Parliament Question: NHs in Tamil Nadu

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document presents the Ministry of Road Transport and Highways' response to questions regarding National Highway (NH) projects in Tamil Nadu. It details proposed, approved, and ongoing NH projects, road declarations, current status, budgetary allocations, and connectivity enhancement efforts. The information covers the period from the last five to ten years, up to June 30, 2025, with project completion dates extending to March 2028. Key Points / Main Content: Project Proposals and Approvals: * 38 works covering 381 km are proposed under the Annual Plan 2025-26 for Tamil Nadu, amounting to Rs. 10767 crore. * Details of approved NH works in Tamil Nadu over the last five years include: * 2020-21: 41 works sanctioned, 405.87 km, Rs. 8888 crore (6 ongoing, completion by October 2026). * 2021-22: 60 works sanctioned, 718.97 km, Rs. 16013 crore (11 ongoing, completion by August 2026). * 2022-23: 20 works sanctioned, 346.60 km, Rs. 3740 crore (7 ongoing, completion by September 2026). * 2023-24: 11 works sanctioned, 150.77 km, Rs. 11214 crore (10 ongoing, completion by March 2028). * 2024-25: 22 works sanctioned, 341.52 km, Rs. 4220 crore (11 in tender stage, 9 ongoing, completion by June 2027). National Highway Declarations: * 23 State roads, totaling 1830 km, have been declared as NHs in Tamil Nadu over the last 10 years. * Year-wise details of declared roads are provided in Annexure I. Current NH Status: * The total length of NHs in Tamil Nadu as of June 30, 2025, is approximately 7000 km. * The present status of ongoing works is detailed in Annexure II. Budgetary Allocation and Expenditure: * Year-wise details of funds allocated and spent for NH development and maintenance: * 2022-23: Allocation - Rs. 8230 crore, Expenditure - Rs. 8230 crore. * 2023-24: Allocation - Rs. 9925 crore, Expenditure - Rs. 9925 crore. * 2024-25: Allocation - Rs. 9077 crore, Expenditure - Rs. 9068 crore. * 2025-26 (Till 30.06.2025): Allocation - Rs. 2095 crore, Expenditure - Rs. 1791 crore. Connectivity Enhancement: * The government considers proposals from state governments, including Tamil Nadu, for upgrading state roads to National Highways. * Declarations are based on connectivity requirements, inter-se priority, traffic levels, and synergy with the PM Gati Shakti National Master Plan (NMP). Impact Analysis: Government of Tamil Nadu: * Impact: State roads are being upgraded to National Highways, enhancing connectivity and infrastructure. * Action Required: Continue submitting proposals for road upgrades and ensure alignment with national plans. Ministry of Road Transport and Highways: * Impact: Responsible for allocating funds, approving projects, and overseeing the development and maintenance of NHs in Tamil Nadu. * Action Required: Monitor project progress, ensure timely completion, and align with the PM Gati Shakti National Master Plan (NMP). Citizens of Tamil Nadu: * Impact: Improved road infrastructure, enhanced connectivity, and reduced travel times. * Action Required: Utilize the improved infrastructure responsibly. Contractors and Construction Companies: * Impact: Opportunity to participate in NH development projects. * Action Required: Bid for projects and ensure timely and quality construction.

Key Entities Referenced

Tamil Nadu: A state in southern India, the primary focus of the highway development projects discussed in the document. National Highways (NHs): A network of highways connecting major cities and towns across India, crucial for transportation and infrastructure. Ministry of Road Transport and Highways: The Indian government ministry responsible for the development and maintenance of the national highway infrastructure. SHRI NITIN JAIRAM GADKARI: The Minister of Road Transport and Highways, responsible for answering the questions in the Lok Sabha. Lok Sabha: The lower house of the Indian Parliament, where questions regarding the National Highways in Tamil Nadu were raised. PM Gati Shakti National Master Plan NMP: A national master plan for multi-modal connectivity in India, aimed at integrated infrastructure development. Chennai: A major metropolitan city in Tamil Nadu, connected to other cities and regions through the National Highways projects. Bangalore Chennai Expressway: A significant infrastructure project connecting two major cities, passing through parts of Tamil Nadu.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION No. 893 ANSWERED ON 24TH JULY, 2025 NHS IN TAMIL NADU 893. SHRI SELVAM G: SHRI NAVASKANI K: SHRI C N ANNADURAI: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार् ग मंत्री be pleased to state: (a) the details of new National Highways (NHs) projects proposed, approved or initiated in Tamil Nadu during the last five years along with their project timelines, sanctioned lengths and expected dates of completion; (b) the number of roads in Tamil Nadu that have been declared as National Highways during the last ten years, year-wise; (c) the present status of ongoing National Highway projects in Tamil Nadu, district and location-wise and the total length of NHs currently in Tamil Nadu; (d) the total budgetary allocation and actual expenditure made by the Government for National Highway development and maintenance in Tamil Nadu during the current financial year and during the last three years, year-wise; and (e ) the steps taken or proposed to enhance highway connectivity in remote, hilly or underdeveloped regions of the State of Tamil Nadu particularly in districts with historically low infrastructure development? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI)(a) 38 works covering a length of 381 km and amounting to Rs.10767 crore are proposed under the Annual Plan 2025-26 for the State of Tamil Nadu. Further, year-wise details of works approved on National Highways (NHs) in the State of Tamil Nadu during the last five years are provided in the table below:- Financial Nos. Sanctio Length Current Status Year of ned (in Km) works Cost (Rs. in Crore) 2020-21 41 8888 405.87 Out of the 41 works, 6 are currently ongoing and are scheduled for completion by October, 2026 2021-22 60 16013 718.97 Out of the 60 works, 11 are currently ongoing and are scheduled for completion by August, 2026 2022-23 20 3740 346.60 Out of the 20 works, 7 are currently ongoing and are scheduled for completion by September, 2026 2023-24 11 11214 150.77 Out of the 11 works, 10 are currently ongoing and are scheduled forcompletion by March, 2028 2024-25 22 4220 341.52 Out of the 22 works, 11 works are in tender/ Appointed Date stage and 9 are currently ongoing which are scheduled for completion by June, 2027 (b) 23 State roads with a total length of 1830 km have been declared as NHs during last 10 years in the State of Tamil Nadu. Year- wise details are at annexure- I. (c) The total length of NHs in Tamil Nadu as on 30.06.2025 is about 7000 km. The present status of on-going works on these NHs are at annexure- II. (d) Year-wise details of funds allocated and expenditure incurred for the development and maintenance of NHs in the State of Tamil Nadu during the last three years and the current financial year are as under; Year Allocation Expenditure (Rs. in Crore) (Rs. in Crore) 2022-23 8230 8230 2023-24 9925 9925 2024-25 9077 9068 2025-26(Till 2095 1791 30.06.2025)(e) Government keeps on receiving proposals from various State Governments/UTs, etc., including from the State of Tamil Nadu for declaration / up-gradation of State roads as National Highways . Government considers declaration of some of the State roads as NHs from time to time based on the requirements of connectivity, inter-se priority, traffic level and synergy with PM Gati Shakti National Master Plan (NMP).ANNEXURE-I ANNEXURE REFERRED TO IN REPLY OF PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 893 FOR ANSWER ON 24.07.2025 ASKED BY SHRI SELVAM G, SHRI NAVASKANI K AND SHRI C N ANNADURAI REGARDING NHS IN TAMIL NADU. Details of State Roads declared as New National Highways since 2014-15 onwards in the state of Tamil Nadu Year Nos. of State Roads Length (in Km) declared as NHs 2014-15 Nil Nil 2015-16 Nil Nil 2016-17 Nil Nil 2017-18 21 1690 2018-19 Nil Nil 2019-20 Nil Nil 2020-21 Nil Nil 2021-22 Nil Nil 2022-23 2 140 2023-24 Nil Nil 2024-25 Nil NilANNEXURE-II ANNEXURE REFERRED TO IN REPLY OF PART (C) OF LOK SABHA UNSTARRED QUESTION NO. 893 FOR ANSWER ON 24.07.2025 ASKED BY SHRI SELVAM G, SHRI NAVASKANI K AND SHRI C N ANNADURAI REGARDING NHS IN TAMIL NADU. Details of ongoing NH Projects in the state of Tamil Nadu and their present status of completion Sl. Name of Project Total Total Cumulative Districts covered No. Length Project Physical Cost (Rs Progress (km) in Cr) (in %) 1 4-laning of Mayiladuthurai, Sattanathapuram - 55.755 2899.77 65 Karaikal & Nagapattinam Nagapattinam section of NH-45A 2 6-laning of Karaipettai to Kancheepuram 36.08 766.51 91 Walajapet section Ranipet of NH-48 3 Mamallapuram - 31.000 1360.53 50 Chengalpattu Mugaiyur section 4 Puducherry - Villupuram, Poondiyankuppam 38.000 1588.40 98 Puducherry & section of NH-45A Cuddalore 5 4 lane Bangalore to Chennai Expressway from Chittoor , 24.00 1438.62 86 Km 156/000 to Km Vellore, Ranipet 180/000 (Gudipala to Walajahpet) - P1 6 4 Lane Bangalore Ranipet 25.50 1525.10 53 Chennai KancheepuramExpressway from Km 204.500 to Km 230.00 (Arakonam to Kancheepuram) - P3 7 4 Bangalore – Chennai Expressway from Km 230.000 to Km Kancheepuram 31.71 3605.73 78 261.705 Tiruvallur (Kanchepuram to Sriperumbudur) - P4 8 4-laning Neraluru- Bengaluru Urban Thorapalli 23.35 1757.27 72 & Agraharam section Krishnagiri of NH-844 9 4-laning of Mugaiyur - Chengalpattu & Marakkanam 31.00 1116.13 40 Villupuram section of NH- 332A 10 Balance works of four Lane from km 43+950 (Thiruvallur Bypass) to km 61+470 17.52 467.99 84 Thiruvallur (Veppampattu Bypass) passing through Thannerkulam, Thozur and Sevapet Bypass (17.520 Kms) ofTirupati-Tiruttani- Chennai Section of NH 205 11 Completion of balance works pending in bit and pieces and listed balance works from Km 247.800 to 338.00 in AP portion and other 7.35 166.52 98 Tirupati listed balance works from Km 0.000 to Km 43.950 in TN portion of 4/2 laning of Tirupati- Tiruttani-Chennai section of NH-205 12 New Double Tier 4- lane Elevated Corridor from Chennai Port to Maduravoyal in 4.95 1388.59 7 Chennai Chennai District from on EPC mode in the State of Tamil Nadu (P-1)13 New Double Tier 4- lane Elevated Corridor from Chennai Port to Maduravyal in 5.10 1616.97 5 Chennai Chennai District from on EPC mode in the State of Tamil Nadu (P-2) 14 New Double Tier 4- lane Elevated Corridor from Chennai Port to Maduravoyal in 4.49 1299.36 9 Chennai Chennai District from on EPC mode in the State of Tamil Nadu (P-3) 15 New Double Tier 4- lane Elevated Corridor from Chennai Port to Maduravoyal in 6.41 1205.40 2 Chennai Chennai District from on EPC mode in the State of Tamil Nadu (P-4)16 Construction of Trumpet Interchange Connecting Bangalore – Chennai Expressway (km.261+705 to 1.10 157.63 18 Kancheepuram km. 262+800) with Maduravoyal to Walajapet Section of NH 48 near Sriperumbudur Toll Plaza at km. 35+700 17 4-laning of STRR Bengaluru, NH 948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil 35.766 1260.74 62 Krishnagiri Nadu border from Km 144.170 to Km 179.936 (35.766 km) in the state of Tamil Nadu 18 Improving the alignment of Thoppur Ghat section from Km Dharmapuri & 158/500 to Km 6.60 905.00 1 Salem 165/100 in Dharmapuri - Salem section of NH-4419 Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur (Design Chainage Km 43.95 1376.10 8 Tiruvallur 17+56) to TN/AP Broder (Design Chainage Km 61+51) of NH-716 (Chennai-Tirupati Package-1) 20 Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border (Design Chainage Km 61+51) to Puttur (Design 37.43 1346.82 8 Chittor & Tirupati Chainage Km 81+540) of NH-716 & 6 Lane with Paved Shoulders from Mallavaram to Renigunta (Chennai-Tirupati Package-2) 21 Balance Works for six laning of Sriperumbudur to karaipettai section 16.820 403.050 6 Kancheepuram of NH-4 (New NH- 48) from 37+000 (Existing Km 37+000) to Km 71+015 on EPCmode 22 4-laning of Kamalapuram - 36.51 1051.69 82 Dindigul Oddanchatram section of NH-209 23 4-laning of Madathukulam - Dindigul & 50.078 1471.71 91 Pollachi section of Tiruppur NH-209 24 4-laning of Vadipatti - Thamaraipatti 29.96 900.05 81 Madurai section of NH- 744A (Madurai Ring Road) 25 4-laning of Melur - Karaikudi section 45.86 1017.29 89 Madurai,Sivagangi of NH-338, NH-36 and NH-383 26 4L of Thirumangalam to Vadugapatti 36.00 1076.97 88 Madurai section from km 0.000 to km 36.000 of NH-744 27 4L of Vadugapatti to Therkuvenganallur (Rajapalyam) 35.60 1317.06 98 Virudhunagar section from km 36.000 to km 71.600 of NH-74428 4-laning of left over works including Additional structures in 53.71 1564.23 49 Kanyakumari KL/TN Border Kanyakumari from Km 43.000 to 96.714 of NH-47 29 Balance works for four laning of Vikravandi to Viluppuram & Sethiyathopu 65.96 1163.17 1 Cuddalore section (from Km 0/0-65/960) of NH 45 C 30 Reconstruction of Existing ROB at km 113/4 and Ranipet Construction of 0.01 34.16 98 Grade Separator at Km 113/8 of NH 4 (Chennai - Chittoor - Bangalore Road)"31 Construction of ROB at km 22/2 of NH 49 Extn (New NH No 85) (Madurai - Cochin road) & Railway chainage in km 19/2-3 in lieu of 0.01 59.38 81 Madurai LC-17 between Vadapalanji & Usilampatti Railway stations under Sethubharatham project 32 Construction of ROB and their Approaches at Km 81/800 (Near Kannamangalam) in Lieu of Existing LC No.109A/3T at 1.10 118.94 37 Vellore Railway Km 130/23-25 of NH- 234 (Mangalore - Villupuram Road) inlcuding Land Acquistion 33 Construction of ROB at Km 93/4 of NH 49 Extn. (Madurai - Cochin 0.85 45.18 41 Theni road) in lieu of LC 85 and Railway Km 89/7-8 in between Theni and Bodi RailwayStations under SethuBharatham project 34 Construction of ROB at Km 75/8 of NH 49 Extn. (Madurai - Cochin road) in lieu of LC 68 and Railway Km 72/6-7 in 1.26 92.02 53 Theni between Aundipatti and Theni Railway Stations Under SethuBharatham Project 35 Construction of ROB and their Approaches at Km 103/4 near Ettivadi in Lieu of Existing Level Crossing 1.01 64.25 22 Tiruvannamalai No.86 of NH-234 (Mangalore - Villupuram Road) inlcuding Land Acquistion 36 Construction of Bypass to Gudiyatham Town in Km 23/100 - 7.3 221.03 80 Vellore 29/250 including Land Acquisition and Shifting of NH- 234 (Mangalore - Villupuram Road)(New NH-75) 37 Construction of LVUP at Km 109/10 of NH-4 0.5 13.51 47 Ranipet (New NH-40) (Chennai-Chittoor Bangalore road) 38 Construction of ROB and their approaches at Km 99/4(LC Gate No.503 / Spl-A-3 / 1.23 53.02 80 Tirunelveli E) of NH 744 (Old NH 208) Kollam- Thirumangalam Road 39 Construction of Bypass to Bagalur town branching from Km.3/0 (Kothapalli) and joining at Km 4.58 90.01 52 Krishnagiri 9/350 (Jee Mangalam) including LA on NH 207 (New NH 648) 40 Widening from Two lane with paved shoulder to four lane with 42.69 257.1 68 Cuddalore paved shoulder and Strengthening in Km 0/8 - 17/6, 18/0 - 25/0, 25/500- 27/900, 29/6 - 34/0 & Km 39/0- 50/570 and strengthening in km17/6-18/0, 25/0- 25/5, 27/9-29/6 and widening from Four lane to four lane with paved shoulder and strengthening in km 34/0-39/0 including centre median in selected stretches, Construction of Storm water drain including Widening and Reconstruction of CD works and Additional Bridge at Km 39/8 of NH 532 (Cuddalore) 41 Strengthening of two lane with paved shoulder from Km 17/8- 18/2, construction of two lane with paved shoulder 18.02 169.70 60 Dharmapuri from Km 18/2 to Km 20/0 and construction of four lane with paved shoulder from Km 20/0 to Km 35/6 of Salem -Thirupathur- Vaniyambadi road (NH-179A) 42 Permanent improvements to the Black spot ID TN(02) 635 at New Cinema Junction at Km 62/4-63/0 by providing additional High level Bridge @ Km 62/6-62/880 including widening 0.6 31.45 50 Cuddalore of existing road with Centre median, Storm water drain, CD works and junction improvements of NH 45A (New NH 32) (Villupuram - Pondy- Nagapattinam Road) 43 Improvements to existing Paver block carriageway at Km 429/2 - 430/8 & Km 433/2 (Selected 3.45 42.22 73 The Nilgiris Stretches) and Providing safety measures at vulnerable location of Km 397/2, 397/4,398/4, 398/6, 399/4, 399/6, 399/10, 400/2, 400/4 & 400/10 including of CD works and Protective works and Improvemets to Charring Cross Junction at Km 430/8 - 431/4 of NH 67 (New NH 181) 44 Construction of Fly Over including Junction Improvements at Km 348/6 - 349/8 of NH 67 (Km 15/6 - 16/8 of New NH 1.14 59.93 22 Coimbatotre 181) (Nagapattinam - Gudalur - Mysore Road) at Saibaba Colony Junction in Coimbatore City 45 Construction of Bypass to Madurai - Achambathu - Viratipathu in between km 6/850 3.53 238.97 28 Madurai - 10/382 of NH 49 Extn (New NH 85) including Land Acquisition46 Construction of additional 2 lane Bow-string ROB adjustant to the existing 2 lane 0.45 33.53 1 Vellore bowstring ROB at Km 56/2 of NH-234 (New NH 75) (Mangalore - Villupuram Road) 47 Strengthening selected stretches from Km 1/2 to Km 23/6(9.50Km) of NH-81 & Strengthening selected stretches Coimbatore & 11.3 47.57 32 from Km 6/0 to Km Tirupur 23/0(1.8Km) of NH- 181 including Junction improvement at Km 6/0 -Km 6/4 of NH-181 48 Widening the leftout existing 2L to 2L+PS, Strengthening the selected stretches 5.0 16.8 2 Coimbatore from Km 9/6 - 15/6 of NH-381A (Vellakovil to Sankari Road) 49 Prevention of 1.75 19.47 2 Coimbatore Landslides and Soil erosin byconstructing of Breastwall, Gabion wall, Geo Mat Covering the Earthslip portions including Grass Seedling & Construction of culverts from Km 66/4 - 155/8 (Selected Stretches) of NH 181 (Coimbatore - Ooty - Gundalpet Road) Construction of Four Lane Bypass 50 to Vettavalam Town from Ch.0/0 Thiruvannamalai to Ch.4/465 (Starting at km 4.47 50.68 5 104/850 and ending at km 109/190 of NH-38 Mangalore - Villupuram Road) 51 Strengthening from Km 0.000 to Km 12.300 (length 12.300 km) of NH- 12.30 20.83 6 Villupuram 38 (old NH 234) Mangalore- Villupuram road 52 Balance work of Salem & 2.11 12.81 15 Widening existing Namakkal two lane to fourlane including strengthening the existing carriageway from km 16/170 to km 18/110 and Improvements from km 16/0 to km 16/170 of NH- 207 (New NH-648) 53 Improvements to eliminate blackspot at Ganapathy Moor Market junction (TN-02-623) at Km 3.40 51.02 1 Coimbatore 312/0-315/4 of NH 948(Length 3.40 Km)(Bangalore - Sathayamangalam- Coimbatore Road) 54 Widening of existing two lane to four lane with paved shoulders road and improvements 4.00 44.09 1 Coimbatore from Km 302/60 to km 306/60 of NH 948 including CD works & Drain works 55 Widening of existing 2 lane 5.40 52.21 1 Gobichettipalayam paved shoulder to 4 Lane pavedshoulder in km 268/40 to km 271/30 & km 273/00 to km 273/80 and widening end to end & Improvements from Km 271/3 to 273/0 of NH-948 (Coimbatore - Sathyamangalam Road) (length 5.40 Km) including permanent rectification of three black spots (IDs- TN-02-238, TN-02-239 & TN- 03-260) 56 Widening to 2L+PS in km 15/600 - 38/800 (except km 28/2-28/6 & km 33/100-33/200) and improvements in km 17/300-21/300, km 22/200-26/0, km 26/600-28/0, 22.70 63.60 1 Gobichettipalayam km 28/60-30/8, km 31/700-33/100, km 33/200-35/200, km 36/200-38/800 of NH-381A (Length 22.70 km) (Vellakoil - Sankagiri Road)57 Strengthening from Km.0/000 to 3/200 on NH-87 5.10 11.32 1 Madurai and from Km.46/275 to 48/175 of NH-85 58 Improvement to the Existing carriage way at Trichy & km 33/610 - 44/010 10.40 7.51 1 Pudukottai of pudukottai - Trichy road (NH 336) *****