GOVERNMENT OF INDIA
MINISTRY OF POWER
RAJYA SABHA
UNSTARRED QUESTION NO.1115
ANSWERED ON 09.02.2026
NON-FOSSIL FUEL ENERGY SHARE IN INSTALLED CAPACITY MILESTONE
1115 # SHRI MOKARIYA RAMBHAI:
Will the Minister of POWER be pleased to state:
(a) the details of India’s achievement of attaining 500 gigawatts (GW) of installed power
capacity in September, 2025;
(b) the current share of non-fossil fuel sources in the total installed power capacity and the
status of achieving the 50 per cent non-fossil fuel target set under COP26;
(c) the details of the growth made in renewable energy capacity during 2025 including the
major milestones achieved under solar and wind energy; and
(d) the action plan (roadmap) for achieving 500 gigawatts of non-fossil fuel capacity by
2030 and the net-zero 2070 objective?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) & (b) : The details of installed generation capacity in September 2025, at the time of
achievement of 500 GW, and the installed generation capacity as on 31.12.2025, indicating the
percentage share of fossil and non fossil fuel sources, are given at Annexure-I. As on 31.12.2025 the
total installed generation capacity is 5,13,730 MW, comprising of 2,46,942 MW (48.07 %) of fossil-
fuel sources and 2,66,788 MW (51.93 %) of non-fossil fuel sources.
India has achieved a landmark in its energy transition journey by reaching 50% of its installed
electricity capacity from non-fossil fuel sources in June, 2025 – more than five years ahead of the
target set under its Nationally Determined Contributions (NDCs) to the Paris Agreement. This
significant milestone underscores the country’s steadfast commitment to climate action and
sustainable development.
(c) : During 2025, a total of 48,436 MW Renewable energy capacity has been added. This includes
37,945 MW of Solar power and 6,347 MW of Wind power. The details of the renewable energy
capacity additions during 2025 are given at Annexure-II.(d) : The details of initiatives undertaken by the Government of India to achieve 500 GW non fossil
capacity by 2030 and the strategy for attaining Net Zero emissions by 2070 are as follows:
1. The Government of India has taken several steps and initiatives to promote and accelerate
renewable energy capacity in the country. These, inter-alia, include the following:
(i) 100% Inter State Transmission System (ISTS) charges have been waived for inter-state sale
of solar and wind power for projects to be commissioned by 30th June 2025 (with waiver
tapering off 25% annually till June 2028), for co-located BESS projects commissioned by
June 2028, for Hydro PSP projects where construction work awarded by June 2028, for
Green Hydrogen Projects commissioned till December 2030 and for offshore wind projects
commissioned till December 2032.
(ii) Standard Bidding Guidelines for tariff based competitive bidding process for procurement
of Power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm & Dispatchable
RE (FDRE) projects have been issued.
(iii) Ministry of New & Renewable Energy (MNRE) has issued Bidding Trajectory for issuance
of RE power procurement bids of 50 GW/annum by Renewable Energy Implementing
Agencies (REIAs) from FY 2023-24 to FY 2027-28.
(iv) Foreign Direct Investment (FDI) has been permitted up to 100 percent under the automatic
route.
(v) Laying of new transmission lines and creating new sub-station capacity has been supported
under the Green Energy Corridor Scheme for evacuation of renewable power
(vi) To augment transmission infrastructure needed for steep RE trajectory, transmission plan
has been prepared till 2032.
(vii) Scheme for setting up of Solar Parks and Ultra Mega Solar Power projects is being
implemented to provide land and transmission to RE developers for installation of RE
projects at large scale
(viii) Schemes such as Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-
KUSUM), PM Surya Ghar Muft Bijli Yojana, National Programme on High Efficiency
Solar PV Modules, New Solar Power Scheme (for Tribal and PVTG Habitations/Villages)
under Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) and Dharti
Aabha Janjatiya Gram Utkarsh Abhiyan (DA JGUA), National Green Hydrogen Mission,
Viability Gap Funding (VGF) Scheme for Offshore Wind Energy Projects have been
launched
(ix) Government of India, in September 2023, approved a Viability Gap Funding (VGF) scheme
for development of Battery Energy Storage Systems (BESS). BESS capacity of 13.22 GWh
is under implementation with a budgetary allocation of Rs 3,760 Cr. under this scheme.
Considering the increasing demand of BESS, Ministry of Power, in June 2025, has approved
another VGF scheme for development of 30 GWh BESS capacity with a financial support
of Rs 5,400 Cr from Power System Development Fund (PSDF).
(x) To boost RE consumption, Renewable Purchase Obligation (RPO) followed by Renewable
Consumption Obligation (RCO) trajectory has been notified till 2029-30. The RCO which
is applicable to all designated consumers under the Energy Conservation Act 2001 will
attract penalties on non-compliance. RCO also includes specified quantum of consumption
from Decentralized Renewable Energy sources.(xi) “Strategy for Establishments of Offshore Wind Energy Projects” has been issued.
(xii) To achieve the objective of increased domestic production of Solar PV Modules, the Govt.
of India is implementing the Production Linked Incentive (PLI) scheme for High Efficiency
Solar PV Modules.
(xiii) 12,973.5 MW of Hydro Electric Projects are under construction. Further, 4,274 MW of
Hydro Electric Projects are under various stage of planning and targeted to be completed
by 2031-32
(xiv) Ministry of Power has initiated the steps to promote Pumped Storage Projects (PSPs) to
support renewable energy integration and grid stability. At present, 10 Pumped Storage
Projects totalling 11,870 MW are under construction in the country.
2. Further, Nuclear power has huge potential to ensure long term energy security and is vital for
India’s clean energy transition towards Net Zero by 2070. It is a clean and environment friendly
source of base load power. The lifecycle emissions of nuclear power are comparable to those of
renewables like hydro and wind. The Government of India has set an ambitious target of 100 GW
nuclear power capacity by 2047. Following steps have been taken to diversify India’s energy
portfolio through Nuclear Energy:
i. A dedicated Nuclear Energy Mission with an allocation of ₹20,000 crore has been launched to
develop at least five indigenously designed Small Modular Reactors (SMRs) by 2033 and
promote advanced nuclear technologies.
ii. Sustainable Harnessing and Advancement of Nuclear energy for Transforming India
(SHANTI) Act, 2025 has been enacted to pave a way to harness the potential of India’s nuclear
energy based on indigenous resources to the maximum extent through active involvement of
both the public and private sectors.
iii. Bharat Small Reactors (BSRs) of 220 MW capacity based on India’s proven Pressurized Heavy
Water Reactor (PHWR) technology are being upgraded for deployment in industrial hubs to
support decarbonisation. BARC is also developing Small Modular Reactors.
iv. India’s fuel security is being enhanced through new uranium discoveries, including a
significant discovery that would extend the life of the Jaduguda mine by over 50 years.
Progress in the closed fuel cycle, such as milestones achieved in the Prototype Fast Breeder
Reactor, will further support sustainable fuel supply.
v. To accelerate capacity addition, NPCIL and NTPC have formed the joint venture ASHVINI
for developing nuclear power plants within the existing legal framework.
3. The National Green Hydrogen Mission would also contribute significantly to India’s efforts
for decarbonization and also create opportunities for employment and economic development. The
Mission targets setting up at least 5 MMT per annum of green hydrogen capacity by 2030.
The impact of this achievement on India’s long term energy transition roadmap is crucial
towards the goal of combating climate change, keeping in view energy security, affordability and
accessibility as critical inalienable priorities to ensure growth and development alongside Energy
transition of the economy towards net-zero by 2070.
***********ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PARTS (a) & (b) OF UNSTARRED QUESTION NO.
1115 ANSWERED IN THE RAJYA SABHA ON 09.02.2026
*************
The details of country's of installed generation capacity, indicating the share of renewable and non-
fossil fuel sources, percentage-wise, in September 2025 and December 2025
Installed Capacity (in MW) of the Country
as on 30.09.2025 as on 31.12.2025
Installed % Share in Installed % Share in
Category
Capacity (MW) Total Capacity (MW) Total
Coal 2,17,458 43.41% 2,19,610 42.75%
l
e
u Lignite 6,620 1.32% 6,620 1.29%
F
l
Gas 20,132 4.02% 20,122 3.92%
i
s
s Diesel 589 0.12% 589 0.11%
o
F
Total Fossil Fuel 2,44,800 48.87% 2,46,942 48.07%
RES (including
Hydro) 2,47,310 49.37% 2,58,008 50.22%
Hydro (including
PSPs) 50,108 10.00% 50,915 9.91%
Wind, Solar &
el Other RE 1,97,201 39.37% 2,07,093 40.31%
u
F Wind 53,124 10.61% 54,511 10.61%
l
i
s Solar 1,27,332 25.42% 1,35,810 26.44%
s
o
F BM
-
n
Power/Cogen. 10,757 2.15% 10,757 2.09%
o
N
Waste to Energy 854 0.17% 857 0.17%
Small Hydro 5,134 1.02% 5,159 1.00%
Nuclear 8,780 1.75% 8,780 1.71%
Total Non-Fossil
Fuel 2,56,090 51.13% 2,66,788 51.93%
Total Installed
5,00,889 100.0% 5,13,730 100.0%
Capacity
*************ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PART (c) OF UNSTARRED QUESTION NO. 1115
ANSWERED IN THE RAJYA SABHA ON 09.02.2026
*************
The details of the renewable energy capacity additions during 2025
All figures in MW
Bio-Power
Small
Wind Solar Large
As on Hydro Total RES
Power Bio Mass Waste to Power Hydro
Power
Power/Cogeneration Energy
2025
58.06 6,347.77 29.10 236.68 37,945.22 3,820.00 48,436.83
(Jan-
Dec)
RES: Renewable Energy Sources
************