**Executive Summary**
This report addresses overcrowding in the Central and Western Railways' suburban train network in Mumbai as raised in Lok Sabha Unstarred Question No. 659 to be answered on 03.12.2025. It details steps taken to meet increasing demand, augment rail network capacity, improve signaling, enhance passenger amenities, and increase passenger safety. Key actions include operating more services, sanctioning urban transport projects, implementing safety measures, and utilizing technology for monitoring and improving rail operations.
**Key Points / Main Content**
* **Suburban Services and Capacity Augmentation:**
* Western Railway operates 1406 services (109 AC), Central Railway operates 1810 services (80 AC).
* 15-car services increased from 79 to 211 after platform extensions.
* New train introductions depend on factors like capacity, path availability, rolling stock, and maintenance requirements.
* **Mumbai Urban Transport Projects (MUTP):**
* MUTP-II (₹8,087 crore), MUTP-III (₹10,947 crore), and MUTP-IIIA (₹33,690 crore) have been sanctioned for various projects.
* Key projects include:
* 6th Line Mumbai Central-Borivali (30 km) - ₹919 crore
* Extension of Harbour Line Goregaon-Borivali (7 km) - ₹826 crore
* Virar-Dahanu Road 3rd & 4th Line (64 km) - ₹3587 crore
* 5th & 6th Line CSTM-Kurla (17.5 km) - ₹891 crore
* Panvel-Karjat Suburban Corridor (29.6 km) - ₹2782 crore
* Airoli-Kalwa (elevated) Suburban Corridor link (3.3 km) - ₹476 crore
* 5th & 6th line Borivali-Virar (26 km) - ₹2184 crore
* 4th line between Kalyan-Asangaon (32 km) - ₹1759 crore
* 3rd & 4th line between Kalyan-Badlapur (14.05 km) - ₹1510 crore
* Kalyan Yard-Segregation of Main Line & Suburban - ₹866 crore
* Vasai bye pass line (Double line) between Naigaon and Juchandra (5.73 km) - ₹176 crore
* Trespass Control such as FOBs etc. (34 locations) - ₹551 crore
* **Rolling Stock and Signalling Improvements:**
* 238 rakes of 12 cars sanctioned under MUTP-III & IIIA (₹19,293 crore).
* 17 AC EMUs with Automatic Door Closure System are operating.
* Non-AC EMU rakes with Automatic Doors Closure mechanism are being developed.
* Signalling system improvements include remodeling works, Electronic Interlocking at stations, and Reliability Enhancement measures.
* **Passenger Amenities and Safety Measures:**
* Provisions for Escalators, Elevators, Platform Extensions, Skywalks, FOBs, Improved signages, lighting and ventilation are being made.
* 142 lifts and 237 escalators have been provided.
* Consequential Train Accidents have reduced from 135 in 2014-15 to 31 in 2024-25 and further to 11 in 2025-26.
* Accidents Per Million Train Kilometer (ΑΡΜΤKM) reduced from 0.11 in 2014-15 to 0.03 in 2024-25 (73% improvement).
* **Expenditure on Safety-Related Activities:**
* Increased from ₹39,463 Cr (2013-14) to ₹1,16,470 Cr (2025-26).
* **Safety Enhancements:**
* Electrical/Electronic Interlocking Systems provided at 6,656 stations by 31.10.2025.
* Interlocking of Level Crossing (LC) Gates at 10,098 gates by 31.10.2025.
* Complete Track Circuiting at 6,661 stations by 31.10.2025.
* Kavach (Automatic Train Protection system) implementation is underway.
* **Other Safety Measures:**
* Vigilance Control Devices (VCD) in all locomotives.
* Fog Safety Device (FSD) for loco pilots.
* Modern track structure and mechanization of track laying.
* Ultrasonic Flaw Detection (USFD) testing.
* Web-based online monitoring of track assets.
* Replacement of conventional ICF design coaches with LHB design coaches.
* Elimination of unmanned level crossings (UMLCs) on Broad Gauge (BG) route.
* Implementation of Rolling Block concept, staff training, fire safety measures.
* **Safety in Mumbai Suburban Network:**
* Coordination with GRP/State Police for crowd management.
* Deployment of GRP & RPF staff, frequent announcements, and awareness videos.
* Use of CCTV surveillance, social media engagement, and flex boards for public safety.
**Impact Analysis**
**Commuters of Mumbai**
* **Impact:** Reduced overcrowding and improved safety of suburban rail travel via increased train frequency, enhanced amenities, and state-of-the-art safety systems.
* **Action Required:** Be aware of safety measures, follow instructions at stations, and utilize available channels for reporting security concerns.
**Ministry of Railways**
* **Impact:** Oversight and responsibility for successful project completion, budget management, and ensuring enhanced service delivery.
* **Action Required:** Monitor MUTP projects and safety measures for Mumbai Suburban Railway, allocate resources efficiently, and enforce safety standards.
**Central and Western Railway Administration**
* **Impact:** Managing increased services, implementing new infrastructure, and ensuring the effectiveness of safety measures in reducing accidents.
* **Action Required:** Execute MUTP projects, modernize signalling, maintain assets, and enhance passenger amenities while enforcing safety protocols and training staff.
**Local Law Enforcement (GRP/State Police)**
* **Impact:** Enhanced coordination and resource deployment for crowd management and security in Mumbai Suburban Railway.
* **Action Required:** Coordinate with railways for crowd management, deploy personnel at sensitive locations, and respond to security incidents effectively.
Key Entities Referenced
Ministry of Railways: The Indian government ministry responsible for the country's railway network.
Mumbai Urban Transport Project (MUTP): A project aimed at improving and augmenting the capacity of the rail network in the Mumbai suburban area.
Kavach: A National ATP (Automatic Train Protection) system to improve railway safety.
Central Railway: One of the 19 zones of Indian Railways, responsible for operating suburban trains in Mumbai.
Western Railway: One of the 19 zones of Indian Railways, responsible for operating suburban trains in Mumbai.
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 659
TO BE ANSWERED ON 03.12.2025
OVERCROWDING IN SUBURBAN TRAINS UNDER CENTRAL AND WESTERN
RAILWAY
659. PROF. VARSHA EKNATH GAIKWAD:
SHRI SANJAY DINA PATIL:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government is aware of severe overcrowding and congestion
in suburban trains operating under Central and Western Railway in
Mumbai;
(b) if so, the average number of passengers travelling per coach against the
prescribed capacity during peak hours;
(c) whether the Government has conducted any study to assess the demand-
supply gap and proposes to introduce additional services, extended rakes
or new coaches to ease congestion and if so, the details thereof;
(d) whether any projects have been approved to expand track capacity,
modernise signalling and segregate suburban and long-distance rail traffic
and if so, the details thereof;
(e) the details and present status of such projects including assistance from
international agencies; and
(f) the measures taken/being taken to enhance passenger safety including
construction of foot overbridges, escalators, lifts and improved crowd
management systems at suburban stations?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (f): To address the increasing demand over the suburban railway network
in Mumbai area, following steps have been taken:-I. To cater to the needs of the commuters of Mumbai, Suburban services
including AC-EMUs are being operated. At present Western Railway runs 1406
services including 109 AC services, while Central Railway runs 1810 services
including 80 AC services.
After extension of all platforms on the slow corridor between Virar and Andheri,
the numbers of 15 car services have been increased from 79 to 211 in a phased
manner.
Besides, introduction of new trains including suburban services on any
route/section depends on various factors which include:
Capacity of that section
Availability of path
Availability of required rolling stock
Availability of matching infrastructure for rolling stock
Maintenance requirement of railway tracks and other assets
II. To improve and augment the capacity of rail network in Mumbai suburban
area, Mumbai Urban Transport Project (MUTP)-II costing ₹8,087 crore, MUTP-III
costing ₹10,947 crore and MUTP-IIIA costing ₹33,690 crore have been
sanctioned. These projects include following works in Mumbai Suburban Area:
SN Name of project Cost
(₹ in crore)
1 6th Line Mumbai Central-Borivali (30 km) 919
2 Extension of Harbour Line Goregaon-Borivali (7 km) 826
3 Virar-Dahanu Road 3rd & 4th Line (64 km) 3587
4 5th & 6th Line CSTM-Kurla (17.5 km) 891
5 Panvel-Karjat Suburban Corridor (29.6 km) 2782
6 Airoli-Kalwa (elevated) Suburban Corridor link (3.3 km) 476
7 5th & 6th line Borivali-Virar (26 km) 2184
8 4th line between Kalyan-Asangaon (32 km) 1759SN Name of project Cost
(₹ in crore)
9 3rd & 4th line between Kalyan-Badlapur (14.05 km) 1510
10 Kalyan Yard-Segregation of Main Line & Suburban 866
11 Vasai bye pass line (Double line) between Naigaon and 176
Juchandra (5.73 km)
12 Trespass Control such as FOBs etc. (34 locations) 551
Also, a total of 238 rakes of 12 cars have been sanctioned under MUTP-III & IIIA
at a cost of ₹19,293 crore. The process for procurement of these rakes has been
taken up.
Presently, 17 rakes of AC EMUs with Automatic Door Closure System are
operating on Mumbai Suburban Network. A decision has been taken for
development of two Non-AC EMU rakes with Automatic Doors Closure
mechanism, by ICF, Chennai. These EMU rakes shall have Automatic Doors,
Vestibules, Roof Mounted Ventilation Unit and Doors with Louvers for air
circulation.
III. Following steps have been taken to improve signaling system and increasing
capacity:
1. Remodelling works in connection with increase in number of coaches from
12 to 15 on suburban trains for CSMT – Kalyan Section of Central Railway
has been sanctioned.
2. Existing Signalling system is being replaced by Electronic Interlocking at 7
stations (Dadar, Lower Parel, Marine lines, Charni Road, Ram Mandir,
Churchgate and Bandra Terminus) of Western Railway. Out of this
Electronic Interlocking work at Lower Parel has been commissioned and
work is in progress at Dadar.
3. Reliability Enhancement measures like provision of dual detection systems
are being provided at Bhayander, Naigoan, Mahim, Prabhadevi and Dahanu
Road stations of Western Railway and work is in progress.IV. For ease of passenger, different amenities like Escalators, Elevators,
Platform Extensions, Skywalks/ Highwalks, Elevated Decks, new FOBs,
interconnection with FOBs, improved signages, lighting and ventilation etc, are
being provided under various works of MUTP III and IIIA. Accordingly, 142 lifts
and 237 escalators have been provided at 84 suburban railway stations over
Central and Western Railway.
V. Safety is accorded the highest priority on Indian Railways. As a consequence
of various safety measures taken over the years, there has been a steep decline
in the number of accidents. Consequential Train Accidents have reduced from
135 in 2014-15 to 31 in 2024-25 as shown in the graph below.
It may be noted that the Consequential Train Accidents during the period 2004-
14 was 1711 (average 171 per annum), which has declined to 31 in 2024-25 and
further to 11 in 2025-26 (upto November, 2025).
Another important index showing improved safety in train operations is
Accidents Per Million Train Kilometer (APMTKM) which has reduced from 0.11 in
2014-15 to 0.03 in 2024-25, indicating an improvement of approx. 73% during the
said period.
234
165
135
55 48
40
31
35
22
11
2005-06 2009-10 2014-15 2019-20 2020-21(Covid 2021-22(Covid 2022-23 2023-24 2024-25 2025-26(upto
Year) Year) Nov)
The various safety measures taken to enhance safety in train operations are as
under:-
stnediccA
niarT
laitneuqesnoC
fo
.oN1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities (Rs. in Cr.)
2013-14 2022-23 2023-24 2024-25 2025-26
(Act.) (Act.) (Act.)
39,463 87,327 1,01,651 1,14,022 1,16,470
2. Electrical/Electronic Interlocking Systems with centralized operation of
points and signals have been provided at 6,656 stations up to 31.10.2025 to
reduce accident due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,098 Level
Crossing Gates up to 31.10.2025 for enhancing safety at LC Gates.
4. Complete Track Circuiting of stations to enhance safety by verification of
track occupancy by electrical means has been provided at 6,661 stations up
to 31.10.2025.
5. Kavach is a highly technology intensive system, which requires safety
certification of highest order. Kavach was adopted as a National ATP system
in July 2020. Kavach is provided progressively in phased manner. Initially,
Kavach Version 3.2 was deployed on 1465 RKm of South Central Railway and
80 RKm of North Central Railway. Kavach specification Version 4.0 was
approved by RDSO on 16.07.2024.
After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on Palwal-Mathura-Kota- Nagda section (633
RKm) on Delhi- Mumbai route and on Howrah-Bardhaman section (105 RKm)
on Delhi-Howrah route. Kavach implementation has been taken up in balance
sections of Delhi-Mumbai and Delhi-Howrah route.
Further, Kavach implementation has been taken up on 15,512 RKm covering
all Golden Quadilateral (GQ), Golden Diagonal (GD), High Density Network
(HDN) and identified sections of Indian Railways.6. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol, preparation of
completion drawing, etc. have been issued.
7. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
8. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
9. Retro-reflective sigma boards are provided on the mast which is located two
OHE masts prior to the signals in electrified territories to alert the crew
about the signal ahead when visibility is low due to foggy weather.
10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength
(UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers
with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel
Channel/H-beam Sleepers on girder bridges is used while carrying out
primary track renewals.
12. Mechanisation of track laying activity through use of track machines like
PQRS, TRT, T-28 etc. to reduce human errors.
13. Maximizing supply of 130m/260m long rail panels for increasing progress of
rail renewal and avoiding welding of joints, thereby improving safety.
14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely
removal of defective rails.
15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and
adoption of better welding technology for rails i.e., Flash Butt Welding.
16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and
TRC (Track Recording Cars).
17. Patrolling of railway tracks to look out for weld/rail fractures.18. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
19. Inspections at regular intervals are carried out to monitor and educate staff
for observance of safe practices.
20. Web based online monitoring system of track assets viz. Track database and
decision support system has been adopted to decide rationalized
maintenance requirement and optimize inputs.
21. Detailed instructions on issues related with safety of Track, e.g. integrated
block, corridor block, worksite safety, monsoon precautions, etc. have been
issued.
22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken
to ensure safe train operations.
23. Replacement of conventional ICF design coaches with LHB design coaches
is being done.
24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been
eliminated by January 2019.
25. Safety of Railway Bridges is ensured through regular inspection of Bridges.
The requirement of repair/rehabilitation of Bridges is taken up based upon
the conditions assessed during these inspections.
26. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in every
coach so as to educate and alert passengers regarding various Do’s and
Don’ts to prevent fire. These include messages regarding not carrying any
inflammable material, explosives, prohibition of smoking inside the coaches,
penalties etc.
27. Production Units are providing Fire detection and suppression system in
newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection
system in newly manufactured coaches. Progressive fitment of the same in
existing coaches is also underway by Zonal Railways in a phased manner.28. Regular counselling and training of staff is undertaken.
29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General
Rules vide Gazette notification dated 30.11.2023, wherein work of integrated
maintenance/ repair/replacement of assets is planned up to 52 weeks in
advance on rolling basis and executed as per plan.
30. The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2014-15 to 2024-
2004-05 to 2014-25 Vs.
S.N. Item 25
2013-14 2004-14
Technological Improvements
1. Use of high-quality rails 57,450 Km 1.43 Lakh Km More than 2
(60 Kg) (Km) times
2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8 times
(260m) (Km)
3. Electronic Interlocking 837 Stations 3,691 Stations More than 4
(Stations) times
4. Fog Pass Safety As on As on 31.03.25: 288 times
Devices (Nos.) 31.03.14: 25,939 Nos.
90 Nos.
5. Thick Web Switches Nil 28,301 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 49,941 Km 1.5 times
(Track Km)
2. USFD (Ultra Sonic Flaw 79.43 Lakh 2 Crore More than 2
detection) Testing of times
Welds (Nos.)
3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % reduction
3699 Nos. 370 Nos.
4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than 88%
2548 Nos. 289 Nos. reductionBetter Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 34,428 Km More than 2
(Track Km) times
2. Flyovers (RoBs)/ 4,148 Nos. 13,808 Nos. More than 3
times
Underpasses (RUBs)
(Nos.)
3. Unmanned Level As on As on 31.03.24: Removed
crossings 31.03.14: Nil
(Nos.) on BG 8,948 (All eliminated by
31.01.19)
4. Manufacture of LHB 2,337 Nos. 42,677 More than 18
Coaches (Nos.) times
VI. The following steps are taken for safety of passengers in Mumbai Suburban
Railway network: -
1. Coordination with GRP/State Police are made for ensuring crowd
management.
2. GRP & RPF staff is deployed at foot-over bridges and other sensitive
locations to regulate crowd smoothly in order to avoid stampede like
situation during the heavy rush period and render real time assistance to
passengers.
3. Frequent announcement is made at railway stations using Public
Announcement systems as well as through Loud Hailers cautioning
passengers against crossing tracks, boarding moving trains and travelling
on footboards/rooftops.
4. Short videos for passenger awareness are also displayed in Rail Display
Network at railway station.
5. Intelligence units(CIB/SIB) and plain cloth staff are deployed for collection
of information regarding rush. Accordingly arrangements are made
associating GRP/Police.6. State Level Security Committee of Railways (SLSCR) under the
chairmanship of DGP have been constituted of the state for regular
monitoring and review of security arrangements of the Railways.
7. For immediate assistance, passengers can make complaint on Rail Madad
Portal directly or through Helpline Number 139 [integrated with Emergency
Response Support System (ERSS) No.112].
8. Railways are in regular touch with passengers through various social media
platforms like Twitter & Facebook etc. to enhance security of passengers
and to address their security concern.
9. Surveillance is kept through CCTV cameras provided at Railway stations
and in coaches for enhanced security of passengers.
10. Various awareness and sensitization campaigns are conducted by railways
using social media, digital & print media.
11. Flex boards in both Hindi & Marathi languages have been installed at
vulnerable locations of trespassing to caution the passengers/public against
crossing railway tracks.
12. Legal action is taken against persons travelling on train rooftops,
footboards and other restricted places of the train formation.
******