GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6405
ANSWERED ON 02ND APRIL, 2026
NATIONAL HIGHWAY PROJECTS IN TAMIL NADU
6405. SHRI NAVASKANI K:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government has been implementing the Bharatmala Pariyojana
Phase-I to strengthen National Highway infrastructure and improve seamless
road connectivity across the country, including in Tamil Nadu;
(b) the details of National Highway projects sanctioned, awarded and
completed under Bharatmala Pariyojana and other highway development
programmes in Tamil Nadu during the last five years;
(c) whether improved highway connectivity is contributing to faster movement
of goods and passengers, enhanced logistics efficiency and regional economic
development in various parts of the State;
(d) the details of road safety measures, audits and modern design standards
adopted in the construction and upgradation of National Highways passing
through Ramanathapuram district; and
(e) whether the Government proposes to take up additional National Highway
projects, bypasses or connectivity corridors in Ramanathapuram district to
further strengthen transport infrastructure and regional economic development
in the area?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) to (c) Bharatmala Pariyojana Phase-I was approved by the Government in
2017, envisaging development of 34,800 km of National Highways at anestimated outlay of Rs. 5,35,000 crore, with the objective of improving
connectivity to key economic centres and reducing logistics costs through
development of economic corridors, feeder routes, inter-corridors, and coastal
roads.
Under the programme, projects covering 26,425 km have been awarded, out of
which 22,223 km have been constructed as of February 2026. Details of
projects sanctioned, awarded, and completed under various programmes in the
State of Tamil Nadu during the last five years by National Highways Authority
of India (NHAI) are annexed.
(d) Road safety provisions are an integral part of the project scope and are
incorporated as per relevant Indian Road Congress (IRC) codes at the time of
estimate sanction. Accordingly, measures such as High Mast Lights, retro-
reflective signs, thermoplastic road markings, road studs, solar blinkers,
rumble strips, crash barriers, signboards, and hazard markers have been
provided at 44 locations on the Thiruppuvanam–Ramanathapuram section,
along with geometrical improvements at four locations on the Karaikudi–
Ramanathapuram section.
(e) The details are annexed.ANNEXURE REFERRED TO IN REPLY TO PART (a) TO (c) OF LOK SABHA
UNSTARRED QUESTION NO. 6405 ANSWERED ON 2ND APRIL, 2026 ASKED BY
SHRI NAVASKANI K REGARDING ‘NATIONAL HIGHWAY PROJECTS IN TAMIL
NADU’.
Physical Actual / Re
Sl. Progress vised Sche
Length ( Cost Date of Appoint
No Name Project Scheme as on 28. duled date
Km) (Rs.in Cr.) Award ed Date
. 02.2026 ( of completi
%) on
1 4-laning Neraluru-ThBharatmat 23.35 1757.27 27.01.20 26.10.2 80.92% 31.07.2026
orapalli Agraharam a Pariyoja 22 022
section of NH-844 ( na
Package-I)
2 6L of Maduravoyal - Bharatmat 23.20 463.07 22.11.20 14.02.2 100.00% Completed
Sriperumbudur Sect a Pariyoja 21 022 on 27.12.20
ion from Km. 13+80 na 24
0 - Km. 37+000 of N
H-4 through NH-GoT
N
3 Balance works of 4- Bharatmat 17.52 467.99 10.05.20 21.09.2 97.92% 30.04.2026
Lane from Thiruvall a Pariyoja 22 022
ur Bypass to Veppa na
mpattu Bypass pas
sing through Thann
erkulam, Thozur an
d Sevapet Bypass of
Tirupati-Tiruttani-Ch
ennai Section of NH
-716
4 4L of Vadugapatti to Bharatmat 35.60 1317.06 31.03.20 12.04.2 99.70% 15.04.2026
Therkuvenganallur ( a Pariyoja 22 023
Rajapalyam) section na
of NH-744 (Package
-II)
5 4L of ThirumangalaBharatmat 36.00 1076.97 31.03.20 23.02.2 93.74% 31.05.2026
m to Vadugapatti se a Pariyoja 22 023
ction of NH-744 (Pa na
ckage-I)
6 4-laning of STRR BeBharatmat 35.766 1260.74 09.03.20 18.05.2 83.02% 30.09.2026
ngaluru, NH 948A B a Pariyoja 24 023
alagondapalli (Tamil na
Nadu) to Karnataka/
Tamil Nadu border
7 Two Lane with Pave NH (O) 85.00 242.40 14.07.20 Packag 100.00% Completed
d Shoulder from Tho 22 e I = 04. on
ppur Mettur Bhavani 08.2022 28.02.2025Erode Section of NH Packag
544H e II = 25
.07.202
2,
Packag
e III = 0
4.08.20
22
Packag
e IV = 0
8.08.20
22
8 Six laning of Tuticor NH (O) 6.14 157.67 31.03.20 05.07.2 100.00% Completed
in Port Road section 23 023 on
of NH-7A 30.06.2025
9 4-laning of left over Bharatmat 53.71 1564.23 31.03.20 12.08.2 72.43% 30.04.2026
works including Add a Pariyoja 23 023
itional structures in na
KL/TN Border Kanya
kumari of NH-66
10 New Double Tier 4-lBharatmat 4.95 1388.59 31.07.20 23.11.2 18.92% 16.11.2027
ane Elevated Corrid a Pariyoja 23 023
or from Chennai Por na
t to Maduravoyal (P
ackage-I)
11 New Double Tier 4-lBharatmat 5.10 1616.97 31.07.20 23.11.2 15.48% 16.11.2027
ane Elevated Corrid a Pariyoja 23 023
or from Chennai Por na
t to Maduravoyal (P
ackage-II)
12 New Double Tier 4-lBharatmat 4.49 1299.36 31.07.20 23.11.2 15.38% 16.11.2027
ane Elevated Corrid a Pariyoja 23 023
or from Chennai Por na
t to Maduravoyal (P
ackage-III)
13 New Double Tier 4-lBharatmat 6.41 1205.40 31.07.20 23.11.2 6.67% 16.11.2027
ane Elevated Corrid a Pariyoja 23 023
or from Chennai Por na
t to Maduravoyal (P
ackage-IV)
14 Construction of TruBharatmat 1.10 162.55 10.01.20 26.02.2 28.79% 31.10.2026
mpet Interchange C a Pariyoja 24 024
onnecting Bangalor na
e –Chennai Express
way with Maduravo
yal - Walajahpet Sec
tion of NH 48 near S
riperumbudur
15 Access Controlled H NH (O) 43.95 1376.10 09.03.20 28.12.2 28.01% 27.12.2026
ighway of 4 Lane wi 24 024
th Paved Shouldersfrom Tiruvallur to T
N/AP Broder section
of NH-716 (Chennai-
Tirupati Package-1)
16 Improving the align NH (O) 6.60 905.00 09.03.20 21.03.2 27.80% 20.03.2028
ment of Thoppur Gh 24 025
at section from in D
harmapuri - Salem s
ection of NH-44
17 Balance Works for s NHDP 16.820 411.160 07.11.20 27.01.2 26.16% 27.10.2026
ix laning of Sriperu (Phase-V) 24 025
mbudur to Karaipett
ai section of NH-48
18 Access controlled H NH (O) 28.021 1338.140 24.01.20 30.09.2 5.00% 29.09.2027
ighway of 4 lane wit 25 025
h paved shoulders fr
om Walajapet/Ranip
et to TN/AP Border
of NH-40
19 Balance works for f NH (O) 65.96 834.430 20.03.20 25.06.2 17.21% 24.06.2027
our laning of Vikrav 25 025
andi to Sethiyathop
u section of NH 45C
20 Construction of Byp NH (O) 7.18 180.59 06.03.20 Agreement to be signed
ass to Gangaikonda 26
Cholapuram in Kalla
gam to Meensurutti
section of NH - 81 (
Old NH - 227) in Ta
mil Nadu on EPC Mo
de under NH (O).
21 Four laning of Para NH (O) 46.67 1853.16 27.11.20 Agreement signed on 08.01.20
makudi to Ramanat 25 26. Appointed Date to be decl
hapuram section of ared
NH-87
22 Four laning of Mara NH (O) 46.05 2157.09 05.02.20 Agreement to be signed
kkanam-Puducherry 26
section of NH 332 A
Total 599.56 23035.94ANNEXURE REFERRED TO IN REPLY TO PART (e) OF LOK SABHA UNSTARRED
QUESTION NO. 6405 ANSWERED ON 2ND APRIL, 2026 ASKED BY SHRI
NAVASKANI K REGARDING ‘NATIONAL HIGHWAY PROJECTS IN TAMIL NADU’.
Details of National Highway Stretches passing through Ramanathapuram District of Tamil Nadu
along with their status and proposed upgradation, by NHAI.
Total Length falling in
Sr. NH Name of the proposed
Length Ramanathapuram Remarks / Present Status
No. No. project
(Km) District (Km)
4-laning of Paramakudi -
Thiruppuvanam
Ramanathapuram Section of 46.67
(Madurai) -
Km has been taken up at a cost of
1 87 Paramakudi - 115.48 64.98
Rs.1853.16 Cr. and contract
Ramanathapuram
awarded on 27.11.2025 and
Section
Agreement signed on 08.01.2026.
Upgraded to 2-lane with Paved
Karaikudi -
Shoulder configuration on
2 536 Ramanathapuram 80.00 49.15
02.05.2023 and is presently under
section
O&M stage.
4 laning of
Nagappattinam -
Detailed Project Report (DPR) is
3 32 Tuticorin via 308.00 131.64
awarded.
Ramanathapuram
Section
Ramanathapuram -
Bids for preparing Detailed Project
4 87 Rameswaram - 74.57 74.57
Report (DPR) have been invited.
Dhanushkodi section
Kerala/Tamil Nadu
border - Theni - Bids for preparing Detailed Project
5 85 225.00 17.80
Madurai - Thondi Report (DPR) have been invited.
section
Total 803.05 338.14
*****