Executive Summary: This document details the status of National Highway (NH) projects in Maharashtra as of August 7, 2025, in response to questions raised in the Lok Sabha. It outlines existing and ongoing NH projects, reasons for delays, and actions taken against contractors. Completion targets extend up to the financial year 2028-29. Key Points / Main Content: * **National Highway Network in Maharashtra:** * There are 102 National Highways (NHs) in Maharashtra, totaling 18,462 km. * 259 NH projects are in various stages of implementation, costing Rs. 97,728 crores. * A district-wise list of under-construction NH projects, including those in Mumbai, is available in the annexure. * **Project Sanctions and Completion Targets:** * 371 NH projects, costing Rs. 1,04,294 crores, have been sanctioned in the last five years. * 126 NH projects, costing Rs. 21,660 crores, have been completed. * 245 NH projects, costing Rs. 82,634 crores, are in progress with phased completion targets up to FY 2028-29. * 90 projects targeted for completion in 2025-2026. * 104 projects targeted for completion in 2026-2027. * 48 projects targeted for completion in 2027-2028. * 3 projects targeted for completion in 2028-2029. * **Bridges, Flyovers, Underpasses:** * 169 NH projects, costing Rs. 63,230 crores, include the construction of 551 bridges, flyovers, over bridges and underpasses. * The need for these is assessed based on traffic, road conditions, safety, and congestion, as determined in Detailed Project Reports (DPRs). * **Reasons for Project Delays:** * Delays have occurred due to Right of Way (RoW) disputes, land acquisition, forest/wildlife clearances, utility shifting, pre-construction activities, and contractor cash flow issues. * **Actions Against Contractors and Resolution of Issues:** * Penalties, including contract termination, have been imposed on contractors for delays. * Pending issues related to land acquisition, clearances, and utility shifting have been substantially resolved in coordination with the State Government. * Delayed projects are targeted for completion within revised timelines. Impact Analysis: * **Contractors:** * Impact: Subject to penalties for delays, including contract termination and financial risk. * Action Required: Adhere to revised timelines, resolve cash flow issues, and coordinate with relevant authorities to avoid further delays. * **Responsible Officials:** * Impact: Accountable for project delays and subject to punitive action. * Action Required: Ensure timely resolution of issues related to land acquisition, clearances, and utility shifting; closely monitor project progress. * **Citizens of Maharashtra:** * Impact: Will benefit from improved infrastructure, reduced travel times, and enhanced road safety upon project completion. * Action Required: Be aware of revised project timelines and any potential disruptions during construction. * **Ministry of Road Transport and Highways:** * Impact: Responsible for the overall development and maintenance of NHs in Maharashtra, including monitoring project progress and ensuring compliance with timelines. * Action Required: Continue to coordinate with the State Government and other stakeholders to resolve pending issues and ensure timely project completion.

Key Entities Referenced

Ministry of Road Transport and Highways: The government ministry responsible for the development and maintenance of national highways in India. National Highways (NHs): A network of highways traversing throughout the country, maintained by the central government. Maharashtra: A state in western India where the mentioned National Highway projects are located. Shri Arvind Ganpat Sawant: A Member of Parliament (MP) who raised questions about the National Highways projects in Maharashtra. Shri Nitin Jairam Gadkari: The Minister of Road Transport and Highways who answered the questions regarding National Highways projects. Mumbai: A district in Maharashtra, specifically mentioned in the context of under-construction National Highway projects. Financial Year 2028-29: The targeted completion date for the remaining 245 National Highway projects currently under implementation in Maharashtra. Vadodara Mumbai Expressway: A controlled-access expressway that passes through Palghar, Thane and Raigad district of Maharashtra
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3093 ANSWERED ON 7TH AUGUST, 2025 NHS IN MAHARASHTRA †3093. Shri Arvind Ganpat Sawant: Will the MINISTER OF ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the details of existing and under construction National Highways(NHs) in Maharashtra, district-wise especially in Mumbai; (b) whether several NH projects in Maharashtra have not been completed within the stipulated time and if so, the details thereof; (c) whether timelines were fixed for the completion of the NHs that were announced during the last five years, if so, the details thereof; (d) the number of such highways on which construction work of flyovers and underpasses is currently underway; (e) the number of such highways where bridge works are incomplete; (f) the reasons for delay in the construction of NHs/flyovers/ underpasses; and (g) the punitive action taken against the concerned contractors or responsible officials in this regard? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) There are total 102 National Highways (NHs) having a total length of 18,462 km in Maharashtra. The development and maintenance of NHs is a continuous process and as on date, 259 NH projects costing Rs.97,728 crores are under various stages of implementation in Maharashtra. District-wise list of under construction NH projects in Maharashtra including Mumbai district is annexed. (b) There have been delays in completion of some NH projects due to disputes on existing NH Right of Way (RoW), delays in land acquisition, forest as well as wildlife clearances, delays in utility shifting and otherpre-construction activities as well as cash flow issues with some of the Contractors. All the pending issues have been substantially resolved and these delayed projects are targeted for completion within the revised timelines in a phased manner. (c) Total 371 NH projects costing Rs. 1,04,294 crores have been sanctioned by the Government in the last five years including current year for development and maintenance of NHs in Maharashtra. Out of this, 126 NH projects costing Rs. 21,660 crores have been completed and the remaining 245 NH projects costing Rs 82,634 crores are under various stages of implementation targeted for completion upto financial year 2028-29 in a phased manner as per details below: S. No. Year No. of projects targeted for completion 1 2025 - 2026 90 2 2026 - 2027 104 3 2027 - 2028 48 4 2028 - 2029 3 (d) to (e) The requirement of construction of bridges/flyovers/over bridges/underpasses is assessed on case to case basis as per traffic requirements, condition of bridges including their functional and other requirements, available Right of Way (RoW), congestion in urban/built-up sections, road safety considerations, etc. at the time of preparation of Detailed Project Reports (DPRs) and provisioned in the approved DPRs of NH works either as part of the NH Corridor or on standalone basis. As on date, 169 NH projects costing Rs. 63,230 crores are under various stages of implementation which inter alia includes construction of 551 bridges/ flyovers/over bridges/underpasses. (f) to (g) There have been delays in completion of some NH projects due to existing ROW disputes, delays in land acquisition, forest as well as wildlife clearances, delays in utility shifting and other pre-construction activities as well as cash flow issues with some of the Contractors. Penalties have been imposed against the Contractors as per the respective Contract provisions for delays attributed to the Contractors including termination of the Contract and awarding the balance works at risk and cost of the previous Contractors. Furthermore, the pending issues of land acquisition, forest clearances and utility shifting have been substantially resolved in close co-ordination with the State Government and the balance works are under implementation with target for completion within the revised timelines in a phased manner.ANNEXURE ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 3093 ANSWERED ON 7TH AUGUST, 2025 ASKED BY SHRI ARVIND GANPAT SAWANT REGARDING NHS IN MAHARASHTRA. S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 1 Indapur to Wadpale Raigad 66 1197.52 section of NH-66 from Km 84/000 to 110/750 - 4L + PS 2 Arawali Kante section Ratnagiri 66 1006.99 of NH-17(New NH-66) 4L + PS from Km.241/300 to 281/300 3 Kante - Wakad section Ratnagiri 66 1117.75 of NH-66 4L + PS from Km.281/300 to 332/200 4 Mhaswad to Tembhurni Solapur 548C 488.6 section of NH-548C - 2L + PS 5 Satara to Mhaswad Satara 548C 653.46 6 Paithan - Shirur section Chhatrapati 752E 341.8 2L+PS Km 0.0 to 55.00 Sambhajinagar, Ahilyanagar, Beed 7 Shirur-Kharda section Ahilyanagar, 752E 381.77 from 55+937 km to Beed 114+486 km to 2L+PS/4L 8 Sarsam - Kothari of NH- Nanded 161A 545.64 161A - 2L + PS from Km.33/00 to 90/00 9 Nasratpur to Barasgaon Nanded, 61 406.54 section of NH-61 2L / 4L Hingoli + PS from Km.514/00 to 558/200 10 Guhagar - Rampur - 2L- Ratnagiri 166E 407.2 PS - km 0/00 (Guhagar) to 26/230 (Rampur) and 40/00 (Mirjoli) to 53/600 (Sati) on NH-166E 11 Pune raigarh District Raigad 753F 223.46 Border To Mangaon ( Ch 69+000 to 103+775)S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) NH-753F 12 Pal Phata Phulambri - Chhatrapati 752H 227.19 Khultabad 2L+PS Sambhajinagar 13 Kashedi to Parshuram Ratnagiri 66 1142.62 Ghat section of NH-66 from Km 161/600 - Km 205/400 - 4L + PS 14 Pen to Khopoli 2L+PS Raigad 166D 369.39 15 Balance work of Raigad, 965D 388.93 Rehabilitation and Up- Ratnagiri gradation to 2-lane road with paved shoulders configuration for NH- 965DD from Pacharal- Mandangad-Mhapral- Rajewadi (Upto Junction of NH-66) (Ch- 22+700 to 75+100 Km) and Ambadave connector (Birth place of Dr. Babasaheb Ambedkar) (Ch-0+000 to 7+325 Km) (length Km 59.725) in the state of Maharashtra on EPC mode. (Balance Work) 16 Kashedi ghat tunnel Raigad, 66 680.43 NH-66 [Bhogaon Khurd - Ratnagiri Kashedi section] 4 lanes under NHDP on EPC mode 17 Rehabilitation and Up Chhatrapati 753F 84.39 gradation of Sambhajinagar, Aurangabad – Sillod Jalgaon – Ajanta – Jalgaon section of NH 753 F from Km.47+500 to Km 54+500 (Design Chainage) to four lane configuration in the state of Maharashtra on EPC mde 18 Construction of Gadchiroli 130D 66.02 Paralkota bridgeS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 19 Widening and Gadchiroli NH 353 C 83.73 Strengthening of NH 353 C From Km, 227/000 to 243/000 ( Total Km, 16.00) Chodampalli to Guggigudam section of Sakoli Wadsa - Armori - Gadchiroli - Ashti - Allapalli - Sironcha Road in Gadchiroli District in the state of Maharashtra. 20 Widening and Gadchiroli NH 353. 81.21 Strengthening of NH 353 C from Km, 243/000 to 269/000 ( Total Km,26.00) Guggigudam to Govindpur section of Sakoli - Wadsa Armori - Gadchiroli - Ashti - Allapalli - Sironcha Road in Gadchiroli 21 Upgradatiobn and Parbhani, NH-361 F 224.44 Rehabilitation of Beed Section of NH 361 F from Parli (00/000) to Gangakhed (30/400) to Two Lanes with paved shoulder / Four lane configurations on EPC mode in the State of Maharashtra. 22 Construction of 4 Lane Nagpur NH-53 478.83 Flyover at Nagpur RTO Chowk To Nagpur University Campus from Ch 2/250 to 5/100 and 4 lane flyover at wadi/midc junction from km 8/360 to km, 10/300 on NH 53 in state of Maharashtra.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 23 Strengthening and Gadchiroli NH 353C 282 Widening of road Sakoli- Wadsa-Armori- Gadchiroli-Ashti- Allapalli -Sironcha National highway NH 353C in Km 262/00 to 321/00 including 16 minor Bridges and 2 Major Bridge (Total length 59 Km) (section from repanpalli to sironcha) in Gadchiroli Dist in the State of Maharashtra. 24 Upgradation of Kolhapur NH 166G 167.97 exhisting 2 lane flexible pavement to 2 lane paved shoulders rigid pavement from design chainage Km 66.00 to Design Km 82.440 (Start of Kolhapur Municipal corporation near Phulewadi to kale), design length 16.440 Km section on Talere Gaganbawada- Kolhapur road (NH 166G) in the state of Maharashtra on EPC mode 25 Upgradation of Guhagar Ratnagiri NH 166E 171.03 Chiplun Road from existing Km 26+890 to 40+610, Design Km 26+230 to 40+000 ( NH 166E) length 13.77 Km two lane with paved shoulders configuration in the state of Maharashta on EPC mode.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 26 Construction of six lane Pune NH 548 169.15 Flyover at Katraj DD junction at Km, 3/880 of NH 548-DD (Vadgaon - Katraj - Kondhwa - Mantarwadi Chowk - Loni Kalbhor - Theur Phata - Lonikand Road) in Pune Dist; of the State of Maharashtra. On Engineering Procurement and construction (EPC) Basis mode (L.1.326 Km,) 27 Upgradation to 2L+PS Pune 61 138 from km 84/00 to km 101/00 of NH-61 Kalyan - Nirmal road. 28 Construction of major Gadchiroli 353D 60.05 bridge across Wainganga River in Km 134.000 (Near Armori) on Nagpur-Umred- Nagbhir- Armori section of NH-353D in the State of Maharashtraon EPC mode 29 Rehabilitation and Nashik 752G 428.8 Upgradation of Satana to Mangrul (Chandwad) Section of NH752 G Design Ch: Km 64.000 to Ch: Km 101.140 two lane with paved shoulder/four lane configuration in the state of Maharashtra on EPC mode. 30 Rehabilitation & Ahilyanagar 548D 157.62 upgradation of Jamkhed to Sautada Section of NH548 D (from km 195.375 to kmS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 208.774, Length – 13.399 Km) to 2L +PS /4L configuration with rigid pavement in the state of Maharashtra on EPC mode. 31 Rehabilitation & Up- Pune 160 778.18 gradation to 4 lane Road with Paved Shoulder configuration of section from Undewadi Kade pathar (Ch. 102+050)- Deshmukh Chowk (Ch. 113+400) and Dhawan Patil Chowk (Baramati) (Ch. 115+750) – Phaltan (Ch. 138+050) of NH- 160 in the State of Maharashtra on EPC mode. 32 Rehabilitation & Up- Nanded 161A 206.54 gradation of Mudkhed to Nanded section from Km. 372+000 to Km 388+400 of NH 161A i.e. Nanded-Bhokar- Himayatnagar-Kinwat- Mahur-Arani Road (Design chainage from Km 372+000 (Mudkhed) to Km 387+650 (Nanded) of NH 161A) (Length 15.65 Km) to 2/4Lane with paved shoulders configuration in the State of Maharashtra on EPC mode.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 33 Rehabilitation/Upgradat Gadchiroli 930 316.44 ion of existing Highway to 2L+PS/4 lane of Dhawali to Rajoli from Design Km.149+476 to 163+476 (existing Km.150+000 to 164+000), Pandhasala to Mohadongri from design Km.170+476 to 181+476 (existing Km.171+000 to 182+000), Ambeshivni Fata to Bodli from design Km.183+476 to 185+476 (existing Km.184+000 to 186+000) and Made Tukum to Gadchiroli from design Km.188+476 to 189+476 (existing Km.188+000 to 189+00) having length = 28 km of NH-930 of Dhawali to Gadchroli road in the state of Maharashtra on EPC mode 34 Rehabilitation/ Gadchiroli 543 163.86 Upgradation of existing Highway to four lane standards in Kurkheda town from (km.413+257 to km 410+775), Two lane in Shankarpur – Gurnuli (km 424+00 to km 431+00) section and Reconstruction of Major Bridge at Ch. 448+558 (Bhuti Nallah) and Ch. 411+695 (Sati River bridge), Minor Bridge at Ch. 411+477 and Ch. 405+800S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Lendhari Bridge) of NH 543 Bhamhapuri-wadsa- kurkheda-korchi-Deori- Amgaon road on EPC mode in the State of Maharashtra 35 Construction of New Parbhani 61 496.64 Four Lane Bypass to Parbhani City (Parwa to Asola) Km 463/265 to Km 481/180 (Design Ch. 19+220 to Ch. 34+434) (Length-15.214 Km) section of NH-61 on EPC mode in the State of Maharashtra. 36 Rehabilitation & Up- Ahilyanagar, 561 213.33 gradation of Sabalkhed Beed to Ashti Section from Km 37+900 to Km 55+100 & Chinchpur to Jamkhed Section from km 70+000 to km 72+922 of NH-561 to Two lane with Paved shoulder/ Four lane configuration in the State of Maharashtra on EPC Mode (Length=20.122km). 37 Construction of two Gadchiroli 130D 34.81 Major Bridges Across Gundenur Nalla along with Approaches of Length 1.72 km on Alapalli Bhamragarh to Maharashtra/Chattisgar h State Border Road of National Highways- 130D from Chainage km 82/000 to km 84/000 in Gadchiroli District in the state of Maharashtra on EPCS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Mode (length= 2km) 38 Kopargaon to Savali Ahilyanagar 752G 195.38 Vihir section 39 Construction of seven Gadchiroli 130D 37.34 minor bridges at design chainages km 2/400, km 9/200, km 14/200, km 32/600, km 34/200, km 43/400 and km 46/400 on NH-130D section (Total length of the project is 1.645 km with approaches) from Allapalli- Bhamragad- Laheri – Binagunda - Narayanpur in Gadchiroli district on EPC mode in the state of Maharashtra. 40 Construction of Major Gadchiroli 353C 24.535 Bridge on Shivni River at design chainage from Km. 122/080 to Km. 123/100 on NH 353C along with approaches of 940m (Total Length = 1020m) of National Highway Sakoli - Lakhandur - Wadsa - Armori - Gadchiroli -Chamorshi - Ashti - Allapalli - Sironcha Road on EPC mode in the state of Maharashtra. 41 Rehabilitation Gadchiroli 353C 459.38 /Upgradation from Lagam to Alapalli section (Desing Km. 199/400 to km 227/400) (Length = 28.0 Km) to 2S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) lane with Paved Shoulders/ 4 lane configuration section of NH-353 C (Sakoli- Wadsa-Armori- Gadchiroli-Ashti- Alapalli Sironcha) in Gadchiroli District on EPC mode in the state of Maharashtra. 42 Up-gradation to four Thane 61 984.07 lane/ Two lane with paved shoulders configuration of Kalyan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15/200 to Km 38/00 and from Km. 58/00 to Km 84/00 (Design length = 48.58 km) of NH-61 on EPC Mode in Thane District in the state of Maharashtra 43 Construction of four- Gondia 543 & 328.11 lane Concrete Road 753 from Police Headquarter Gondia City to Rawanwadi Village (Birsi Airport Junction) from design km 0.000 to km 15.781 (existing km 39/720 of NH-753 to existing Km 8/400 of NH 543) on sections from Kohmara- Goregaon- Police Headquarter(Karanja) - Collector Office Square - Balaghat T Point- Rawanwadi- Rajegaon of NH-753 and NH-543 in Gondia District in the state of Maharashtra.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) (Total Length of the project: 15.781 Km). 44 Up-gradation to 4 lane Sangli 166H 856.82 configuration for the work of Peth Naka to Sangli Road, NH-166H, from Km 0+000 to Km 41+250 (Design length = 41.25 km) in the state of Maharashtra on EPC mode. 45 Rehabilitation and Up- Solapur 965G 253.78 gradation to 2 lane with paved shoulder configuration of Mahud Sangola road NH 965 G 159+400 to 161+900and 162+400 to 183+960 (Design Chainage from km. 32/300 to km. 34/800 and km. 35/800 to km. 56/860) (Rigid Pavement) on EPC mode in the State of Maharashtra. 46 Rehabilitation, Pune, 965DD 723.13 Upgradation & Satara Widening of existing Highway to Rigid Pavement 2 Lane with Paved Shoulder of NH 965DD from Lonand – Shirval-Bhor – Mandangad-Pchral Section ShindewadiPhata to Varandah Ghat Dist Border from Km 33/550 to 92/550 in the state of Maharashtra on EPCS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) mode. 47 One time improvement Buldhana 753A 11.2 to Deulgaon Raja City portion from Km 122/600 to 127/00 (length-4.40 Km) of NH 753A of section Chikhali- Jalna Road in the state of Maharashtra in EPC mode 48 Consultancy Services Raigad 0.59 for preparation of Feasibility Study /Detailed Project Report for Lp-gradation of (i) Banda-lnsuli- Sawantwadi-Buradi- Devasu litha (Km 0+00 to Km 25+00 ) Section of NH-548H to Two lane Paved Shoulder of Sindhudurg District in the State of Maharashtra (L-25.00 Km) (ii) VadkhalAlibag (Km 0+00 to 22+200) Section of NH-166A to two lane with paved shoulder of Raigad District in the State of Maharashtra ." (L- 22.200 Km). 49 Construction of Major Chandrapur 930 21.11 Bridge with approaches across Andhari River on Design Km 249+724 (total length of project- 0.720 km) on Mul- Chandrapur Road, NH- 930 in the ChandrapurS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) District in the state of Maharashtra on EPC Mode. 50 Construction of Raigad, 66 13.65 Vehicular underpass & Ratnagiri Service Road at Khopi Phata in Km 180/170 on Panvel Mahad Panji road NH 66 in the state of Maharashtra and Road Safety Improvement to Kashedi Amba Black Spot (at Km 160/200) 51 Providing Service Road Ratnagiri, 4.1 on Panvel Mahad Panji Sindhudurg Road NH 66 Km. 406/030 to 450/170, Road Safety Panvel Mahad Panji Road NH 66 Km. 406/030 to 450/170 to four lane with paved shoulder & Construction of Foot Bridge near New English High school And Jr. Collage, Kasal Tal. Kankavli, Dist. Sindhudurg, at Ch.422/600 (Design Ch 254.140) (Kalmath - Zarap Section) in the state of Maharashtra 52 Construction of Major Buldhana 548CC 35.08 Bridge on Painganga River along with approaches (having length of 1130m) from design chainage Km. 52/450 to km 53/680 of NH 548CC (Total Length of the project = 1230m) of section of Mehkar-Chikhli-S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Khamgaon Road on NH- 548CC in the state of Maharashtra on EPC mode. 53 Panvel-Mahad-Panji Ratnagiri, 66 86 Road NH-66 from Km. Sindhudurg 450/170 to Km. 471/300 (Zarap to Patradevi section) Construction of Vehicular underpass in km existing ch 466/650 at Khamdeo Naka in the village Insuli, and Construction of Vehicular underpass in km existing ch 450/370 at Zarap- Sawantwadi Junction in Sindhudurg district in the State of Maharashtra 54 Urgent repairs of major Dhule 160H 3.92 bridge near Sarangkheda at chainage 111/300 (Constructing cant retaining wall) and constructing box drain at chainage 73/300 on NH-160H (Malegaon Kusumba Dondaicha Shahada) in the state of Maharashtra. 55 Widening and Akola, 63 10.241 Strengthening of Dharashiv Yedshi to Jawale section of NH-63 {from Km 20/350 to 24/350 (Length=4.00 km)} to 2- lane configuration in the State of Maharashtra on EPC mode.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 56 Construction of 2 new Ahilyanagar 548D 92.03 ROBs in parallel in lieu of LC-6 at Km 284/3-4 along with LA for approaches on Daund Manmad railway line (DD-MNR) Crossing at Ch 116/700 of NH-548D near Limpangaon on Talegaon Shikrapur Nhavara Shrigonda Jamkhed Road in Ahmednagar District in the State of Maharashtra on EPC Mode. 57 Construction of 01 Sangli 561 60.08 Major & 05 Minor Bridges on Mangalwedha-Umadi section of NH-561 (from Ch-96+000 to 123+100) in Sangli District in the state of Maharashtra on EPC Mode. 58 Widening and Latur 63 95.262 Strengthening of Borgaon Kale to Murud Akola (Section-I) [from Km 61/800 to 72/900 (Length=11.10 Km)] section of NH-63 to 2- Lane configuration and Latur Airport Junction to Mahila Polytechnic (Section-II) [from Km 78/900 to 86/850 (Length= 7.95 Km)] section of NH-63 to 4- lane configuration [Total project length= 19.05 km] in the State of Maharashtra on EPC Mode.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 59 Consultancy Services Thane 61 0.9428 for Preparation of Detailed Project Report for up-gradation to four lane/ two lane with paved shoulders configuration of Kalyan - Murbad - MalshejGhat -Nirmal road NH- 61 km 15/200 to 84/000 including RoB at km 9/500 district Thane in the state of Maharashtra 60 Panvel-Mahad-Panji Sindhudurg 66 50.7 Road NH-66 from Km. 450/170 to Km. 471/300 (Zarap to Patradevi section) whitetoping work in stretches from Km. 450/170 to Km. 452/000 and Km. 455/330 to Km. 460/000 and Service Road of 4.09 Km. in Sindhudurg district in the State of Maharashtra 61 Construction of Service Ratnagiri, 66 18.12 Roads in stretches, Sindhudurg pick up sheds and Foot Over Bridge in the section of Watul Talgaon and Talgaon Kalmath in Km 332/200 to 406/030, on Panvel Mahad Panaji Road NH- 66 under Road Safety Annual Plan 2022-23 in the state of Maharashtra on EPC mode 62 Construction of Major Ahilyanagar 61 27.16 Bridge including construction ofS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) approach road & RCC gutter on Sina River at km 214.180 of Kalyan Ahmednagar Pathardi road NH-61 (Old NH- 222) in the State of Maharashtra. 63 Construction of new 2- Akola, 548B 41.27 lane Major Bridge (L= Dharashiv 144m) on Terna River at Km.227+311 (Design ch. 20+890) along with approaches on Mantha- Latur-Omerga-Nagansur section of NH-548B on EPC mode in the State of Maharashtra. 64 Construction of drains Jalgaon 753J 6.29 at various locations from Km 4+000 to Km 103+000 of NH-753J Jalgaon to Chalisgaon in the state of Maharashtra 65 Construction of new 2- Hingoli 752I 61.22 lane ROB near Bhendegaon in lieu of L.C. No. 165-B at Design Ch. 60+780 along with approaches (Ch. 60+179 to 61+278) of NH-752I in the State of Maharashtra on EPC mode. 66 Rehabilitation/Up Akola, 361C 594.44 gradation of Karanja – Washim Kherda - Murtizapur Section to 4Lane+Paved shoulder standards from Design km 74+351 to km 102+331 (Excluding overlapping portion withS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Samaruddhi Mahamarg from Design Km 76+380 to 78+280) (Total length of project = 26.080 km) section of NH 361C on EPC Mode in the state of Maharashtra. 67 Rehabilitation and Up Latur 752K 138.892 gradation of Kopra to Gharola (Km 76/350 to 102/350) section of NH- 752K (Total project Length= 26 km) to 2- lane/ 4 lane configuration on EPC mode in the State of Maharashtra 68 Rehabilitation & Washim 461B 108.58 Upgradation of Risod Town to Four Lane with Paved Shoulders standards from KM.36/845 to KM. 39/340 & KM. 41/520 to 44/220 (Total length = 5.20 KM) of NH 461 B in the state of Maharashtra on EPC mode. 69 Construction of Raigad, 66 65.24 Vehicular Under pass Ratnagiri with Service Road in Km 176.787 For Khed Railway Station, Gunde phata in Km.191.900 and Construction of Vehicular Over Pass at Km. 129.400 in Nadgaon villages on National Highway No.66 in Raigad and Ratnagiri District in the State of MaharashtraS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 70 Strengthening of Nashik 60 19.42 Nashik Road to Dwarka Junction section (km 201/350 to 202/080 & 203/080 to 208/649) of Pune-Nashik road NH- 60 in the state of Maharashtra on EPC mode. 71 Construction of Major Jalna 753H 72.62 Bridges at Ch. 8+00, Ch. 35+488 on Wadigodri-Ambad-Jalna section & Ch.3+300 of Jalna Bypass road section of NH 753-H on EPC mode in the state of Maharashtra, 72 Construction of ROB at Nashik 753J 116.62 LC 115B (near Nastanpur) at Km 126/150 of Manmad- Chalisgaon section of NH 753J in the State of Maharashtra on EPC mode. 73 Strengthening of Ahilyanagar 61 16.39 10.65km sections in Km. 232.150 to km 255.280 on Ahmednagar to Kharwandi Kasar section of NH 61 in the State of Maharashtra on EPC mode. 74 Rehabilitation and Latur 63 34.738 Upgradation to two lane with paved shoulder of Barshi- Yedshi-Murud-Latur- Aashtamode-Udgir- Degloor road NH-63 in km 118/600 to 125/00 (section Kharola toS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Bamni) (Project length- 6.4 Km) with flexible pavement on EPC mode in the State of Maharashtra 75 Consultancy Services Solapur 465 0.87 for preparation of Feasibility study and Detailed project report and providing preconstruction service for Rehabilitation/Up gradation of existing road of Mohol - Kural - Kamati - Kanbas - Achegaon- Walsang Dhotri-Musti- Tandulwadhi (Km 0+00 to 107+600) to 2 Lane / 4 Lane configuration Section of NH-465 District Solapur in the state of Maharashtra. (L- 107.600 Km)-Tender Based Acceptance Proposal 76 Consultancy Services Solapur 548B 0.69 for preparation of Feasibility Study and Detailed Project Report and providing preconstruction services for Rehabilitation/Upgradat ion of existing road to 2lane/4lane with paved shoulders configuration of Murum-Alur- Waghdari-Akkalkot- Nagansur-Tolnur- Maharashtra State Border NH 548B (Km 263+00 (Dalimb Junction) to 344+562S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) (MAH/ KA Border) - District Solapur in the State of Maharashtra. (L- 81.562 km ) -Tender Based Acceptance Proposal 77 Construction of Major Amravati 353K 19.48 Bridge on Chargad River at Ch. 27+650 with approaches From Km. 27/427 to Km. 27/782 & Minor Bridge on Khar Nallah at Ch. 47+020 with approaches From Km.46/905 to Km.47/101 on Nandgaon peth- Morshi Road NH-353 K Tal. Morshi, Dist. Amravati on EPC mode in the state of Maharashtra. 78 Rehabilitation & Up- Solapur 965G 112.47 Gradation to 2-Lanes with Paved Shoulder Configuration of Velapur-Mahud section of NH-965G Design Chainage From km. 10/500 to km. 32/300 in the State of Maharashtra on EPC Mode. 79 Construction of RCC Buldhana, 753M 12.92 Drains at various Jalna villages/Towns location from Km 28+000 to Km 67+600 on Dhad- Bhokardan Road section of 753M in the state of Maharashtra.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 80 Construction of New Washim 753C 42.36 High level Major Bridge on Katepurna River at design chainage 133/450 along with approaches of 640 m from Km. 133/025 to Km. 133/875 (total Length of the project = 850 m) on Jalna- Pulgaon section of NH- 753C in District Washim on EPC mode in the state of Maharashtra. 81 Upgradation of the Gadchiroli 353C 50.34 section from Sironcha to Major Bridge across Godavari River from Design hainage km 321+000 to km 326+200 (Length-5.20km) of NH- 353C Section of Sakoli- Wadsa-Armori- Gadchiroli-Ashti- Allapalli-Sironcha Road NH 353C in Gadchiroli District in the State of Maharashtra on EPC mode. 82 Rehabilitation & Akola 161A 67.26 Upgradation of Gandhigram Realignment alongwith reconstruction of Major Bridge on Purna River from Ch. km 24+250 to Ch. km 27+200 (Length of the project = 2.95 km) on NH-161A on Akola-Akot Section in the state of Maharashtra on EPC Mode.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 83 Land Acquisition Kolhapur 166G 39.3 proposal for Rehabilitation & Up- gradation to Gaganbawda-Kale section of NH-166G from Km. 35.30 Km to Km. 66.00 Km to 2L+PS configuration lane in the State of Maharashtra. 84 Construction of RCC Chhatrapati 753F 26.86 Drains at various Sambhajinagar, villages/Towns location Jalgaon from Km 1+050 to Km 143+870 for length of 17.818 km on NH-753F Aurangabad-Jalgaon road in the state of Maharashtra. 85 Rehabilitation & Up- Jalna 752H 87.07 gradation to two lane with paved shoulder/ four laning configuration of Rajur- Chanegaon-Chikhali section of NH-752H from Km 188+280 to Km 179+430 [Design Chainage from Km. 0/000 to Km. 8/850 (Length-8.850 km)] on EPC Mode in the State of Maharashtra. 86 Construction of Major Amravati, 347A 31.87 Bridge on Wardha River Wardha at Ch 28/362.50 alongwith approaches from km 28+107 to km 28+684(total length of the project = 0.577 km) on Talegaon Warud Gonapur road section of NH 347A on EPCS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Mode in the state of Maharashtra 87 Construction of 2/4 lane Solapur 150E 97 with Rigid Pavement in Balance Length (4.122 Km) of KA/MH Border (Km70+682) to Akkalkot (Km 106+526) section of NH-150E along with construction of ROB at Km 77+600 (LC 74 SPL) near Dudhani village in the State of Maharashtra. 88 Road Maintenance Raigad, 66 24.3 work by executing one- Ratnagiri time bituminous work improvement treatment to Panvel-Mahad-Panji road NH-66 in Km 148.00 to Km 161.600in Raigad and Ratnagiri district in the State of Maharashtra Annual Plan 23-24. 89 Rehabilitation Nandurbar 753B 890.81 &Upgradation of NH 753B from Nandurbar to Taloda (Km. 49+050 to Km. 78+270) to Four lane with Paved Shoulder in the States of Maharashtra/Gujarat on EPC mode. (Length=29.220 Km) 90 Rehabilitation and Up- Satara 166E 181.45 gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak- Patan-Karad section (Km. 85+000 to 133+S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 417) of NH-166E in the state of Maharashtra on EPC mode. 91 Rehabilitation and Thane 61 36.95 Augmentation of NH- 222 (New NH No.61) from end of Malshej Ghat to Start of Ane Ghat (Km.101.000 to Km.161.570) in the State of Maharashtra to under Two-Lanes with Paved Shoulders under NHDP-IV. - Settlement through the scheme “Vivad se Vishwas II. 92 Widening and Parbhani, 752K 162.67 strengthening of Latur Gangakhed to Kingaon section of NH-752K in Km 38/750 to 72/304 (Flexible Pavement) (Length=33.554 km) to 2-lane configuration on EPC mode in the State of Maharashtra. 93 Strengthening of Banda Sindhudurg 548H 45.94 -Amboli Sankeshvar Road NH 548H fom Km 0.000 to 52/600 ( khambdev Naka to Sindhudurg -Kolhapur Border)in Sindhudurg District in the state of Maharashtra. 94 Road Maintenance Raigad 66 7 work by executing one- time bituminous work improvement treatment to existing road of Panvel-Mahad-Panji road NH-66 in Km 84.00 to Km 87.000 in Raigad district in the State ofS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Maharashtra (Indapur village). 95 Rehabilitation & Sangli 266 25.12 Upgradation to 2L+PS in Balance Length (2.051Km) of Tasgaon to Shirdhon section of NH-266 (from Ch. 69/289 to 69/669, Ch. 70/100 to 70/743, Ch. 80/133 to 81/141, Ch. 81/495 to 81/610) in the State of Maharashtra. 96 Construction of 4 lane Nagpur 353D 46.09 Concrete White topping (WT) road in Bhivapur City portion from km 68/500 to 70/900 (length 2.4 km) on Nagpur Umred Nagbhid Armori section of NH 353D in the state of Maharashtra on EPC Mode 97 Rehabilitation and Up Nashik 953 125.45 gradation to Two Lane with Paved Shoulders from Saputara (Gujarat- Maharashtra Border) to Chausale section of NH 953 in Km 104/000 to 121/570 (length-17.570 Km) on EPC mode in the State of Maharashtra. 98 Construction of Missing Nagpur 753 7.98 Length in Amdi to Saoner section of NH 753 in following sections (i) 4 laning in Kothurna village from design chainage Km 251+350 to KmS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 251+500 and (ii) 4 laning in Sawali village from design km 247+780 to km 247+900 and 2LPS in Sawali village from km 248+000 to km 248+220 with balance work of MNB in Km 248+168 at Sawali Village (iii) And Irrigation Canal Structure at Parseoni Town from Km 236+690 to 236+760 (total length of the project= 560m) of NH-753 in the state of Maharashtra on EPC Mode. 99 Rehabilitation and Up- Beed 361F 48.85 gradation of Shivaji Maharaj Chowk to Barshi Naka (Ch.47+000 to Ch. 49+500) (2.5 km length) section of NH-361F to 4 Lane configuration in Beed City on EPC Mode in the state of Maharashtra. 100 One Time Improvement Parbhani 61 33.88 to Kalyan-Ahmednagar- Parbhani-Nanded- Nirmal Road NH-61 Km 463/700 to 481/00 (PARBHANI CITY PORTION) in the State of Maharashtra. 101 Rehabilitation and Buldhana 548CC 21.47 upgradation of Vairagarh (Mohadi) section from Design Ch. 73/830 to Ch.76/00 of NH-548CC (total length of the project- 2.17 Km)S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) to two lane with paved shoulder Configuration in Chikhli-Khamgaon section in the state of Maharashtra on EPC Mode. 102 Construction of Nashik 160H 73.21 Malegoan Bypass Road of length 7.45 km to 2L+PS configuration connecting Kusumba Malegoan section of NH-160H to Dhule- Nashik section of NH- 60 in District Nashik in the State of Maharashtra on EPC mode. 103 Rehabilitation and Dhule 753B 181.57 Upgradation of Shewali phata to Kalambhir section i.e. Km 0+443 to Km 4+500 & Nizampur to Chadwel section i.e. Km 13+485 to Km 26+265 (Length=16.317 Km) (excluding 2 Major Bridges with approaches Km 13+735 to Km 14+095 & Km 19+660 to Km 20+030) of NH 753B to 2L+PS Configuration in the State of Maharashtra on EPC Mode. 104 Permanent repair work Dhule 160H 11.74 to protect abutment of Major Bridge on Dondaicha-Shahada road of NH-160H at Ch. 111/300 towards Takarkheda side in theS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) state of Maharashtra. 105 Reconstruction/ Latur 63 5.1 Widening of narrow Minor Bridges 4 Nos. at CH. 71+920, 74+064, 74+856 and 75+690 in the Section Murud Akola to Latur airport junction on NH-63 in the State of Maharashtra. 106 Strengthening and Thane 61 12.78 Maintenance to Shahad ROB Km 9/300 to Km 9/800 on Kalyan - Nirmal Road N.H. 61 by providing Mastic asphalt and structural strengthening work in 2023-24 in district Thane in the state of Maharashtra 107 Realignment and curve Buldhana 753A 13.36 improvement near Deulgaon Mahi town from design chainage Km. 105/300 to Km. 106/185 (length- 0.885 Km) on NH 753A to Four lane with paved Shoulder configuration in the state of Maharashtra on EPC mode. 108 Rehabilitation and Dhule 752G 226.58 Upgradation to two lane with paved shoulder configuration of NH-752G from Sakri to Pimpalner Section (Design Ch: km 0+000 to Ch: km 21+411) in the state ofS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Maharashtra on EPC Mode. (Length = 21.411 km). 109 Development/Widening Pune 548D 396.17 of Talegaon Chakan Shikrapur Nhavara Section of NH-548D from existing chainage km. 54/000 to 82/300 and Design chainage Km. 54/000 to 82/120 (Shikrapur to Nhavara Section) to 2L+PS/4L Configuration on EPC Mode in the State of Maharashtra 110 Upgradation and Four Chandrapur 543 52.37 Laning of Bramhapuri town section from design km 448/670 to km 451/370 (Length 2.70 km) of NH 543 Section of Gondia - Amgaon - Deori - Korchi - Kurkheda - Wadsa Bramhapuri road in the State of Maharashtra on EPC Mode 111 Treatment for critical Raigad, 66 77.19 land slide prone spots Ratnagiri posing significant threat by taking Slope Protection Measures from Km 144.800 to Km145.000, Km148.00 to Km 148.350, Km150.920 to Km 151.020 & Km 155.800 to Km 156.000 in Kashedi Ghat and Km 200.317 to Km 200.932, Km 200.932 to Km 201.487 in Parshuram Ghat on Panvel-Mahad-S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Panji Road NH-66, in the state of Maharashtra 112 Rehabilitation, Sangli, 160 631.76 upgradation & widening Satara of existing highway to 2L/4L+PS (Rigid Pavement) of NH 160 section- Phaltan to Mhaishal near Karnataka Border (including Tasgaon Bypass), from existing chainage Km 301/430 to Km 458/415 in the State of Maharashtra- Package-II & Package III combined- starting from existing chainage Km 341/300 to Km 394/130 and design chainage Km 340/250 at Dahiwadi Village to Km 392/950 ending at Vita Village in the State of Maharashtra on EPC Mode. 113 Rehabilitation & up- Sindhudurg 166G 164.13 gradation for Talere – Gaganbawada - kolhapur Road (NH 166G) stretch start from km. 0/00 to Km. 06/00 and km. 13/00 to km 19/440 of NH-166G, length 12.440 km in the State of Maharashtra. 114 Construction of 6 lane Nagpur 44 619.55 flyover from Khapari ROB to Mihan Interchange design chainage km 8+760 toS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 11+450 (L- 2.69 km) and upgradation of existing 4L +PS road to 6L+PS with service road by flexible pavement design chainage km 11+450 to 14+500 (L- 3.05) [total project length 5.74 km] in section of Nagpur - Hyderabad NH-44 (Old NH-7) in Nagpur district in the state of Maharashtra on HAM mode. 115 Rehabilitation and Up- Beed 361F 540.35 gradation of Jarud - Sirsala section of NH- 361F km 59+500 to km115+00 to Two lane with paved shoulder/ Four Lane in the state of Maharashtra on EPC mode (Length – 55.5 Km). 116 Rehabilitation and Up- Parbhani, 361F 355.11 gradation of Nanded Gangakhed – Loha section of NH-361F from Km 169/00 to 210/00 to two lane with paved shoulder/ four lane configuration in the state of Maharashtra on EPC mode (Length - 41.00 Km). 117 Construction of Minor Ahilyanagar 548D 10.55 Bridge at Km.126/460 including median in four lane section & built up gutter in approaches in Shrigonda Town onS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) NH-548D (Talegaon Shikrapur Nhavra Adhalgaon Jamkhed) in the State of Maharashtra. 118 Rehabilitation, Satara 160 533.94 upgradation & widening of existing highway to 2L/4L+PS (Rigid Pavement) of NH 160 section- Phaltan to Mhaisal near Karnataka Border (including Tasgaon Bypass), from existing chainage Km 301/430 to Km 458/415 in the State of Maharashtra. Package-I starting from existing chainage Km 301/430 at Phaltan Village @ Junction of Phaltan – Baramati Road (Design Chainage -301/430km) & ending at existing chainage Km 341/300 @ Dahiwadi Village Bus Stop (Design chainage Km 340+466km) in the State of Maharashtra on EPC Mode 119 Rehabilitation and Nandurbar 753B 927.88 Upgradation of NH- 753B to Four lane with Paved Shoulder configuration from Km 78.270 to Km 116.670 (Taloda to Gujarat- Maharashtra Border) in the State of Maharashtra on HAM.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 120 Rehabilitation and Up- Parbhani 548B 761.83 gradation of (i). Deogaon phata to Digras phata (Ch. 0/000 to 15/000) & Selu to Borgavhan (Ch 20/900 to 35/800) [Length= 29.9km] (ii). Injegaon (Dhamoni) to Pohner Phata (Ch.58/200 to Ch. 83/700) [Length=25.5 km] and (iii). Pohner phata to Pathri (Design Ch. 42/700 to 58/200) [Length= 15.5 km] sections of NH-548B to Two lane with paved shoulder configuartion in the state of Maharashtra on EPC mode (Total project length – 70.9 Km). 121 Balance work on NH- Ahilyanagar 61 35.43 61: (i) Strengthening in km 211.00 to km 216.100 - Kalyan Bypass to Shukkar Chaulk (Ahmednagar city area) (excluding Seena Bridge length- 710m) (ii) Strengthening in km 218.500 to 228.00 - part State Bank Chaulk to Chandbibi mahal (Bhingar Town) (iii) Strengthening and widening to 10 m in km 228.000 to km 232.00 (section Chandbibi Mahal to Mehekari) (excluding km 228.00 to 228.630 - Ahmednagar bypassS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) overlapping portion) in the State of Maharashtra. 122 Strengthening, Pune, 761 386.16 Widening & Up- Ahilyanagar gradation of newly declared NH-761 from NH-61Junction-Belhe– Alkuti–Devibhoyare– Nighoj–Shirur, from Design chainage Km 0.000 to Km 37.970 from Single/Intermediate/2L to 2L+PS in the State of Maharashtra on EPC Mode (Length 37.970 Km) 123 Widening, Beed 561 349.566 Reconstruction & Up- gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Sautada to Shirapur Section of NH- 561 from Design km 86+300 to km 125+589 in the state of Maharashtra on EPC mode. (Design length = 39.289 km) 124 Widening, Ahilyanagar, 561 657.15 Reconstruction & Up- Beed gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Ahmednagar to Sabalkhed & Ashti to Chinchpur Section of NH-561 from Design kmS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 2+915 to km 37+728 & Design km 55+100 to km 70+000 in the State of Maharashtra on EPC mode. (Length = 49.713 km) 125 Consultancy Buldhana 161G 0.55 servicesfor the preparation feasibilty studies and detailed project report for Sangrampur- State border NH-161G(total length - 30 Km) In the State of Maharashtra. 126 Strengthening of NH Raigarh 166A 49.65 166A to two lane paved shoulder from Km 0+000 to Km 22+200 of Vadhkal – Alibag road for design length 22.200 Km in Raigad district, in the State of Maharashtra on EPC Mode- regarding submission of estimate under AP 2023-24 – Pen Division 127 Rehabilitation and Up- Latur, 63 809.77 gradation of NH-63 (i) Nanded Udgir to Raavi (ii) Raavi to Degloor (iii) Aadampur phata to Sagroli Phata Km 67.000 to Km 124.357, Km 139.500 to 160.856 (Total length 78.713 km) Part of the Renapur-Ashtamode (NH-361)-Udgir-Deglur (NH-101)-Adampur Phata (NH-101)- Khatgaon-Sagroli- Bodhan-NizamabadS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) (NH-6) project to Two/Four lane with paved shoulder configuration in the State of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract- Regarding Submission of Estimate Under AP 2024-25. 128 Construction of Major Solapur 150E 26.05 Bridge on Bori River at Ch. 98+020 alongwith approaches from Km 97+600 to km 98+350 (total length of the project=0.750 km) on Akkalkot- Gangapur road of NH-150E on EPC Mode in the state of Maharashtra. 129 Upgradation to two Nashik 848 69.09 lanes with paved shoulder configuration from km 38/970 to km 41/816 and km 49/730 to km 51/413 (Total length - 4.529 Km) of NH-848 in Nashik District in the State of Maharashtra on EPC mode under Annual Plan 2024-25. 130 Estimate of Akola, 161A 1.63 Preconstruction Washim activities for 2.6 km of forest length in Mangrulpir Mahan section of NH-161A in the State of Maharashtra.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 131 Preconstruction Akola, Amravati 548CC 2.10 activities of 3.06 km forest section in Anjangaon-MP Border section of NH 548C- Regarding: -Submission of Preconstruction activities Forest Estimate under Annual Plan 2024-25. 132 Design and execution Thane 61 37.15 of Necessary Protective measures in Malshej Ghat Section of Kalyan Nirmal road NH- 61 form km 83/100 to km 93/200 133 Construction of new Solapur 561A 77.71 high level bridge on upstream side of existing bridge (known as Ahilya Bridge) across Bhima River @ Chainage 37+686 (L- 365.00 mtr.) along with its approaches and development /widening / strengthening of length from Km.36+190 to Km. 37+350 & Km.38+030 to 38+890 (L-2.335 Km.) section of NH-561-A (Tembhurni -Pandharpur- Mangalwedha) on EPC mode in the state of Maharashtra.- Submission of estimate –reg. 134 Widening, Pune 60 1389.17 Reconstruction & Up- gradation to 2 lane with Paved Shoulder- configuration for theS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) work of Bhimashankar- Taleghar-Wada- Rajgurunagar Road (NH-60 Spur) from Design km 2+928 to km 63+378 in the State of Maharashtra on Hybrid Annuity Mode 135 2L+PS on Junnar to Pune 61 960.16 Taleghar section of NH 61 spur 136 Construction of Chhatrapati 752H 57.54 Daulatabad Bypass Sambhajinagar (Existing Ch. from Km 98+500 to Km 102 +000 & Design Ch. from Km 0+00 to 3+865) Section of NH 752H in Chhatrapati Sambhajinagar District in the State of Maharashtra on EPC mode. 137 Rehabilitation and Up- Thane 61 272.20 gradation to two lanes with paved shoulders configuration of Kalyan - Murbad - Malshej Ghat - Nirmal road NH-61 from km 37/850 to km 57/900 (Murbad to Kadampada section) in the State of Maharashtra on EPC Mode. 138 Rehabilitation and Nagpur, 353J 136.35 Upgradation to Two Amravati Lane with paved shoulder configuration from km 67/100 to 67/885, km 76/100 to 77/060, km 80/450 to 81/520, km 82/000 to 82/230, km 82/400 toS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 82/610 and km 96/840 to 98/095 on balance length of 4.51 km long Katol-Warud section of NH 353J in the state of Maharashtra on EPC mode 139 Strengthening, Nashik, 160D 325.79 upgradation & widening Ahilyanagar of Nandur Shingote- Kolhar Section of NH- 160D km. 00/00 to 47/370 (Nandur Shingote - Kolhar Section). Total length- 47.37 Km(2L+PS) Configuration in the State of Maharashtra on EPC Mode. 140 Preconstruction Gadchiroli 353C 73.48 activities on (i) Wadsa to Armori (64/850 to 81/000) section (ii) Gadchiroli to Ashti forest section(Km 115/800 to Km 123/100, Km 151/020 and Km 158.020 and Km 161/020 to Km 182/350) (iii) Ashti to Lagam(182/350 to 199/400) section of NH 353C 141 Preconstruction Gadchiroli 130D 97.71 activities for forest diversion including wildlife clearance for NH-130D from chainage Km 0/00 (Alapalli - 353C Junction) to Km 112/00 (Maharashtra- Chhattisgarh border) in the State of Maharashtra underS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Annual Plan 2024-25. 142 Rehabilitation And Dharashiv, 63 574.18 Upgradation to four Latur lane with paved shoulder configuration from km 24+350 to km 61+875 (Jawale - Borgaon Kale) of NH-63 in the State of Maharashtra on EPC mode under Annual Plan 2024-25 (Total length - 37.525 Km). 143 Rectification of Black Ratnagiri 66 78.46 spot and Curve improvement of Bhosate Ghat turn on Panvel-Mahad-Panji road NH-66 in Km 180.550 to km 181.950 and other road safety measures in the state of Maharashtra on EPC mode-Regarding submission of estimate under AP 2023-24 – Pen Division. 144 Construction of Missing Gadchiroli 30 381.32 Link Road from Km 84/00 to 112/00 section of NH130D Alapalli- Bhamragad- Laheri – Binagunda Kuvakodi- Maharashtra- Chattishgad Border connecting to junction NH-30 near Kondagaon Chattishgarh in Gadchiroli District in the state of MaharashtraS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) submission of Estimate under Annual Plan FY 2024-25 145 Protective Treatment Raigadh 965DD 61.16 Works on Landslide Zone in Varandh Ghat Section from km 90.180 to km 90.260 and km 94.150 to km 96.600 on NH-965 DD in Raigad District in the state of Maharashtra 146 Construction of Road Palghar 160A 26.21 Protection measures from km 110/000 to km 176/000 (Section between Mokhada to Jawhar ) on NH-160A in State of Maharashtra on EPC mode 147 Construction of Kolhapur 17 468.99 Highway starting from NH-17-Talere – Gagangawada- Kolhapur NH-166G Road Section from Design Ch. 35.300 to Design Ch. 65.740 (Length-30.440Km) to 2-Lane with paved shoulder configuration in the state of Maharashtra on EPC mode.- Reg. submission of estimate under additional AP 2024-25 – Kolhapur Div.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 148 Consultancy services Wardha 347A 0.39 for Preparation of DPR for Rehabilitation /Up gradation of Talegaon Warud Gonapur Section to 2 lane with paved shoulder+Paved shoulder standards from Design km Ch 14- 300 to 19-800, 24-150 to 24-800,31-00 to 47- 00, 48-010 to 60-7(Total length of the project 35.25 km) section of NH 347A on EPC Mode in the state of Maharashtra. (Tender ID 2024_MoRTH_789596_3 ).- proposal regarding tender based acceptance of H-1 bidder M/s EKAM Venture JV M/s Almondz Global Infra- Consultant Limited with Associate Partner M/s MAKE Infracon-in association-Reg. 149 Construction of Pune 753F 40.07 Bhaugaon Reraligment raod Ch. 0/000 to Ch. 0/860 four lane along with NH-753F (Design - Length0.860 Kms) in the village Bhugaon Tal. Mulshi in the State of Maharashtra on EPC mode. 150 Consultancy services Nagpur 247 0.49 for preparation of Detailed Project Report and Feasibility study for construction of 2S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) lane CC road with paved shoulder on Dahegaon - Kuhi Umred section of NH-247 from Km 17+870 to 32+000 & 51 +420 to 72+000 (Including Feasibility Study of Bypass to Railway crossing at 17/870 in Kamptee village) (Length= 34.71 km) in State of Maharashtra. 151 Tender based estimate Buldhana 753E 1.14 for consultancy services for the preparation of feasibility studies and detailed project for the work of Rehabilitation and Up-gradation of 2/4 lane paved shoulder of Buldhana - Khamgaon road section of NH- 753E including flyover in Botha Forest. (Length 47.5 Km) in Buldhana district in the State of Maharashtra. 152 Consultancy services Akola 161A 0.17 for the preparation of Feasibility studies and Detailed project report for the work of Rehabilitation, Up- gradation and Widening of existing Highway to 2 Lane with paved shoulder of Mahan Akola from Km 107/500 to Km 136/809 (Length 29.309 Km) of NH-161A in Akola district in the State of MaharashtraS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) (Tender ID 2024_MoRTH_810879_ 1) - proposal regarding tender based acceptance of M/s CEOMA Consulting Pvt. Ltd, New Delhi Lead, Manglam Infra & Engineering Limited - JV, Insignia Infratech - In Association. 153 Construction of Minor Nanded 161A 16.39 Bridge On NH 161A Kundral to Wazar road section At Hangarga Khurd Village Chainage 84/820 including Approach Road (Total Length including approach 0.361 km) on EPC Mode in the State of Maharashtra. 154 Rehabilitation and Up Parbhani 752 I 157.69 gradation of Charthana – Jintur Section of NH 752 I Km 25+100 to 47+100 to 2 Lane with Paved Shoulder configuration (Flexible Pavement) in the state of Maharashtra on EPC mode. Reg:- Resubmission of Annual Plan Estimate. 155 Construction of RoB in Buldhana 161H 209.61 view of Railway Level Crossing No.20 near Nandura on NH-161H on Jalgaon Jamod Nandura Section NH- 161H in the State of Maharashtra drawing (GAD) and detailedS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) estimate regarding. 156 Rehabilitation and Up- Nandurbar 752G 349.08 gradation of Visarwadi (Near Junction of NH- 6)-Kalamba–Nandurbar- Kolde of NH-752G (Design Ch.0+000 to 37+800 and Ch 43+600 to Ch 50+200) (Length- 44.40 km) to Two Lane with Paved shoulders/4 lane with Paved Shoulder Configuration on EPC Mode in the State of Maharashtra. Submission of estimate under AP 2024-25 -reg 157 Balance work of NH-66 Raigad 66 354.21 from design Km 84/00 to Km 87/100 (Indapur Bypass) and Km 91/600 to Km 99/100 (Mangaon Bypass) to four lane with paved shoulder in State of Maharashtra under NH(O) on EPC Mode. 158 Construction of Service Sindhudurg 66 14.01 Road and Slip Road between Km 450+170 to Km 471+300 (Zarap to Patradevi Section) of NH-66 in the State of Maharashtra on EPC Mode. 159 Consultancy Buldhana 161G 0.55 servicesfor the preparation feasibilty studies and detailed project report for the work of rehabilation, upgradation & wideningS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) of existing Highway to 2L+PS of shegaon- Sangrampurfrom Km 55/000 to 88/000(length - 33 km) of NH 161GIn buldhana district in the State of Maharashtra 160 Construction of 2L+PS Amravati 353K 78.17 configuration road, Minor Bridge, Culvert in forest stretches (Length - 7.1 km) & Balance MJB work on Nal river on Nadgaonpeth - Morshi- Warud - MH/MP Border road section of NH- 353K on EPC mode in the state of Maharashtra 161 Rehabilitation and Bhandara 543K 120.24 upgradation of Maharashtra/MP border to Tumsar section of NH 543K from km 51/000 to 69/000 to two lane with paved shoulder configuration in the State of Maharashtra on EPC mode (total length - 18.00 km) 162 Construction of Major Ratnagiri 66 47.91 Bridge, Minor Bridge, Service Roads, RCC Drain,Culverts and Bus Bay between km 367/200 to km 450/170 (Talgaon-Kalmath- Zarap Section) on NH- 66 in the State of Maharashtra on EPC ModeS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 163 4 laning of NH 353J Amravati 548C 112.68 from Chandur Bazar Naka to Zasi Rani Chowk_(Junction of NH 353J with NH-548C) in Paratwada/ Achalpur city on EPC_mode in the state of Maharashtra (Length - 6.192 km) 164 Rehabilitation, Akola 161A 403.4 Upgradation & Widening of Akola to Mahan section from km 35/265 to km 64/574 (Length – 29.309 km) including construction of 4 lane with paved shoulder configuration Barshi Takli Bypass (Length – 3.160 km) on NH-161A the State of Maharashtra on EPC mode 165 Rehabilitation and Buldhana 161G 629.65 upgradation of Shegaon to Maharashtra/MP Border section of NH 161G from km 55+000 to km 118+000 (Length – 63.00 km ) to 2 Lane with Paved Shoulder configuration in the state of Maharashtra on EPC mode. 166 Construction of four- Parbhani 548B 55.83 lane Road Over Bridge (ROB) with approaches in lieu of railway crossing no. LC 99 including a low height subway (LHS) at km 20+670 on NH-548B in the state ofS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Maharashtra on EPC mode 167 Rehabilitation and Chandrapur 353D 1135.03 Upgradation of Umred- Nagbhir Section from km 48/400 to 96/700 (excluding Bhiwapur city portion from km 68/370 to km 70/770 and RUB of NH-353D to four lane with paved shoulder configuration in the state of Maharashtra on HAM mode. 168 Mitigation Measures Gondia 53 540.24 structure on CG/MH Border to Wainganga bridge section (EPC) 169 Nagpur-Katol NH(O) Nagpur 353J 1166.96 (EPC) section of NH- 353J 170 Four laning of existing Chandrapur 930D 968.05 2-lane stretch from Bamni (Design km 19.000) to MH/TG Border (Design km 51.985) Design Length 32.985 km section under NH(O) in the State of Maharashtra on HAM 171 Four laning of existing Chandrapur 353B 1013.33 2-lane stretch from Govindpur (MH/TG Border) (Design km 32.910) to Rajura (Design km 89.090) Design Length 56.180 km section under NH(O) in the State of Maharashtra on HAMS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 172 4-laning of Aurangabad Chhatrapati 752E 1505 - Paithan section from Sambhajinagar existing km 0.000 (design km (-) 1.800) to existing km 44.400 (Design km 42.417) (Design length 44.217 km) in the State of Maharashtra to be executed on EPC Mode under Bharatmala Pariyojana 173 Design & Construction Nagpur 353D 1038.84 of Elected Structure (Flyover) from Indora Chowk to Dighori Chowk (Design Length 8.90 km) in Nagpur City on Nagpur - Umred section in the State of Maharashtra on EPC Mode 174 Construction of Nagpur 361 15.15 Balance Works (i) Pedestrian Underpass at Km.514+960 including approaches & both side service road, (ii) Bus lay bay & bus shelter, (iii) Drain from Km.514.660 to Km.515.087 on both sides and (iv) Junction at Km.514.960 on 4- laned Wardha - Butibori section of NH-361 [Km.465.500 to Km.524.690 in the state of Maharashtra on EPC Mode 175 One Time Improvement Wardha 361 21.02 of existing carriageway in Deoli Town with white topping [Length –S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 3.200 Km.] on Yavatmal – Wardha Section of NH-361 in the State of Maharashtra on EPC Mode 176 Construction of balance Dharashiv 361 61.08 works (VUP, Service Road, Drain, Junction development, Bus Bay and FOB) for four laning of Tuljapur - Ausa section of NH-361 from Km0.000 to Km 55.835 (including Tuljapur Bypass Km 0.000 to Km 11.593) under Bharatmala Pariyojna in the State of Maharashtra on EPC Mode 177 Construction of the 6- Wardha 44 136.34 lane Flyover including approaches from Existing PUP of Nandori Flyover (Kalode Square) at Km.74.745 to Hospital Square at Km.76.020 (Total Design Length- 1.275 km) Section of Nagpur – Hyderabad NH-44 in the state of Maharashtra on EPC mode 178 Construction of balance Yavatmal 361 61.22 works in descoped section in the village Amboda, Hiwara Sangam, Lonbehal, Dattarampur & Kinhi in Four laning of Mahagaon-Yavatmal section of NH-361 from Km 320.580 to Km 400.575 (design lengthS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 80.195 km) in the state of Maharashtra on EPC Mode 179 Construction of 07 Nos. Nagpur 44, 47, 53 257.445 of Standalone Safety & 353J Structures / works (Package-V) at different locations on 4 different NHs (NH-44, 47, 53 & 353J) in the State of Maharashtra on EPC Mode 180 Construction of 11 Nos. Amravati, 361, 53, 357.22 of Standalone Safety Wardha, 161 Structures / works Nagpur (Package-III) at different locations on various NHs in the State of Maharashtra on EPC Mode 181 Construction of 9 Nos. Chhatrapati 52, 53 324.57 of Standalone Safety Sambhajinagar, Structures / works at Beed, Dhule & different locations on Jalgaon various NHs in the State of Maharashtra on EPC Mode 182 Strengthening under Nagpur 353J 25.00 one-time improvement of Nagpur - Katol Section of NH353J from km 7+300 to km 13+000 in Maharashtra on EPC mode 183 6L Saundad ROB on Gondia 53 32.52 Raipur-Nagpur (from 441.970 km to 443.560 km) NH-53 in Maharashtra on EPC mode 184 One Time Improvement Jalgaon 52 23.56 in Mehunbare town from Km 415.940 toS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 419.940 and Gartad from Km 450.840 to 454.140 on NH-52 in Maharashtra on EPC mode 185 Construction of VUPs Dhule 52 132.97 at km 177.900 (Palasner) & at km 237.200 (Waghadi) & other remedial measures for rectification of MoRT&H identified Blackspots & 7 Accident spots on MH / MP Border – Dhule section of NH-52 in Maharashtra on EPC mode 186 One-Time improvement Latur 361 22.63 with white topping in Ahmedpur Town on Chakur-Latur section of NH-361 in Maharashtra on EPC mode 187 Construction of Service Latur 361 5.59 Roads and Bus Shelters between km 143.300 to km 143.900 in Chakur- Loha Section of NH-361 in Maharashtra on EPC mode 188 Construction of Flyover Chandrapur 353B 191.31 cum ROB from Km 66.600 to 68.800 in Gandchandur Town on Rajura Korpana MH/ TL border NH-353B in Maharashtra on EPC mode 189 One Time improvement Latur 361 30.47 with white topping in Chakur & Latur Towns & construction of BusS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) shelters in Ashta village on NH-361 in Maharashtra on EPC mode 190 Construction of VUPs Akola 52 104.47 at Km 226/150 near Nipana Village and Flyover at km 240.660 (Appu T point near Akola MIDC) in stretch of Kurankhed to Shelad (Amravati Chikhli Pkg- 2) section of NH-53 in Maharashtra on EPC mode 191 Strengthening, Repair Jalgaon 753BE 14.16 & Maintenance of Taloda Burhanpur NH- 753BE for 20.600 Km length between Km. 128.000 to Km. 226.500 (5.375 Km strengthening) in Jalgaon District in Maharashtra on percentage Item rate basis 192 Construction of Minor Latur 361 13.9 Bridge & RCC Drain at km 28.842 in Ujani, 3 No. of Box culverts in Ashiv & RCC Drain in Tuljapur Bypass of Tuljapur-Ausa Section of NH-361 in Maharashtra on EPC Mode 193 Rectification of 6 Nos Nagpur 361 173.21 of accident spots in (a) Yavatmal-Wardha section of NH-361, (B) Nagpur-Kondhali section of NH-53 in Maharashtra on EPCS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Mode 194 One time improvement Jalgaon 53 49.2 of Jalgaon city on Tarsod Fagne section of NH-53 in Maharashtra on EPC mode 195 One time improvement Nagpur 547E & 96.22 in Kalmeshwar town 353J on NH-547E & NH-353J in Maharashtra on EPC mode 196 6 laning of Pune-Satara Pune & Satara 48 1725.00 section of NH-48 on BOT 197 4 laning of Solapur- Solapur & 65 923.00 Mah./KNT Border of NH- Dharashiv 65 on BOT 198 8-laning of Vadape at Thane 848 1252.92 Km 539.202 to Thane at km 563 section of NH-848 on HAM 199 Construction of new 6- Satara 48 907.03 lane tunnel at Khambataki Ghat of NH-4 on EPC 200 Construction of 8-lane Palghar NE-4 1534.71 access controlled Expressway from km. 77 to 103.400 (Ganjad to Talasari section of Vadodara Mumbai Expressway) on HAM basis, Pkg-XI. 201 Construction of 8-lane Palghar NE-4 1711.38 access controlled Expressway from km. 50.700 to 77 (Masvan to Ganjad section of Vadodara Mumbai Expressway) on HAM basis, Pkg-XII.S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 202 Construction of 8-lane Palghar NE-4 3536.9 access controlled Expressway from km. 26.582 to 50.70 of Main Expressway and km.0 to 3 of SPUR (Shirsad to Masvan section of Vadodara Mumbai Expressway) on HAM basis, Pkg-XIII. 203 Dharampuri – Lonand, Solapur & 965 1411.71 Pkg-IV (Sant Satara Dyaneshwar Palkhi Marg) 204 Baramati - Indapur Pune 965G 1471.32 Package - II 205 Construction of 8-lane Palghar & NE-4 2058.59 access controlled Thane Expressway from km. 3.000 to 20.200 (Shirsad to Akloli section –SPUR of Vadodara Mumbai Expressway) on HAM basis, Pkg-XIV. 206 Construction of 8-lane Thane NE-4 2610.8 access controlled Expressway from km. 20.200 to 43.000 (Akloli to Amne section –SPUR of Vadodara Mumbai Expressway) on HAM basis, Pkg-XV. 207 Construction of 8-lane Thane NE-4 4051.8 access controlled Expressway from km. 43.000 to 69.800 (Amne to Bhoj section - SPUR of Vadodara Mumbai Expressway) on HAM basis, Pkg-XVI. 208 Construction of Eight Thane & Raigad NE-4 2208.68 lane access controlled Expressway from KmS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 69.700 to Km 79.783 (Bhoj to Morbe -Spur) Section of Vadodara Mumbai Expressway, Pkg-XVII 209 4-laning of Lonand to Satara 965 1709.96 Diveghat (Mohol-Alandi section), Pkg-V section of NH-965 210 4-laning of Ratnagiri- Ratnagiri 166 1774 Kolhapur section of NH- 166, Pkg-I 211 4-laning of Ratnagiri- Ratnagiri & 166 1985.4 Kolhapur section of NH- Kolhapur 166, Pkg-II 212 4-laning of Ratnagiri- Kolhapur 166 1939.23 Kolhapur section of NH- 166, Pkg-III 213 6-laning of Satara- Satara 48 2330.71 Kagal section of NH-48, Pkg-II 214 6-laning of Satara- Satara & 48 2111.25 Kagal, Pkg-I section of Kolhapur NH-48 215 Ahmednagar-Solapur Solapur 150C 1370.75 (Greenfield Section) (Pkg XIV) 216 Balance work for 4- Raigad 66 546.44 laning of Panvel to Indapur section from km.42.3 to km.84.6 of NH-66 217 Balance work for 4- Raigad 66 329.82 laning of Panvel to Indapur section from km.0.0 to km.42.3 of NH-66 218 Standalone 6-lane Dhule 60 31.59 Purmepada VUP (Balance work) at Km 282+800 in Dhule - Pimpalgaon section of NH-3S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 219 Surat-Dahisar Section Thane & 48 69.77 of NH-48 Palghar 220 4 locations viz. (i) Pune 65 99.92 Bhandgaon Jn (Km 47.920) (ii) VarkuteJn (Km 126.735) (iii) Indapur bypass Entry (km 135.675) (iv) Indapur Bypass Exit (Km 142.735) on Pune- Solapur (Pkg-I) 221 Standalone 4-lane Pune & 60 34.42 Vehicular Underpass Ahilyanagar with approaches at Sangamner Bypass End Junction (Km.150.200) and Wavi Junction (Km.163.900) on Khed- Sinnar section of NH-60 222 Hadapsar - Dive Ghat Pune 965 818.52 section of NH-965 223 6-laning of Gonde to Nashik 848 856.93 Pimpri Sado in section of NH-3 224 Navi Mumbai Raigad 348A 254.68 International Airport Interchange on West side) (Amra Marg/NH- 348A) at Ch.2.860 & construction of 2 nos. of VUPs at Ch. 3+380 & 4+093 225 Karnala Jn of Navi Raigad NH-4B 397.22 Mumbai International Airport interchange on East side (NH-4B D-G Section) 226 Construction of White Pune, 60 334.90 topping work of Khed – Ahilyanagar & Sinnar section of NH-60 NashikS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 227 White Topping along Ahilyanagar 61 254.79 with reconstruction of 20 number of culverts of Two-lane Paved shoulders of NH 61 (old NH 222) from Malshej Ghat to Ane Ghat (from Km 101/000 to Km 161/570-Package-I), from Ane Ghat to Ahmednagar Bypass (from Km 161/570 to Km 211/000 – Package- II) & from Kharwandi Kasar to Junction of NH 211 (from Km 284/000 to Km 337/000 – Package-III) of total length 163Km in the State of Maharashtra on EPC mode 228 Additional Structures Nashik & Dhule 848 / 60 479.00 Pkg-I Nashik) (12 structure works on Dhule-Nashik Highway) 229 Additional Structures Pune & Solapur 65 169.86 Pkg-II (Solapur) (4 Structures works on Highway in Solapur and Pune City) 230 One Time improvement Solapur 965 83.71 of Pandharpur town 231 Construction of White Thane & 48 553.00 Topping on the existing Palghar bituminous carriageway and secrvice road from km.381 to km.502 on Surat - Dahisar section of NH-48 232 Construction of VUP Ahilyanagar 60 29.03 with approaches at Khodad Junction (Km.78.600) andS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Ambikhalsa Junction (Km.113.150) on Khed Sinnar Section of NH-60 (Old NH-50) 233 Design and Pune & Satara 48 34.88 construction of crossing facility of VUP at 4 locations viz. (i) Kikvi Village (Km 801+080) (ii) Harischandri (Km 806+020) (iii) Shivare (km 817+360) (iv) Khedshivapur (km 820+340) and FOB at 863+200 and other miscellaneous works on Pune-Satara Section of NH-4 from km 725.000 to 865+350 (length km 140.350) in the State of Maharashtra on EPC Mode 234 Design and Thane 848 44.19 Construction of 6-lane Stand-alone single span Grade Separated structure at Km 532+552 (Bapgaon) on Gonde-Vadape section of NH-3 (New NH-848) in the state of Maharashtra (balance work) 235 Construction of Major Satara 48 42.69 Bridges (Service Road Bridges) at Krishna River including approaches for Rectification of Black Spot (MH-04-218) on both sides at Km 756+395 (Krishna RiverS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Bridge) and Construction of Flyover including a LVUP and Approaches for Rectification of Black Spot (MH-04-216) on both sides at Km 770+550 (Vele Village) of Pune-Satara Section of NH-48 in the State of Maharashtra on EPC Mode 236 Long-term rectification Pune & Satara 48 27.54 work at 4 Nos. of MoRTH Blackspots i.e. (i) Bhumkar Pull (MH- 04-27) (ii) Navale Bridge (MH-04-26) (iii) Bavdhan (MH-04-42) (iv) Wakad (MH-04-41) and Design and Construction of FOB at Km 842+680 near NDA Chowk on Pune-Satara Section of NH-48 in the State of Maharashtra on EPC Mode 237 Design and Nashik 848 39.13 Construction of Vehicular Underpass as Long-term rectification work at MoRTH Blackspot i.e. Dongarbaba Temple (MH-04-192) at Ch. 425.510 on Pimpalgaon- Nashik-Gonde Section of NH-3 in the State of Maharashtra on EPC Mode 238 Construction/widening Solapur & 52 45.10 of service road and Dharashiv installation of street lights on Solapur-S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Yedeshi section of NH- 52. 239 Construction of works Solapur 166 / 65 96.51 in the state of Maharashtra on EPC mode; A) ROB at km 377+800 along with approaches at Bhaiya Chowk Junction & Service Road from Ch. 365+740 to Ch. 366+580 (BHS) on Sangli - Solapur section of NH-166, B) VUP at Ch. 210.592 (Yawali) including SVUP at Ch. 211.139 on Pune Solapur Pkg-II section of NH-65, C) VUP at Ch. 36+580 along with street light work on Solapur-Yedshi section of NH-52., D) Service Road from Ch.129+440 to 129+990 RHS, Ch. 129+750 to 129+990 LHS, Ch. 135+650 to 136+100 BHS, Ch. 101+750 to 102+050 BHS, Ch. 104+200 to 104+780 RHS & Widening of Box culvert at Ch. 104+759 on Akkalkot - Solapur section of NH-150(E) 240 Development of Raigad 548 826.00 Kalamboli Interchange junction 241 Savali Vihir to Ahilyanagar 160 867.08 Ahmednagar Bypass section of NH-160 242 4 Laning of Karmala- Solapur 561A 1,234.12 Tembhurni (NH-561A)S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 243 Lonand Shirwal section Satara 965D / 611.84 of NH-965 DD & 965DD Lonand Satara section of NH-965D 244 Ghoti-Sinnar section of Nashik 160A 264.35 NH-160A 245 Pirachi Kuroli (Km Solapur 965 168.52 55+900 -Km 56+400), Malshiras bypass merging at Khudus- Dharmapuri and Natepute bypass (Km 101+500) at Khudus- Dharmapuri on NH-965 246 Strengthening of Pune & Satara 48 785.75 service/slip road of Pune-Satara section of NH-48 247 Balance work of 4- Nashik & 160 114.89 laning of Sinnar to Ahilyanagar Shirdi section of NH 160 from Km.0+000 to Km.50+943 (including Sinnar Bypass) 248 Construction of VOP at Sangli 166 16.52 Ch.217+060 to Km 217+682 and Slip Road From Ch.194+710 to 195+086 on NH 166. 249 Construction of minor Pune 48 49.46 and major bridge at Mutha River on Pune- Satara section of NH-4 (Blackspot Rectification) 250 Construction of Major Solapur 65 51.57 Bridgeat Bale Bridge & Old Pune Naka on Pune-Solapur section of NH-65 (Blackspot Rectification) 251 Construction of VUP at Palghar 48 44.78 Ibadpada in Surat- Dahisar section of NH-S. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) 48 (Blackspot Rectification) 252 Construction of VUP & Nashik 60 49.90 LVUP at Khadakjamb junction on Dhule- Pimpalgaon section of NH-3 (Blackspot Rectification) 253 Construction of SVUP Pune 48 18.80 at Ch. 863+200 (Kiwale) on Pune – Satara section of NH4 254 Construction of Service Nashik & Dhule 60 63.64 Road at Laling, Mungase, Vadalibhoi & Raigad Nagar and Road Safety Works in Rahud Ghat on Dhule- Pimpalgaon Section of NH-3 in the State of Maharashtra on EPC Mode 255 Strenghtening of town Ahilyanagar 516A 15.19 portion roads of Ruichhatissi, Mahijalgaon and Ghogargaon villages 256 Construction of Pune 65 99.20 additional structures at Warvand (Ch.59+000), Patas (Ch. 66+350) & Khadaki (Ch. 90+300) on Pune - Solapur section of NH-65 (PKG- I). 257 Strengthening of Raigad 48 34.22 service/slip road of NH- 4B of JNPT Pkg-IV 258 Khed- Sinnar Section of Pune, 60 98.90 NH -60: Removal of At- Ahilyanagar & Grade junctions VUPs Nashik at (i) Km 47.150, (ii)Saykhindi Phata at Km-153.880 andS. Name of Work District NH No. Sanction Cost No. (Rs. in Cr.) Nandurshingote BP End Junction: (iii) Km 165.430 259 Construction of VME Thane NE-4 609.00 Spur of 7.00 KM length (from Borivali KM 38.200 to Kirawali KM 45.200) for connecting Samruddhi Mahamarg of MSRDC Total 97728.0124 *****