†*345. SHRI PATEL UMESHBHAI BABUBHAI:
Will the Minister of RAILWAYS be pleased to state:
(a) whether lifts, escalators and Foot Over Bridges (FOBs) at many railway
stations of Western Railway were shown as operational on paper while
they have remained closed for a long time and if so, the details thereof;
(b) whether the Western Railway has conducted physical verification of the
said works and if so, the details thereof;
(c) the time by which the report thereon is likely to be laid in the House;
(d) whether any action has been taken by the Government against railway
employees during the last three years as regular complaints against
Tatkal ticket touts are receiving in Western Railway and if so, the details
thereof, year-wise;
(e) whether such activities are not possible without internal collusion; and
(f) if so, whether an independent investigation of the said system is likely to
be conducted and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (f) OF STARRED
QUESTION NO.345 TO BE ANSWERED ON 12.08.2026 IN LOK SABHA
(a) to (f): Presently, 191 escalators at 46 Railway stations and 240 Lifts at 86
Railway stations have been provided in Western Railway.
Further, Development / Upgradation of railway stations is complex in nature
involving safety of passengers & trains and requires various statutory
clearances such as tree cutting, heritage, fire clearance, airport clearance
etc. These stations are in operation since long, so brownfield work
challenges are being faced, such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipelines, power/signal cables
etc.), infringements, operation of trains without hindering passenger
movement, speed restrictions due to works carried out in close proximity of
the tracks and near to high voltage power lines, etc. and these factors affect
the progress of work and completion time.
Indian Railways has adopted a phased, passenger-centric redevelopment
strategy to address space constraints, shifting of utilities and operational
continuity at the brownfield station projects. Master planning of station
estate carried out in a holistic way ensuring functional zoning, utilizing
railway land efficiently. Detailed utility mapping and advance diversion
planning are undertaken in coordination with local agencies to prevent
service disruptions. Execution of works is carefully sequenced in phases, so
that train operations and essential passenger amenities remain functional.
Temporary facilities, clear signage and crowd management measures,
wherever required, are also taken to minimize inconvenience to passengers
during the redevelopment period.
Page 1 of 7Station-redevelopment:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach. The scheme involves
preparation of master plans and their implementation in phases to improve
the stations of Indian Railways.
The master planning, keeping in view the necessity of each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface and provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
Page 2 of 7So far, 1340 stations have been identified for development under Amrit
Bharat Station Scheme, out of which 123 stations are located in Western
Railway. The names of stations identified for development under Amrit
Bharat Station Scheme in Western Railway are as following:
Zonal No. of Names of Stations
Railway Stations
Western 123 Ahmedabad, Akodia, Amalner, Anand,
Railway Andheri, Ankleshwar, Asarva, Bandra
Terminus, Bardoli, Berchha, Bhachau,
Bhaktinagar, Bhanvad, Bharuch, Bhatiya,
Bhavnagar, Bhestan, Bhildi, Bilimora Jn,
Borivali, Botad Jn., Chanderiya, Chandlodia,
Charni Road, Chittorgarh Jn., Chorvad Road,
Dabhoi Jn, Dadar (WR), Dahisar, Dahod,
Dakor, Derol, Dewas, Dharangaon,
Dhrangadhra, Dwarka, Gandhidham, Godhra
Jn, Gondal, Grant Road, Hapa, Himmatnagar,
Indore Jn, Jam Jodhpur, Jam Wanthali,
Jamnagar, Jetalsar Jn., Jogeshwari,
Junagadh Jn, Kalol Jn, Kanalus Jn,
Kandivali, Karamsad, Keshod, Khachrod,
Khambhaliya, Kim, Kosamba Jn, Lakhtar,
Laxmi Bai Nagar, Limbdi, Limkheda, Lower
Parel, Mahemadabad Kheda Road,
Mahesana Jn, Mahuva, Maksi Jn, Malad,
Mandsor, Maninagar, Marine Lines,
Meghnagar, Mithapur, Miyagam Karjan Jn,
Morbi, Mumbai Central, Nadiad Jn, Nagda
Jn, Nandurbar, Navsari, New Bhuj, Nimuch,
Page 3 of 7Zonal No. of Names of Stations
Railway Stations
Okha, Paddhari, Palanpur Jn, Palghar,
Palitana, Patan, Porbandar, Prabhadevi,
Pratapnagar, Rajkot Jn, Rajula Jn, Ratlam,
Sabarmati BG, Sabarmati MG, Sachin,
Samakhiyali, Sanjan, Savarkundla, Sayan,
Sehore, Shujalpur, Siddhpur, Sihor Jn.,
Somnath, Songadh, Surat, Surendranagar,
Than, Udhna, Udvada, Ujjain, Umargaon
Road, Unjha, Utran, Vadodara, Vapi, Vatva,
Veraval, Viramgam, Vishvamitri Jn.,
Wankaner
Completed Stations of Western Railway:
Development works at railway stations under Amrit Bharat Station Scheme
have been taken up at a good pace. Details of stations completed in Western
Railway are as under:
No. of
Zonal Railway Name of Stations
Stations
Western 23 Bhaktinagar, Dakor, Derol, Godhra
Railway Junction, Hapa, Jam Jodhpur, Jam
Wanthali, Kanalus Junction, Karamsad,
Khambhaliya, Kosamba Junction, Limbdi,
Mahuva, Mithapur, Morbi, Okha, Palitana,
Porbandar, Pratapnagar, Rajula Junction,
Samakhiyali, Sihor Junction, Utran
Page 4 of 7The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Amrit Bharat Stations in Western Railway:
New Bhuj station: The structural work of new station building at main
and second entry and air concourse has been completed and finishing
works have been taken up. The works of new foot over bridge, through
roof, improvement of circulating area at main entry and second entry,
new platform shelters, lifts and escalators have been taken up.
Kalol Junction station: The works of new station building at main and
second entry, platform shelter, improvement of platform surface,
improvement of circulating area and parking have been completed. The
works of new 12 m wide foot over bridge, improvement of water booth
and entry/ exit gate have been taken up.
Mahesana Junction station: The works of improvement of station
building at main entry, new station building at second entry,
improvement of circulating area, parking platform shelter,
improvement of platform surface, boundary wall and entry/exit gate
have been completed. The works of 12 m wide foot over bridge,
improvement of water booth and toilet block have been taken up.
Ankleshwar station: The works of improvement of station building at
main entry and second entry, improvement of circulating area,
approach road, new platform shelters and parking have been
completed. The work of 12 m wide foot over bridge has been taken up.
Page 5 of 7 Surendranagar station: The works of improvement of station building,
improvement of circulating area, parking, improvement of platform
surface and new platform shelters have been completed. The works of
12 m wide foot over bridge and lifts have been taken up.
Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways including provision of lifts, escalators and Foot
Over Bridges is a continuous and ongoing process and works in this regard
are undertaken as per requirement, subject to inter-se priority and
availability of funds. Development / redevelopment / upgradation /
modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
However, no lift, escalator or Foot Over Bridge is permanently closed at any
station in Western Railway. In case lifts, escalators and FOBs are temporarily
closed for maintenance, repair, or other operational reasons, alternate
means at the station remain open to facilitate passenger movement between
platforms. The availability of one or more FOBs at a station is planned based
on operational requirements and passenger footfall, ensuring uninterrupted
passenger movement.
In order to curb the misuse of reservation system by unscrupulous elements,
a number of preventive and punitive measures have been introduced by
Indian Railways. Some of the important initiatives taken in this regard are as
under:
Regular checks are conducted in mass contact areas such as
Passenger Reservation System (PRS) centers, Booking Offices,
Platforms, Trains etc. to prevent unauthorized ticketing activities. Such
Page 6 of 7checks are also intensified during peak period like festivals, holidays
etc.
General public are also educated through Public Address System and
media, not to buy tickets from unscrupulous elements and
consequences of buying tickets from these sources.
Regular drives are conducted by Railway Protection Force (RPF)
personnel against touts over Indian Railway and action is taken against
persons found involved as per the provisions contained in the Railways
Act. Cases having wider ramifications and involving ingredients of other
offences are dealt in coordination with other law enforcement agencies
like Police & Central Bureau of Investigation.
Regular Cyber patrolling through cyber cells of RPF is done to prevent
activities of unscrupulous elements/touts using illegal software and
action is taken against them as per extant legal provisions.
Legal action is taken against offenders (including Railway employees) under
section 143 of the Railways Act, 1989. During last 3 years i.e. 2023 to 2025
and up to June 2026, 65 Railway employees were arrested over Indian
Railways, of whom 9 were arrested in Western Railway under relevant
provision of law. Further, 13580 touts have been arrested and legal action
has been taken against offenders under section 143 of the Railways Act,
1989.
*****