Parliament Question: NHs Projects in Andhra Pradesh

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: The Ministry of Road Transport and Highways addresses Lok Sabha Unstarred Question No. 3036 regarding National Highway (NH) projects in Andhra Pradesh. As of July 2025, 96 NH projects are underway in Andhra Pradesh, with a provisional allocation of ₹2,958 crore for development and maintenance in the financial year 2025-26. The projects do not include any activity in the Anakapalle district. Key Points / Main Content: Ongoing NH Projects: * 96 NH projects are under implementation in Andhra Pradesh. * The total length of these projects is 1,980 km. * The sanctioned cost for these projects is ₹44,536 crore. * Project-wise details, including scheduled/revised completion dates, are in the Annexure. Anakapalle District: * No NH project is currently under implementation in the Anakapalle district of Andhra Pradesh. Financial Allocation and Expenditure: * A provisional allocation of ₹2,958 crore has been made for the development and maintenance of NHs in Andhra Pradesh for the financial year 2025-26. * Expenditure of ₹2,745 crore has been incurred up to 30.06.2025. IMPACT ANALYSIS Government of Andhra Pradesh: * Impact: Receives central funding for NH development and maintenance. The state benefits from improved infrastructure and connectivity through the completion of these projects. * Action Required: Monitor project progress, ensure timely approvals and clearances, and coordinate with the Ministry of Road Transport and Highways for effective implementation. Ministry of Road Transport and Highways: * Impact: Responsible for overseeing the implementation of NH projects, allocating funds, and ensuring compliance with project timelines and standards. * Action Required: Continue to monitor project progress, release funds as per schedule, and address any issues or bottlenecks to ensure timely completion of projects. Contractors and Concessionaires: * Impact: Responsible for executing the NH projects as per the terms of the contract, including meeting quality standards and project timelines. * Action Required: Expedite project execution, adhere to quality standards, and coordinate with relevant authorities to resolve any issues or delays. Citizens of Andhra Pradesh: * Impact: Benefit from improved road infrastructure, reduced travel time, and enhanced connectivity. * Action Required: Utilize the improved infrastructure responsibly and provide feedback to relevant authorities regarding any issues or concerns.

Key Entities Referenced

Andhra Pradesh: A state in India where the National Highway projects are being implemented. Ministry of Road Transport and Highways: The Indian government ministry responsible for the development and maintenance of national highways. National Highway NH projects: Road infrastructure projects involving the construction, maintenance, and development of National Highways. Nitin Jairam Gadkari: The Minister of Road Transport and Highways at the time of the answer. Bharatmala Pariyojana: A centrally-sponsored and funded Road and Highways project of the Government of India. Bengaluru Vijayawada Economic Corridor: An economic corridor project connecting Bengaluru and Vijayawada, involving the development of access-controlled greenfield highways. Anakapalle district of Andhra Pradesh: A district in Andhra Pradesh, India. No project is currently under implementation here. Krishnapatnam Port: A port in Andhra Pradesh, India that is the endpoint for some of the highway projects.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION No. 3036 ANSWERED ON 7TH AUGUST,2025 NHS PROJECTS IN ANDHRA PRADESH 3036. DR. C M RAMESH: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार् ग मंत्री be pleased to state: (a) the details of each of 117 National Highway(NHs) projects under implementation in Andhra Pradesh; (b) the details of projects that are passing through Anakapalle district of Andhra Pradesh including their expected time of completion; and (c) whether the Government has allocated Rupees 2,516 crore for NH construction and maintenance in Andhra Pradesh and if so, the details of the expenditure made out of the said allocation as on July, 2025? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) & (b) At present, 96 National Highway (NH) projects covering a total length of 1,980 km, at a sanctioned cost of ₹ 44,536 crore, are under implementation in the State of Andhra Pradesh. Project- wise details, including Scheduled/Revised Scheduled dates of completion, are placed at Annexure. No project is currently under implementation in Anakapalle district of Andhra Pradesh. (c) A provisional allocation till 30.06.2025 (i.e. first quarter of Financial Year 2025-26) of ₹ 2958 crore has been made for the development and maintenance of NHs in Andhra Pradesh during the current financial year 2025-26, out of which an expenditure of ₹ 2745 crore has been incurred up to 30.06.2025.ANNEXURE ANNEXURE REFERRED TO IN REPLY OF PARTS (a) & (b) OF LOK SABHA UNSTARRED QUESTION NO. 3036 FOR ANSWER ON 07.08.2025 ASKED BY DR. C M RAMESH REGARDING NHS PROJECTS IN ANDHRA PRADESH. Project-wise details of ongoing NH Projects in the state of Andhra Pradesh Sl. Name of Project NH Total Total Date Scheduled/revised No. Length Project of Scheduled No. Cost (Rs Start Completion Date (km) in Cr) 1 Construction of Six Laning 67 18.975 348.72 18- 31-12-2025 of dedicated Port Road to 12- Krishnapatnam Port 2018 (Package-I) Km 0+000 to Km 18+000 under Bharatmala Pariyojana Phase-I (Package-1) 2 Construction of four 516W 15.95 609.43 25- 31-03-2026 laning of Green field Road 09- connecting North & South 2023 Industrial Cluster of Khandaleru creek near Krishnapatnam port at extension of Dedicated port road on NH-67 (Part-Il form Km 18+000 to Km 19+300) under Bharatmala Pariyojana Phase-I (Package-3) 3 VUP at Km. 1379.934 of 16 3.43 102.91 27- 17-10-2025 NH-16 [Golagamudi 03- Junction with Blackspot 2023 ID: AP-(02)-392), Service Road from Km. 1380.350 to Km. 1380.957 of NH-16 [Sundaraiah Colony Junction with BlackspotID: AP-(02)-188] & Flyover at Km. 1383.195 of NH-16 Nellore T Junction with Blackspot ID: AP-(02)-189] for rectification of Blackspots 4 Construction of Four Lane 516W 36.06 909.47 07- 02-09-2026 access-controlled 12- highway from Chillakur 2023 Cross Road to Turpukanupuru Km 0+000 (131-500 of NH- 16) to Km 23+770 on New NH-516W including six-lane flyover and approaches on NH-16 (Length 1.050 Km) and Six Lane access controlled from Turpukanupuru to Port south Gate Km 23+770 to Km 35+015 on new 516W under Bharatmala Pariyojana Phase (Package-2) 5 Construction of Six laning 71 34.881 1398.84 20- 28-02-2027 of Naidupeta Junction- 10- Turpukanupur Section 2023 from Km.57+046 to Km.91+927 Under Bharathmala Pariyojana Phase-I (Package-4) 6 Development of six Lane 544G 7.5 1092.18 07- 06-02-2027 Access Controlled Green 02- Field Highway from 2025 Kavulakuntla (Km.196.000) to Narayanampet (Km 203.500) of NH-544(G) Bengaluru-Vijayawada Economic Corridor UnderBharatmala Pariyojana Phase-I (Package-09) 7 Development of six Lane 544G 24.5 813.66 12- 11-06-2026 Access Controlled Green 02- Field Highway from 2024 Narayanampet (Km 203.500) to chandrasekharapuram (Km.228.000) of NH- 544(G) Bengaluru- Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-10) 8 Development of six Lane 544G 32 1292.65 12- 11-08-2026 Access Controlled Green 02- Field Highay from 2024 chandrasekharapuram (Km.228.000) to Polavaram (Km 260.000) of NH-544(G) Bengaluru- Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-11) 9 Development of six Lane 544G 25.5 747.29 12- 11-05-2026 Access Controlled Green 02- Field Highay from 2024 Polavaram (Km 260.000) to Marripudi (Km 285.500) of NH-544(G) Bengaluru- Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-12) 10 Development of six Lane 544G 29.1 976.4 10- 09-02-2026 Access Controlled Green 02- Field Highway from 2024 Marripudi (Km.285.500) tosomavaappadu (Km.314.600) of NH- 544(G) Bengaluru- Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-13) 11 Development of six Lane 544G 28.64 1103.89 12- 11-08-2026 Access Controlled Green 02- Field Highay from 2024 Somavarappadu (Km 314.600) to Muppavaram (Km 343.240) of NH- 544(G) Bengaluru- Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-14) 12 Strengthening & 16 1.84 83.55 28- 28-05-2026 Construction of (i) VUP 05- including approaches and 2025 Service Roads at Rajupalem Cross Road at Km.1185+665 (Black spot ID:AP-(03)-169-BS) & (ii) LVUP including approaches at Jonnathali cross road at km 1191+787 (Black spot ID:AP-(03)170-BS) on Chilakaluripeta - Nellore Section of NH-16 (Old NH- 5) 13 4L PS from Mandlem 340C 35.515 887.28 23- 22-11-2025 (Existing Km. 11- 38.000/Design Km.30.600) 2023 to Atmakur (Existing Km.73.000/Design Km 66.115) of NH‐340C(Package‐2) 14 Development of Six Lane 130CD 31.767 922.5 31- 31-12-2025 Aluru - Jakkuva Section of 03- NH-130CD Road from Km 2022 365.033 to Km 396.800 under Raipur- Visakhapatnam Economic Corridor [Package-1(AP)] 15 Strengthening & 30 1.2 20.12 24- 30-11-2026 Construction of 2 - lane 05- ROB at Km. 5+467 (RHS) 2025 of Ibrahimpatnam - Chandragudem section of NH-30 16 4-laning of Achampeta 516F 13.198 140.515 13- 31-12-2025 Junction on NH-216 to 07- Kakinada Anchorage Port 2022 Connecting Vakalapudi light house 17 4 laning of Samarlakota to 516F 12.25 660.82 17- 31-12-2025 Achampeta Junction 08- Section of NH-516F under 2023 Port Connectivity 18 Construction of Flyover at 216A 6.425 187.91 19- 31-12-2025 Km 936+440 of NH-216A 09- [Jonnada Junction with 2022 Black Spot ID: AP – (02)- 134], Flyover at Km 967+180 of NH-216A [Undrajavaram Junction with Black Spot ID: AP - (02)-078], Flyover at Km 970+370 of NH-216A (Tetali Junction with Black Spot ID: AP – 005), VUP at Km 1006+525 of NH-216A (KaikaramJunction with Black Spot ID: AP – 007) for rectification of Blackspots and construction of Flyover at Km 910+760 of NH-216A in Rajahmundry City (Morampudi Junction) 19 4 Laning of NH 544D from 544D 36.846 907.76 23- 21-10-2025 existing km 346.300 of NH 07- 44 (Design Chainage km 2023 0.000) to km 39 380 (Design Chainage km 37.000) of Anantapur Muchukota section 20 4 laning from existing Km 544D 32 1055.23 17- 28-02-2026 39.380 (Design Ch. 08- 37.000) to Km 74.450 2023 (Design Ch. 69.000) of Muchukota – Bugga section of NH 544D 21 Construction of Proposed 44 3.17 74.19 02- 04-10-2026 Half Clover leaf 04- interchange cum ROB 2025 at Yerramanchi and Gudipalli Villages across NH-44 at Km 416.005 22 6-laning of Vijayawada 16 17.636 1757.82 07- 15-09-2025 Bypass from Gollapudi 07- (Km.30+000) to 2021 Chinnakakani (Km.47+881) including Major Bridge across river Krishna in Vijayawada- Gundagolanu section of NH-16 under Bharatmala Pariyojana (Pkg.IV) 23 Construction of Four- 71 18.1 1047.32 24- 15-10-2025 Laning of Pileru - Kalur 10-Section of NH-71 from 2023 design Km 55+900 to Km 95+717 under Bharatmala Pariyojana 24 Construction of 1 Nos 69 5.45 149.77 19- 02-02-2026 ROB 2 Nos VUPs Service 06- roads provision of lighting 2023 and construction of other miscellaneous works at various stretches including maintenance of existing section of NH-4 from AP/Tamil Nadu Border (Km. 134.890) to Nalagampalli village (Km.172.000) 25 Bangalore Chennai NE-7 25 1311.36 10- 30-09-2025 Expressway From km 10- 71.000 (Bethamangala) to 2022 km 96.000 (Baireddypalle) Section in the states of Karnataka and Andhra Pradesh under Bharatmala Paroyojana (Phase - II/Package - I) 26 Bangalore Chennai NE-7 31 2206.45 08- 17-06-2026 Expressway From km 06- 96.000 (Baireddypalle) to 2023 km 127.000 (Bangarupalem) Section in the states of Karnataka and Andhra Pradesh under Bharatmala Paroyojana (Phase - II/Package - II) 27 Development of Six laning 716B 17.58 702.52 30- 31-12-2025 of Chittoor - Thachur 10- Highway of NH - 716B 2023 From km 43.800 (Kumarjapet) to km61.380 (Veera Kaveri Raja Puram) on Hybrid Annuity Mode under Bharatmala Paroyojana in the states of Andhra Pradesh and Tamilanadu (Package - II) 28 Development of Six laning 716B 20.06 1359.81 24- 31-07-2026 of Chittoor - Thachur 01- Highway of NH - 716B 2023 From km 96.040 (Pondavakkam) to km 116.100 (Kannigaipair) on Hybrid Annuity Mode under Bharatmala Paroyojana in the states of Andhra Pradesh and Tamilanadu (Package - IV) 29 Four Laning of Mydukur- 67 45.14 1063.72 21- 19-09-2025 Badvel Section of NH-67 09- from Km.585.820 to 2023 Km.630.960 under Bharatmala Pariyojna 30 Development of Six-Lane 544G 24.3 912.94 05- 03-02-2026 Access Controlled 02- Highway from Kodur (Ch. 2024 0+000) to Vanavolu (Ch. 24+300) of (NH-544G) Bengaluru-Vijayawada Economic Corridor under Bharatmala Pariyojana Phase-I (Package-1) 31 Development of Six-Lane 544G 21.4 750.81 02- 01-03-2026 Access Controlled 03- Greenfield Highway from 2024 Vanavolu (Ch. 24+300) to Vankarakunta (Ch. 45+700) of Bengaluru -Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-2) 32 Development of Six-Lane 544G 26.3 992.89 02- 01-03-2026 Access Controlled 03- Greenfield Highway from 2024 Vankarakunta (Ch. 45+700) to Odulapalle (Ch.72+000) of Bengaluru - Vijayawada Economic Corridor Under Bharatmala Pariyojana Phase-I (Package-3) 33 Development of Six-Lane 544G 24.3 1058.9 05- 01-02-2026 Access Controlled 02- Greenfield Highway from 2024 Odulapalle (Ch.72+000) to Nallacheruvupalli (Ch.96+300) of Bengaluru - Vijayawada Economic Corridor of NH-544G under Bharatmala Pariyojana Phase-I (Package-4) 34 Development of Six-Lane 544G 32.7 1253.24 12- 01-11-2026 Access Controlled 02- Greenfield Highway from 2024 Nallacheruvupalli (Ch.96+300) to Yerragudipadu (Ch.129+000) of Bengaluru - Vijayawada Economic Corridor of NH-544G under Bharatmala Pariyojana Phase-I (Package-5) 35 Development of Six-Lane 544G 31 1200.42 12- 01-11-2026 Access Controlled 02- Greenfield Highway from 2024 Yerragudipadu(Ch.129+000) to Audireddipalle (Ch.160+000) of Bengaluru - Vijayawada Economic Corridor of NH-544G under Bharatmala Pariyojana Phase-I (Package-6) 36 Development of Six-Lane 544G 16 956.14 07- 06-03-2026 Access Controlled 03- Greenfield Highway from 2024 Audireddipalle (Ch. 160+000) to Mallapalle (Ch. 176+000) of Bengaluru –Vijayawada Economic Corridor under Bharatmala Pariyojana Phase-I (Package-7) 37 Development of Six-Lane 544G 20 909.02 12- 01-11-2026 Access Controlled 02- Greenfield Highway from 2024 Mallapalle (Ch. 176+000) to Kavulakuntla (196+000) of Bengaluru –Vijayawada Economic Corridor under Bharatmala Pariyojana Phase-I (Package-8) 38 Construction of 6 lane 16 4.59 252.427 21- 20-03-2027 elevated corridor 03- including its approaches 2025 from Km. 629+880 to Km. 634+470 (Design Chainage) of NH-16 in Ranasthalam Town portion 39 Construction of 16 1.935 58.72 16- 15-09-2025 Flyover/Underpass at 08- Vizag Airport Junction to 2023 ensure Flow of container trailers to/from MMLPsetup at NH-16 40 Improvement of 4L road to 516C 9.58 685.99 14- 13-02-2026 6L road and 4L dedicated 02- Port Roads for the Port 2024 connectivity road from Convent junction to Sheelanagar Junction 41 Kalyandurg-Molakalmuru 544DD 46.20 289.67 16- 30-09-2025 (Km 56.00 to 102.20) 08- section -544DD 2018 42 2L+PS from Km. 0+000 to 342 32.00 401.72 17- 31-12-2025 Km. 32+000 (Mudigubba 03- to Puttaparthi) of NH-342 2023 43 440 53.59 439.82 02- 31-03-2026 NH-440 Rayachoty- 05- Vempalli 2L+PS 2022 44 Major bridge across 716 1.81 82.18 01- 31-08-2025 Papagni river including 02- approaches at km. 153/2 2023 of Renigunta - Kadapa- Muddanur Road NH-716 45 167 54.80 290.15 31- 31-12-2025 Chintakunta to Adoni 05- section of NH-167 2017 46 Widening & Strengthening 340C 9.01 96.15 02- 31-03-2026 of 2/4 lane to 4 lane 03- carriageway from Km 6/0 2022 to 15/0 of Kurnool Guntur road (NH-340C) 47 NH-165 From Km 0.000 To 165 60.45 529.54 17- 31-03-2026 Km 64.020 (Pamarru To 01- Akiveedu Section) To Two 2022 Lane With Paved Shoulders48 2L+PS from Km. 36/400 to 167BG 67.40 423.68 04- 15-12-2025 Km. 107/224 of NH-167BG 07- from Duttalur to Kavali 2022 section 49 Construction of new two- 67 2.68 99.48 15- 02-03-2026 lane Major Bridge across 02- Penna River at 2023 Km.739.234 of NH-67 including approaches 50 NH-167AD from Macherla 167AD 43.66 403.22 27- 31-08-2025 to Dachepalli from 01- Km.0.000 to 43.659 to 2023 2L+PS 51 Const. of Approaches to 26 1.37 37.22 19- 15-12-2025 2L ROB of LC No. RV324 @ 07- KM 436/12-13 on NH26 2021 (Manapuram) 52 2L+PS of NH-30- 30 63.86 388.70 26- 31-12-2025 Bhadrachalam Konta 09- section 2022 53 Widening to two lane with 516E 70.12 568.12 02- 30-11-2025 paved shoulder of 01- Rampachodavaram - 2023 Koyyuru section of NH- 516E from Km.43+700 to Km 113+820 54 Timmapuram to 216 19.23 350.61 05- 30.11.2025 gurajanapalle section 01- from km 26+150 to 2017 41+161 of NH-214(NH216)( kakinada bypass) 55 2L+PS from Pasarlapudi- 216 21.00 263.45 27- 30-09-2025 Dhindi (105/700 to 09- 127.500 of NH-214) of NH- 2017 21656 Construction of Proposed 205 1.35 63.79 31- 15-09-2025 4-Lane ROB and its 01- approaches in lien of 2019 existing level crossing No. 67 @ Km 133.20(Railway Chainage 109/3-4) on NH 205 57 2-lane ROB and its 40 1.40 60.04 10- 03-05-2026 approaches in Lieu of 02- existing LC No.120 is at 2023 K.M. 56.700 of NH-18 (New NH-40) under Setu Bharatam 58 Construction of two lane 71 1.20 66.60 19- 31-03-2026 ROB and its approaches in 07- lieu of existing LC No. 119 2023 at km. 226/800 of NH -205 (Km 52+688 of New NH- 71) under Setu Bharatam 59 Construction of 4-Lane 67 0.95 51.44 06- 31-08-2025 ROB and subway in lien of 12- level crossing No. 17 @ 2019 Km 108/1-2 between Jamalamagudu & Proddator Station on Nandyal-Yerraguntla Section at km 563/200 of NH-67 60 4 Lane ROB at Km 510/8 565 2.27 98.76 05- 30-10-2025 of NH-565 (Near Yerpedu) 12- in Lieu of LC No.36 2022 61 Construction of 2-Lane 326A 1.40 54.38 06- 31.12.2025 ROB and its approaches in 03- lien of level crossing 2019 No.31 @ Km 2.100 (Railway chainage 33/900- 1000) on NH-326A62 4-lane ROB and its 165 1.28 90.84 10- 31-10-2025 approaches at Km 10+906 12- of NH-165 2021 63 Construction of New 4 165 1.53 129.65 16- 31-05-2026 lane ROB including its 12- approach at Railway Km 2022 74/8-9 between Kaikaluru & pallevada railway station on Gudivada- Bhimavaram section at NH Km 46+430 on Pamaru-Digamarru Bypass road of NH 165 in Krishna district 64 Construction of 2 Lane 165 5.54 317.22 22- 01-06-2026 ROB In replacement Of LC 05- No.3e/Spl3 on Gudiwada - 2023 Machilipatnam railway Section at Km 231+700 of NH-165 and Construction of 2 Lane ROB in replacement of LC No. 52 on Vijayawada- Bhimavaram railway Section at km 230+600 of NH-165 including one time improvement of bypassed Gudiwada town Stretch from Km 228+00 to Km 233+540 65 2L+PS from Paderu to 516E 24.90 222.61 31- 15-09-2025 Gondiguda (Km 2.400 to 03- Km 27.480) section of NH 2021 516E 66 2L+PS from Gondiguda to 516E 24.47 296.66 08- 31-10-2025 Araku (Bhallaguda) (Km 09- 27.480 to Km 51.772) 2021 section of NH 516E67 Two laning with paved 516E 45.50 349.29 08- 31-12-2025 shoulders of Koyyuru to 07- Chaprathipalem section of 2022 NH 516E 68 Two laning with paved 516E 39.50 311.22 12- 31-03-2026 shoulders of 10- Chaprathipalem to 2022 Lambasingi Section of NH 516E 69 4 lane from Km.56+400 to 716G 57.00 839.98 15- 14-12-2025 Km 120+300 (i.e. from 09- B.Kothapalli Junction to 2023 Gorantla) of NH 716G 70 342 46.67 1318.57 07- 06-03-2026 4-laning of Puttaparthi- 11- Koduru Section of NH-342 2023 71 Rehabilitation and 516E 48.97 361.24 03- 31-06-2026 Upgradation to 2-lane with 11- paved shoulder 2023 configuration of Lambasingi to Paderu section (Km 205+000 to Km 253+974) of NH-516E 72 Rehabilitation & 340B 53.33 629.73 22- 31-03-2026 Upgradation of 11- Somayajulapalli – Dhone 2023 section of NH – 340B from Km.0/0 To 56/200 [Design Ch. Km 0/00 to km 53/33] to two lane with paved shoulders 73 Widening to two lane with 326 8.35 98.49 17- 30-06-2026 paved shoulder of 01- Chinturu to Motu section 2024 of NH326 from km 0+00 to Km9+600(Design Chainage Km0+00 to Km8+345) 74 Widening of Vodarevu- 167A 47.00 1064.24 14- 12-03-2026 Chilakaluripet Section 02- (Design Chainage 0+00 to 2024 47+000) of NH-167A (Package-I) to to 4L+PS 75 Construction of bypass 167 7.30 241.99 29- 28-03- road to Adoni town 02- 2026 connecting NH-167 2024 (Hagari - Jadcharla road) from km.62/700 to 71/400 in Kurnool District 76 Construction of Tadipatri 67 6.29 159.66 13- 13-06-2026 Bypass of 4 lane with 03- paved shoulders on NH 67 2024 in Ananthapuramu district 77 Widening to 2-Lane with 765 24.20 244.83 14- 13-11-2025 Paved shoulders of 03- Dornala to Kunta Junction 2024 from Design Chainage Km 244+000 to 267+990 section of NH-765 (Package-2) 78 One time improvement to 544DD 2.15 13.40 13- 31-12-2025 the road work 03- Strengthening of existing 2024 Bypassed section of two lane stretch of NH 544DD of Kalyanadurgam – Rayadurgam – Molkalamuru Road (N.Gundlapalli Town) from Km. 74/200 to Km. 76/350 under one time Improvement 79 2-lane ROB and its 71 1.50 78.63 07- 05-06-2026 approaches in lieu of 06-existing LC No.95 at Km 2024 183/600of NH 205(Km. 9/6 of new NH-71) under Setu Bharatam 80 NH 167 B MudireddyPalle 167B 36.34 279.29 12- 12-04-2026 to Kadapa Nellore Border 10- (i.e. from Km 22+300 to 2024 58+635) 81 One time improvement for 67 2.7 11.48 10-9- 31-10-2025 bypass reach of Muddanur 2024 town from Km.523+500 to 526+200 of NH-67 82 One time improvement to 544E 4.01 13.79 10-9- 30-11-2025 the road in Bypassed 2024 stretch of NH 544E via Overlay from Km 58/970 to Km 62/980 (Madakasira town limits) of Kandikonda-Madakasira- Sira Road 83 Construction of Kanigiri 565 5.5 70.3 18- 17.11.2025 Bypass on NH-565 from 11- Km 261+700 to Km 2024 267+200 to Two Lane with Paved shoulders 84 Rehabilitation and 167K 21.89 292.63 18- 17-12-2026 Upgradation of NH 167K 12- from Kurnool/Kadapa 2024 Border-Jammalamadugu section of NH-167K i.e. Design Ch. Km 248+010 to km 269+900 to 2 lane with paved shoulders 85 Widening from two lane to 440 1.532 17.1 31- 31.12.2025 2 lane with paved 12- shoulders of link road 2024 between NH-40 and NH440 from km. 0+000 to km 1+532 of Rayachoti bypass 86 Construction of 2-lane 42 1.73 65.03 20- 19-01-2027 ROB with approaches in 01- lieu of existing L.C.NO. 2025 41E at Km. 86/100 (railway chainage km 64/5-6) of NH-205(New NH- 42) under Sethubharatham 87 Construction of Paderu 516E 13 244.43 09- 08-07-2026 bypass (Km 0+000 to Km 01- 13+000) of 2- lane with 2025 paved shoulder on NH- 516E 88 Upgradation of 565 20.294 393.61 24- 23-07-2026 Davualapally to 01- Mallapalem Section 2025 {Design Ch. Km 133+922 to Km 154+216 (Existing Ch. Km 133+922 to Km 154+900)} of NH-565 to 2 Lane with Paved shoulder 89 Rehabilitation & 167B 18 135.08 15- 14-02-2026 Upgradation from km 0+00 02- to 18+00 of Mydukur to 2025 Mudireddypalli Section of NH-167B two lane with paved shoulder 90 Widening of Existing Road 365BB 40.42 368.63 23- 23-10-2026 to Two Lane with Paved 04- Shoulder Configuration 2025 from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB91 Widening of Kondamodu 167AG 49.92 1032.52 20- 19-04-2027 to Perecherla Section 04- (Design Ch. Km 0+00 to 2025 Km 49+917) of NH-167AG to to 4L+PS 92 Construction of 2 Lane 165 1.35 91 13- 12-02-2027 Rob & Approches in Lieu 02- of L.C. No. 104e/spl3 at 2025 Km.97/06-07 between Cherukuwada and Undi Railway Stations on Gudivada - Bhimavaram Railway section at N.H. Km.170+400 on N.H.214 (New NH-165) in west Godavari district 93 One Time Improvement 71 21.60 21.53 21- 20-06-2026 from Km 101+000 to Km 05- 106+600, Km 107+600 to 2025 Km 111+600 & from Km 112+600 to Km 124+600 of Madanapalli - Naidupeta road (NH-71) 94 OTI of Bypass stretches 42 7.75 22.36 29- 28-02-2026 at Mudigubba from Km 05- 130/392 to 138/141 on NH 2025 42 95 Strengthening of NH 67 67 8.89 14.69 05- 04-01-2026 from Km 740/150 to 07- 742/195 and Km 743/005 2025 to 749/850 of NH 67 in SPS Nellore District 96 Strengthening of Four 26 11.36 39.72 14- 13-01-2026 Lane Carriageway from 07- Km 552.000 to 563.620 of 2025 NH26 *****