Executive Summary:
This document details the status of National Highway (NH) projects in Maharashtra as of August 7, 2025, in response to questions raised in the Lok Sabha. It outlines existing and ongoing NH projects, reasons for delays, and actions taken against contractors. Completion targets extend up to the financial year 2028-29.
Key Points / Main Content:
* **National Highway Network in Maharashtra:**
* There are 102 National Highways (NHs) in Maharashtra, totaling 18,462 km.
* 259 NH projects are in various stages of implementation, costing Rs. 97,728 crores.
* A district-wise list of under-construction NH projects, including those in Mumbai, is available in the annexure.
* **Project Sanctions and Completion Targets:**
* 371 NH projects, costing Rs. 1,04,294 crores, have been sanctioned in the last five years.
* 126 NH projects, costing Rs. 21,660 crores, have been completed.
* 245 NH projects, costing Rs. 82,634 crores, are in progress with phased completion targets up to FY 2028-29.
* 90 projects targeted for completion in 2025-2026.
* 104 projects targeted for completion in 2026-2027.
* 48 projects targeted for completion in 2027-2028.
* 3 projects targeted for completion in 2028-2029.
* **Bridges, Flyovers, Underpasses:**
* 169 NH projects, costing Rs. 63,230 crores, include the construction of 551 bridges, flyovers, over bridges and underpasses.
* The need for these is assessed based on traffic, road conditions, safety, and congestion, as determined in Detailed Project Reports (DPRs).
* **Reasons for Project Delays:**
* Delays have occurred due to Right of Way (RoW) disputes, land acquisition, forest/wildlife clearances, utility shifting, pre-construction activities, and contractor cash flow issues.
* **Actions Against Contractors and Resolution of Issues:**
* Penalties, including contract termination, have been imposed on contractors for delays.
* Pending issues related to land acquisition, clearances, and utility shifting have been substantially resolved in coordination with the State Government.
* Delayed projects are targeted for completion within revised timelines.
Impact Analysis:
* **Contractors:**
* Impact: Subject to penalties for delays, including contract termination and financial risk.
* Action Required: Adhere to revised timelines, resolve cash flow issues, and coordinate with relevant authorities to avoid further delays.
* **Responsible Officials:**
* Impact: Accountable for project delays and subject to punitive action.
* Action Required: Ensure timely resolution of issues related to land acquisition, clearances, and utility shifting; closely monitor project progress.
* **Citizens of Maharashtra:**
* Impact: Will benefit from improved infrastructure, reduced travel times, and enhanced road safety upon project completion.
* Action Required: Be aware of revised project timelines and any potential disruptions during construction.
* **Ministry of Road Transport and Highways:**
* Impact: Responsible for the overall development and maintenance of NHs in Maharashtra, including monitoring project progress and ensuring compliance with timelines.
* Action Required: Continue to coordinate with the State Government and other stakeholders to resolve pending issues and ensure timely project completion.
Key Entities Referenced
Ministry of Road Transport and Highways: The government ministry responsible for the development and maintenance of national highways in India.
National Highways (NHs): A network of highways traversing throughout the country, maintained by the central government.
Maharashtra: A state in western India where the mentioned National Highway projects are located.
Shri Arvind Ganpat Sawant: A Member of Parliament (MP) who raised questions about the National Highways projects in Maharashtra.
Shri Nitin Jairam Gadkari: The Minister of Road Transport and Highways who answered the questions regarding National Highways projects.
Mumbai: A district in Maharashtra, specifically mentioned in the context of under-construction National Highway projects.
Financial Year 2028-29: The targeted completion date for the remaining 245 National Highway projects currently under implementation in Maharashtra.
Vadodara Mumbai Expressway: A controlled-access expressway that passes through Palghar, Thane and Raigad district of Maharashtra
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3093
ANSWERED ON 7TH AUGUST, 2025
NHS IN MAHARASHTRA
†3093. Shri Arvind Ganpat Sawant:
Will the MINISTER OF ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the details of existing and under construction National
Highways(NHs) in Maharashtra, district-wise especially in Mumbai;
(b) whether several NH projects in Maharashtra have not been
completed within the stipulated time and if so, the details thereof;
(c) whether timelines were fixed for the completion of the NHs that
were announced during the last five years, if so, the details thereof;
(d) the number of such highways on which construction work of
flyovers and underpasses is currently underway;
(e) the number of such highways where bridge works are incomplete;
(f) the reasons for delay in the construction of NHs/flyovers/
underpasses; and
(g) the punitive action taken against the concerned contractors or
responsible officials in this regard?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) There are total 102 National Highways (NHs) having a total length
of 18,462 km in Maharashtra. The development and maintenance of NHs
is a continuous process and as on date, 259 NH projects costing
Rs.97,728 crores are under various stages of implementation in
Maharashtra. District-wise list of under construction NH projects in
Maharashtra including Mumbai district is annexed.
(b) There have been delays in completion of some NH projects due to
disputes on existing NH Right of Way (RoW), delays in land acquisition,
forest as well as wildlife clearances, delays in utility shifting and otherpre-construction activities as well as cash flow issues with some of the
Contractors. All the pending issues have been substantially resolved and
these delayed projects are targeted for completion within the revised
timelines in a phased manner.
(c) Total 371 NH projects costing Rs. 1,04,294 crores have been
sanctioned by the Government in the last five years including current
year for development and maintenance of NHs in Maharashtra. Out of
this, 126 NH projects costing Rs. 21,660 crores have been completed
and the remaining 245 NH projects costing Rs 82,634 crores are under
various stages of implementation targeted for completion upto financial
year 2028-29 in a phased manner as per details below:
S. No. Year No. of projects targeted for completion
1 2025 - 2026 90
2 2026 - 2027 104
3 2027 - 2028 48
4 2028 - 2029 3
(d) to (e) The requirement of construction of bridges/flyovers/over
bridges/underpasses is assessed on case to case basis as per traffic
requirements, condition of bridges including their functional and other
requirements, available Right of Way (RoW), congestion in urban/built-up
sections, road safety considerations, etc. at the time of preparation of
Detailed Project Reports (DPRs) and provisioned in the approved DPRs of
NH works either as part of the NH Corridor or on standalone basis. As on
date, 169 NH projects costing Rs. 63,230 crores are under various stages
of implementation which inter alia includes construction of 551 bridges/
flyovers/over bridges/underpasses.
(f) to (g) There have been delays in completion of some NH projects due
to existing ROW disputes, delays in land acquisition, forest as well as
wildlife clearances, delays in utility shifting and other pre-construction
activities as well as cash flow issues with some of the Contractors.
Penalties have been imposed against the Contractors as per the
respective Contract provisions for delays attributed to the Contractors
including termination of the Contract and awarding the balance works at
risk and cost of the previous Contractors. Furthermore, the pending
issues of land acquisition, forest clearances and utility shifting have
been substantially resolved in close co-ordination with the State
Government and the balance works are under implementation with
target for completion within the revised timelines in a phased manner.ANNEXURE
ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED
QUESTION NO. 3093 ANSWERED ON 7TH AUGUST, 2025 ASKED BY SHRI
ARVIND GANPAT SAWANT REGARDING NHS IN MAHARASHTRA.
S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
1 Indapur to Wadpale Raigad 66 1197.52
section of NH-66 from
Km 84/000 to 110/750 -
4L + PS
2 Arawali Kante section Ratnagiri 66 1006.99
of NH-17(New NH-66)
4L + PS from
Km.241/300 to 281/300
3 Kante - Wakad section Ratnagiri 66 1117.75
of NH-66 4L + PS from
Km.281/300 to 332/200
4 Mhaswad to Tembhurni Solapur 548C 488.6
section of NH-548C - 2L
+ PS
5 Satara to Mhaswad Satara 548C 653.46
6 Paithan - Shirur section Chhatrapati 752E 341.8
2L+PS Km 0.0 to 55.00 Sambhajinagar,
Ahilyanagar,
Beed
7 Shirur-Kharda section Ahilyanagar, 752E 381.77
from 55+937 km to Beed
114+486 km to
2L+PS/4L
8 Sarsam - Kothari of NH- Nanded 161A 545.64
161A - 2L + PS from
Km.33/00 to 90/00
9 Nasratpur to Barasgaon Nanded, 61 406.54
section of NH-61 2L / 4L Hingoli
+ PS from Km.514/00 to
558/200
10 Guhagar - Rampur - 2L- Ratnagiri 166E 407.2
PS - km 0/00 (Guhagar)
to 26/230 (Rampur) and
40/00 (Mirjoli) to 53/600
(Sati) on NH-166E
11 Pune raigarh District Raigad 753F 223.46
Border To Mangaon (
Ch 69+000 to 103+775)S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
NH-753F
12 Pal Phata Phulambri - Chhatrapati 752H 227.19
Khultabad 2L+PS Sambhajinagar
13 Kashedi to Parshuram Ratnagiri 66 1142.62
Ghat section of NH-66
from Km 161/600 - Km
205/400 - 4L + PS
14 Pen to Khopoli 2L+PS Raigad 166D 369.39
15 Balance work of Raigad, 965D 388.93
Rehabilitation and Up- Ratnagiri
gradation to 2-lane road
with paved shoulders
configuration for NH-
965DD from Pacharal-
Mandangad-Mhapral-
Rajewadi (Upto
Junction of NH-66) (Ch-
22+700 to 75+100 Km)
and Ambadave
connector (Birth place
of Dr. Babasaheb
Ambedkar) (Ch-0+000
to 7+325 Km) (length
Km 59.725) in the state
of Maharashtra on EPC
mode. (Balance Work)
16 Kashedi ghat tunnel Raigad, 66 680.43
NH-66 [Bhogaon Khurd - Ratnagiri
Kashedi section] 4
lanes under NHDP on
EPC mode
17 Rehabilitation and Up Chhatrapati 753F 84.39
gradation of Sambhajinagar,
Aurangabad – Sillod Jalgaon
– Ajanta – Jalgaon
section of NH 753 F
from Km.47+500 to Km
54+500 (Design
Chainage) to four lane
configuration in the
state of Maharashtra on
EPC mde
18 Construction of Gadchiroli 130D 66.02
Paralkota bridgeS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
19 Widening and Gadchiroli NH 353 C 83.73
Strengthening of NH
353 C From Km,
227/000 to 243/000 (
Total Km, 16.00)
Chodampalli to
Guggigudam section of
Sakoli Wadsa - Armori -
Gadchiroli - Ashti -
Allapalli - Sironcha
Road in Gadchiroli
District in the state of
Maharashtra.
20 Widening and Gadchiroli NH 353. 81.21
Strengthening of NH
353 C from Km, 243/000
to 269/000 ( Total
Km,26.00) Guggigudam
to Govindpur section of
Sakoli - Wadsa Armori -
Gadchiroli - Ashti -
Allapalli - Sironcha
Road in Gadchiroli
21 Upgradatiobn and Parbhani, NH-361 F 224.44
Rehabilitation of Beed
Section of NH 361 F
from Parli (00/000) to
Gangakhed (30/400) to
Two Lanes with paved
shoulder / Four lane
configurations on EPC
mode in the State of
Maharashtra.
22 Construction of 4 Lane Nagpur NH-53 478.83
Flyover at Nagpur RTO
Chowk To Nagpur
University Campus from
Ch 2/250 to 5/100 and 4
lane flyover at
wadi/midc junction
from km 8/360 to km,
10/300 on NH 53 in
state of Maharashtra.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
23 Strengthening and Gadchiroli NH 353C 282
Widening of road
Sakoli- Wadsa-Armori-
Gadchiroli-Ashti-
Allapalli -Sironcha
National highway NH
353C in Km 262/00 to
321/00 including 16
minor Bridges and 2
Major Bridge (Total
length 59 Km) (section
from repanpalli to
sironcha) in Gadchiroli
Dist in the State of
Maharashtra.
24 Upgradation of Kolhapur NH 166G 167.97
exhisting 2 lane flexible
pavement to 2 lane
paved shoulders rigid
pavement from design
chainage Km 66.00 to
Design Km 82.440
(Start of Kolhapur
Municipal corporation
near Phulewadi to
kale), design length
16.440 Km section on
Talere Gaganbawada-
Kolhapur road (NH
166G) in the state of
Maharashtra on EPC
mode
25 Upgradation of Guhagar Ratnagiri NH 166E 171.03
Chiplun Road from
existing Km 26+890 to
40+610, Design Km
26+230 to 40+000 ( NH
166E) length 13.77 Km
two lane with paved
shoulders configuration
in the state of
Maharashta on EPC
mode.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
26 Construction of six lane Pune NH 548 169.15
Flyover at Katraj DD
junction at Km, 3/880 of
NH 548-DD (Vadgaon -
Katraj - Kondhwa -
Mantarwadi Chowk -
Loni Kalbhor - Theur
Phata - Lonikand Road)
in Pune Dist; of the
State of Maharashtra.
On Engineering
Procurement and
construction (EPC)
Basis mode (L.1.326
Km,)
27 Upgradation to 2L+PS Pune 61 138
from km 84/00 to km
101/00 of NH-61 Kalyan
- Nirmal road.
28 Construction of major Gadchiroli 353D 60.05
bridge across
Wainganga River in Km
134.000 (Near Armori)
on Nagpur-Umred-
Nagbhir- Armori section
of NH-353D in the State
of Maharashtraon EPC
mode
29 Rehabilitation and Nashik 752G 428.8
Upgradation of Satana
to Mangrul (Chandwad)
Section of NH752 G
Design Ch: Km 64.000
to Ch: Km 101.140 two
lane with paved
shoulder/four lane
configuration in the
state of Maharashtra on
EPC mode.
30 Rehabilitation & Ahilyanagar 548D 157.62
upgradation of
Jamkhed to Sautada
Section of NH548 D
(from km 195.375 to kmS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
208.774, Length –
13.399 Km) to 2L +PS
/4L configuration with
rigid pavement in the
state of Maharashtra on
EPC mode.
31 Rehabilitation & Up- Pune 160 778.18
gradation to 4 lane
Road with Paved
Shoulder configuration
of section from
Undewadi Kade pathar
(Ch. 102+050)-
Deshmukh Chowk (Ch.
113+400) and Dhawan
Patil Chowk (Baramati)
(Ch. 115+750) – Phaltan
(Ch. 138+050) of NH-
160 in the State of
Maharashtra on EPC
mode.
32 Rehabilitation & Up- Nanded 161A 206.54
gradation of Mudkhed
to Nanded section from
Km. 372+000 to Km
388+400 of NH 161A
i.e. Nanded-Bhokar-
Himayatnagar-Kinwat-
Mahur-Arani Road
(Design chainage from
Km 372+000 (Mudkhed)
to Km 387+650
(Nanded) of NH 161A)
(Length 15.65 Km) to
2/4Lane with paved
shoulders configuration
in the State of
Maharashtra on EPC
mode.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
33 Rehabilitation/Upgradat Gadchiroli 930 316.44
ion of existing Highway
to 2L+PS/4 lane of
Dhawali to Rajoli from
Design Km.149+476 to
163+476 (existing
Km.150+000 to
164+000), Pandhasala
to Mohadongri from
design Km.170+476 to
181+476 (existing
Km.171+000 to
182+000), Ambeshivni
Fata to Bodli from
design Km.183+476 to
185+476 (existing
Km.184+000 to
186+000) and Made
Tukum to Gadchiroli
from design
Km.188+476 to
189+476 (existing
Km.188+000 to 189+00)
having length = 28 km
of NH-930 of Dhawali to
Gadchroli road in the
state of Maharashtra on
EPC mode
34 Rehabilitation/ Gadchiroli 543 163.86
Upgradation of existing
Highway to four lane
standards in Kurkheda
town from (km.413+257
to km 410+775), Two
lane in Shankarpur –
Gurnuli (km 424+00 to
km 431+00) section and
Reconstruction of
Major Bridge at Ch.
448+558 (Bhuti Nallah)
and Ch. 411+695 (Sati
River bridge), Minor
Bridge at Ch. 411+477
and Ch. 405+800S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Lendhari Bridge) of NH
543 Bhamhapuri-wadsa-
kurkheda-korchi-Deori-
Amgaon road on EPC
mode in the State of
Maharashtra
35 Construction of New Parbhani 61 496.64
Four Lane Bypass to
Parbhani City (Parwa to
Asola) Km 463/265 to
Km 481/180 (Design Ch.
19+220 to Ch. 34+434)
(Length-15.214 Km)
section of NH-61 on
EPC mode in the State
of Maharashtra.
36 Rehabilitation & Up- Ahilyanagar, 561 213.33
gradation of Sabalkhed Beed
to Ashti Section from
Km 37+900 to Km
55+100 & Chinchpur to
Jamkhed Section from
km 70+000 to km
72+922 of NH-561 to
Two lane with Paved
shoulder/ Four lane
configuration in the
State of Maharashtra
on EPC Mode
(Length=20.122km).
37 Construction of two Gadchiroli 130D 34.81
Major Bridges Across
Gundenur Nalla along
with Approaches of
Length 1.72 km on
Alapalli Bhamragarh to
Maharashtra/Chattisgar
h State Border Road of
National Highways-
130D from Chainage km
82/000 to km 84/000 in
Gadchiroli District in
the state of
Maharashtra on EPCS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Mode (length= 2km)
38 Kopargaon to Savali Ahilyanagar 752G 195.38
Vihir section
39 Construction of seven Gadchiroli 130D 37.34
minor bridges at design
chainages km 2/400,
km 9/200, km 14/200,
km 32/600, km 34/200,
km 43/400 and km
46/400 on NH-130D
section (Total length of
the project is 1.645 km
with approaches) from
Allapalli- Bhamragad-
Laheri – Binagunda -
Narayanpur in
Gadchiroli district on
EPC mode in the state
of Maharashtra.
40 Construction of Major Gadchiroli 353C 24.535
Bridge on Shivni River
at design chainage
from Km. 122/080 to
Km. 123/100 on NH
353C along with
approaches of 940m
(Total Length = 1020m)
of National Highway
Sakoli - Lakhandur -
Wadsa - Armori -
Gadchiroli -Chamorshi -
Ashti - Allapalli -
Sironcha Road on EPC
mode in the state of
Maharashtra.
41 Rehabilitation Gadchiroli 353C 459.38
/Upgradation from
Lagam to Alapalli
section (Desing Km.
199/400 to km 227/400)
(Length = 28.0 Km) to 2S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
lane with Paved
Shoulders/ 4 lane
configuration section of
NH-353 C (Sakoli-
Wadsa-Armori-
Gadchiroli-Ashti-
Alapalli Sironcha) in
Gadchiroli District on
EPC mode in the state
of Maharashtra.
42 Up-gradation to four Thane 61 984.07
lane/ Two lane with
paved shoulders
configuration of Kalyan
- Murbad - Malshej Ghat
- Nirmal Road NH- 61
km 15/200 to Km 38/00
and from Km. 58/00 to
Km 84/00 (Design
length = 48.58 km) of
NH-61 on EPC Mode in
Thane District in the
state of Maharashtra
43 Construction of four- Gondia 543 & 328.11
lane Concrete Road 753
from Police
Headquarter Gondia
City to Rawanwadi
Village (Birsi Airport
Junction) from design
km 0.000 to km
15.781 (existing km
39/720 of NH-753 to
existing Km 8/400 of
NH 543) on sections
from Kohmara-
Goregaon- Police
Headquarter(Karanja) -
Collector Office Square
- Balaghat T Point-
Rawanwadi- Rajegaon
of NH-753 and NH-543
in Gondia District in the
state of Maharashtra.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
(Total Length of the
project: 15.781 Km).
44 Up-gradation to 4 lane Sangli 166H 856.82
configuration for the
work of Peth Naka to
Sangli Road, NH-166H,
from Km 0+000 to Km
41+250 (Design length
= 41.25 km) in the state
of Maharashtra on EPC
mode.
45 Rehabilitation and Up- Solapur 965G 253.78
gradation to 2 lane with
paved shoulder
configuration of Mahud
Sangola road NH 965 G
159+400 to 161+900and
162+400 to 183+960
(Design Chainage from
km. 32/300 to km.
34/800 and km. 35/800
to km. 56/860) (Rigid
Pavement) on EPC
mode in the State of
Maharashtra.
46 Rehabilitation, Pune, 965DD 723.13
Upgradation & Satara
Widening of existing
Highway to Rigid
Pavement 2 Lane with
Paved Shoulder of NH
965DD from Lonand –
Shirval-Bhor –
Mandangad-Pchral
Section
ShindewadiPhata to
Varandah Ghat Dist
Border from Km 33/550
to 92/550 in the state of
Maharashtra on EPCS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
mode.
47 One time improvement Buldhana 753A 11.2
to Deulgaon Raja City
portion from Km
122/600 to 127/00
(length-4.40 Km) of NH
753A of section
Chikhali- Jalna Road in
the state of
Maharashtra in EPC
mode
48 Consultancy Services Raigad 0.59
for preparation of
Feasibility Study
/Detailed Project Report
for Lp-gradation of (i)
Banda-lnsuli-
Sawantwadi-Buradi-
Devasu litha (Km 0+00
to Km 25+00 ) Section
of NH-548H to Two lane
Paved Shoulder of
Sindhudurg District in
the State of
Maharashtra (L-25.00
Km) (ii) VadkhalAlibag
(Km 0+00 to 22+200)
Section of NH-166A to
two lane with paved
shoulder of Raigad
District in the State of
Maharashtra ." (L-
22.200 Km).
49 Construction of Major Chandrapur 930 21.11
Bridge with approaches
across Andhari River on
Design Km 249+724
(total length of project-
0.720 km) on Mul-
Chandrapur Road, NH-
930 in the ChandrapurS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
District in the state of
Maharashtra on EPC
Mode.
50 Construction of Raigad, 66 13.65
Vehicular underpass & Ratnagiri
Service Road at Khopi
Phata in Km 180/170 on
Panvel Mahad Panji
road NH 66 in the state
of Maharashtra and
Road Safety
Improvement to
Kashedi Amba Black
Spot (at Km 160/200)
51 Providing Service Road Ratnagiri, 4.1
on Panvel Mahad Panji Sindhudurg
Road NH 66 Km.
406/030 to 450/170,
Road Safety Panvel
Mahad Panji Road NH
66 Km. 406/030 to
450/170 to four lane
with paved shoulder &
Construction of Foot
Bridge near New
English High school
And Jr. Collage, Kasal
Tal. Kankavli, Dist.
Sindhudurg, at
Ch.422/600 (Design Ch
254.140) (Kalmath -
Zarap Section) in the
state of Maharashtra
52 Construction of Major Buldhana 548CC 35.08
Bridge on Painganga
River along with
approaches (having
length of 1130m) from
design chainage Km.
52/450 to km 53/680 of
NH 548CC (Total
Length of the project =
1230m) of section of
Mehkar-Chikhli-S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Khamgaon Road on NH-
548CC in the state of
Maharashtra on EPC
mode.
53 Panvel-Mahad-Panji Ratnagiri, 66 86
Road NH-66 from Km. Sindhudurg
450/170 to Km. 471/300
(Zarap to Patradevi
section) Construction
of Vehicular underpass
in km existing ch
466/650 at Khamdeo
Naka in the village
Insuli, and Construction
of Vehicular underpass
in km existing ch
450/370 at Zarap-
Sawantwadi Junction
in Sindhudurg district in
the State of
Maharashtra
54 Urgent repairs of major Dhule 160H 3.92
bridge near
Sarangkheda at
chainage 111/300
(Constructing cant
retaining wall) and
constructing box drain
at chainage 73/300 on
NH-160H (Malegaon
Kusumba Dondaicha
Shahada) in the state
of Maharashtra.
55 Widening and Akola, 63 10.241
Strengthening of Dharashiv
Yedshi to Jawale
section of NH-63 {from
Km 20/350 to 24/350
(Length=4.00 km)} to 2-
lane configuration in
the State of
Maharashtra on
EPC mode.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
56 Construction of 2 new Ahilyanagar 548D 92.03
ROBs in parallel in lieu
of LC-6 at Km 284/3-4
along with LA for
approaches on Daund
Manmad railway line
(DD-MNR) Crossing at
Ch 116/700 of NH-548D
near Limpangaon on
Talegaon Shikrapur
Nhavara Shrigonda
Jamkhed Road in
Ahmednagar District in
the State of
Maharashtra on EPC
Mode.
57 Construction of 01 Sangli 561 60.08
Major & 05 Minor
Bridges on
Mangalwedha-Umadi
section of NH-561 (from
Ch-96+000 to 123+100)
in Sangli District in the
state of Maharashtra on
EPC Mode.
58 Widening and Latur 63 95.262
Strengthening of
Borgaon Kale to Murud
Akola (Section-I) [from
Km 61/800 to 72/900
(Length=11.10 Km)]
section of NH-63 to 2-
Lane configuration and
Latur Airport Junction
to Mahila Polytechnic
(Section-II) [from Km
78/900 to 86/850
(Length= 7.95 Km)]
section of NH-63 to 4-
lane configuration
[Total project length=
19.05 km] in the State
of Maharashtra on EPC
Mode.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
59 Consultancy Services Thane 61 0.9428
for Preparation of
Detailed Project Report
for up-gradation to four
lane/ two lane with
paved shoulders
configuration of Kalyan
- Murbad - MalshejGhat
-Nirmal road NH- 61 km
15/200 to 84/000
including RoB at km
9/500 district Thane in
the state of
Maharashtra
60 Panvel-Mahad-Panji Sindhudurg 66 50.7
Road NH-66 from Km.
450/170 to Km. 471/300
(Zarap to Patradevi
section) whitetoping
work in stretches from
Km. 450/170 to Km.
452/000 and Km.
455/330 to Km. 460/000
and Service Road of
4.09 Km. in Sindhudurg
district in the State of
Maharashtra
61 Construction of Service Ratnagiri, 66 18.12
Roads in stretches, Sindhudurg
pick up sheds and Foot
Over Bridge in the
section of Watul
Talgaon and Talgaon
Kalmath in Km 332/200
to 406/030, on Panvel
Mahad Panaji Road NH-
66 under Road Safety
Annual Plan 2022-23 in
the state of
Maharashtra on EPC
mode
62 Construction of Major Ahilyanagar 61 27.16
Bridge including
construction ofS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
approach road & RCC
gutter on Sina River at
km 214.180 of Kalyan
Ahmednagar Pathardi
road NH-61 (Old NH-
222) in the State of
Maharashtra.
63 Construction of new 2- Akola, 548B 41.27
lane Major Bridge (L= Dharashiv
144m) on Terna River
at Km.227+311 (Design
ch. 20+890) along with
approaches on Mantha-
Latur-Omerga-Nagansur
section of NH-548B on
EPC mode in the State
of Maharashtra.
64 Construction of drains Jalgaon 753J 6.29
at various locations
from Km 4+000 to Km
103+000 of NH-753J
Jalgaon to Chalisgaon
in the state of
Maharashtra
65 Construction of new 2- Hingoli 752I 61.22
lane ROB near
Bhendegaon in lieu of
L.C. No. 165-B at
Design Ch. 60+780
along with approaches
(Ch. 60+179 to 61+278)
of NH-752I in the State
of Maharashtra on EPC
mode.
66 Rehabilitation/Up Akola, 361C 594.44
gradation of Karanja – Washim
Kherda - Murtizapur
Section
to 4Lane+Paved
shoulder standards
from Design km 74+351
to km 102+331
(Excluding overlapping
portion withS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Samaruddhi Mahamarg
from Design Km 76+380
to 78+280) (Total
length of project =
26.080 km) section of
NH 361C on EPC Mode
in the state of
Maharashtra.
67 Rehabilitation and Up Latur 752K 138.892
gradation of Kopra to
Gharola (Km 76/350 to
102/350) section of NH-
752K (Total project
Length= 26 km) to 2-
lane/ 4 lane
configuration on EPC
mode in the State of
Maharashtra
68 Rehabilitation & Washim 461B 108.58
Upgradation of Risod
Town to Four Lane with
Paved Shoulders
standards from
KM.36/845 to KM.
39/340 & KM. 41/520 to
44/220 (Total length =
5.20 KM) of NH 461 B in
the state of
Maharashtra on EPC
mode.
69 Construction of Raigad, 66 65.24
Vehicular Under pass Ratnagiri
with Service Road in
Km 176.787 For Khed
Railway Station, Gunde
phata in Km.191.900
and Construction of
Vehicular Over Pass at
Km. 129.400 in
Nadgaon villages on
National Highway
No.66 in Raigad and
Ratnagiri District in the
State of MaharashtraS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
70 Strengthening of Nashik 60 19.42
Nashik Road to Dwarka
Junction section (km
201/350 to 202/080 &
203/080 to 208/649) of
Pune-Nashik road NH-
60 in the state of
Maharashtra on EPC
mode.
71 Construction of Major Jalna 753H 72.62
Bridges at Ch. 8+00,
Ch. 35+488 on
Wadigodri-Ambad-Jalna
section & Ch.3+300 of
Jalna Bypass road
section of NH 753-H on
EPC mode in the state
of Maharashtra,
72 Construction of ROB at Nashik 753J 116.62
LC 115B (near
Nastanpur) at Km
126/150 of Manmad-
Chalisgaon section of
NH 753J in the State of
Maharashtra on EPC
mode.
73 Strengthening of Ahilyanagar 61 16.39
10.65km sections in
Km. 232.150 to km
255.280 on
Ahmednagar to
Kharwandi Kasar
section of NH 61 in the
State of Maharashtra
on EPC mode.
74 Rehabilitation and Latur 63 34.738
Upgradation to two
lane with paved
shoulder of Barshi-
Yedshi-Murud-Latur-
Aashtamode-Udgir-
Degloor road NH-63 in
km 118/600 to 125/00
(section Kharola toS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Bamni) (Project length-
6.4 Km) with flexible
pavement on EPC mode
in the State of
Maharashtra
75 Consultancy Services Solapur 465 0.87
for preparation of
Feasibility study and
Detailed project report
and providing
preconstruction service
for Rehabilitation/Up
gradation of existing
road of Mohol - Kural -
Kamati - Kanbas -
Achegaon- Walsang
Dhotri-Musti-
Tandulwadhi (Km 0+00
to 107+600) to 2 Lane /
4 Lane configuration
Section of NH-465
District Solapur in the
state of Maharashtra.
(L- 107.600 Km)-Tender
Based Acceptance
Proposal
76 Consultancy Services Solapur 548B 0.69
for preparation of
Feasibility Study and
Detailed Project Report
and providing
preconstruction
services for
Rehabilitation/Upgradat
ion of existing road to
2lane/4lane with paved
shoulders configuration
of Murum-Alur-
Waghdari-Akkalkot-
Nagansur-Tolnur-
Maharashtra State
Border NH 548B (Km
263+00 (Dalimb
Junction) to 344+562S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
(MAH/ KA Border) -
District Solapur in the
State of Maharashtra.
(L- 81.562 km ) -Tender
Based Acceptance
Proposal
77 Construction of Major Amravati 353K 19.48
Bridge on Chargad
River at Ch. 27+650
with approaches From
Km. 27/427 to Km.
27/782 & Minor Bridge
on Khar Nallah at Ch.
47+020 with
approaches From
Km.46/905 to
Km.47/101 on
Nandgaon peth- Morshi
Road NH-353 K Tal.
Morshi, Dist. Amravati
on EPC mode in the
state of Maharashtra.
78 Rehabilitation & Up- Solapur 965G 112.47
Gradation to 2-Lanes
with Paved Shoulder
Configuration of
Velapur-Mahud section
of NH-965G Design
Chainage From km.
10/500 to km. 32/300 in
the State of
Maharashtra on EPC
Mode.
79 Construction of RCC Buldhana, 753M 12.92
Drains at various Jalna
villages/Towns location
from Km 28+000 to Km
67+600 on Dhad-
Bhokardan Road
section of 753M in the
state of Maharashtra.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
80 Construction of New Washim 753C 42.36
High level Major Bridge
on Katepurna River at
design chainage
133/450 along with
approaches of 640 m
from Km. 133/025 to
Km. 133/875 (total
Length of the project =
850 m) on Jalna-
Pulgaon section of NH-
753C in District Washim
on EPC mode in the
state of Maharashtra.
81 Upgradation of the Gadchiroli 353C 50.34
section from Sironcha
to Major Bridge across
Godavari River from
Design hainage km
321+000 to km 326+200
(Length-5.20km) of NH-
353C Section of Sakoli-
Wadsa-Armori-
Gadchiroli-Ashti-
Allapalli-Sironcha Road
NH 353C in Gadchiroli
District in the State of
Maharashtra on EPC
mode.
82 Rehabilitation & Akola 161A 67.26
Upgradation of
Gandhigram
Realignment alongwith
reconstruction of Major
Bridge on Purna River
from Ch. km 24+250 to
Ch. km 27+200 (Length
of the project = 2.95
km) on NH-161A on
Akola-Akot Section in
the state of
Maharashtra on EPC
Mode.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
83 Land Acquisition Kolhapur 166G 39.3
proposal for
Rehabilitation & Up-
gradation to
Gaganbawda-Kale
section of NH-166G
from Km. 35.30 Km to
Km. 66.00 Km to 2L+PS
configuration lane in
the State of
Maharashtra.
84 Construction of RCC Chhatrapati 753F 26.86
Drains at various Sambhajinagar,
villages/Towns location Jalgaon
from Km 1+050 to Km
143+870 for length of
17.818 km on NH-753F
Aurangabad-Jalgaon
road in the state of
Maharashtra.
85 Rehabilitation & Up- Jalna 752H 87.07
gradation to two lane
with paved shoulder/
four laning
configuration of Rajur-
Chanegaon-Chikhali
section of NH-752H
from Km 188+280 to
Km 179+430 [Design
Chainage from Km.
0/000 to Km. 8/850
(Length-8.850 km)] on
EPC Mode in the State
of Maharashtra.
86 Construction of Major Amravati, 347A 31.87
Bridge on Wardha River Wardha
at Ch 28/362.50
alongwith approaches
from km 28+107 to km
28+684(total length of
the project = 0.577 km)
on Talegaon Warud
Gonapur road section
of NH 347A on EPCS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Mode in the state of
Maharashtra
87 Construction of 2/4 lane Solapur 150E 97
with Rigid Pavement in
Balance Length (4.122
Km) of KA/MH Border
(Km70+682) to
Akkalkot (Km 106+526)
section of NH-150E
along with construction
of ROB at Km 77+600
(LC 74 SPL) near
Dudhani village in the
State of Maharashtra.
88 Road Maintenance Raigad, 66 24.3
work by executing one- Ratnagiri
time bituminous work
improvement treatment
to Panvel-Mahad-Panji
road NH-66 in Km
148.00 to Km 161.600in
Raigad and Ratnagiri
district in the State of
Maharashtra Annual
Plan 23-24.
89 Rehabilitation Nandurbar 753B 890.81
&Upgradation of NH
753B from Nandurbar to
Taloda (Km. 49+050 to
Km. 78+270) to Four
lane with Paved
Shoulder in the States
of Maharashtra/Gujarat
on EPC mode.
(Length=29.220 Km)
90 Rehabilitation and Up- Satara 166E 181.45
gradation to 2 lane road
with paved shoulders
configuration for the
balance work of 13 km
length on Helwak-
Patan-Karad section
(Km. 85+000 to 133+S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
417) of NH-166E in the
state of Maharashtra on
EPC mode.
91 Rehabilitation and Thane 61 36.95
Augmentation of NH-
222 (New NH No.61)
from end of Malshej
Ghat to Start of Ane
Ghat (Km.101.000 to
Km.161.570) in the
State of Maharashtra to
under Two-Lanes with
Paved Shoulders under
NHDP-IV. - Settlement
through the scheme
“Vivad se Vishwas II.
92 Widening and Parbhani, 752K 162.67
strengthening of Latur
Gangakhed to Kingaon
section of NH-752K in
Km 38/750 to 72/304
(Flexible Pavement)
(Length=33.554 km) to
2-lane configuration on
EPC mode in the State
of Maharashtra.
93 Strengthening of Banda Sindhudurg 548H 45.94
-Amboli Sankeshvar
Road NH 548H fom Km
0.000 to 52/600 (
khambdev Naka to
Sindhudurg -Kolhapur
Border)in Sindhudurg
District in the state of
Maharashtra.
94 Road Maintenance Raigad 66 7
work by executing one-
time bituminous work
improvement treatment
to existing road of
Panvel-Mahad-Panji
road NH-66 in Km 84.00
to Km 87.000 in Raigad
district in the State ofS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Maharashtra (Indapur
village).
95 Rehabilitation & Sangli 266 25.12
Upgradation to 2L+PS
in Balance Length
(2.051Km) of Tasgaon
to Shirdhon section of
NH-266 (from Ch.
69/289 to 69/669, Ch.
70/100 to 70/743, Ch.
80/133 to 81/141, Ch.
81/495 to 81/610) in the
State of Maharashtra.
96 Construction of 4 lane Nagpur 353D 46.09
Concrete White topping
(WT) road in Bhivapur
City portion from km
68/500 to 70/900
(length 2.4 km) on
Nagpur Umred Nagbhid
Armori section of NH
353D in the state of
Maharashtra on EPC
Mode
97 Rehabilitation and Up Nashik 953 125.45
gradation to Two Lane
with Paved Shoulders
from Saputara (Gujarat-
Maharashtra Border) to
Chausale section of NH
953 in Km 104/000 to
121/570 (length-17.570
Km) on EPC mode in
the State of
Maharashtra.
98 Construction of Missing Nagpur 753 7.98
Length in Amdi to
Saoner section of NH
753 in following
sections (i) 4 laning in
Kothurna village from
design chainage Km
251+350 to KmS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
251+500 and (ii) 4
laning in Sawali village
from design km
247+780 to km 247+900
and 2LPS in Sawali
village from km
248+000 to km 248+220
with balance work of
MNB in Km 248+168 at
Sawali Village (iii) And
Irrigation Canal
Structure at Parseoni
Town from Km 236+690
to 236+760 (total
length of the project=
560m) of NH-753 in the
state of Maharashtra on
EPC Mode.
99 Rehabilitation and Up- Beed 361F 48.85
gradation of Shivaji
Maharaj Chowk to
Barshi Naka
(Ch.47+000 to Ch.
49+500) (2.5 km length)
section of NH-361F to 4
Lane configuration in
Beed City on EPC Mode
in the state of
Maharashtra.
100 One Time Improvement Parbhani 61 33.88
to Kalyan-Ahmednagar-
Parbhani-Nanded-
Nirmal Road NH-61 Km
463/700 to 481/00
(PARBHANI CITY
PORTION) in the State
of Maharashtra.
101 Rehabilitation and Buldhana 548CC 21.47
upgradation of
Vairagarh (Mohadi)
section from Design Ch.
73/830 to Ch.76/00 of
NH-548CC (total length
of the project- 2.17 Km)S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
to two lane with paved
shoulder Configuration
in Chikhli-Khamgaon
section in the state of
Maharashtra on EPC
Mode.
102 Construction of Nashik 160H 73.21
Malegoan Bypass Road
of length 7.45 km to
2L+PS configuration
connecting Kusumba
Malegoan section of
NH-160H to Dhule-
Nashik section of NH-
60 in District Nashik in
the State of
Maharashtra on EPC
mode.
103 Rehabilitation and Dhule 753B 181.57
Upgradation of Shewali
phata to Kalambhir
section i.e. Km 0+443
to Km 4+500 &
Nizampur to Chadwel
section i.e. Km 13+485
to Km 26+265
(Length=16.317 Km)
(excluding 2 Major
Bridges with
approaches Km
13+735 to Km 14+095
& Km 19+660 to Km
20+030) of NH 753B to
2L+PS Configuration in
the State of
Maharashtra on EPC
Mode.
104 Permanent repair work Dhule 160H 11.74
to protect abutment of
Major Bridge on
Dondaicha-Shahada
road of NH-160H at Ch.
111/300 towards
Takarkheda side in theS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
state of Maharashtra.
105 Reconstruction/ Latur 63 5.1
Widening of narrow
Minor Bridges 4 Nos. at
CH. 71+920, 74+064,
74+856 and 75+690 in
the Section Murud
Akola to Latur airport
junction on NH-63 in
the State of
Maharashtra.
106 Strengthening and Thane 61 12.78
Maintenance to Shahad
ROB Km 9/300 to Km
9/800 on Kalyan -
Nirmal Road N.H. 61 by
providing Mastic
asphalt and structural
strengthening work in
2023-24 in district
Thane in the state of
Maharashtra
107 Realignment and curve Buldhana 753A 13.36
improvement near
Deulgaon Mahi town
from design chainage
Km. 105/300 to Km.
106/185 (length- 0.885
Km) on NH 753A to
Four lane with paved
Shoulder configuration
in the state of
Maharashtra on EPC
mode.
108 Rehabilitation and Dhule 752G 226.58
Upgradation to two
lane with paved
shoulder configuration
of NH-752G from Sakri
to Pimpalner Section
(Design Ch: km 0+000
to Ch: km 21+411) in
the state ofS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Maharashtra on EPC
Mode. (Length = 21.411
km).
109 Development/Widening Pune 548D 396.17
of Talegaon Chakan
Shikrapur Nhavara
Section of NH-548D
from existing chainage
km. 54/000 to 82/300
and Design chainage
Km. 54/000 to 82/120
(Shikrapur to Nhavara
Section) to 2L+PS/4L
Configuration on EPC
Mode in the State of
Maharashtra
110 Upgradation and Four Chandrapur 543 52.37
Laning of Bramhapuri
town section from
design km 448/670 to
km 451/370 (Length
2.70 km) of NH 543
Section of Gondia -
Amgaon - Deori - Korchi
- Kurkheda - Wadsa
Bramhapuri road in the
State of Maharashtra
on EPC Mode
111 Treatment for critical Raigad, 66 77.19
land slide prone spots Ratnagiri
posing significant
threat by taking Slope
Protection Measures
from Km 144.800 to
Km145.000, Km148.00
to Km 148.350,
Km150.920 to Km
151.020 & Km 155.800
to Km 156.000 in
Kashedi Ghat and Km
200.317 to Km 200.932,
Km 200.932 to Km
201.487 in Parshuram
Ghat on Panvel-Mahad-S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Panji Road NH-66, in
the state of
Maharashtra
112 Rehabilitation, Sangli, 160 631.76
upgradation & widening Satara
of existing highway to
2L/4L+PS (Rigid
Pavement) of NH 160
section- Phaltan to
Mhaishal near
Karnataka Border
(including Tasgaon
Bypass), from existing
chainage Km 301/430
to Km 458/415 in the
State of Maharashtra-
Package-II & Package
III combined- starting
from existing chainage
Km 341/300 to Km
394/130 and design
chainage Km 340/250
at Dahiwadi Village to
Km 392/950 ending at
Vita Village in the State
of Maharashtra on EPC
Mode.
113 Rehabilitation & up- Sindhudurg 166G 164.13
gradation for Talere –
Gaganbawada -
kolhapur Road (NH
166G) stretch start
from km. 0/00 to Km.
06/00 and km. 13/00 to
km 19/440 of NH-166G,
length 12.440 km in the
State of Maharashtra.
114 Construction of 6 lane Nagpur 44 619.55
flyover from Khapari
ROB to Mihan
Interchange design
chainage km 8+760 toS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
11+450 (L- 2.69 km) and
upgradation of existing
4L +PS road to 6L+PS
with service road by
flexible pavement
design chainage km
11+450 to 14+500 (L-
3.05) [total project
length 5.74 km] in
section of Nagpur -
Hyderabad NH-44 (Old
NH-7) in Nagpur district
in the state of
Maharashtra on HAM
mode.
115 Rehabilitation and Up- Beed 361F 540.35
gradation of Jarud -
Sirsala section of NH-
361F km 59+500 to
km115+00 to Two lane
with paved shoulder/
Four Lane in the state
of Maharashtra on EPC
mode (Length – 55.5
Km).
116 Rehabilitation and Up- Parbhani, 361F 355.11
gradation of Nanded
Gangakhed – Loha
section of NH-361F
from Km 169/00 to
210/00 to two lane with
paved shoulder/ four
lane configuration in
the state of
Maharashtra on EPC
mode (Length - 41.00
Km).
117 Construction of Minor Ahilyanagar 548D 10.55
Bridge at Km.126/460
including median in
four lane section &
built up gutter in
approaches in
Shrigonda Town onS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
NH-548D (Talegaon
Shikrapur Nhavra
Adhalgaon Jamkhed) in
the State of
Maharashtra.
118 Rehabilitation, Satara 160 533.94
upgradation & widening
of existing highway to
2L/4L+PS (Rigid
Pavement) of NH 160
section- Phaltan to
Mhaisal near Karnataka
Border (including
Tasgaon Bypass), from
existing chainage Km
301/430 to Km 458/415
in the State of
Maharashtra. Package-I
starting from existing
chainage Km 301/430
at Phaltan Village @
Junction of Phaltan –
Baramati Road (Design
Chainage -301/430km)
& ending at existing
chainage Km 341/300 @
Dahiwadi Village Bus
Stop (Design chainage
Km 340+466km) in the
State of Maharashtra
on EPC Mode
119 Rehabilitation and Nandurbar 753B 927.88
Upgradation of NH-
753B to Four lane with
Paved Shoulder
configuration from Km
78.270 to Km 116.670
(Taloda to Gujarat-
Maharashtra Border) in
the State of
Maharashtra on HAM.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
120 Rehabilitation and Up- Parbhani 548B 761.83
gradation of (i).
Deogaon phata to
Digras phata (Ch. 0/000
to 15/000) & Selu to
Borgavhan (Ch 20/900
to 35/800) [Length=
29.9km] (ii). Injegaon
(Dhamoni) to Pohner
Phata (Ch.58/200 to Ch.
83/700) [Length=25.5
km] and (iii). Pohner
phata to Pathri (Design
Ch. 42/700 to 58/200)
[Length= 15.5 km]
sections of NH-548B to
Two lane with paved
shoulder configuartion
in the state of
Maharashtra on EPC
mode (Total project
length – 70.9 Km).
121 Balance work on NH- Ahilyanagar 61 35.43
61: (i) Strengthening in
km 211.00 to km
216.100 - Kalyan
Bypass to Shukkar
Chaulk (Ahmednagar
city area) (excluding
Seena Bridge length-
710m) (ii)
Strengthening in km
218.500 to 228.00 - part
State Bank Chaulk to
Chandbibi mahal
(Bhingar Town) (iii)
Strengthening and
widening to 10 m in km
228.000 to km 232.00
(section Chandbibi
Mahal to Mehekari)
(excluding km 228.00
to 228.630 -
Ahmednagar bypassS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
overlapping portion) in
the State of
Maharashtra.
122 Strengthening, Pune, 761 386.16
Widening & Up- Ahilyanagar
gradation of newly
declared NH-761 from
NH-61Junction-Belhe–
Alkuti–Devibhoyare–
Nighoj–Shirur, from
Design chainage Km
0.000 to Km 37.970
from
Single/Intermediate/2L
to 2L+PS in the State of
Maharashtra on EPC
Mode (Length 37.970
Km)
123 Widening, Beed 561 349.566
Reconstruction & Up-
gradation to 2 lane with
Paved Shoulder/Four
Lane configuration for
the work of Sautada to
Shirapur Section of NH-
561 from Design km
86+300 to km 125+589
in the state of
Maharashtra on EPC
mode. (Design length =
39.289 km)
124 Widening, Ahilyanagar, 561 657.15
Reconstruction & Up- Beed
gradation to 2 lane with
Paved Shoulder/Four
Lane configuration for
the work of
Ahmednagar to
Sabalkhed & Ashti to
Chinchpur Section of
NH-561 from Design kmS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
2+915 to km 37+728 &
Design km 55+100 to
km 70+000 in the State
of Maharashtra on EPC
mode. (Length = 49.713
km)
125 Consultancy Buldhana 161G 0.55
servicesfor the
preparation feasibilty
studies and detailed
project report for
Sangrampur- State
border NH-161G(total
length - 30 Km) In the
State of Maharashtra.
126 Strengthening of NH Raigarh 166A 49.65
166A to two lane paved
shoulder from Km
0+000 to Km 22+200 of
Vadhkal – Alibag road
for design length
22.200 Km in Raigad
district, in the State of
Maharashtra on EPC
Mode- regarding
submission of estimate
under AP 2023-24 – Pen
Division
127 Rehabilitation and Up- Latur, 63 809.77
gradation of NH-63 (i) Nanded
Udgir to Raavi (ii) Raavi
to Degloor (iii)
Aadampur phata to
Sagroli Phata Km
67.000 to Km 124.357,
Km 139.500 to 160.856
(Total length 78.713
km) Part of the
Renapur-Ashtamode
(NH-361)-Udgir-Deglur
(NH-101)-Adampur
Phata (NH-101)-
Khatgaon-Sagroli-
Bodhan-NizamabadS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
(NH-6) project to
Two/Four lane with
paved shoulder
configuration in the
State of Maharashtra
on Engineering,
Procurement &
Construction (EPC)
Basis Contract-
Regarding Submission
of Estimate Under AP
2024-25.
128 Construction of Major Solapur 150E 26.05
Bridge on Bori River at
Ch. 98+020 alongwith
approaches from Km
97+600 to km 98+350
(total length of the
project=0.750 km) on
Akkalkot- Gangapur
road of NH-150E on EPC
Mode in the state of
Maharashtra.
129 Upgradation to two Nashik 848 69.09
lanes with paved
shoulder configuration
from km 38/970 to km
41/816 and km 49/730
to km 51/413 (Total
length - 4.529 Km) of
NH-848 in Nashik
District in the State of
Maharashtra on EPC
mode under Annual
Plan 2024-25.
130 Estimate of Akola, 161A 1.63
Preconstruction Washim
activities for 2.6 km of
forest length in
Mangrulpir Mahan
section of NH-161A in
the State of
Maharashtra.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
131 Preconstruction Akola, Amravati 548CC 2.10
activities of 3.06 km
forest section in
Anjangaon-MP Border
section of NH 548C-
Regarding: -Submission
of Preconstruction
activities Forest
Estimate under Annual
Plan 2024-25.
132 Design and execution Thane 61 37.15
of Necessary
Protective measures in
Malshej Ghat Section of
Kalyan Nirmal road NH-
61 form km 83/100 to
km 93/200
133 Construction of new Solapur 561A 77.71
high level bridge on
upstream side of
existing bridge (known
as Ahilya Bridge)
across Bhima River @
Chainage 37+686 (L-
365.00 mtr.) along with
its approaches and
development /widening
/ strengthening of
length from Km.36+190
to Km. 37+350 &
Km.38+030 to 38+890
(L-2.335 Km.) section
of NH-561-A (Tembhurni
-Pandharpur-
Mangalwedha) on EPC
mode in the state of
Maharashtra.-
Submission of estimate
–reg.
134 Widening, Pune 60 1389.17
Reconstruction & Up-
gradation to 2 lane with
Paved Shoulder-
configuration for theS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
work of Bhimashankar-
Taleghar-Wada-
Rajgurunagar Road
(NH-60 Spur) from
Design km 2+928 to km
63+378 in the State of
Maharashtra on Hybrid
Annuity Mode
135 2L+PS on Junnar to Pune 61 960.16
Taleghar section of NH
61 spur
136 Construction of Chhatrapati 752H 57.54
Daulatabad Bypass Sambhajinagar
(Existing Ch. from Km
98+500 to Km 102 +000
& Design Ch. from Km
0+00 to 3+865) Section
of NH 752H in
Chhatrapati
Sambhajinagar District
in the State of
Maharashtra on EPC
mode.
137 Rehabilitation and Up- Thane 61 272.20
gradation to two lanes
with paved shoulders
configuration of Kalyan
- Murbad - Malshej Ghat
- Nirmal road NH-61
from km 37/850 to km
57/900 (Murbad to
Kadampada section) in
the State of
Maharashtra on EPC
Mode.
138 Rehabilitation and Nagpur, 353J 136.35
Upgradation to Two Amravati
Lane with paved
shoulder configuration
from km 67/100 to
67/885, km 76/100 to
77/060, km 80/450 to
81/520, km 82/000 to
82/230, km 82/400 toS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
82/610 and km 96/840
to 98/095 on balance
length of 4.51 km long
Katol-Warud section of
NH 353J in the state of
Maharashtra on EPC
mode
139 Strengthening, Nashik, 160D 325.79
upgradation & widening Ahilyanagar
of Nandur Shingote-
Kolhar Section of NH-
160D km. 00/00 to
47/370 (Nandur
Shingote - Kolhar
Section). Total length-
47.37 Km(2L+PS)
Configuration in the
State of Maharashtra
on EPC Mode.
140 Preconstruction Gadchiroli 353C 73.48
activities on (i) Wadsa
to Armori (64/850 to
81/000) section (ii)
Gadchiroli to Ashti
forest section(Km
115/800 to Km 123/100,
Km 151/020 and Km
158.020 and Km
161/020 to Km 182/350)
(iii) Ashti to
Lagam(182/350 to
199/400) section of NH
353C
141 Preconstruction Gadchiroli 130D 97.71
activities for forest
diversion including
wildlife clearance for
NH-130D from chainage
Km 0/00 (Alapalli - 353C
Junction) to Km 112/00
(Maharashtra-
Chhattisgarh border) in
the State of
Maharashtra underS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Annual Plan 2024-25.
142 Rehabilitation And Dharashiv, 63 574.18
Upgradation to four Latur
lane with paved
shoulder configuration
from km 24+350 to km
61+875 (Jawale -
Borgaon Kale) of NH-63
in the State of
Maharashtra on EPC
mode under Annual
Plan 2024-25
(Total length - 37.525
Km).
143 Rectification of Black Ratnagiri 66 78.46
spot and Curve
improvement of
Bhosate Ghat turn on
Panvel-Mahad-Panji
road NH-66 in Km
180.550 to km 181.950
and other road safety
measures in the state
of Maharashtra on EPC
mode-Regarding
submission of estimate
under AP 2023-24 – Pen
Division.
144 Construction of Missing Gadchiroli 30 381.32
Link Road from Km
84/00 to 112/00 section
of NH130D Alapalli-
Bhamragad- Laheri –
Binagunda Kuvakodi-
Maharashtra-
Chattishgad Border
connecting to junction
NH-30 near Kondagaon
Chattishgarh in
Gadchiroli District in
the state of
MaharashtraS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
submission of Estimate
under Annual Plan FY
2024-25
145 Protective Treatment Raigadh 965DD 61.16
Works on Landslide
Zone in Varandh Ghat
Section from km 90.180
to km 90.260 and km
94.150 to km 96.600 on
NH-965 DD in Raigad
District in the state of
Maharashtra
146 Construction of Road Palghar 160A 26.21
Protection measures
from km 110/000 to km
176/000 (Section
between Mokhada to
Jawhar ) on NH-160A in
State of Maharashtra
on EPC mode
147 Construction of Kolhapur 17 468.99
Highway starting from
NH-17-Talere –
Gagangawada-
Kolhapur NH-166G
Road Section from
Design Ch. 35.300 to
Design Ch. 65.740
(Length-30.440Km) to
2-Lane with paved
shoulder configuration
in the state of
Maharashtra on EPC
mode.- Reg. submission
of estimate under
additional AP 2024-25 –
Kolhapur Div.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
148 Consultancy services Wardha 347A 0.39
for Preparation of DPR
for Rehabilitation /Up
gradation of Talegaon
Warud Gonapur Section
to 2 lane with paved
shoulder+Paved
shoulder standards
from Design km Ch 14-
300 to 19-800, 24-150
to 24-800,31-00 to 47-
00, 48-010 to 60-7(Total
length of the project
35.25 km) section of
NH 347A on EPC Mode
in the state of
Maharashtra. (Tender
ID
2024_MoRTH_789596_3
).- proposal regarding
tender based
acceptance of H-1
bidder M/s EKAM
Venture JV M/s
Almondz Global Infra-
Consultant Limited with
Associate Partner M/s
MAKE Infracon-in
association-Reg.
149 Construction of Pune 753F 40.07
Bhaugaon Reraligment
raod Ch. 0/000 to Ch.
0/860 four lane along
with NH-753F (Design -
Length0.860 Kms) in
the village Bhugaon
Tal. Mulshi in the State
of Maharashtra on EPC
mode.
150 Consultancy services Nagpur 247 0.49
for preparation of
Detailed Project Report
and Feasibility study
for construction of 2S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
lane CC road with
paved shoulder on
Dahegaon - Kuhi Umred
section of NH-247 from
Km 17+870 to 32+000
& 51 +420 to 72+000
(Including Feasibility
Study of Bypass to
Railway crossing at
17/870 in Kamptee
village) (Length= 34.71
km) in State of
Maharashtra.
151 Tender based estimate Buldhana 753E 1.14
for consultancy
services for the
preparation of
feasibility studies and
detailed project for the
work of Rehabilitation
and Up-gradation of 2/4
lane paved shoulder of
Buldhana - Khamgaon
road section of NH-
753E including flyover
in Botha Forest.
(Length 47.5 Km) in
Buldhana district in the
State of Maharashtra.
152 Consultancy services Akola 161A 0.17
for the preparation of
Feasibility studies and
Detailed project report
for the work of
Rehabilitation, Up-
gradation and Widening
of existing Highway to
2 Lane with paved
shoulder of Mahan
Akola from Km 107/500
to Km 136/809 (Length
29.309 Km) of NH-161A
in Akola district in the
State of MaharashtraS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
(Tender ID
2024_MoRTH_810879_
1) - proposal regarding
tender based
acceptance of M/s
CEOMA Consulting Pvt.
Ltd, New Delhi Lead,
Manglam Infra &
Engineering Limited -
JV, Insignia Infratech -
In Association.
153 Construction of Minor Nanded 161A 16.39
Bridge On NH 161A
Kundral to Wazar road
section At Hangarga
Khurd Village Chainage
84/820 including
Approach Road (Total
Length including
approach 0.361 km) on
EPC Mode in the State
of Maharashtra.
154 Rehabilitation and Up Parbhani 752 I 157.69
gradation of Charthana
– Jintur Section of NH
752 I Km 25+100 to
47+100 to 2 Lane with
Paved Shoulder
configuration (Flexible
Pavement) in the state
of Maharashtra on EPC
mode. Reg:-
Resubmission
of Annual Plan
Estimate.
155 Construction of RoB in Buldhana 161H 209.61
view of Railway Level
Crossing No.20 near
Nandura on NH-161H on
Jalgaon Jamod
Nandura Section NH-
161H in the State of
Maharashtra drawing
(GAD) and detailedS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
estimate regarding.
156 Rehabilitation and Up- Nandurbar 752G 349.08
gradation of Visarwadi
(Near Junction of NH-
6)-Kalamba–Nandurbar-
Kolde of NH-752G
(Design Ch.0+000 to
37+800 and Ch 43+600
to Ch 50+200) (Length-
44.40 km) to Two Lane
with Paved shoulders/4
lane with Paved
Shoulder Configuration
on EPC Mode in the
State of Maharashtra.
Submission of estimate
under AP 2024-25 -reg
157 Balance work of NH-66 Raigad 66 354.21
from design Km 84/00
to Km 87/100 (Indapur
Bypass) and Km 91/600
to Km 99/100 (Mangaon
Bypass) to four lane
with paved shoulder in
State of Maharashtra
under NH(O) on EPC
Mode.
158 Construction of Service Sindhudurg 66 14.01
Road and Slip Road
between Km 450+170
to Km 471+300 (Zarap
to Patradevi Section) of
NH-66 in the State of
Maharashtra on EPC
Mode.
159 Consultancy Buldhana 161G 0.55
servicesfor the
preparation feasibilty
studies and detailed
project report for the
work of rehabilation,
upgradation & wideningS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
of existing Highway to
2L+PS of shegaon-
Sangrampurfrom Km
55/000 to 88/000(length
- 33 km) of NH 161GIn
buldhana district in the
State of Maharashtra
160 Construction of 2L+PS Amravati 353K 78.17
configuration road,
Minor Bridge, Culvert in
forest stretches
(Length - 7.1 km) &
Balance MJB work on
Nal river on
Nadgaonpeth - Morshi-
Warud - MH/MP Border
road section of NH-
353K on EPC mode in
the state of
Maharashtra
161 Rehabilitation and Bhandara 543K 120.24
upgradation of
Maharashtra/MP border
to Tumsar section of
NH 543K from km
51/000 to 69/000 to two
lane with paved
shoulder configuration
in the State of
Maharashtra on EPC
mode (total length -
18.00 km)
162 Construction of Major Ratnagiri 66 47.91
Bridge, Minor Bridge,
Service Roads, RCC
Drain,Culverts and Bus
Bay between km
367/200 to km 450/170
(Talgaon-Kalmath-
Zarap Section) on NH-
66 in the State of
Maharashtra on EPC
ModeS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
163 4 laning of NH 353J Amravati 548C 112.68
from Chandur Bazar
Naka to Zasi Rani
Chowk_(Junction of NH
353J with NH-548C) in
Paratwada/
Achalpur city on
EPC_mode in the state
of Maharashtra (Length
- 6.192 km)
164 Rehabilitation, Akola 161A 403.4
Upgradation &
Widening of Akola to
Mahan section from km
35/265 to km 64/574
(Length – 29.309 km)
including construction
of 4 lane with paved
shoulder configuration
Barshi Takli Bypass
(Length – 3.160 km) on
NH-161A the State of
Maharashtra on EPC
mode
165 Rehabilitation and Buldhana 161G 629.65
upgradation of Shegaon
to Maharashtra/MP
Border section of NH
161G from km 55+000
to km 118+000 (Length
– 63.00 km ) to 2 Lane
with Paved Shoulder
configuration in the
state of Maharashtra on
EPC mode.
166 Construction of four- Parbhani 548B 55.83
lane Road Over Bridge
(ROB) with approaches
in lieu of railway
crossing no. LC 99
including a low height
subway (LHS) at km
20+670 on NH-548B in
the state ofS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Maharashtra on EPC
mode
167 Rehabilitation and Chandrapur 353D 1135.03
Upgradation of Umred-
Nagbhir Section from
km 48/400 to 96/700
(excluding Bhiwapur
city portion from km
68/370 to km 70/770
and RUB of NH-353D to
four lane with paved
shoulder configuration
in the state of
Maharashtra on HAM
mode.
168 Mitigation Measures Gondia 53 540.24
structure on CG/MH
Border to Wainganga
bridge section (EPC)
169 Nagpur-Katol NH(O) Nagpur 353J 1166.96
(EPC) section of NH-
353J
170 Four laning of existing Chandrapur 930D 968.05
2-lane stretch from
Bamni (Design km
19.000) to MH/TG
Border (Design km
51.985) Design Length
32.985 km section
under NH(O) in the
State of Maharashtra
on HAM
171 Four laning of existing Chandrapur 353B 1013.33
2-lane stretch from
Govindpur (MH/TG
Border) (Design km
32.910) to Rajura
(Design km 89.090)
Design Length 56.180
km section under NH(O)
in the State of
Maharashtra on HAMS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
172 4-laning of Aurangabad Chhatrapati 752E 1505
- Paithan section from Sambhajinagar
existing km 0.000
(design km (-) 1.800) to
existing km 44.400
(Design km 42.417)
(Design length 44.217
km) in the State of
Maharashtra to be
executed on EPC Mode
under Bharatmala
Pariyojana
173 Design & Construction Nagpur 353D 1038.84
of Elected Structure
(Flyover) from Indora
Chowk to Dighori
Chowk (Design Length
8.90 km) in Nagpur City
on Nagpur - Umred
section in the State of
Maharashtra on EPC
Mode
174 Construction of Nagpur 361 15.15
Balance Works (i)
Pedestrian Underpass
at Km.514+960
including approaches &
both side service road,
(ii) Bus lay bay & bus
shelter, (iii) Drain from
Km.514.660 to
Km.515.087 on both
sides and (iv) Junction
at Km.514.960 on 4-
laned Wardha - Butibori
section of NH-361
[Km.465.500 to
Km.524.690 in the state
of Maharashtra on EPC
Mode
175 One Time Improvement Wardha 361 21.02
of existing carriageway
in Deoli Town with
white topping [Length –S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
3.200 Km.] on Yavatmal
– Wardha Section of
NH-361 in the State of
Maharashtra on EPC
Mode
176 Construction of balance Dharashiv 361 61.08
works (VUP, Service
Road, Drain, Junction
development, Bus Bay
and FOB) for four laning
of Tuljapur - Ausa
section of NH-361 from
Km0.000 to Km 55.835
(including Tuljapur
Bypass Km 0.000 to Km
11.593) under
Bharatmala Pariyojna in
the State of
Maharashtra on EPC
Mode
177 Construction of the 6- Wardha 44 136.34
lane Flyover including
approaches from
Existing PUP of Nandori
Flyover (Kalode Square)
at Km.74.745 to
Hospital Square at
Km.76.020 (Total
Design Length- 1.275
km) Section of Nagpur –
Hyderabad NH-44 in the
state of Maharashtra on
EPC mode
178 Construction of balance Yavatmal 361 61.22
works in descoped
section in the village
Amboda, Hiwara
Sangam, Lonbehal,
Dattarampur & Kinhi in
Four laning of
Mahagaon-Yavatmal
section of NH-361 from
Km 320.580 to Km
400.575 (design lengthS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
80.195 km) in the state
of Maharashtra on EPC
Mode
179 Construction of 07 Nos. Nagpur 44, 47, 53 257.445
of Standalone Safety & 353J
Structures / works
(Package-V) at different
locations on 4 different
NHs (NH-44, 47, 53 &
353J) in the State of
Maharashtra on EPC
Mode
180 Construction of 11 Nos. Amravati, 361, 53, 357.22
of Standalone Safety Wardha, 161
Structures / works Nagpur
(Package-III) at
different locations on
various NHs in the
State of Maharashtra
on EPC Mode
181 Construction of 9 Nos. Chhatrapati 52, 53 324.57
of Standalone Safety Sambhajinagar,
Structures / works at Beed, Dhule &
different locations on Jalgaon
various NHs in the
State of Maharashtra
on EPC Mode
182 Strengthening under Nagpur 353J 25.00
one-time improvement
of Nagpur - Katol
Section of NH353J from
km 7+300 to km 13+000
in Maharashtra on EPC
mode
183 6L Saundad ROB on Gondia 53 32.52
Raipur-Nagpur (from
441.970 km to 443.560
km) NH-53 in
Maharashtra on EPC
mode
184 One Time Improvement Jalgaon 52 23.56
in Mehunbare town
from Km 415.940 toS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
419.940 and Gartad
from Km 450.840 to
454.140 on NH-52 in
Maharashtra on EPC
mode
185 Construction of VUPs Dhule 52 132.97
at km 177.900
(Palasner) & at km
237.200 (Waghadi) &
other remedial
measures for
rectification of
MoRT&H identified
Blackspots & 7
Accident spots on MH /
MP Border – Dhule
section of NH-52 in
Maharashtra on EPC
mode
186 One-Time improvement Latur 361 22.63
with white topping in
Ahmedpur Town on
Chakur-Latur section of
NH-361 in Maharashtra
on EPC mode
187 Construction of Service Latur 361 5.59
Roads and Bus Shelters
between km 143.300 to
km 143.900 in Chakur-
Loha Section of NH-361
in Maharashtra on EPC
mode
188 Construction of Flyover Chandrapur 353B 191.31
cum ROB from Km
66.600 to 68.800 in
Gandchandur Town on
Rajura Korpana MH/ TL
border NH-353B in
Maharashtra on EPC
mode
189 One Time improvement Latur 361 30.47
with white topping in
Chakur & Latur Towns
& construction of BusS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
shelters in Ashta
village on NH-361 in
Maharashtra on EPC
mode
190 Construction of VUPs Akola 52 104.47
at Km 226/150 near
Nipana Village and
Flyover at km 240.660
(Appu T point near
Akola MIDC) in stretch
of Kurankhed to Shelad
(Amravati Chikhli Pkg-
2) section of NH-53 in
Maharashtra on EPC
mode
191 Strengthening, Repair Jalgaon 753BE 14.16
& Maintenance of
Taloda Burhanpur NH-
753BE for 20.600 Km
length between Km.
128.000 to Km. 226.500
(5.375 Km
strengthening) in
Jalgaon District in
Maharashtra on
percentage Item rate
basis
192 Construction of Minor Latur 361 13.9
Bridge & RCC Drain at
km 28.842 in Ujani, 3
No. of Box culverts in
Ashiv & RCC Drain in
Tuljapur Bypass of
Tuljapur-Ausa Section
of NH-361 in
Maharashtra on EPC
Mode
193 Rectification of 6 Nos Nagpur 361 173.21
of accident spots in (a)
Yavatmal-Wardha
section of NH-361, (B)
Nagpur-Kondhali
section of NH-53 in
Maharashtra on EPCS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Mode
194 One time improvement Jalgaon 53 49.2
of Jalgaon city on
Tarsod Fagne section
of NH-53 in
Maharashtra on EPC
mode
195 One time improvement Nagpur 547E & 96.22
in Kalmeshwar town 353J
on NH-547E & NH-353J
in Maharashtra on EPC
mode
196 6 laning of Pune-Satara Pune & Satara 48 1725.00
section of NH-48 on
BOT
197 4 laning of Solapur- Solapur & 65 923.00
Mah./KNT Border of NH- Dharashiv
65 on BOT
198 8-laning of Vadape at Thane 848 1252.92
Km 539.202 to Thane
at km 563 section of
NH-848 on HAM
199 Construction of new 6- Satara 48 907.03
lane tunnel at
Khambataki Ghat of
NH-4 on EPC
200 Construction of 8-lane Palghar NE-4 1534.71
access controlled
Expressway from km.
77 to 103.400 (Ganjad
to Talasari section of
Vadodara Mumbai
Expressway) on HAM
basis, Pkg-XI.
201 Construction of 8-lane Palghar NE-4 1711.38
access controlled
Expressway from km.
50.700 to 77 (Masvan to
Ganjad section of
Vadodara Mumbai
Expressway) on HAM
basis, Pkg-XII.S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
202 Construction of 8-lane Palghar NE-4 3536.9
access controlled
Expressway from km.
26.582 to 50.70 of Main
Expressway and km.0
to 3 of SPUR (Shirsad
to Masvan section of
Vadodara Mumbai
Expressway) on HAM
basis, Pkg-XIII.
203 Dharampuri – Lonand, Solapur & 965 1411.71
Pkg-IV (Sant Satara
Dyaneshwar Palkhi
Marg)
204 Baramati - Indapur Pune 965G 1471.32
Package - II
205 Construction of 8-lane Palghar & NE-4 2058.59
access controlled Thane
Expressway from km.
3.000 to 20.200
(Shirsad to Akloli
section –SPUR of
Vadodara Mumbai
Expressway) on HAM
basis, Pkg-XIV.
206 Construction of 8-lane Thane NE-4 2610.8
access controlled
Expressway from km.
20.200 to 43.000 (Akloli
to Amne section –SPUR
of Vadodara Mumbai
Expressway) on HAM
basis, Pkg-XV.
207 Construction of 8-lane Thane NE-4 4051.8
access controlled
Expressway from km.
43.000 to 69.800 (Amne
to Bhoj section - SPUR
of Vadodara Mumbai
Expressway) on HAM
basis, Pkg-XVI.
208 Construction of Eight Thane & Raigad NE-4 2208.68
lane access controlled
Expressway from KmS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
69.700 to Km 79.783
(Bhoj to Morbe -Spur)
Section of Vadodara
Mumbai Expressway,
Pkg-XVII
209 4-laning of Lonand to Satara 965 1709.96
Diveghat (Mohol-Alandi
section), Pkg-V section
of NH-965
210 4-laning of Ratnagiri- Ratnagiri 166 1774
Kolhapur section of NH-
166, Pkg-I
211 4-laning of Ratnagiri- Ratnagiri & 166 1985.4
Kolhapur section of NH- Kolhapur
166, Pkg-II
212 4-laning of Ratnagiri- Kolhapur 166 1939.23
Kolhapur section of NH-
166, Pkg-III
213 6-laning of Satara- Satara 48 2330.71
Kagal section of NH-48,
Pkg-II
214 6-laning of Satara- Satara & 48 2111.25
Kagal, Pkg-I section of Kolhapur
NH-48
215 Ahmednagar-Solapur Solapur 150C 1370.75
(Greenfield Section)
(Pkg XIV)
216 Balance work for 4- Raigad 66 546.44
laning of Panvel to
Indapur section from
km.42.3 to km.84.6 of
NH-66
217 Balance work for 4- Raigad 66 329.82
laning of Panvel to
Indapur section from
km.0.0 to km.42.3 of
NH-66
218 Standalone 6-lane Dhule 60 31.59
Purmepada VUP
(Balance work) at Km
282+800 in Dhule -
Pimpalgaon section of
NH-3S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
219 Surat-Dahisar Section Thane & 48 69.77
of NH-48 Palghar
220 4 locations viz. (i) Pune 65 99.92
Bhandgaon Jn (Km
47.920) (ii) VarkuteJn
(Km 126.735) (iii)
Indapur bypass Entry
(km 135.675) (iv)
Indapur Bypass Exit
(Km 142.735) on Pune-
Solapur (Pkg-I)
221 Standalone 4-lane Pune & 60 34.42
Vehicular Underpass Ahilyanagar
with approaches at
Sangamner Bypass End
Junction (Km.150.200)
and Wavi Junction
(Km.163.900) on Khed-
Sinnar section of NH-60
222 Hadapsar - Dive Ghat Pune 965 818.52
section of NH-965
223 6-laning of Gonde to Nashik 848 856.93
Pimpri Sado in section
of NH-3
224 Navi Mumbai Raigad 348A 254.68
International Airport
Interchange on West
side) (Amra Marg/NH-
348A) at Ch.2.860 &
construction of 2 nos.
of VUPs at Ch. 3+380 &
4+093
225 Karnala Jn of Navi Raigad NH-4B 397.22
Mumbai International
Airport interchange on
East side (NH-4B D-G
Section)
226 Construction of White Pune, 60 334.90
topping work of Khed – Ahilyanagar &
Sinnar section of NH-60 NashikS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
227 White Topping along Ahilyanagar 61 254.79
with reconstruction of
20 number of culverts
of Two-lane Paved
shoulders of NH 61 (old
NH 222) from Malshej
Ghat to Ane Ghat (from
Km 101/000 to Km
161/570-Package-I),
from Ane Ghat to
Ahmednagar Bypass
(from Km 161/570 to
Km 211/000 – Package-
II) & from Kharwandi
Kasar to Junction of
NH 211 (from Km
284/000 to Km 337/000
– Package-III) of total
length 163Km in the
State of Maharashtra
on EPC mode
228 Additional Structures Nashik & Dhule 848 / 60 479.00
Pkg-I Nashik) (12
structure works on
Dhule-Nashik Highway)
229 Additional Structures Pune & Solapur 65 169.86
Pkg-II (Solapur) (4
Structures works on
Highway in Solapur and
Pune City)
230 One Time improvement Solapur 965 83.71
of Pandharpur town
231 Construction of White Thane & 48 553.00
Topping on the existing Palghar
bituminous
carriageway and
secrvice road from
km.381 to km.502 on
Surat - Dahisar section
of NH-48
232 Construction of VUP Ahilyanagar 60 29.03
with approaches at
Khodad Junction
(Km.78.600) andS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Ambikhalsa Junction
(Km.113.150) on Khed
Sinnar Section of NH-60
(Old NH-50)
233 Design and Pune & Satara 48 34.88
construction of
crossing facility of VUP
at 4 locations viz. (i)
Kikvi Village (Km
801+080) (ii)
Harischandri (Km
806+020) (iii) Shivare
(km 817+360) (iv)
Khedshivapur (km
820+340) and FOB at
863+200 and other
miscellaneous works
on Pune-Satara Section
of NH-4 from km
725.000 to 865+350
(length km 140.350) in
the State of
Maharashtra on EPC
Mode
234 Design and Thane 848 44.19
Construction of 6-lane
Stand-alone single span
Grade Separated
structure at Km
532+552 (Bapgaon) on
Gonde-Vadape section
of NH-3 (New NH-848)
in the state of
Maharashtra (balance
work)
235 Construction of Major Satara 48 42.69
Bridges (Service Road
Bridges) at Krishna
River including
approaches for
Rectification of Black
Spot (MH-04-218) on
both sides at Km
756+395 (Krishna RiverS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Bridge) and
Construction of Flyover
including a LVUP and
Approaches for
Rectification of Black
Spot (MH-04-216) on
both sides at Km
770+550 (Vele Village)
of Pune-Satara Section
of NH-48 in the State of
Maharashtra on EPC
Mode
236 Long-term rectification Pune & Satara 48 27.54
work at 4 Nos. of
MoRTH Blackspots i.e.
(i) Bhumkar Pull (MH-
04-27) (ii) Navale
Bridge (MH-04-26) (iii)
Bavdhan (MH-04-42) (iv)
Wakad (MH-04-41) and
Design and
Construction of FOB at
Km 842+680 near NDA
Chowk on Pune-Satara
Section of NH-48 in the
State of Maharashtra
on EPC Mode
237 Design and Nashik 848 39.13
Construction of
Vehicular Underpass as
Long-term rectification
work at MoRTH
Blackspot i.e.
Dongarbaba Temple
(MH-04-192) at Ch.
425.510 on Pimpalgaon-
Nashik-Gonde Section
of NH-3 in the State of
Maharashtra on EPC
Mode
238 Construction/widening Solapur & 52 45.10
of service road and Dharashiv
installation of street
lights on Solapur-S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Yedeshi section of NH-
52.
239 Construction of works Solapur 166 / 65 96.51
in the state of
Maharashtra on EPC
mode; A) ROB at km
377+800 along with
approaches at Bhaiya
Chowk Junction &
Service Road from Ch.
365+740 to Ch.
366+580 (BHS) on
Sangli - Solapur section
of NH-166, B) VUP at
Ch. 210.592 (Yawali)
including SVUP at Ch.
211.139 on Pune
Solapur Pkg-II section
of NH-65, C) VUP at Ch.
36+580 along with
street light work on
Solapur-Yedshi section
of NH-52., D) Service
Road from Ch.129+440
to 129+990 RHS, Ch.
129+750 to 129+990
LHS, Ch. 135+650 to
136+100 BHS, Ch.
101+750 to 102+050
BHS, Ch. 104+200 to
104+780 RHS &
Widening of Box culvert
at Ch. 104+759 on
Akkalkot - Solapur
section of NH-150(E)
240 Development of Raigad 548 826.00
Kalamboli Interchange
junction
241 Savali Vihir to Ahilyanagar 160 867.08
Ahmednagar Bypass
section of NH-160
242 4 Laning of Karmala- Solapur 561A 1,234.12
Tembhurni (NH-561A)S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
243 Lonand Shirwal section Satara 965D / 611.84
of NH-965 DD & 965DD
Lonand Satara section
of NH-965D
244 Ghoti-Sinnar section of Nashik 160A 264.35
NH-160A
245 Pirachi Kuroli (Km Solapur 965 168.52
55+900 -Km 56+400),
Malshiras bypass
merging at Khudus-
Dharmapuri and
Natepute bypass (Km
101+500) at Khudus-
Dharmapuri on NH-965
246 Strengthening of Pune & Satara 48 785.75
service/slip road of
Pune-Satara section of
NH-48
247 Balance work of 4- Nashik & 160 114.89
laning of Sinnar to Ahilyanagar
Shirdi section of NH
160 from Km.0+000 to
Km.50+943 (including
Sinnar Bypass)
248 Construction of VOP at Sangli 166 16.52
Ch.217+060 to Km
217+682 and Slip Road
From Ch.194+710 to
195+086 on NH 166.
249 Construction of minor Pune 48 49.46
and major bridge at
Mutha River on Pune-
Satara section of NH-4
(Blackspot
Rectification)
250 Construction of Major Solapur 65 51.57
Bridgeat Bale Bridge &
Old Pune Naka on
Pune-Solapur section of
NH-65 (Blackspot
Rectification)
251 Construction of VUP at Palghar 48 44.78
Ibadpada in Surat-
Dahisar section of NH-S. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
48 (Blackspot
Rectification)
252 Construction of VUP & Nashik 60 49.90
LVUP at Khadakjamb
junction on Dhule-
Pimpalgaon section of
NH-3 (Blackspot
Rectification)
253 Construction of SVUP Pune 48 18.80
at Ch. 863+200 (Kiwale)
on Pune – Satara
section of NH4
254 Construction of Service Nashik & Dhule 60 63.64
Road at Laling,
Mungase, Vadalibhoi &
Raigad Nagar and Road
Safety Works in Rahud
Ghat on Dhule-
Pimpalgaon Section of
NH-3 in the State of
Maharashtra on EPC
Mode
255 Strenghtening of town Ahilyanagar 516A 15.19
portion roads of
Ruichhatissi,
Mahijalgaon and
Ghogargaon villages
256 Construction of Pune 65 99.20
additional structures at
Warvand (Ch.59+000),
Patas (Ch. 66+350) &
Khadaki (Ch. 90+300)
on Pune - Solapur
section of NH-65 (PKG-
I).
257 Strengthening of Raigad 48 34.22
service/slip road of NH-
4B of JNPT Pkg-IV
258 Khed- Sinnar Section of Pune, 60 98.90
NH -60: Removal of At- Ahilyanagar &
Grade junctions VUPs Nashik
at (i) Km 47.150,
(ii)Saykhindi Phata at
Km-153.880 andS. Name of Work District NH No. Sanction Cost
No. (Rs. in Cr.)
Nandurshingote BP End
Junction: (iii) Km
165.430
259 Construction of VME Thane NE-4 609.00
Spur of 7.00 KM length
(from Borivali KM
38.200 to Kirawali KM
45.200) for connecting
Samruddhi Mahamarg
of MSRDC
Total 97728.0124
*****