Executive Summary:
This document responds to a parliamentary question regarding the Mohanlalganj crossing overbridge project, railway projects in the Mohanlalganj Lok Sabha Constituency, and station redevelopment under the Amrit Bharat Station Scheme. It details the status of ongoing and planned infrastructure projects, including ROBs/RUBs and station upgrades, while addressing factors affecting project timelines. No specific deadlines are provided due to the variable nature of project completion.
Key Points / Main Content:
Road Over Bridges/Road Under Bridges (ROBs/RUBs)
* Sanctioning and execution of ROBs/RUBs is a continuous process, prioritized based on impact on safety, mobility, and road users.
* From 2014 to June 2025, 13,426 ROBs/RUBs were constructed on Indian Railways, including 1649 in Uttar Pradesh.
* As of 01.04.2025, 4,402 ROBs/RUBs are sanctioned at a cost of ₹1,00,860 crore on Indian Railways, including 736 in Uttar Pradesh at a cost of ₹14,022 crore.
* Nine ROB/RUB works are sanctioned in the Mohanlalganj Lok Sabha Constituency at a cost of ₹184 crore, currently in various stages of planning and execution.
* A Technical Feasibility Report/Detailed Project Report (TFR/DPR) is planned for LC No. 196 C between Mohanlalganj-Kankaha station on the Mohanlalganj-Sultanpur section. Further action will be taken after its finalization.
Amrit Bharat Station Scheme
* The Amrit Bharat Station Scheme aims to enhance customer experience and provide better amenities through station redevelopment.
* Master plans are prepared and implemented in phases, including improvements to station access, integration with the city, building upgrades, and enhanced passenger amenities.
* 1337 stations have been identified for development under the scheme, with 157 in Uttar Pradesh, including Mohanlalganj and Utraitia Junction stations in Mohanlalganj Lok Sabha Constituency.
* Phase I works have been completed at 20 stations in Uttar Pradesh.
* At Mohanlalganj station, works include platform shelter, station building improvement, circulating area, parking, platform surfacing, toilets, and Divyangjan facilities.
* At Utraitia Junction station, works include main and second entry station buildings, platform shelter, circulating area, parking, toilet, and Divyangjan facilities.
Factors Affecting Project Timelines
* Completion depends on land acquisition, forest clearance, utility shifting, statutory clearances, geological conditions, law and order, and working months available.
* Development and upgradation of railway stations is complex in nature involving safety of passengers trains and requires various statutory clearances
* Progress is also affected by brownfield challenges such as shifting of utilities and operational constraints.
* Due to these factors, no specific time frame can be indicated for project completion.
Impact Analysis:
State Government:
* Impact: Required to facilitate land acquisition and provide necessary clearances.
* Action Required: Expedite land acquisition processes and ensure timely forest clearances.
Railway Authorities:
* Impact: Responsible for the planning, execution, and monitoring of ROB/RUB projects and station redevelopment.
* Action Required: Prioritize projects based on safety and mobility, conduct feasibility studies, and manage project execution effectively.
Citizens/Road Users:
* Impact: Benefit from improved safety, reduced congestion, and enhanced station amenities.
* Action Required: None specified.
Passengers/Station Users:
* Impact: Benefit from upgraded station facilities and improved access.
* Action Required: None specified.
Key Entities Referenced
Mohanlalganj Lok Sabha Constituency, Uttar Pradesh: A parliamentary constituency in Uttar Pradesh where railway projects are being undertaken.
Ministry of Railways: The Indian government ministry responsible for the railway sector.
SHRI ASHWINI VAISHNAW: Minister of Railways, Information Broadcasting and Electronics Information Technology.
Indian Railways: The state-owned railway company of India.
Amrit Bharat Station Scheme: A scheme by Indian Railways for the redevelopment and modernization of railway stations.
Road Over Bridges Road Under Bridges ROBsRUBs: Infrastructure projects undertaken by Indian Railways to improve safety and mobility.
Lucknow Raibarely Rail path: A railway route where an overbridge is proposed at Mohanlalganj crossing.
Utraitia Junction station, Uttar Pradesh: A railway station in Uttar Pradesh which is part of the Amrit Bharat Station Scheme.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO.4491
TO BE ANSWERED ON 20.08.2025
OVERBRIDGE ON MOHANLALGANJ CROSSING
4491. SHRI R K CHAUDHARY:
Will the Minister of RAILWAYS be pleased to state:
(a) whether it is a fact that work related to Overbridge on
Mohanlalganj crossing at Mohanlalganj Gosaiganj road (railway
crossing at Lucknow Raibarely Rail path) has not been
commenced yet though it has been aproved and survey for the
same has also been done and if so, the reasons therefor;
(b) the timeline by which it is likely to be started; and
(c) the details of approved railway projects in Mohanlalganj Lok
Sabha Constituency of Uttar Pradesh?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (c) : Sanctioning and execution of works of Road Over Bridges/
Road Under Bridges (ROBs/RUBs) is a continuous and ongoing
process on Indian Railways. Such works are prioritized and taken up
on the basis of its impact on safety and mobility in train operations
and impact on road users.
Nos. of ROBs/ RUBs constructed on Indian Railways during the
period 2004-14 vis a vis 2014-25 (June’25) is as under:
Period ROBs/ RUBs constructed
2004-14 4,148 Nos.2014-25 (June’25) 13,426 Nos. (including 1649 Nos. in
the State of Uttar Pradesh)
As on 01.04.2025, 4,402 Nos. ROBs/ RUBs are sanctioned at the
cost of ₹ 1,00,860 Cr on Indian Railways including 736 Nos. Road
Over Bridge (ROB)/Road Under Bridge (RUB) at the cost of ₹ 14,022
crore in the State of Uttar Pradesh.
Presently, 9 Nos. works of ROBs/RUBs at a cost of ₹ 184 crore
are sanctioned in Mohanlalganj Lok Sabha Constituency, which are
at various stages of planning and execution.
There is a LC No. 196 C between Mohanlalganj-Kankaha station
on Mohanlalganj-Sulatnapur section. It is planned to be take up the
work of preparation of Technical Feasibility Report / Detailed Project
Report (TFR / DPR) for the construction of ROB/RUB at this location.
Further action will be taken up after finalization of Technical
Feasibility Report / Detailed Project Report (TFR / DPR).
Station redevelopment:
Upgradation / Modernisation of stations on Indian Railways is a
continuous and ongoing process and works in this regard are
undertaken as per requirement, inter-se priority, availability of
funds. The priority for development / redevelopment / upgradation /
modernisation of stations is accorded to higher category of station
over lower category of station while sanctioning and executing the
works.
To enhance customer experience and provide better amenities,
Indian Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.The scheme involves preparation of master plans and their
implementation in phases to improve the stations. The master
planning includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement,
water booths
Provision of wider foot over bridge/air concourse
commensurate with passenger traffic
Provision of lift/escalators/ramp
Improvement /Provision of platform surface and cover over
platforms
Provision of kiosks for local products through schemes like
‘One Station One Product’
Parking areas, Multimodal integration
Amenities for Divyangjans
Better passenger information systems
Provision of executive lounges, nominated spaces for business
meetings, landscaping, etc. keeping in view the necessity at
each station
The scheme also envisages sustainable and environment
friendly solutions, provision of ballastless tracks etc. as per
necessity, phasing and feasibility and creation of city centre at the
station in the long term.
So far, 1337 stations have been identified for development
under Amrit Bharat Station Scheme, out of which 157 stations,
including Mohanlalganj and Utraitia Junction stations ofMohanlalganj Lok Sabha Constituency, are located in the state of
Uttar Pradesh.
Development works at railway stations under Amrit Bharat
Station Scheme in the state of Uttar Pradesh have been taken up at
a good pace. Till now, phase-I works of 20 stations (Ayodhya Dham,
Balrampur, Bareilly City, Bijnor, Fatehabad, Gola Gokarnath,
Gomtinagar, Govardhan, Govindpuri, Hathras City, Idgah Agra Jn,
Izzatnagar, Mailani, Pokhrayan, Ramghat Halt, Saharanpur Jn.,
Siddharth nagar, Suraimanpur, Swaminarayan Chappia, Ujhani) in
the state of Uttar Pradesh have been completed under this scheme.
The status of works at Mohanlalganj and Utraitia Junction
stations of Mohanlalganj Lok Sabha Constituency is as given below:
Mohanlalganj station: The works of platform shelter, improvement
of station building, circulating area, parking area, platform
shelter, platform surfacing, toilets and Divyangjan facilities have
been taken up.
Utraitia Junction station: The works of main entry station
building, second entry station building, platform shelter,
circulating area, parking area, toilet and Divyangjan facilities
have been taken up.
Development / upgradation of railway stations is complex in
nature involving safety of passengers & trains and requires various
statutory clearances such as fire clearance, heritage, tree cutting,
airport clearance etc. The progress also gets affected due to
brownfield related challenges such as shifting of utilities (involving
water/sewage lines, optical fibre cables, gas pipe lines,
power/signal cables, etc.), infringements, operation of trains without
hindering passenger movement, speed restrictions due to works
carried out in close proximity of tracks and high voltage powerlines, etc. and these factors affect the completion time. Therefore,
no time frame can be indicated at this stage.
Completion & commissioning of Railway project/s including
ROBs/RUBs works depends on following factors:-
Land acquisition by State Government,
Forest clearance by officials of forest department,
Shifting of infringing utilities,
Statutory clearances from various authorities,
Geological and topographical conditions of area,
Law and order situation in the area of project/s site,
Number of working months in a year for particular project site
etc.
*****