See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 2785
TO BE ANSWERED ON 05.08.2026
OVER UTILISATION OF ROHA-MADGAON SECTION
2785. SHRI ARVIND GANPAT SAWANT:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government is aware that the Roha-Madgaon section of the
Konkan Railway is operating at an acute capacity utilization of
approximately 168 per cent causing severe year- round waitlists and if
so, the details thereof;
(b) whether Central Railway has received representations regarding the
immediate coach augmentation of major passenger trains on this route
to their maximum permissible limit (potentially adding 45 coaches and
3691 seats daily) and if so, the details thereof; and
(c) the details of the specific time-bound action plan to address this heavy
demand-supply mismatch and implement these cost-effective
infrastructure solutions initiated by the Railway Board in coordination
with Konkan Railway Corporation Limited (KRCL)?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c): Konkan Railway Corporation Limited (KRCL) was established in
1990 with five shareholders, namely, Ministry of Railways, Government of
Maharashtra, Government of Goa, Government of Karnataka and
Government of Kerala. The Konkan Railway line extends from Roha in
Maharashtra to Thokur in Karnataka.
The average line capacity utilization of RohaβMadgaon section of the Konkan
Railway route is about 145 %. On Indian Railways, demand pattern is not
Β§ Page 1 of 7uniform throughout the year, and it varies over lean and peak periods. During
peak rush periods, the occupancy of the trains especially on popular routes
remains full whereas during lean period and on less popular routes, there is
sub-optimal utilization.
To increase the line capacity of Konkan railway route, 08 crossing stations
viz. Sape-Wamane, Kalambani, Kadvai, Veravali, Kharepatan, Achirne,
Indapur & Goregaon Road & 12 additional loop lines viz Vinhere, Anjani,
Savarda, Adavali, Rajapur Road, Vaibhavwadi Road, Kankavali, Sawantvadi
Road (2), Karanjadi, Madgaon and Chiplun have also been constructed over
Konkan Railway route between Roha to Madgaon during the last 10 years.
Out of the 739-route km of Konkan Railway jurisdiction, doubling of
about 55 km between Roha- Veer and Madgaon-Majorda sections has
already been completed. The work of preparation of feasibility survey for
doubling of identified sections (263 km) to increase the capacity of route
has been sanctioned.
Presently there are 57 pairs of Mail/Express/Passenger trains operating over
Konkan Railway. Most of mail/express trains are running with full load. The
details of trains operating over Konkan Railway are as under:
SN Train No. & Train Name
1 10103/10104 Mandovi Express
2 10105/10106 Diva β Sawantwadi Express
3 10107/10108 Madgaon β Mangaluru MEMU Express
4 10109/10110 Madgaon β Karwar Express
5 10115/10116 Bandra (T) β Madgaon Express
6 10215/10216 Madgaon β Ernakulam SF Express
Page 2 of 77 11003/11004 Tutari Express
8 11097/11098 Poorna Express
9 11099/11100 Lokmanya Tilak (T) β Madgaon Express
10 11203/11204 Nagpur β Madgaon Express
11 12051/12052 Jan Shatabdi Express
12 12133/12134 Chhatrapati Shivaji Maharaj (T) β Mangaluru Jn
Express
13 12201/12202 Lokmanya Tilak (T) β Kochuveli Garib Rath Express
14 12217/12218 Kerala Sampark Kranti Express
15 12223/12224 Ernakulam Jn β Lokmanya Tilak (T) Duronto Express
16 12283/12284 Hazrat Nizamuddin β Ernakulam Jn Duronto Express
17 12431/12432 Thiruvananthapuram Central β Hazrat Nizamuddin
Rajdhani Express
18 12449/12450 Goa Sampark Kranti Express
19 12483/12484 Kochuveli β Amritsar SF Express
20 12617/12618 Mangala Lakshadweep Express
21 12619/12620 Matsyagandha Express
22 12741/12742 Vasco de Gama β Patna SF Express
23 12789/12790 Kacheguda β Kumta SF Express
24 12977/12978 Marusagar SF Express
25 16311/16312 Shri Ganganagar β Thiruvananthapuram North Express
26
16333/16334 Veraval β Thiruvananthapuram Central Express
Page 3 of 727 16335/16336 Gandhidham β Nagercoil Express
28 16337/16338 Okha β Ernakulam Express
29 16345/16346 Netravati Express
30 16515/16516 Karwar β Yesvantpur Express
31 16585/16586 SMVT Bengaluru β MurdeshwarExpress
32 16595/16596 Panchaganga SF Express
33 19057/19058 Surat β Mangaluru Jn Express
34 19259/19260 Bhavnagar (T) β Thiruvananthapuram North Express
35 19577/19578 Tirunelveli β Jamnagar Express
36 20111/20112 Konkankanya Express
37 20645/20646 Madgaon β Mangaluru Central Vande Bharat
38 20909/20910 Thiruvananthapuram North β Porbandar SF Express
39 20923/20924 Gandhidham β Tirunelveli Humsafar Express
40 20931/20932 Thiruvananthapuram North- Indore SF Express
41 22113/22114 Lokmanya Tilak (T) β Thiruvananthapuram North SF
Express
42 22115/22116 Lokmanya Tilak (T) β Karmali SF Express
43 22119/22120 Chhatrapati Shivaji Maharaj (T) β Madgaon Tejas
Express
44 22149/22150 Ernakulam β Pune SF Express
45 22229/22230 Chhatrapati Shivaji Maharaj (T) β Madgaon Vande
Bharat Express
46 22413/22414 Madgaon β Hazrat Nizamuddin Rajdhani Express
Page 4 of 747 22475/22476 Hisar β Coimbatore SF Express
48 22629/22630 Lokmanya Tilak (T) β Tirunelveli SF Express
49 22633/22634 Thiruvananthapuram Central β Hazrat Nizamuddin SF
Express
50 22653/22654 Thiruvananthapuram Central β Hazrat Nizamuddin SF
Express
51 22655/22656 Ernakulam β Hazrat Nizamuddin SF Express
52 22659/22660 Thiruvananthapuram North β Yog Nagari Rishikesh SF
Express
53 22907/22908 Madgaon β Hapa SF Express
54 50103/50104 Diva β Ratnagiri Passenger
55 50107/50108 Sawantwadi β Madgaon Passenger
56 70101/70102 Madgaon β Karwar Passenger (MEMU)
57 56615/56616 Madgaon β Mangaluru Passenger
In addition to this, during various festivals, summer vacation and long
weekends, 381 Ganpati, 249 Summer, 148 Winter & 1366 other Specials were
run during 2025-26 to clear the extra rush of passengers on Konkan Railway.
Non AC coaches on IR ( General and Sleeper)
Indian Railways (IR), continuously monitor the demand pattern and makes
consistent efforts to cater to the needs of travelling passengers by
introducing new trains, extending and increasing the frequencies of existing
trains. Loads of existing trains are also augmented, both on temporary and
permanent basis, to enhance the accommodation available for passengers.
Page 5 of 7With a view to meet the demand of passengers travelling in unreserved
coaches, Indian Railways (IR) have significantly increased the facilities for
passengers demanding general class travel.
During the financial year 2024-25 alone, 1250 general coaches have been
utilised in various long-distance trains to have at least 4 general class
coaches. Similarly, during the year 2025-26 about 870 Coaches including 160
General Class have been utilised for permanent augmentation. This includes
trains operated on Konkan railway line also.
To cater to the travel demand of the low and middle income families, Indian
Railways (IR) have taken up manufacturing of 17,000 non-AC coaches
(general/sleeper).
On Indian Railways, the percentage of non-AC coaches is about 70%, while
the percentage of non-AC seats is around 78% as compared to AC seats
which is around 22%. The details are as under:
Table 1: Distribution of Coaches:
Type of Coaches No. of Coaches Percentage
Non-AC coaches (general and sleeper) ~62,000 ~70%
AC coaches ~27,000 ~30%
Total coaches ~89,000 100%
Table 2: Distribution of Seats:
Type of Seats Number of Seats Percentage
Non-AC Seats ~54 lakhs ~78%
AC Seats ~15 lakhs ~22%
Total Seats ~69 lakhs 100%
Page 6 of 7Waiting list pattern is monitored on regular basis. To cater to additional
demand, various steps are taken such as running special trains, introduction
of new trains, increase in frequency/extension of existing trains,
augmentation of loads of existing trains on permanent basis etc. subject to
operational feasibility. Further, waiting list limits have also been rationalised
linking it to the extent of accommodation of that class available in that train.
Proposals/ requests/ suggestions/ representations, both formal and informal
inter alia for augmentation of trains are received from Members of
Parliament, elected representatives, organizations/rail users etc. at various
levels including Railway Board, Zonal Railways, Divisional Office etc. The
receipt of such proposals/ requests/ suggestions is a continuous and
dynamic process. These are examined and action as found feasible and
justified is taken from time to time, which is an on-going process.
*****
Page 7 of 7