Km 16.510 & Perm
anent Restoration of da
maged road bench at k
m 60.180 of NH-110 (Old
NH-55) in the District of
Darjeeling under Annual
Plan 2022-23 on item ra
te mode using SBD (Job
No.-110/KOL/2022-23/50
5)
Restoration works at va
lley side rain damaged
Road Bench at km 22.9
0, km 22.95 , km 23.10
& km 23.70 of NH-10 for
22 the Year 2022-23, under 06-02-2023 2.38 2.33 Kalimpong Completed
National Highway Divisi
on No IX in the District
of Kalimpong on item ra
te mode using SBD(Job
No.10/KOL/2022-23/509)
Improvement of the stre
tch from km 597.00 to k
m 598.00 of NH-31 by pr
oviding Mastic Asphalt
wearing course, Constr
uction of New Five Num
bers of Culverts includi
ng valley / hill side prot
ective work & Restorati
on of rain damaged emb
23 28-02-2023 7.7 7.76 Kalimpong Completed
ankment by Constructio
n of guard wall at km 59
8.900 under NH Division
No-IX in the District of
Kalimpong in the State
of West Bengal during t
he year 2022-23 in EPC
Mode(Job No.17/WB/202
2-23/
513)
9Repair/ Rehabilitation of
6 (Six) number Bridges i
.e Leesh bridge, Gheesh
bridge , Chell bridge, Ma
l bridge, Newra bridge ,
New Zarda bridge at km
607.151, km 611.920, k
m 614.775, km 628.720,
24 27-03-2023 12.96 12.05 Jalpaiguri Completed
km 630.895 & km 672.8
30 respectively on NH-1
7 (Old NH-31) under NH
Division-IX in the distric
t of Jalpaiguri West Ben
gal during the year 2022
-2023.(Job No. 17/WB/20
22-23/ 516)
Widening Carriageway
width along with constr
uction of footpath from
km 69.00 to km 71.40 ,
Permanent Restoration
of depressed road benc
h at km 60.480 and Rest
oration of Valley side pr
otection wall at km 60.9
25 31-03-2023 18.45 18.55 Darjeeling Completed
50 in between km 60 to
km 61 & Repair & Reha
bilitation of Panchanai
bridge at km 75.030 of
NH-110 (Old NH-55)in th
e district of Darjeeling
West Bengal during the
year 2022-2023 (Job No.
110/WB/2022-23/ 521)
Repair and Rehabilitatio
n of Coronation Bridge o
ver Teesta river at km 5
95.200 on NH-31 (New
NH-17) under NH Divisio
n-IX, Siliguri in the distri
26 24-08-2022 4.09 4.82 Darjeeling Completed
ct of Darjeeling West Be
ngal during the year 202
2-2023 on item rate mo
de using SBD. [Job No.
NH-31(New NH-17)/WB/2
022-23/RSCE-04]
10Road safety works in dif
ferent stretches from (k
m 35.545 to km 36.20 ,
km 38.97 to km 39.22 ,
km 42.01 to km 42.32 &
km 44.78 to km 45.04) f
or improvement of shar
p turning & narrow road
bench and construction
27 19-10-2022 9.46 9.43 Kalimpong Completed
of Over Head Gantry sig
ns at 51.3 km of NH-10 (
old NH-31A) under NH D
ivision-IX in the District
of Kalimpong in the Stat
e of West Bengal under
Road Safety Annual Pla
n 2022-23 [Job No. NH-1
0/WB/2022-23/RSCE-08]
Widening of Culvert at 0
.90 Km and 22.50 Km of
N.H-10 under N.H. Divisi
on No lX in the District
of Darjeeling and Kalim Darjelling
28 pong in the state of Wes 24-11-2022 2.57 0.89 & Kalimpo Completed
t Bengal during the year ng
2022-2023 on item rate
mode using SBD [Job N
o. NH-10/WB/2022-23/RS
CE-09]
Road Safety Works in k
m 40 to km 77 of NH-11
0 (Old NH-55) by (i) Re-c
onstruction and widenin
g of narrow culvert nos.
65/3(Old No- 21), 64/6(Ol
d No-27) & 59/2(Old No-
63) at km 64.820, km 63
.627, km 58.935 respect
ively & other allied prot
29 24-11-2022 12.8 12.98 Darjeeling Completed
ection works between k
m64.650 to km 64.950 i
n vicinity of CD no.65/3,
km 63.560 to km 63.730
in vicinity of CD no. 64/6
, km 58.915 to km 58.95
5 in vicinityof CD no. 59/
2 respectively in betwe
en km 58.00 to km 64.0
0 . (ii) Re-construction a
11nd widening of narrow c
ulvert nos. 64/4 (Old No-
29),62/1(Old No-50), 61/
6(Old No-51) and 52/2(Ol
d No-98) at km 63.300,
km 61.008, km 60.925,
km 51.494 respectively
& other allied protectio
n works between km 63
.170 to km 63.385 in vic
inity of CD no.64/4, km 6
0.870 to km 61.070 in vi
cinity of CD nos. 62/1 &
61/6 in between km 51.
00 to km 63.00. (iii) Rep
lacement of Damaged d
rops and guides of 10 c
ulvert Nos. 64/7 (Old no-
26),63/5 (Old no-36),63/4
(Old no-37),62/5 (Old no-
46),62/3 (Old no-48),61/4
(Old no-53),60/6 (Old no-
59),60/4 (Old no-61),54/3
(Old no-91) and 45/6 (Ol
d no-137) at km 63.00, k
m 62.561, km 62.462, k
m 61.422, km 61.271, k
m 60.531, km 59.791, k
m 59.425, km 53.555 an
d km 44.413 in the Distr
ict of Darjeeling under R
oad Safety Annual Plan
2022-23 – reg. (Job No.
NH-110/KOL/2022-23/RS
CE-10)
Road Safety work in bet
ween km 40 to km 77 of
NH-110 (Old NH-55) by(i
) Improvement of road g
eometrics by widening r
oad width locally at km
51.508 to km 51.682 on
30 30-11-2022 14.65 14.95 Darjeeling Completed
NH-110 (Old NH-55). (ii)
Road Widening at km 47
.300 to km 47.420 under
Improvement of road ge
ometrics by widening ro
ad width locally at km 5
8.700 to km 58.830, km
1255.790 to km 55.846 &
km 47.300 to km 47.420
NH-110 (Old NH-55). (iii)
Road Widening at km 61
.420 to km 61.500 under
"Improvement of road g
eometrics by widening r
oad width locally at km
64.475 to km 64.675, k
m 62.960 to km 63.240
& km 61.420 to km 61.5
00 on NH-110 (Old NH-5
5) respectively in betwe
en km 61.00 to km 64.0
0 - sanction [Job-NH-11
0/Kol/2022-23/RSCE-11]
Improvement of Spots (I
ncluding widening of cu
lvert, drops & guide) fro
m km 4.390 to km 4.585
, km 5.328 to km 5.430,
km 8.520 to km 9.075 (A
t 02 nos. of locations), k
m 9.335 to km 9.520 an
31 d km 12.060 to 12.235 o 01-03-2024 15.02 0 Darjeeling Ongoing
n NH-110 (Old NH-55) in
between km 0.00 to km
20.00 of NH-110 under
NH Division-IX in the Di
strict of Darjeeling, Wes
t Bengal [ Job No. NH-1
10 (Old NH-55)/West Be
ngal/2023-24/RSEC-15]
Slope Stabilization Sche
me at location of landsli
de at km 52.240 km of
NH-110 at Tindharia, We
st Bengal & Permanent
32 22-03-2024 24.52 7.18 Darjeeling Ongoing
Restoration of damaged
Road under NH Division-
IX in the district of Darj
eeling, West Bengal duri
ng the year 2022-23.
Improvement of Spots fr
om 21.710 km to 21.838
km (including reconstru
33 06-03-2024 14.48 4.77 Darjeeling Ongoing
ction & culvert widenin
g), 21.921 km to 22.000
km (including drop & gu
13ides), 23.760 km to 23.8
00 km, 26.597 km to 26.
705 km (including drop
& Guides), 28.270 km to
28.340 km, 35.878 km t
o 35.980 km, 36.025 km
to 36.135 km, 36.245 k
m to 36.400 km (includi
ng reconstruction & cul
vert widening) on NH-11
0 (old NH-55) in betwee
n km 20.00 to km 40.00
of Nh-110 (old NH-55) u
nder NH Division No.-IX
in the dist. Of Darjeeling
.
Slope protection and la
ndslide mitigation at 4 v
ulnerable locations (km
1.950 to Km 2.100, km 1
1.100 to 11.450, km 22.
435 to km 22.485 and k
34 m 22.610 to km 22.680) 05-02-2024 152.27 0 Kalimpong Ongoing
within Sevoke-Rangpo s
ection of NH-10 (old NH-
31A) in Darjeeling & Kal
impong district in the St
ate of West Bengal on E
PC mode (Job No 533)
Slope Protection and La
ndslide Mitigation at 2
Vulnerable locations viz
. Km 23.200 to 23.960,
Km 26.530 to Km 26.58
35 0 within Sevoke-Rangpo 25-09-2023 68.49 0 Kalimpong Ongoing
section of NH-10 (old N
H-31A) in Kalimpong dis
trict in the State of Wes
t Bengal on EPC mode (
Job No .526)
Balance work of Falaka Alipurduar
36 ta – Salsalabari section 14-11-2023 2040.59 1503.43 & Cooch B Ongoing
of NH-31D (PKG-2A). ehar
Specialized Slope Prote
ction Bagrakot-Kafer (K
37 31-03-2025 86.66 0 Kalimpong Sanctioned
m 25.600) to (Km 26.10
0), Package-IV(C)
Lava More (Km 61.100)
38 31-03-2025 522.35 0 Kalimpong Sanctioned
to Pedong Bypass (Km
1479.700), Package VA(i)
39 Deposit Work (IRCON) 25-11-2024 11.22 0 Kalimpong Sanctioned
Improvement of Spots i
ncluding reconstruction
and widening of Culvert
s in between Ch. km 40.
000 to km 65.000 of NH-
40 23-12-2024 32.35 0 Darjeeling Ongoing
55 (New NH-110) under
NH Division – IX (I) in th
e District of Darjeeling,
West Bengal in the FY
2024-25
PBMC work from Chaina
ge 0.000 kmp to 34.000
kmp of NH-55 (New NH-
41 110) under NH Division-I 24-01-2025 62.40 0 Darjeeling Ongoing
X in the district of Darje
eling during the year
2024-25.
Rehabilitation of land sl
ide location along with
slope protection and dr
ainage improvement at
42 Paglajhora on NH-55 (k 06-02-2025 32.6 0 Darjeeling Sanctioned
m 43.500 to km 43.950)
in Phase-I in Darjeeling
District of West Bengal-
Balance Work.
Valley side protection w
orks from km. 25.80 to
km 26.65, km 26.75 to k
m 27.20 & km 27.41 to
km 27.48 to restore da
43 mages by flash flood in 04-06-2024 49.22 0 Kalimpong Sanctioned
2023 of NH-10 in the Dis
trict of Kalimpong durin
g the year 2024-25 on E
PC mode (Job No 548)
Widening of Valley side
at 3 locations viz. Km 2
0.900, Km 35.500 and K
m 36.700 and culvert at
44 13 locations viz. Km 17. 04-06-2024 75.85 0 Kalimpong Sanctioned
600, Km 17.800, Km 18.
300, Km 20.200, Km 21.
500, Km 21.650, Km 21.
850, Km 32.800, Km 33.
15100, Km 38.300, Km 40.
300, Km 43.700, Km 47.
300 (Job No 547)
Slope Protection and La
ndslide Mitigation at 3
Vulnerable Locations (k
m 6.50 to km 6.705 km,
7.17 to km 7.25, and km
22.80 to km 22.95) withi
45 n Sevoke Rangpo Sectio 27-03-2025 57.21 0 Kalimpong Sanctioned
n of NH-10 (old NH 31A)
in the district of Kalimp
ong in West Bengal duri
ng FY 2024-25 (Job No
32)
Re-sectioning from Km
0.00 to Km 0.500, stren
gthening from km 0.00 t
o km 8.20 and km 15.00
to km 15.50 and Wideni
ng and Strengthening fr
om km 8.20 to km 15.00
46 03-12-2024 49.96 10.52 Darjeeling Ongoing
of NH-327 (Old NH-31C)
in the district of Darjeel
ing under NH Division N
o. IX, P.W.(Roads) Direc
torate, West Bengal (Jo
b No. 327/WB/2024-25/5
54)
Replacement of Six nu
mbers existing narrow/p
oor Minor Bridge/Culvert
by suitable Waterways
Structure with provision
of Temporary diversion
(At Three Locations) an
d raising of embankmen
47 29-03-2025 16.12 0 Jalpaiguri Ongoing
t (From km 611.400 to k
m 611.820) in between
km 610.00 to km 626.00
of NH-31(Old)/NH-17(Ne
w) in the District of Jalp
aiguri in West Bengal du
ring 2024-25 Job Numb
er (17/WB/2024-25/566)
48 Dhupguri- Falakata sect 01.10.2024 1606.14 161.84 Jalpaiguri Awarded
16ion of NH-31D (PKG-2B) & Alipurdu
ar & Cooch
Behar
Descoped portion of Bin
49 naguri Bypass of NH-31 12.03.2025 305.17 0 Jalpaiguri Ongoing
D
Strengthening and carp
etting work from Km 0.0
00 to Km 26.000 of NH-
50 17-11-2025 82.06 0 Kalimpong Sanctioned
10 during the current fin
ancial year under M&R
head
Strengthening and carp
etting work from Km 26.
0 to Km 52.10 of NH-10
51 17-11-2025 78.67 0 Kalimpong Sanctioned
during the current finan
cial year under M&R he
ad
Reconstruction of Distr
essed Minor Bridge over
Dhari Jhora (Km 617.94
5) of NH-31( New NH-17
52 ) under NH Division IX ( 6-05-2025 19.29 0 Jalpaiguri Ongoing
PWRD) in the district of
Jalpaiguri West Bengal .
Job No.(17/WB/2025-26/
568)
*****
17