Executive Summary & Key Takeaways
**Executive Summary:**
This document, a response to Lok Sabha Unstarred Question No. 3189 answered on August 7, 2025, by the Ministry of Power, provides details regarding operational hydropower plants in India with a capacity of more than 25 Megawatt. It includes information on the number and locations of such plants, environmental clearances, sustainability studies, and identification of hazardous plants. The Central Electricity Authority (CEA) has identified vulnerable projects and issued advisories.
**Key Points / Main Content:**
* **Operational Hydropower Plants:**
* Currently, 209 Hydroelectric Projects (HEPs) with an aggregate installed capacity of 43.18 GW have been commissioned.
* Detailed state-wise and station-wise installed capacity information is available in Annexure I.
* **Environmental Clearances:**
* Environmental clearances are obtained by the respective developer of HEPs from the Ministry of Environment, Forest & Climate Change (MoEFCC) before construction.
* **Sustainability and Ecological Impact Studies:**
* The document does not provide the dates on which the last study was conducted for sustainability and ecological impact on each of these plants.
* **Hazardous Plants Identification and Early Warning Systems (EWS):**
* The Central Electricity Authority (CEA) has identified HEPs located generally above 1500 meters and first in the basin in the upper reaches of the Himalayan region as vulnerable.
* A list of such projects is provided in Annexure II.
* Implementation of Early Warning Systems (EWS) is mandatory for these vulnerable HEPs.
* CEA has issued an advisory to developers of identified vulnerable projects for implementing EWS.
**Impact Analysis:**
* **Hydropower Plant Developers:**
* *Impact:* Developers of HEPs, particularly those in the Himalayan region and above 1500 meters, are significantly affected.
* *Action Required:* Developers of identified vulnerable projects must implement Early Warning Systems (EWS) in their plants.
* **Central Electricity Authority (CEA):**
* *Impact:* Responsible for identifying vulnerable HEPs and ensuring the implementation of safety measures.
* *Action Required:* Continue to monitor and enforce the implementation of EWS in the identified vulnerable projects.
* **Ministry of Environment, Forest & Climate Change (MoEFCC):**
* *Impact:* Responsible for granting environmental clearances to HEPs before construction.
* *Action Required:* Ensure that environmental standards and guidelines are followed during the assessment and clearance processes.
* **State Governments:**
* *Impact:* States with identified vulnerable HEPs need to be aware of the potential hazards and ensure necessary safety measures are in place.
* *Action Required:* Coordinate with developers and the CEA to monitor and support the implementation of EWS in vulnerable HEPs within their jurisdiction.
Key Entities Referenced
Ministry of Power : The government ministry responsible for power-related matters.
Hydroelectric Projects HEPs : Hydroelectric Projects with aggregated installed capacity of 43.18 GW commissioned as of the document date.
Ministry of Environment, Forest Climate Change MoEFCC : The ministry responsible for environmental clearances for Hydroelectric Projects.
Central Electricity Authority CEA : Identifies vulnerable Hydroelectric Projects HEPs, especially those in the Himalayan region.
Early Warning System EWS : A mandatory system for vulnerable Hydroelectric Projects HEPs, especially those in the Himalayan region.
Himachal Pradesh : A state in India with many Hydroelectric Projects HEPs.
Jammu Kashmir : A region in India with many Hydroelectric Projects HEPs.
Uttarakhand : A state in India with many Hydroelectric Projects HEPs.
See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF POWER
LOK SABHA
UNSTARRED QUESTION NO.3189
ANSWERED ON 07.08.2025
OPERATIONAL HYDROPOWER PLANTS
†3189. SHRI AZAD KIRTI JHA:
Will the Minister of POWER
be pleased to state:
(a) the details of the number of hydropower plants with a capacity more than
25 Megawatt that are currently operational in the country along with the
locations;
(b) whether environmental clearance has been obtained for the same and if
so, the details thereof;
(c) the date on which last study was conducted for sustainability and
ecological impact on each of these plants; and
(d) whether the Government has identified any hazardous plants out of the
above plants and intimated the concerned States in this regard and if so, the
details thereof?
A N S W E R
THE MINISTER OF STATE IN THE MINISTRY OF POWER
(SHRI SHRIPAD NAIK)
(a) : Presently, 209 nos. of Hydroelectric Projects (HEPs) with aggregated
installed capacity of 43.18 GW have been commissioned. Details are at
Annexure-I.
(b) & (c) : The Environmental clearances are duly obtained by the respective
developer of HEPs from Ministry of Environment, Forest & Climate Change
(MoEF&CC) prior to taking up construction of the plant.
(d) : The HEPs which are located generally above elevation of 1500 meter and
which are first in the basin in the upper reaches of Himalayan region, have been
identified as vulnerable by the Central Electricity Authority (CEA). List of such
projects is at Annexure-II. For such HEPs, it is mandatory to implement Early
Warning System (EWS). An advisory has also been issued by CEA to all the
developers of identified vulnerable projects for implementing EWS in these
projects.
********ANNEXURE-I
ANNEXURE REFERRED IN REPLY TO PART (a) OF UNSTARRED QUESTION NO.
3189 ANSWERED IN THE LOK SABHA ON 07.08.2025
*************
State-wise/Station-wise Installed Capacity of Hydroelectric Projects (HEPs)
in the country
Sl. District No. of Units X
Utilities/Stations Capacity (MW)
No. Capacity(MW)
Northern Region
BBMB
HIMACHAL PRADESH
1 Bhakra Left BILASPUR (5X126) 630.00
2 Bhakra Right BILASPUR (5X157) 785.00
3 Dehar MANDI (6X165) 990.00
4 Pong KANGRA (6X66) 396.00
Sub-Total BBMB (HP) 2801.00
NHPC
5 Baira Siul CHAMBA (3X60) 180.00
6 Chamera-I CHAMBA (3X180) 540.00
7 Chamera-II CHAMBA (3X100) 300.00
8 Chamera-III CHAMBA (3X77) 231.00
9 Parbati-III KULLU (4X130) 520.00
10 Parbati-II KULLU (4X200) 800.00
Sub-Total HP 2571.00
SJVNL
11 Nathpa Jhakri SHIMLA (6X250) 1500.00
12 Rampur SHIMLA (6X68.67) 412.02
Total SJVNL 1912.02
NTPC LTD.
13 Koldam BILASPUR (4X200) 800.00
Total NTPC LTD. 800.00
Total Central Sector-HP 8084.02
HPSEBL
14 Bassi MANDI (4X16.5) 66.00
15 Giri Bata SIRMAUR (2X30) 60.00
16 Larji KULLU (3X42) 126.00
17 Sanjay KINNAUR (3X40) 120.00
Total HPSEBL 372.00
HPPCL
18 Integrated Kashang KINNAUR (3X65) 195
19 Sainj KULLU (2X50) 100
20 Sawra Kuddu SHIMLA (3X37) 111
Total HPPCL 406
Beas Valley Power. Corp. Ltd. (BVPC)
21 Uhl-III MANDI (3x3.33) 100
Total BVPC 100
PSPCL
22 Shanan MANDI (1X50)+(4X15) 110.00
Sub Total PSPCL-HP 110.00
Total State Sector 988.00
Private Sector
MPCL
23 Malana KULLU (2X43) 86.00
Total MPCL 86.00
GBHPPL
24 Budhil CHAMBA (2X35) 70.00
Total GBHPPL 70.00
EPPL
25 Malana-II KULLU (2X50) 100.00
Total EPPL 100.00IA Energy
26 Chanju-I CHAMBA (3X12) 36.00
Total IA Energy 36.00
27 Allain Duhangan KULLU (2X96) 192.00
Total ADHPL 192.00
HBPCL
28 Baspa KINNAUR (3X100) 300.00
Total HBPCL 300.00
JSW
29 Karcham Wangtoo KINNAUR (4X261.25) 1045.00
Total JSW 1045.00
HSPPL
30 Sorang KINNAUR (2x50) 100.00
Total HSPPL 100.00
GMR
31 Bajoli Holi CHAMBA (3x60) 180.00
Total GMR 180.00
Total PVT 2109
Total Himachal Pradesh 11181.02
JAMMU & KASHMIR
JKSPDC
32 Baglihar-I RAMBAN (3X150) 450.00
33 Baglihar-II RAMBAN (3X150) 450.00
34 Lower Jhelum BARAMULLAH (3X35) 105.00
35 Upper Sindh-II GANDERBAL (3X35) 105.00
Total JKSPDC 1110.00
NHPC
36 Dulhasti KISTWAR (3X130) 390.00
37 Salal-I&II REASI & UDAMPUR (3X115) 690.00
38 Uri-I BARAMULA (4X120) 480.00
39 Uri-II BARAMULA (4X60) 240.00
40 Sewa-II MAHSKA (3X40) 120.00
41 Kishanganga BANDIPORA (3X110) 330.00
Sub-Total NHPC 2250
Total Jammu & Kashmir 3360
LADAKH
NHPC
42 Chutak KARGIL (4X11) 44.00
43 Nimoo Bazgo LEH (3X15) 45.00
Sub-Total NHPC 89.00
Total Ladakh 89
PUNJAB
PSPCL
44 Anandpur Sahib-I RUPNAGAR (2X33.5) 67.00
45 Anandpur Sahib-II RUPNAGAR (2X33.5) 67.00
46 Mukerian-I HOSHIARPUR (3X15) 45.00
47 Mukerian-II HOSHIARPUR (3X15) 45.00
48 Mukerian-III HOSHIARPUR (3X19.5) 58.50
49 Mukerian-IV HOSHIARPUR (3X19.5) 58.50
50 Ranjit Sagar PATHANKOT (4X150) 600.00
Total PSPCL 941.00
BBMB
51 Ganguwal RUPNAGAR (2X24.2)+(1X29.25) 77.65
52 Kotla RUPNAGAR (2X24.2)+(1X29.25) 77.65
Sub-Total BBMB (Punjab) 155.30
Total Punjab 1096.30
Rajasthan
RRVUNL
53 Jawahar Sagar BUNDI (3X33) 99.00
54 Mahi Bajaj-I BANSWARA (2X25) 50.00
55 Mahi Bajaj-II BANSWARA (2X45) 90.00
56 R P Sagar CHITTORGARH (4X43) 172.00
Total RRVUNL 411.00
Total Rajasthan 411.00UTTARAKHAND
NHPC
57 Dhauli Ganga PITHORAGARH (4X70) 280.00
58 Tanakpur CHAMPAVAT (3X31.4) 94.20
Sub-Total NHPC 374.20
SJVNL
59 Naitwar Mori (2X30) 60.00
Sub-Total SJVNL 60.00
THDC
60 Tehri St-I TEHRI GARHWAL (4X250) 1000.00
61 Koteshwar TEHRI GARHWAL (4X100) 400.00
Total THDC 1400.00
Sub Total Central 1834.2
State Sector
UJVNL
62 Chibro (Yamuna) DEHRADUN (4X60) 240.00
63 Chilla HARIDWAR (4X36) 144.00
64 Dhakrani DEHRADUN (3X11.25) 33.75
65 Dhalipur DEHRADUN (3X17) 51.00
UDHAM SINGH
66 Khatima (3X13.8) 41.40
NAGAR
67 Khodri DAK PATHAR (4X30) 120.00
68 Kulhal DEHRADUN (3X10) 30.00
69 Maneri Bhali-I UTTARKASHI (3X30) 90.00
70 Maneri Bhali-II UTTARKASHI (4X76) 304.00
71 Ramganga PAURI GARHWAL (3X66) 198.00
72 Vyasi DEHRADUN (2x60) 120.00
Total UJVNL 1372.15
Private Sector
AHPC
73 Shrinagar TRHRI & PAURI (4X82.50) 330.00
JPPVL
74 Vishnu Prayag CHAMOLI (4X100) 400.00
ReNew Power Private Limited
75 Singoli Bhatwari RUDRAPRAYAG (3x33) 99.00
Sub Total Private 829.00
Total Uttarakhand 4035.35
UPJVNL
UTTAR PRADESH
76 Khara SUNEBHADRA (3X24) 72.00
77 Matatila LALITPUR (3X10.2) 30.60
78 Obra SUNEBHADRA (3X33) 99.00
79 Rihand SINGRAULI (6X50) 300.00
Total UPJVNL 501.60
Total Northern Region 20674.27
Western Region
MADHYA PRADESH
NHDC
80 Indira Sagar KHANDWA (8X125) 1000.00
81 Omkareshwar KHANDWA (8X65) 520.00
Sub-Total NHDC 1520.00
Total Central 1520.00
MPPGCL
82 Bansagar Tons-I SATNA (3X105) 315.00
83 Bansagar Tons-III REWA (2X15) 30.00
84 Bansagar Tons-II SATNA (3X20) 60.00
85 Bargi JABALPUR (2X45) 90.00
86 Gandhi Sagar MANDSAUR (5X23) 115.00
87 Madhikhera SHIVPURI (3X20) 60.00
88 Rajghat ASHOK NAGAR (3X15) 45.00
Sub-Total MPPGCL 715.00
Total Madhya Pradesh 2235.00
MAHARASHTRAMAHAGENCO
89 Bhira Tail Race RAIGAD (2X40) 80.00
90 Koyna DPH SATARA (2X18) 36.00
91 Koyna-I&II PATAN (4X70)+(4X80) 600.00
92 Koyna-III RATNAGIRI (4X80) 320.00
93 Koyna-IV SATARA (4X250) 1000.00
94 Tillari KOLHAPUR (1X60) 60.00
95 Vaitarna NASIK (1X60) 60.00
Sub-Total MAHAGENCO 2156.00
MPPGCL
96 Pench CHINDWARA (2X80) 160.00
Sub-Total MPPGCL 160.00
Total State SECTOR 2316.00
Private Sector
Dodson-Lindblom Hydro
Power Pvt. Ltd.(DLHP)
97 Bhandardhara St-II ADMEDNAGAR (1X34) 34.00
Sub-Total DLHP 34.00
Tata Power Company
98 Bhira RAIGAD (6X25) 150.00
99 Bhivpuri RAIGAD (3X24) + (2X1.5) 75.00
100 Khopoli RAIGAD (3X24) 72.00
Sub-Total TPCL 297.00
Total Pvt. (Maharashtra) 331.00
Total Maharashtra 2647.00
CHHATISGARG
CSPGCL
State Sector
101 Hasdeobango KORBA (3X40) 120.00
Total CSPGCL 120.00
Total Chhattisgarh 120.00
GUJARAT
State Sector
GSECL
102 Ukai TAPI (4X75) 300.00
Sub-Total GSECL 300.00
SSNNL
103 Sardar Sarovar CHPH NARMADA (5X50) 250.00
Sub-Total SSNNL 250.00
Total Gujarat 550.00
Total Western Region 5552.00
Southern Region
ANDHRA PRADESH
APGENCO
State Sector
104 Lower Sileru KHAMMAM (4X115) 460.00
105 N J Sagar RBC & EXT. SATRASALA (3X30) 90.00
106 Srisailam MAHABUBNAGAR (7X110) 770.00
107 Upper Sileru-I&II VISHAKAPATNAM (4X60) 240.00
108 N J Sagar TPD GUNTUR (2X25) 50.00
Total APGENCO 1610.00
Total Andhra Pradesh 1610.00
TELANGANA
TSGENCO
State Sector
MAHABOOB
109 Priyadarshni Jurala (6X39) 234.00
NAGAR
110 Pochampad NIZAMABAD (4X9) 36.00
111 N J Sagar MP KARNOOL (1X110) 110.00
112 N J Sagar LBC GUNTUR (2X30) 60.00
113 Lower Jurala WANPARTHY (6X40) 240.00
114 Pulinchinthala SURAPETA (4X30) 120.00
Total TSGENCO 800.00
Total Telangana 800.00
KARNATAKA
KPCLState Sector
115 Almatti BIJAPUR (5X55)+(1X15) 290.00
Gerusoppa(Sharavathy Tail UTTARA KANNADA
116 (4X60) 240.00
Race)
117 Ghat Prabha BELGAUM (2X16) 32.00
118 Mahatma Gandhi (Jog) SHIMOGA (4X21.6)+(4X13.2) 139.20
119 Kadra UTTARA KANNADA (3X50) 150.00
120 Kalinadi (Nagjhari) UTTARA KANNADA (6X150) 900.00
121 Kalinadi (Supa) UTTARA KANNADA (2X50) 100.00
122 Kodasali UTTARA KANNADA (3X40) 120.00
123 Lingnamakki SHIMOGA (2X27.5) 55.00
124 Munirabad KOPPAL (2X9)+(1X10) 28.00
125 Sharavathy SHIMOGA (10X103.5) 1035.00
126 Sivasamundrum MANDYA (4X6)+(6X3) 42.00
127 Varahi UDUPI (4X115) 460.00
128 Bhadra CHICKMAGALUR (2x12)+(1x2) 26.00
Total KPCL 3617.20
APGENCO
129 T B Dam BELLARI (4X9) 36.00
130 Hampi BELLARI (4X9) 36.00
Sub-Total APGENCO 72.00
Total Karnataka 3689.20
KERALA
KSEB
State Sector
131 Idamalayar ERANAKULAM (2X37.5) 75.00
132 Idukki IDUKKI (6X130) 780.00
133 Kakkad PATHANAMTHITTA (2X25) 50.00
134 Kuttiyadi KOZHIKODE (3X25) 75.00
135 Kuttiyadi Extn. KOZHIKODE (1X50) 50.00
136 Kuttiyadi Additional Extn. KOZHIKODE (2X50) 100.00
137 Lower Periyar IDUKKI (3X60) 180.00
138 Nariamangalam IDUKKI (3X17.55) 52.65
139 Pallivasal IDUKKI (3X5)+(3X7.5) 37.50
140 Pallivasal Ext IDUKKI (2x30) 60.00
141 Panniar IDUKKI (2X15) 30.00
142 Poringalkuttu COIMBATORE (4X8) 32.00
143 Sabirigiri PATHANAMTHITTA (6X50) 300.00
144 Sengulam IDUKKI (4X12) 48.00
145 Sholayar COIMBATORE (3X18) 54.00
146 Thottiyar IDUKKI (1x30+1x10) 40.00
Total KSEB 1964.15
Total Kerala 1964.15
TAMILNADU
TANGEDCO
147 Aliyar COIMBATORE (1X60) 60.00
148 Bhavani Kattalai Barrage-I ERODE (2X15) 30.00
149 Bhavani Kattalai Barrage-II ERODE (2X15) 30.00
150 Bhavani Kattalai Barrage-III ERODE (2X15) 30.00
151 Kodayar-I KANYAKUMARI (1X60) 60.00
152 Kodayar-II KANYAKUMARI (1X40) 40.00
153 Kundah-I NILGRIS (3X20) 60.00
154 Kundah-II NILGRIS (5X35) 175.00
155 Kundah-III COIMBATORE (3X60) 180.00
156 Kundah-IV COIMBATORE (2X50) 100.00
157 Kundah-V NILGRIS (2X20) 40.00
158 Lower Mettur-I SALEM (2X15) 30.00
159 Lower Mettur-II SALEM (2X15) 30.00
160 Lower Mettur-III SALEM (2X15) 30.00
161 Lower Mettur-IV SALEM (2X15) 30.00
162 Mettur Dam SALEM (4X12.5) 50.00
163 Mettur Tunnel SALEM (4X50) 200.00
164 Moyar NILGRIS (3X12) 36.00
165 Papanasam TIRUNELVELI (4X8) 32.00
166 Parson's Valley NILGIRIS (1X30) 30.00
167 Periyar IDUKKI (3X42)+(1X35) 161.00168 Pykara NILGRIS (3X7)+(2X13.6)+(1X11) 59.20
169 Pykara Ultimate NILGRIS (3X50) 150.00
170 Sarakarpathy KOZHIKODE (1X30) 30.00
171 Sholayar-I COIMBATORE (2X35) 70.00
172 Suruliyar TIRUNELVELI (1X35) 35.00
Total TANGEDCO 1778.20
Total Tamilnadu 1778.20
Total Southern Region 9841.55
Eastern Region
WEST BENGAL
DVC
173 Maithon WEST DHANBAD (1X23.2)+(2X20) 63.20
Sub-Total DVC 63.20
NHPC
174 Teesta Low Dam-III DARJEELING (4X33) 132.00
175 Teesta Low Dam-IV DARJEELING (4X40) 160.00
Sub Total NHPC 292.00
Sub-Total Central 355.20
WBSEDCL
176 Jaldhaka KALIMPONG (4X9) 36.00
177 Rammam PURULIA (4X12.5) 50.00
Sub-Total WBSEDCL 86.00
Total West Bengal 441.20
SIKKIM
NHPC
178 Rangit GANGTOK (3X20) 60.00
179 Teesta-V EAST SIKKIM (3X170) 510.00
Sub-Total NHPC 570.00
State Sector
Sikkim Urja Ltd.
180 Teesta-III# NORTH SIKKIM (6X200) 1200.00
Sub-Total SUL 1200.00
Private
GIPL (Gati Infra Pvt. Ltd.)
181 Chujachen EAST SIKKIM (2*55) 110.00
Sneha Kinetic Power Projects Pvt. Ltd. (SKPPPL)
EAST & NORTH
182 Dikchu (2*48) 96.00
SIKKIM
Shiga Energy Pvt. Ltd.(SEPL)
183 Tashiding WEST SIKKIM (2*48.50) 97.00
DANS Energy Pvt. Ltd. (DEPL)
184 Jorethang Loop SOUTH/WEST (2*48) 96.00
MBPC
185 Rongnichu EAST SIKKIM (2*56.5) 113.00
Sub-Total Private 512.00
Total Sikkim 2282.00
JAHARKHAND
186 Panchet DHANBAD (2X40) 80.00
Sub-Total DVC 80.00
JUUNL
187 Subernrekha-I RANCHI (1X65) 65.00
188 Subernrekha-II RANCHI (1X65) 65.00
Total JUUNL 130.00
Total Jharkhand 210.00
ODISHA
OHPC
189 Balimela MALKANGIRI (6X60)+(2X75) 510.00
SAMBALPUR (2X43.65)+
190 Hirakud (Burla) 287.80
(1X37.5)+(2X49.5)+(2X32)
191 Hirakud (Chiplima) SAMBALPUR (3X24) 72.00
192 Rengali ANGUL (5X50) 250.00
193 Upper Indravati KALAHANDI (4X150) 600.00
194 Upper Kolab KORAPUT (4X80) 320.00
Total OHPC 2039.80APGENCO
195 Machkund KORAPUT (3X17)+(3X21.25) 114.75
Sub-Total APGENCO 114.75
Total Odisha 2154.55
Total Eastern Region 5087.75
North Eastern Region
ARUNACHAL PRADESH
NEEPCO
196 Ranganadi LOWER SUBANSIRI (3X135) 405.00
197 Pare DIKRONG (2X55) 110.00
BICHOM &
198 Kameng (4X150) 600.00
TENGA/KAMENG
Sub-Total NEEPCO Ar. Pr. 1115.00
Total Arunachal Pradesh 1115.00
ASSAM
NEEPCO
199 Kopoli DIMA HASAO (4X50) 200.00
200 Khandong DIMA HASAO (2X25) 50.00
Sub-Total NEEPCO Assam 250.00
APGCL
201 Karbi Langpi KARBI ANGLONG (2X50) 100.00
Sub-Total APGCL 100.00
Total Assam 350.00
MIZORAM
NEEPCO
202 Tuirial KOLASIB (2X30) 60.00
Total NEEPCO Mizoram 60.00
Total Mizoram 60.00
NAGALAND
NEEPCO
203 Doyang WOKHA (3X25) 75.00
Total-NEEPCO Nagaland 75.00
Total Nagaland 75.000
MANIPUR
NHPC
204 Loktak CHURACHANDPUR (3X35) 105.00
Sub-Total NHPC 105.00
Total Manipur 105.000
MEGHALAYA
MePGCL
205 Kyrdemkulai RI-BHOI (2X30) 60.00
206 Umiam St. I RI-BHOI (4X9) 36.00
207 New Umtru RI-BHOI (2X20) 40.00
208 Umiam St. IV RI-BHOI (2X30) 60.00
209 Myntdu St-I JAINTIA HILLS (3X42) 126.00
Total MePGCL 322.00
Total Mehghalaya 322.00
Total NE Region 2027.00
Total 43182.57
NOTE:
a. R-Run of river, R(P)-Run of river with Pondage, MP-Multipurpose and S-Storage
b. (#): A Flash Flood hit the Teesta-III Dam site, and washed it away.
**************ANNEXURE-II
ANNEXURE REFERRED IN REPLY TO PART (d) OF UNSTARRED QUESTION NO.
3189 ANSWERED IN THE LOK SABHA ON 07.08.2025
*************
List of Vulnerable Hydroelectric Projects
Sl. Name of the Project & Developer Sector State Project Status
No. Installed Capacity
1 Sewa-II NHPC Central Jammu & Kashmir Commissioned
(120 MW)
2 Baira Siul NHPC Central Himachal Pradesh Commissioned
(180 MW)
3 Dhauliganga NHPC Central Uttarakhand Commissioned
(280 MW)
4 Nimoo Bazgo NHPC Central Ladakh Commissioned
(45 MW)
5 Chutak NHPC Central Ladakh Commissioned
(44 MW)
6 Kishanganga NHPC Central Jammu & Kashmir Commissioned
(330 MW)
7 Rangit NHPC Central Sikkim Commissioned
(60 MW)
8 Chamera-III NHPC Central Himachal Pradesh Commissioned
(231 MW)
9 Panyor Lower NEEPCO Central Arunachal Pradesh Commissioned
(405 MW)
10 Kameng NEEPCO Central Arunachal Pradesh Commissioned
(600 MW)
11 Nathpa Jhakri SJVN Central Himachal Pradesh Commissioned
(1500 MW)
12 Vyasi UJVNL State Uttarakhand Commissioned
(120 MW)
13 Maneribhali-I UJVNL State Uttarakhand Commissioned
(90 MW)
14 Maneribhali-II (Dharasu) UJVNL State Uttarakhand Commissioned
(304 MW)
15 Budhil GREENKO Private Himachal Pradesh Commissioned
(70 MW)
16 Malana-II EPPL/GREEN Private Himachal Pradesh Commissioned
(100 MW) KO
17 Singoli Bhatwari Renew Jal Private Uttarakhand Commissioned
(99 MW) Urja Private
Limited
18 Baspa-II JSW Energy Private Himachal Pradesh Commissioned
(300MW) Ltd
19 Karcham Wangtoo JSW Energy Private Himachal Pradesh Commissioned
(1045 MW) Ltd
20 Chanju-I IA HYDRO Private Himachal Pradesh Commissioned
(36 MW) ENERGY Pvt.
LTD
21 Vishnuprayag JPVL Private Uttarakhand Commissioned
(400 MW)22 Chuzachen GIPL Private Sikkim Commissioned
(110 MW)
23 Tashiding SHIGA Private Sikkim Commissioned
(97 MW) ENERGY
24 Rongnichu MBPCL Private Sikkim Commissioned
(113 MW)
25 Malana MPCL Private Himachal Pradesh Commissioned
(86 MW)
26 Bajoli Holi GMR Private Himachal Pradesh Commissioned
(180 MW)
27 Sainj HPPCL State Himachal Pradesh Commissioned
(100 MW)
28 Allain Duhangan (192 ADHPL Private Himachal Pradesh Commissioned
MW)
29 Subansiri Lower (2000 NHPC Central Arunachal Pradesh Under
MW) Construction
30 Pakal Dul CVPPL Central Jammu & Kashmir Under
(1000 MW) Construction
31 Kiru CVPPL Central Jammu & Kashmir Under
(624 MW) Construction
32 Tapovan Vishnugad NTPC Central Uttarakhand Under
(520 MW) Construction
33 Tidong-I Statkraft IPL Private Himachal Pradesh Under
(100 MW) Construction
34 Kutehr JSW Energy Private Himachal Pradesh Under
(240 MW) Ltd Construction
35 Parbati St. II NHPC Central Himachal Pradesh Under
(800 MW) Construction
36 Naitwar Mori SJVNL Central Uttarakhand Commissioned
(60 MW)
37 Integrated Kashang HPPCL State Himachal Pradesh Commissioned
(195 MW)
38 Dikchu GREENKO Private Sikkim Commissioned
(96 MW)
39 Shongtong Karcham HPPCL State Himachal Pradesh Under
(450 MW) Construction
40 Sorang GREENKO Private Himachal Pradesh Commissioned
(100 MW)
41 Sawra Kuddu HPPCL State Himachal Pradesh Commissioned
(111 MW)
42 Vishnugad Pipalkoti THDC Central Uttarakhand Under
(444 MW) Construction
43 Shanan PSPCL State Himachal Pradesh Commissioned
(110 MW)
44 Teesta III SUL State Sikkim Commissioned
(1200 MW) (Not in Operation)
45 Sanjay (Bhaba) HPSEB State Himachal Pradesh Commissioned
(120 MW)
46 Upper Sindh-II JKSPDC State Jammu & Kashmir Commissioned
(105 MW)
***************