Executive Summary:
This document details the sanctioned National Highway (NH) projects in Tamil Nadu, including those in the Dharmapuri Lok Sabha Constituency, over the past three years. It outlines project specifics such as location, length, cost, timelines, and implementation mode (EPC, Item Rate, or HAM). The projects are under the purview of the Ministry of Road Transport and Highways. A comprehensive list of projects and their specifics are detailed in the annexure.
Key Points / Main Content:
Project Details:
* The document provides details of sanctioned NH projects, including name, scope, location, and length.
* Total project cost, commencement date (Appointed Date), and scheduled completion date are specified.
* The mode of execution (EPC, Item Rate, or HAM) is identified for each project.
Location and Parliamentary Constituencies:
* Projects span various locations within Tamil Nadu.
* Includes projects within the Dharmapuri Lok Sabha Constituency.
* Lists the parliamentary constituencies through which each project passes.
Project Specifics:
* Includes two-lane roads with paved shoulders, improving alignment of ghat sections, and balance works of four-lane roads.
* Features six-laning of port road sections and construction of double-tier four-lane elevated corridors.
* Covers construction of trumpet interchanges, access-controlled highways, and balance works for six-laning projects.
* Includes elimination of black spots, construction of missing storm water drains, and four-laning of road sections.
* Addresses widening, strengthening, construction of retaining walls, and improvements to existing carriageways.
* Involves construction of ROBs (Road Over Bridges) and approaches, and permanent improvements of black spots.
* Deals with widening of existing roads, strengthening selected stretches, and prevention of landslides and soil erosion.
Implementation Details:
* Projects are implemented through Engineering, Procurement, and Construction (EPC), Item Rate, or Hybrid Annuity Model (HAM).
Impact Analysis:
Ministry of Road Transport and Highways:
* Impact: Primarily responsible for the development and maintenance of the listed National Highway projects.
* Action Required: Oversee and ensure the timely and effective implementation of the sanctioned projects.
Contractors/Construction Companies:
* Impact: Responsible for executing the projects as per the specified scope, timelines, and mode of implementation.
* Action Required: Adhere to the project specifications, meet the scheduled completion dates, and follow the guidelines for EPC, Item Rate, or HAM projects.
Citizens of Tamil Nadu (Including Dharmapuri Lok Sabha Constituency):
* Impact: Will benefit from improved road infrastructure, reduced travel time, and enhanced connectivity.
* Action Required: Be aware of construction activities and adhere to safety guidelines during the project implementation phase.
Local Governments and Authorities:
* Impact: Required to coordinate with the Ministry and contractors to facilitate smooth project execution, including land acquisition and regulatory approvals.
* Action Required: Provide necessary support and clearances for the projects, address local concerns, and ensure compliance with environmental and safety regulations.
Key Entities Referenced
Ministry of Road Transport and Highways: The Indian governmental body primarily responsible for the development and maintenance of National Highways.
Tamil Nadu: A state in southern India where the proposed National Highway projects are located.
SHRI MANI A: The Member of Parliament who raised the unstarred question in Lok Sabha regarding new National Highway projects in Tamil Nadu.
Dharmapuri Lok Sabha Constituency: A parliamentary constituency in Tamil Nadu, specifically mentioned as being included in the National Highway projects.
SHRI NITIN JAIRAM GADKARI: The Minister of Road Transport and Highways who answered the question in Lok Sabha.
National Highways (NHs): The road network that the Ministry of Road Transport and Highways is responsible for developing and maintaining.
Bharatmala Pariyojana: A centrally sponsored scheme for highway development in India.
NH44: National Highway number 44
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION No. 3110
ANSWERED ON 7th AUGUST, 2025
NEW NHS IN TAMIL NADU
3110. SHRI MANI A:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government has proposed any new National Highway
(NH) projects in Tamil Nadu including Dharmapuri Lok Sabha
Constituency in the past three years;
(b) if so, the proposed projects including the name and location of
each project, the proposed length and scope of the work and the
estimated cost of each project;
(c) the expected timeline for the commencement and completion of
each of these proposed projects; and
(d) whether any of these projects are being implemented under
centrally sponsored schemes such as Bharatmala Pariyojana or other
Public-Private Partnership (PPP) models and if so, the details thereof?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS(SHRI NITIN JAIRAM GADKARI)
(a) to (d) The Government, through the Ministry of Road Transport and
Highways is primarily responsible for the development and
maintenance of National Highways (NHs). Details of projects
sanctioned on National Highways in Tamil Nadu, including those in the
Dharmapuri Lok Sabha Constituency during the last three years,
comprising the name / scope of each project, location, length, total
project cost, date of commencement (Appointed Date), scheduled date
of completion, and the mode of implementation such as Engineering,
Procurement and Construction (EPC), item rate or Hybrid Annuity
Model (HAM), are provided at Annexure.ANNEXURE
ANNEXURE REFERRED TO IN REPLY OF PARTS (a) to (d) OF LOK
SABHA UNSTARRED QUESTION NO. 3110 FOR ANSWER ON 7th
AUGUST, 2025 ASKED BY SHRI MANI A REGARDING NEW NHS IN
TAMIL NADU.
Details of Projects sanctioned on National Highways in Tamil Nadu,
including those in the Dharmapuri Lok Sabha Constituency during the last
three years
Name of
the
Sched
Parliame
uled/R
ntary Total
Total evised
Locatio Constitu Projec
Sl. Leng Appoint Sched Mode of
Name of Project n of encies t Cost
No. th ed Date uled execution
project (LS) (Rs.in
(Km) Compl
through Cr.)
etion
which
Date
project
passes
1 Two Lane with Paved Thoppur Dharmap 85.00 242.40 Package Comple EPC
Shoulder from Thoppur to uri, I = ted
Mettur Bhavani Erode Lakshmi Erode & 04.08.20
Section of NH 544H Nagar Tiruppur 22
(Bhavani Package
) II =
25.07.20
22,
Package
III =
04.08.20
22
Package
IV =
08.08.20
22
2 Improving the Thoppur Dharmap 6.60 905.00 21.03.20 20.03.2 HAM
alignment of Thoppur to uri & 25 028
Ghat section from Km Sekkarai Salem
158/500 to Km 165/100 patti
in Dharmapuri - Salem
section of NH-44
3 Balance works of four Thiruninr Tiruvallur 17.52 467.99 21.09.20 30.09.2 EPC
Lane from km 43+950 avur to 22 025
(Thiruvallur Bypass) to Thirupac
km 61+470 hur
(Veppampattu Bypass)
passing throughThannerkulam, Thozur
and Sevapet Bypass
(17.520 Kms) of
Tirupati-Tiruttani-
Chennai Section of NH
205
4 4-laning of left over Kerala Kanyaku 53.71 1564.2 12.08.20 EPC
works including /Tamil mari 3 23 16.04.2
Additional structures in Nadu 026
KL/TN Border Border
Kanyakumari from Km to
43.000 to 96.714 of Kanyaku
NH-47 mari
5 Completion of balance Utharap Tirupati 7.35 166.52 06.07.20 15.09.2 Item Rate
works pending in bit ukhandri 23 025
and pieces and listed ga to
balance works from Kaalur
Km 247.800 to 338.00
in AP portion
6 Six laning of Tuticorin Thermal Tuticorin 6.14 200.30 05.07.20 Comple EPC
Port Road section of Nagar to 23 ted
NH-7A FCI
Rounda
na
7 New Double Tier 4- Vepperi Chennai 4.95 1388.5 23.11.20 20.02.2 EPC
lane Elevated Corridor to Central 9 23 027
from Chennai Port to Pudupet
Maduravoyal in
Chennai District (P-1)
8 New Double Tier 4- Pudupet Chennai 5.10 1616.9 23.11.20 20.02.2 EPC
lane Elevated Corridor to Central 7 23 027
from Chennai Port to Aminjika
Maduravyal in Chennai rai
District (P-2)
9 New Double Tier 4- Aminjika Chennai 4.49 1299.3 23.11.20 20.02.2 EPC
lane Elevated Corridor rai to South 6 23 027
from Chennai Port to Arumbak
Maduravoyal in kam
Chennai District (P-3)
10 New Double Tier 4- Arumbak Sriperum 6.41 1205.4 23.11.20 20.02.2 EPC
lane Elevated Corridor kam to budhur 0 23 027
from Chennai Port to Madurav
Maduravoyal in oyal
Chennai District (P-4)
11 Construction of Nemili Sriperum 1.10 157.63 26.02.20 31.03.2 EPC
Trumpet Interchange budhur 24 026
Connecting Bangalore
–Chennai Expressway
(km.261+705 to km.
262+800) with
Maduravoyal to
Walajapet Section of
NH 48 near
Sriperumbudur Toll
Plaza at km. 35+70012 4-laning of STRR S.Muthu Krishnagir 35.76 1260.7 18.05.20 31.05.2 HAM
Bengaluru, NH 948A ganapalli i 6 4 23 026
Balagondapalli (Tamil to
Nadu) to Devarap
Karnataka/Tamil Nadu alli
border from Km
144.170 to Km 179.936
(35.766 km)
13 Access Controlled Thirupac Tiruvallur 43.95 1376.1 28.12.20 27.12.2 HAM
Highway of 4 Lane with hur to 0 24 026
Paved Shoulders from Tamil
Tiruvallur (Design Nadu/
Chainage Km 17+56) Andhra
to TN/AP Border Pradesh
(Design Chainage Km Border
61+51) of NH-716 (Alamelu
(Chennai-Tirupati mangap
Package-1) uram)
14 Access Controlled Tamil Tirupati 37.43 1346.8 14.12.20 13.12.2 HAM
Highway of 4 Lane with Nadu/ 2 24 026
Paved Shoulders from Andhra
TN/AP Border (Design Pradesh
Chainage Km 61+51) Border
to Puttur (Design (Alamelu
Chainage Km 81+540) mangap
of NH-716 & 6 Lane uram) to
with Paved Shoulders C.Mallav
from Mallavaram to aram
Renigunta (Chennai-
Tirupati Package-2)
15 Balance Works for six Sriperu Kancheep 16.82 403.05 27.01.20 27.10.2 EPC
laning of mbudhur uram & 0 0 25 026
Sriperumbudur to to Sriperum
karaipettai section of Karaipett budhur
NH-4 (New NH-48) ai
from 37+000 (Existing
Km 37+000) to Km
71+015
16 Access controlled Walajha Vellore & 28.02 1338.1 Not yet appointed HAM
Highway of 4 lane with pet to Arakkona 1 40
paved shoulders from Muthara m
Walajhapet/Ranipet sikuppa
(Design chainage km m
106+800) to TN/AP
Border (Design
Chainage Km
134+821) of NH 40
17 Balance works for four Vikravan Viluppura 65.96 1163.1 25.06.20 24.06.2 EPC
laning of Vikravandi to di to m & 7 25 027
Sethiyathopu section Sethiyat Cuddalor
(from Km 0/0-65/960) hope e
of NH45C
18 Elimination of identified Cuddalor 1.43 15.00 12.10.20 Comple EPC
Black spots at Km Arasaku e 22 ted
46/020 – 46/810 zhi to
(Arasakuzhi- TN-02- Adari310 and km 84/200 –
84/840 (Adari- TN-02-
112, by permanent
Remedial Measures of
NH-532 (Cuddalore-
Vridhachalam –Salem
Road)
19 Construction of Missing Villupura 8.00 15.34 10.02.20 Comple EPC
Strom Water drain in Mazhav m 23 ted
selected stretches from anthang
Km 170/800-192/600 al,
(7600m) and Kandach
Construction of Box ipuram,
culvert at Km Keezhva
171/0,174/0 & 197/8 lai,
and Construction of Mangala
Protection wall from puram,
Km 170/8-171/100 Kedar &
(L/S) (300m) & 199/0- Soorapa
199/200 (200m) of NH ttu
234 Mangalagiri-
Vengatagiri-Kottah-
Pernampet-
Gudiyatham-Katpadi-
Vellore-Polur-
Thiruvannamali-
Villupuram road
20 Four laning of Dindigul 17.17 172.15 18.05.20 Comple EPC
Ottanchatram to Palani Samiyar 23 ted
section of NH 209 from pudur to
Km 30/700 to Km Ramana
55/000 of NH 209 tha
including footpath for Nagar
pedestrian and way
side amenities except
from Km 39/2 to Km
41/0, from Km 43/4 to
Km -44/100, From Km
47/4- to Km 51/0 and
from Km 52/2-52/965.
21 Widening to 4 lane in Usilamp Virudhun 42.70 94.69 20.02.20 Comple EPC
Km.40/510 to 41/450 atti to agar & 23 ted
and Strengthening Aniakara Theni
from km 15/00 to pptti
19/800, Km.36/000 to
54/500, Km.55/375 to
57/400, Km.58/600 to
59/600, Km.60/200 to
61/900, Km.62/600 to
64/000, Km.74/000 to
75/126, Km.76/373 to
76/450 & Km.77/600 to
90/275 including
Geometrical
Improvement at
Km.37/400 &Km.46/800,
Construction of
retaining wall & breast
wall, construction of
storm water drain,
reconstruction &
widening of culverts
and Foot over bridge at
Km.78/900 of NH 85
(Old NH-49 Extn.)
22 Improvement from Km Vasudev Kadayana 17.70 35.61 10.05.20 Comple EPC
94/0-96/0, 96/2-96/8, anallur llur & 23 ted
97/6-101/0, 102/0- to Vasudeva
103/0, 138/0-139/3, Kottaiva nallur
142/0-151/4 including sal
Protective works and
CD works of
Thirumangalam -
Kollam road NH 744
(Old No 208)
23 Construction of RCC Achamb Virudhun - 3.45 26.05.20 Comple Item Rate
Retaining wall from km athu agar 23 ted
9/830 to10/065 (RHS)
of NH-85 (Old NH 49
Extn.) (Madurai -
Cochin Road) on Item
Rate
24 Widening from two Ellaikatt Karur 26.13 137.25 07.03.20 Compl EPC
lane paved shoulder to u valasu 24 eted
four lane with paved to
shoulder Km 81/300- Thennila
86/500,88/700-90/500, i and
Km 90/900-96/300 and paramat
97/700-110/700 of NH- hthi to
81 (Old NH-67 Km Govindh
251/000- ampalay
245/800,243/600- am
242/800,242/400-
236/000 and 234/4-
221/600 and
strengthening from Km
81/300-85/600 ,87/600-
96/3 of NH-81 (old NH-
67 251/0-236/0)
including widening of
pipe, slab culvert,
Minor bridge ,
reconstruction of box
culvert Kerb type
Median, Retaining and
well protective works
and junction
Improvements of NH-
81.25 Construction of Kombup Nilgiris - 9.27 31.01.20 Comple EPC
Additional two lane allam 24 ted
bridge at Km 249/6 of
NH 948 (Bangalore -
Coimbatore Road)
26 Strengthening in Km Kottamp Madurai 2.90 11.69 01.02.20 Comple EPC
0/0 -1/500 & Widening atti & & 24 ted
and strengthening at Thirupat Sivagang
Km 30/830 -32/230 of hur ai
NH 383 Extn
(Kottampatti -
Thiruppathur Road)
27 Improvements to Barliar Nilgiris 3.44 42.21 09.02.20 Comple EPC
existing Paver block to 24 ted
carriageway at Km Udhaga
429/2 – 430/8 & Km mandala
433/2 (Selected m
Stretches) and
Providing safety
measures at vulnerable
location of Km 397/2,
397/4, 398/4, 398/6,
399/4, 399/6, 399/10,
400/2, 400/4 & 400/10
including of CD works
and Protective works
and Improvements to
Charring Cross
Junction at Km 430/8 -
431/4 of NH 67 (New
NH 181)
28 Widening from Two Palladam 47.60 274.84 07.11.20 Comple EPC
Lane with Paved Pallada 23 ted
Shoulder to Four lane m
Paved shoulder and Kurukath
improvements at Km thi
26/5 - 34/2, 35/6 - 40/2, village
42/2 - 53/2, 55/8 - 56/2,
58/7 - 61/2, 76/6 - 81/2
and widening from Two
Lane with Paved
Shoulder to Four lane
from Km 40/2-42/2, Km
53/2-55/8,Km 61/2-
66/7,Km 67/2-72/4 and
improvements from km
34/2 – 35/6 including
CD works of NH 81
(Coimbatore –
Chidambaram)(Old
NH-67) (Nagapattinam-
Trichy-Coimbatore-
Gudalur
29 Strengthening of two Manjava Dharmap 18.01 169.68 01.02.20 Comple EPC
lane with paved di uri 24 ted
shoulder from Km 17/8 Kanavai– 18/2, construction of to
two lane with paved A.Pallipa
shoulder from Km 18/2 tti
to Km 20/0 and
construction of four
lane with paved
shoulder from Km 20/0
to Km 35/6 of Salem-
Thirupathur –
Vaniyambadi road
(NH-179A)
30 Construction of ROB Kunnaku Tenkasi 1.23 53.02 15.09.20 13.12.2 EPC
and their Approaches di & 23 025
at Km 99/4 (LC Gate Kuthukal
No.503/Spl – A -3/E) of Valasai
NH208 Kollam –
Thirumangalam Road
including land
acquisition
31 Permanent Cuddalo Cuddalor 0.60 31.44 24.01.20 13.01.2 EPC
Improvement of Black re Town e 24 026
Spot (TN-(02)- 635) at
New Cinema junction
@ Km 62/4-63/0 by
Providing additional
high level bridge @
Km62/6-62/880
including widening of
existing road with
Centre median, Storm
Water drain, CD works
and Junction
improvements of NH
45A (New NH 32)
(Villupuram - Pondy -
Nagapattinam Road)
32 Construction of Katpadi Vellore - 33.52 04.10.20 24.09.2 EPC
additional 2 lane Bow– 24 026
String ROB adjacent to
the existing 2 lane
Bow–String ROB at
Km 56/2 of NH-234
(new NH-75)
(Mangalore –
Villupuram Road)
33 Widening the leftout Shantha Erode 5.00 16.84 07.02.20 07.11.2 EPC
existing 2L to 2L+PS, nlingapu 25 025
Strengthening the ram
selected stretches from Village
Km 9/6 - 15/6 of NH- to
381A (Vellakovil to Velayuth
Sankari Road) ampalay
am
34 Construction of RRM Bodimett Theni - 1.51 30.10.20 Comple Item Rate
Retaining wall at u 23 ted
Km.117/600 (LHS) ofNH-85 (Old NH 49
Extn.) (Madurai -
Cochin Road)
35 Strengthening selected Chinnar Namakkal 9.6 19.01 12.12.20 Comple EPC
streches from Km palayam 24 ted
58/700 to km 68/900 of to
NH-381A (length 9.6 Sankagir
Km) (Vellakoil- i
Sangagiri Road)
36 Strengthening from Km Mazhav Villupura 31.8 42.52 19.08.24 Comple EPC
110/2 to km 142/0 of anthang m ted
NH-38 (length 31.8 al to
Km) (Mangalore- Ayinamp
Villupuram Road). alayam
37 Strengthening selected Perk Coimbato 11.3 47.57 05.12.24 05.12.2 EPC
stretches from km 1/2 school re 5
to km 23/6 (9.50 km) of junction
NH-81 and to
strengthening selected NGGO
stretches from km 6/0 colony
to km 23/0 (1.8Km) of
NH-181 including
junctions improvement
at km 6/0 to km 6/4 of
NH-181
38 Strengthening from Km Vellore Vellore 12.3 20.83 20.03.25 27.10.2 EPC
0/0 to Km 12/3 (4.92 (Green 5
Km) of NH-38 Circle)
(Mangalore-Villupuram to
road) Nelvoy
39 “Prevention of Kurumb Nilgiris 1.75 19.47 19.05.25 17.04.2 EPC
Landslides and Soil adi 6
erosion by constructing to
of Breastwall, Gabion Thorapal
wall, Geo Mat li
Covering the Earthslip
portions including
Grass Seedling &
Construction of culvert
from
Km 66/4 – 155/8
(Selected Stretches) of
NH 181(Coimbatore –
Ooty-Gundalpet Road)”
“Strengthening from Kannam
Km 22/000 to 78/000 of agalam Arni &
Bids under
40 NH-38 (Length 54.223 to Tiruvanna 54.22 71.03 EPC
evaluation
km) (Mangalore - Deepam malai- MP
Villupuram Road) NagarProviding Speed
calming measures in oodanth
Kallar Elephant urai
Corridor from Km village 28.02.20 28.09.2
41 Nilgiris 2.4 0.68 Item Rate
56/000 to km 58/400 of to 25 025
NH-181 (Coimbatore - oodanth
Ooty - Gundalpet urai
Road).
Construction of Four
Lane Bypass to
Vettavalam Town from
Oolaipad
Ch.0/0 to Ch.4/465
i to 24.10.2
42 (Starting at km 104/850 Tiruvanna 4.47 50.68 02.05.25 EPC
Anukum 026
and ending at km malai
alai
109/190 of NH-38
Mangalore - Villupuram
Road)
Widening of existing 2
lane paved shoulder to
4 Lane paved shoulder
in Km 268/40 to Km
271/30 & Km 273/00 to
Km 273/80 of NH 948
Nallur to
(Coimbatore - 23.01.2
43 Tanapud Nilgiris 5.40 52.21 24.07.25 EPC
Sathyamangalam 7
hur
Road) (Length 5.40
Km) including
permanent retification
of three black spots
(IDs - TN -02-238, TN-
02-239 & TN-03-260)
Widening to 2L+PS in
km 15/600-38/800
(except km 28/2-28/6 &
km 33/100-33/200) and
Near
improvements in km
Noyyal
17/300-21/300, km
bridge to 23.01.2
44 22/200-26/0, km Erode 22.70 63.60 24.07.25 EPC
Near 7
26/600-28/0, km 28/60-
Thambir
30/8, km 31/700-
an
33/100, km 33/200-
valasu
35/200, km 36/200-
38/800 of NH 381A
(Length 22.70 Km)
(Vellakoil - SankagiriRoad)
Balance work of
Widening existing two
lane to four lane
including strengthening
the existing
Samathu
carriageway from km Krishnagir 03.06.20 02.03.2
45 vapuram 2.11 12.81 EPC
16/170 to km 18/110 i 25 026
to Hosur
and Improvements
from km 16/0 to km
16/170 of NH-207 (New
NH-648) (Length 2.11
Km)
Widening of existing
two lane to four lane
Koil
with paved shoulders
Palaym
road and improvements Coimbato
46 to 4.00 44.09 Not yet appointed EPC
from Km 302/60 to Km re
Saravan
306/60 of NH 948
ampatty
including CD works &
Drain works
Improvements to
eliminate the Blackspot
at Ganapathy Moor
Market Junction (TN-
02-623) at Km 312/0 to Coimbat Coimbato
47 3.40 51.02 Not yet appointed EPC
Km 315/4 of NH 948 ore re
(Length 3.40 Km)
(Banglore -
Sathyamangalam -
Coimbatore Road)
Widening of service
road in Mettupalayam
Jothipur
side approach of
am
Periyanaickenpalayam
village Koundam Bids under
48 flyover including Land 0.40 7.43 EPC
to palayam evaluation
Acquisition from Km
Jothipur
31/600 to 32/000 of NH
am
181 (Coimbatore - Ooty
- Gundlupet road)Strengthening from Km
Peramb
78/200 to 106/200 on
alur to Perambal
49 NH 136 Thanjavur - 28.00 28.82 Not yet appointed EPC
Udumbiy ur
Perambalur - Atthur
um
road
Realignment from Km Araman
15/4 - 16/350 of NH- ur to
Kallakuric Bids under
50 179A (Salem - Manjava 0.95 12.65 EPC
hi evaluation
Tirupathur - di
Vaniyambadi Road) Kanavai
Vilakkut
hun to
Theppak
Strengthening from Km Madurai
ulam &
0/000 to 3/200 on NH & 30.05.20 26.12.2
51 Kalavas 5.10 11.32 EPC
87 and from Km 46/275 Sivagang 25 025
al to
to Km 48/175 of NH 85 ai
Sivagan
gai
Town
Improvement to the
existing carriage way at
Mathur Trichirapa 24.07.20 21.11.2
52 Km 33/610 - 44/010 of 10.40 7.51 EPC
to Trichy lli 25 025
Pudukkottai - Trichy
road (NH-336)
Construction of Four
Lane Bypass to Vellore
Town starting from Km Latheri
53 47/400 of NH 75 & to 20.42 752.94 Bids invited EPC
Vellore
ending at Km 12.65 of Nelvoy
NH 38 (length 20.492
Km)
******