GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
STARRED QUESTION NO. 341
TO BE ANSWERED ON 12.08.2026
PASSENGER AMENITIES AT BADLAPUR RAILWAY STATION IN
MAHARASHTRA
†*341. SHRI BALYA MAMA SURESH GOPINATH MHATRE:
Will the Minister of RAILWAYS be pleased to state:
(a) whether there is a need to improve passenger amenities and suburban
local train services at Badlapur Railway Station in Maharashtra; and
(b) if so, the details of the step taken/being taken by the Government to
augment passenger amenities and improve suburban local train
services at said Railway Station?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) and (b): A Statement is laid on the Table of the House.
*****
§STATEMENT REFERRED TO IN REPLY TO PARTS (a) AND (b) OF STARRED
QUESTION NO.341 TO BE ANSWERED ON 12.08.2026 IN LOK SABHA
(a) & (b): The existing infrastructural facilities and passenger amenities
available at Badlapur railway station are as under:
S.No Passenger Description
Amenities
1 Platforms All 3 high level platforms of 330m
length
2 COP (Cover Over Available at all 3 platforms
Platform)
3 FOB (Foot Over Two FOBs of 12 mts width and 1
Bridge)
FOB of 6 mts width
4 Deck 152 mtr long connecting middle of
FOB to Kalyan end FOB
5 Escalators 5 Escalators
6 Lifts 1 lift
7 Skywalk 120 mtr long connected to FOBs on
west side of station.
Further following works have also been taken up at Badlapur railway
station:
S.No. Item
1 Construction of 100 m long platform shelter over Platform No. 2.
2 Construction of a skywalk connecting the Kalyanend Foot Over
Bridge with the east side Municipal skywalk.
3 Installation of 3 additional escalators.
4 Installation of 3 additional elevators.
5 Construction of a new toilet block outside Platform No. 1.
6 Construction of an additional 6 m wide Foot Over Bridge at the
Kalyan end.
Page 1 of 26Connectivity
Badlapur is an existing station on Indian Railway Network. To further
improve the connectivity and enhance the capacity at Badlapur, following
works have been sanctioned:-
S.No. Project Cost Status
(₹ in crore)
1. Kalyan – 1,510 1 out of 2 major bridges
Badlapur 3rd & completed.
4th Line (14 2 out of 4 ROBs completed.
Km) 30 out of 40 minor bridges
completed.
2. Badlapur – 1,324 The project has been sanctioned
Karjat 3rd & 4th at a cost of ₹1,324 crore
Line (32 Km) recently.
Work of Design and drawings
has been taken up.
3. Kalyan – 836 Land acquisition has been taken
Murbad New up.
Line (28 Km)
Train Services at Badlapur Station
To cater to the sub-urban passengers, presently, 3234 EMU sub-urban
services which include both non-AC and AC EMU services are operated by
the Western Railway and the Central Railway. Western Railway operates
1414 services including 145 AC EMU services while Central Railway
operates 1820 services including 120 AC EMU services. Badlapur station
which comes under the jurisdiction of Central Railway, is presently served
by 148 EMU services including 78 EMU services originating/terminating
from/at Badlapur.
Page 2 of 26List of trains serving Badlapur is as under:
SN Train No. and Name SN Train No. and Name
1 95001 Kalyan-Palasdhari EMU 21 95107 Kalyan-Karjat EMU
2 95002 Palasdhari-Kalyan EMU 22 95108 Karjat-Kalyan EMU
3 95003 Kalyan-Palasdhari EMU 23 95109 Kalyan-Karjat EMU
4 95004 Palasdhari-Kalyan EMU 24 95110 Karjat-Kalyan EMU
5 95005 Kalyan-Palasdhari EMU 25 95111 Kalyan-Karjat EMU
6 95006 Palasdhari-Kalyan EMU 26 95112 Karjat-Kalyan EMU
7 95007 Kalyan-Palasdhari EMU 27 95113 Kalyan-Karjat EMU
8 95008 Palasdhari-Kalyan EMU 28 95114 Karjat-Kalyan EMU
9 95009 Kalyan-Palasdhari EMU 29 95115 Kalyan-Karjat EMU
10 95010 Palasdhari-Kalyan EMU 30 95116 Karjat-Kalyan EMU
11 95011 Kalyan-Palasdhari EMU 31 95117 Kalyan-Karjat EMU
12 95012 Palasdhari-Kalyan EMU 32 95118 Karjat-Kalyan EMU
13 95013 Kalyan-Palasdhari EMU 33 95119 Kalyan-Karjat EMU
14 95015 Kalyan-Palasdhari EMU 34 95120 Karjat-Kalyan EMU
15 95101 Kalyan-Karjat EMU 35 95121 Kalyan-Karjat EMU
16 95102 Karjat-Kalyan EMU 36 95122 Karjat-Kalyan EMU
17 95103 Kalyan-Karjat EMU 37 95123 Kalyan-Karjat EMU
18 95104 Karjat-Kalyan EMU 38 95124 Karjat-Kalyan EMU
19 95105 Kalyan-Karjat EMU 39 95125 Kalyan-Karjat EMU
20 95106 Karjat-Kalyan EMU 40 95126 Karjat-Kalyan EMU
Page 3 of 2641 95127 Kalyan-Karjat EMU 63 95208 Badlapur-Kalyan EMU
42 95128 Karjat-Kalyan EMU 64 95209 Kalyan-Badlapur EMU
43 95129 Kalyan-Karjat EMU 65 95210 Badlapur-Kalyan EMU
44 95130 Karjat-Kalyan EMU 66 95211 Kalyan-Badlapur EMU
45 95131 Kalyan-Karjat EMU 67 95212 Badlapur-Kalyan EMU
46 95132 Karjat-Kalyan EMU 68 95213 Kalyan-Badlapur EMU
47 95133 Kalyan-Karjat EMU 69 95214 Badlapur-Kalyan EMU
48 95134 Karjat-Kalyan EMU 70 95215 Kalyan-Badlapur EMU
49 95135 Kalyan-Karjat EMU 71 95216 Badlapur-Kalyan EMU
50 95136 Karjat-Kalyan EMU 72 95217 Kalyan-Badlapur EMU
51 95138 Karjat-Kalyan EMU 73 95218 Badlapur-Kalyan EMU
52 95140 Karjat-Kalyan EMU 74 95219 Kalyan-Badlapur EMU
53 95142 Karjat-Kalyan EMU 75 95220 Badlapur-Kalyan EMU
54 95144 Karjat-Kalyan EMU 76 95221 Kalyan-Badlapur EMU
55 95146 Karjat-Kalyan EMU 77 95222 Badlapur-Kalyan EMU
56 95201 Kalyan-Badlapur EMU 78 95223 Kalyan-Badlapur EMU
57 95202 Badlapur-Kalyan EMU 79 95224 Badlapur-Kalyan EMU
58 95203 Kalyan-Badlapur EMU 80 95225 Kalyan-Badlapur EMU
59 95204 Badlapur-Kalyan EMU 81 95226 Badlapur-Kalyan EMU
60 95205 Kalyan-Badlapur EMU 82 95227 Kalyan-Badlapur EMU
61 95206 Badlapur-Kalyan EMU 83 95228 Badlapur-Kalyan EMU
62 95207 Kalyan-Badlapur EMU 84 95229 Kalyan-Badlapur EMU
Page 4 of 2685 95230 Badlapur-Kalyan EMU 107 96102 Karjat-Kalyan EMU
86 95231 Kalyan-Badlapur EMU 108 96103 Kalyan-Karjat EMU
87 95232 Badlapur-Kalyan EMU 109 96104 Karjat-Kalyan EMU
88 95233 Kalyan-Badlapur EMU 110 96105 Kalyan-Karjat EMU
89 95234 Badlapur-Kalyan EMU 111 96106 Karjat-Kalyan EMU
90 95235 Kalyan-Badlapur EMU 112 96107 Kalyan-Karjat EMU
91 95236 Badlapur-Kalyan EMU 113 96108 Karjat-Kalyan EMU
92 95237 Kalyan-Badlapur EMU 114 96109 Kalyan-Karjat EMU
93 95238 Badlapur-Kalyan EMU 115 96110 Karjat-Kalyan EMU
94 95239 Kalyan-Badlapur EMU 116 96111 Kalyan-Karjat EMU
95 95240 Badlapur-Kalyan EMU 117 96113 Kalyan-Karjat EMU
96 95241 Kalyan-Badlapur EMU 118 96115 Kalyan-Karjat EMU
97 95242 Badlapur-Kalyan EMU 119 96201 Kalyan-Badlapur EMU
98 95243 Kalyan-Badlapur EMU 120 96202 Badlapur-Kalyan EMU
99 95244 Badlapur-Kalyan EMU 121 96203 Kalyan-Badlapur EMU
100 95245 Kalyan-Badlapur EMU 122 96204 Badlapur-Kalyan EMU
101 95246 Badlapur-Kalyan EMU 123 96205 Kalyan-Badlapur EMU
102 95247 Kalyan-Badlapur EMU 124 96206 Badlapur-Kalyan EMU
103 95248 Badlapur-Kalyan EMU 125 96207 Kalyan-Badlapur EMU
104 96019 Kalyan-Palasdhari EMU 126 96208 Badlapur-Kalyan EMU
105 96020 Palasdhari-Kalyan EMU 127 96209 Kalyan-Badlapur EMU
106 96101 Kalyan-Karjat EMU 128 96210 Badlapur-Kalyan EMU
Page 5 of 26129 96211 Kalyan-Badlapur EMU 139 96221 Kalyan-Badlapur EMU
130 96212 Badlapur-Kalyan EMU 140 96222 Badlapur-Kalyan EMU
131 96213 Kalyan-Badlapur EMU 141 96223 Kalyan-Badlapur EMU
132 96214 Badlapur-Kalyan EMU 142 96224 Badlapur-Kalyan EMU
133 96215 Kalyan-Badlapur EMU 143 96225 Kalyan-Badlapur EMU
134 96216 Badlapur-Kalyan EMU 144 96226 Badlapur-Kalyan EMU
135 96217 Kalyan-Badlapur EMU 145 96227 Kalyan-Badlapur EMU
136 96218 Badlapur-Kalyan EMU 146 96228 Badlapur-Kalyan EMU
137 96219 Kalyan-Badlapur EMU 147 96229 Kalyan-Badlapur EMU
138 96220 Badlapur-Kalyan EMU 148 96230 Badlapur-Kalyan EMU
Further, to provide additional accommodation to the passengers,
Central Railway, w.e.f 20.07.2026, has increased the number of Cars in 10
EMU services from 12 Cars to 15 Cars. Of these 10 EMU services, 4
services are also serving the passengers of Badlapur.
Besides, introduction of new train services, including sub-urban
services on various routes/sections, is an on-going process, which depends
on various factors including:
● Capacity of that section
● Availability of path
● Availability of required rolling stock
● Availability of matching infrastructure for rolling stock
● Maintenance requirement of railway tracks and other assets
● Occupancy and the traffic requirement of the section
Page 6 of 26Amrit Bharat Stations:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
This scheme involves preparation of master plans and their
implementation in phases to improve the stations of Indian Railways. The
master planning, keeping in view the necessity of each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface and provision of platform shelter
Provision of kiosks for local products through scheme like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal
integration, landscaping, etc.
The scheme also envisages sustainable and environment friendly
solutions etc. as per necessity, phasing and feasibility and creation of city
centre at the station in the long term.
Page 7 of 26So far, 1,340 stations have been identified for development under this
scheme, out of which 132 stations, are located in Maharashtra. The names
of stations identified for development under Amrit Bharat Station Scheme
in Maharashtra are as following:
State No. of Name of Stations
Stations
Maharashtra 132 Ahmednagar, Ajni (Nagpur), Akalkot Road,
Akola, Akurdi, Amalner, Amgaon, Amravati,
Andheri, Badnera, Balharshah, Bandra Terminus,
Baramati, Belapur, Bhandara Road, Bhokar,
Bhusawal, Borivali, Byculla, Chalisgaon, Chanda
Fort, Chandrapur, Charni Road, Chhatrapati
Sambhajinagar, Chhatrapati Shivaji Maharaj
Terminus, Chinchpokli, Chinchwad, Dadar (CR),
Dadar (WR), Dahisar, Daund, Dehu Road, Devlali,
Dhamangaon, Dharangaon, Dharashiv,
Dharmabad, Dhule, Diva, Dudhani, Gangakher,
Godhani, Gondia, Grant Road, Hadapsar,
Hatkanangale, Hazur Sahib Nanded,
Himayatnagar, Hinganghat, Hingoli Deccan,
Igatpuri, Jalgaon, Jalna, Jeur, Jogeshwari,
Kalyan Jn, Kamptee, Kandivali, Kanjur Marg,
Karad, Katol, Kedgaon, Kinwat, Kopargaon,
Kurduwadi Jn, Kurla Jn, Lasalgaon, Latur,
Lokmanya Tilak Terminus, Lonand Jn, Lonavla,
Lower Parel, Malad, Malkapur, Manmad Jn,
Manwath Road, Marine Lines, Matunga, Miraj Jn,
Mudkhed Jn, Mumbai Central, Mumbra,
Murtizapur Jn, Nagarsol, Nagpur Jn, Nandgaon,
Page 8 of 26State No. of Name of Stations
Stations
Nandura, Nandurbar, Narkher Jn, Nashik Road,
Netaji Subhash Chandra Bose Itwari Junction,
Pachora Jn, Palghar, Pandharpur, Panvel Jn,
Parbhani Jn, Parel, Parli Vaijnath, Partur,
Phaltan, Prabhadevi, Pulgaon Jn, Pune Jn, Purna
Jn, Raver, Rotegaon, Sainagar Shirdi, Sandhurst
Road, Sangli, Satara, Savda, Selu, Sewagram,
Shahad, Shegaon, Shivaji Nagar Pune, Shri
Chhatrapati Shahu Maharaj Terminus Kolhapur,
Solapur, Talegaon, Thakurli, Thane, Titvala,
Tumsar Road, Umri, Uruli, Vadala Road,
Vidyavihar, Vikhroli, Wadsa, Wardha, Washim,
Wathar
Completed Stations in Maharashtra:
Development works at railway stations under Amrit Bharat Station
Scheme in Maharashtra have been taken up at a good pace. Details of the
stations completed in Maharashtra are as under:
State No. of Name of stations
stations
Maharashtra 20 Amgaon, Baramati, Byculla, Chanda Fort,
Chinchpokli, Devlali, Dhule, Himayatnagar,
Kedgaon, Lasalgaon, Lonand Junction, Malkapur,
Matunga, Murtizapur Junction, Nandura, Netaji
Subhash Chandra Bose Itwari Junction, Parel,
Savda, Shahad, Vadala Road
Page 9 of 26The activities for development at other stations have also been taken
up at a good pace and progress of some of the stations is as given below:
Diva station: The works of improvement of existing station building, foot
over bridge, improvement of platform surface, parking, entry gate, platform
shelter, new toilet blocks and raising of platform have been completed.
The work of new foot over bridge has been taken up.
Mumbra station: The works of improvement of station building,
improvement of platform surface, improvement of circulating area,
parking, foot over bridge, and new toilet block have been completed. The
work of escalators has been taken up.
Titwala station: The works of improvement of station building,
improvement of platform surface, parking, approach road, new toilet block
and entrance gate have been completed. The work of new foot over bridge
has been taken up.
Vikhroli station: The works of improvement of existing station building
elevation, improvement of platform surface, platform shelters,
construction of new station building and new toilet blocks have been
completed. The works of booking office, improvement of circulating area
and parking on the east side have been taken up.
Kurla station: The works of improvement of the booking office, toilets,
parking, and platform shelter have been completed. The work of the
escalator has been taken up.
Further, development / redevelopment / upgradation / modernisation
of stations on Indian Railways including provision of passenger amenities,
Page 10 of 26is a continuous and ongoing process and works in this regard are
undertaken as per requirement, subject to inter-se priority and availability
of funds. Development / redevelopment / upgradation / modernisation of a
station is carried out based on category of station/condition/traffic handled
etc.
Maharashtra
Railway Budget
Budget allocation in recent years has increased significantly. Budget
allocation for infrastructure projects and safety works, falling fully/partly in
the State of Maharashtra, is as under:
Period Outlay
2009-14 ₹1,171 crore/year
2026-27 ₹23,926 crore (More than 20 times)
Track Construction:
The details of constructing new track falling fully/partly in the State of
Maharashtra during 2009-14 and 2014-26 are as under:
Period New track Average commissioning of new
Commissioned tracks
2009-14 292 Km 58.4 Km/year
2014-26 2,585 Km 215.4 Km/year (Nearly 4 times)
Page 11 of 26Projects sanctioned:
As on 01.04.2026, 52 projects (13 New Lines, 02 Gauge Conversion and 37
Doubling), of a total length of 5,956 km, costing ₹1,42,635 crore, falling
fully/partly in Maharashtra, are sanctioned. The summary is as under:-
Category No. of Total Length Exp.
sanctioned Length Commissioned upto Mar'26
Projects (in Km) Upto Mar'26 (₹ in Cr.)
(in Km)
New Line 13 1,399 266 13,065
Gauge Conversion 02 609 334 5,013
Doubling/ 37 3,948 998 16,704
Multitracking
Total 52 5,956 1,598 34,782
Recently completed projects:
Details of some of the recently completed projects falling fully/partly in
Maharashtra, are as under:
S.No. Project Cost
(₹ in crore)
1 Pune-Miraj-Londa Doubling (467 Km) 6,463
2 Hotgi-Kudgi-Gadag Doubling (284 Km) 2,459
3 Manmad-Jalgaon 3rd Line (160 Km) 1,677
4 Jabalpur-Gondia Gauge Conversion (300 2,005
Km)
Page 12 of 265 Chhindwara-Nagpur Gauge Conversion (150 1,512
Km)
6 Panvel-Pen Doubling (35 Km) 263
7 Pen-Roha Doubling (40 Km) 330
8 Udhna-Jalgaon Doubling (307 Km) 2,448
9 Mudkhed-Parbhani Doubling (81 Km) 673
10 Bhusawal-Jalgaon 3rd Line (24 Km) 325
11 Jalgaon-Bhusawal 4th Line (24 Km) 261
12 Daund-Gulbarga Doubling (225 Km) 3,182
13 Daund-Manmad Doubling (236 Km) 3,426
Ongoing Projects:
To further improve the Railway Infrastructure in the state of Maharashtra
including tribal and aspirational districts, following works have been taken
up:-
S.No. Name of the project Cost
(₹ In crore)
1 Ahilyanagar-ParliVaijnath New Line (261 5,800
Km)
2 Baramati-Lonand New Line (64 Km) 1,844
3 Wardha-Nanded New Line (284 Km) 5,248
4 Indore-Manmad New Line (360 Km) 18,529
5 Wadsa-Gadchiroli New Line (52 Km) 1,886
6 Jalna-Jalgaon New Line (174 Km) 5,804
7 Wardha-Nagpur 3rd Line (76 Km) 917
8 Wardha-Ballarshah 3rd Line (132 Km) 1,755
Page 13 of 269 Itarsi-Nagpur 3rd Line (280 Km) 2,607
10 Rajnandgaon-Nagpur 3rd Line (228 Km) 3,545
11 Wardha-Nagpur 4th Line (79 Km) 1,215
12 Jalgaon-Manmad 4th Line (160 Km) 2,574
13 Bhusawal-Khandwa 3rd & 4th Line (131 Km) 3,285
14 Solapur-Tuljapur-Osmanabad New Line (84 3,296
Km)
15 Panvel-Chowk Double Line (17 Km) 491
16 Wardha-Balharshah 4th Line (135 Km) 2,226
17 Itarsi-Nagpur 4th Line (297 Km) 5,010
18 Wardha-Bhusawal 3rd & 4th Line (314 Km) 9,197
19 Gondia-Dongargarh 4th Line (84 Km) 2,223
20 Gondia-Balharshah Doubling (240 Km) 4,819
21 Kalyan-Kasara 3rd Line (68 Km) 1,433
22 Naigaon-Juichendra Double Chord Line (5 176
Km)
23 Nilje-Kopar Double Chord Line (5 Km) 338
24 Badlapur-Karjat 3rd & 4th Line (32 Km) 1,324
25 Asangaon-Kasara 4th Line (35 Km) 794
26 Kasara-Manmad 3rd & 4th Line (131 Km) 10,154
27 Gondia-Jabalpur Doubling (231 Km) 5,236
28 Chalisgaon Rail Over Rail Flyover (11 Km) 264
29 Chord line between Chikhli and Somtane (4 172
Km)
30 Puntamba-SainagarShirdi Doubling (17 Km) 227
Page 14 of 26Completion of Railway project/s depends on various factors which include
the following:
Land acquisition by State Government
Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors affect the completion time and cost of the project/s.
Capacity Augmentation works for Mumbai Suburban area
Presently, about 120 Mail/Express trains and 3200 sub urban trains are
handled daily in Mumbai area.
To increase train handling capacity at various stations in Mumbai area,
following works have been completed/taken up/planned at various stations:
S.No. Location Details
1 Bandra Terminus 3 Pit Lines have been completed
2 Mumbai Central Platform extension for 24 LHB
coaches
3 Jogeshwari 5 additional Platforms, 2 pit lines
4 Dadar 1 additional platform
5 Panvel-Kalamboli 5 platforms, 4 pit lines and 2 sick
lines
6 Kalyan 6 platforms and 4 pit lines
7 LTT 4 platforms and 2 pit lines
Page 15 of 268 Parel 6 platforms, 5 pit lines, 6 stabling
lines
9 Vasai - Virar Area Vasai road: 6 Platforms, 3 pit lines
and 5 stabling lines
Naigaon- 30 stabling Lines
Virar- 2 stabling Lines
10 Dahanu Area Dahanu: 5 stabling Lines
New Vangaon: 30 stabling Lines
In addition to above, Platform extension work at 34 stations to
accommodate 15 car EMUs have been taken up.
New projects for increasing capacity:
To improve the connectivity and capacity of rail network in Mumbai
suburban areas, Mumbai Urban Transport Project (MUTP)-I costing ₹4,502
Cr., MUTP-II costing ₹8,087 Cr., MUTP-III costing ₹10,947 Cr. & MUTP-IIIA
costing ₹33,690 Cr have been sanctioned. The progress of works is as
below:
Cost
Name of the
S.No. (₹ in Status of work
project
crore)
1 Virar-Dahanu 3,578 Entire 39 Ha. Land acquired.
Road 3rd & 4th Entire 3 lac cum. earthwork
line (64 km) completed.
13 out of 16 major bridges
completed.
53 out of 68 minor bridges
completed.
All 4 RUBs completed.
Page 16 of 26 60 out of 181 Station/Service
buildings completed.
31 km out of 128 km track
laying completed.
2 Borivali-Virar 2,184 16 Ha. out of 17 Ha.
5th & 6th line (26 landacquired.
km) Forest clearance obtained
from MoEFCC.
Permission for Mangroves
felling obtained from Hon’ble
High Court.
3.3 lac cum. earthwork out
of 6.7 lac cum. completed.
5 out of 23 FOB Extn.
completed.
2 out of 12 minor Bridges
completed.
Work in progress in 3
majorbridges.
Work in progress in Station
buildings and other items.
3 Naigaon- 176 Land acquisition has been
Juichandra taken up.
double chord
line (6 km)
4 Extension of 826 Land acquisition has been
Harbour line taken up.
from
Goregaon-
Page 17 of 26Borivali (7 km)
5 Mumbai 919 Phase-I (Borivali-Khar
Central- Road, 17 km): Commissioned.
Borivali 6th line Phase-II (Khar Road -
(30 km) Mumbai Central): Land
acquisition has been taken up.
6 4th line 794 Design & drawings have
Asangaon- been taken up.
Kasara (35 km)
7 Kalyan- 1,759 8 out of 92 minor bridges
Asangaon 4th completed.
line (32 km) Land Acquisition of 17 Ha
out of 28 Ha completed.
Work in progress in 7
major bridges.
8 Kalyan-Kasara 1,433 Land acquisition of 48 Ha.
3rd Line (68 km) out of 54 Ha. completed.
4 out of 9 major bridges
completed.
All 5 Station buildings
completed.
23 km out of 68 km track
laying completed.
9 Kalyan- 1,510 1 out of 2 major bridges
Badlapur 3rd & completed.
4th line (14 km) 2 out of 4 ROBs completed.
30 out of 40 minor bridges
completed.
10 3rd and 4th line 1,324 Design & drawings have
Page 18 of 26Badlapur - been taken up.
Karjat (32 km)
11 Panvel-Karjat 2,782 All 3 tunnels (3 km)
Suburban completed.
Corridor (30 5 ROBs, 16 RUBs
km) completed.
9 major bridges, 35 minor
bridges completed.
67 km out of 70 km track
laying completed.
12 Airoli-Kalwa 476 Phase-I (Halt station at
(elevated) Digha): Commissioned.
Suburban Phase-II (Airoli-Kalwa
Corridor link (3 elevated track, 3.3 km): Land
km) acquisition and R&R has been
taken up.
13 Nilje-Kopar 338 Land acquisition has been
double chord taken up.
line (5 km) 6 out of 15 minor bridges
completed.
0.85 lac cum. earthwork
out of 1 lac cum. completed
14 CSMT-Kurla 5th 891 Phase-I (Kurla-Parel, 10.1 km):
& 6th line (18 1 out of 12 minor bridges
km) completed.
2 out of 4 station buildings
completed.
Rebuilding of Sion ROB is
in progress.
Page 19 of 26Phase-II (Parel-CSMT, 7.4 km):
Land acquisition has been
taken up.
New generation trains:
To enhance passenger carrying capacity, 238 rakes of 12 cars each with
doors have been sanctioned under MUTP-III & IIIA at a cost of ₹19,293
crore. The process for procurement of these rakes has been taken up.
Bullet Train project:
Presently, the Mumbai-Ahmedabad High Speed Rail (MAHSR) Project (508
km) is under execution. The Project is passing through the States of
Gujarat, Maharashtra and Union Territory of Dadra & Nagar Haveli with 12
stations planned at Mumbai, Thane, Virar, Boisar, Vapi, Billimora, Surat,
Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati.
Entire land (1389.5 Ha.) for the MAHSR project has been acquired. All
Statutory Clearances have been obtained. All 1651 utilities have been
shifted. The delay in land acquisition in the State of Maharashtra has
impacted the project till 2021. The land acquisition picked up in 2022 in
Maharashtra.
The progress of various major items so far is as under:
Item Progress
Piers 452 kms.
Girder 356 kms.
Track Bed 209 kms.
OHE Masts 190 kms.
Page 20 of 26The progress of stations is given below:-
S. No. Station Status
Foundation works completed, Platform slab &
1 Sabarmati roof structural works and finishing works are in
progress
2 Ahmedabad
Structural works completed and finishing works
Anand/Nadia
3 have been taken up.
d
Foundation work completed, structural works
4 Vadodara
and finishing works have been taken up.
5 Bharuch
6 Surat Structural works completed and finishing works
7 Bilimora have been taken up.
8 Vapi
9 Boisar Foundation works have been taken up and in an
10 Virar advanced stage. Structural works have been
11 Thane taken up.
This is an underground station. Foundation works
BKC
12 almost completed and Base Slab has been taken
(Mumbai)
up.
Page 21 of 26The progress on the River Bridges is as under:-
S.
River Name Status
No.
Sabarmati River Sub-Structure work completed,
1
(480m) Superstructure work has been taken up.
Meshwa River
2
(120m)
Vatrak River
3 Bridge construction completed.
(280m)
Mohar (Shedhi)
4
River (160m)
Mahi River 11 out of 12 wells completed; 5 spans
5
(720m) launched
Vishwamitri River
6
(80m)
Bridge construction completed.
Dhadhar River
7
(120m)
Narmada River 21 out of 25 wells completed; 4 spans
8
(1366m) launched
9 Kim River (120m) Bridge construction completed.
Foundation work has been taken up, 10 out
10 Tapi River (720m)
of 12 wells completed
Mindhola River
11
(240m)
Purna River
12 Bridge construction completed.
(360m)
Ambika River
13
(200m)
Page 22 of 26Venganiya River
14
(200m)
Kaveri River
15
(120m)
Kharera River
16
(120m)
Auranga River
17
(320m)
18 Par River (320m)
Kolak River
19
(160m)
Daman Ganga
20
River (360m)
Darotha River
21
(80m)
Jagani River
22 Foundation works have been completed
(360m)
Vaitarna River 12 Pile Cap and 11 Pier (out of 58)
23
(2320m) completed.
Ulhas River Temporary Access Bridge (TAB) completed
24
Branch (120m) to start the foundation work.
Geo-technical Investigation (GTI) has been
Desai Khadi River
25 completed and Design work has been taken
Bridge (400m)
up.
The work of the under-sea tunnel (approximately 21 km) has commenced,
out of which 4.8 km of tunnel between Ghansoli and Shilphata in
Maharashtra has been completed.
Page 23 of 26On the Surat–Vapi section (97 km) entire civil works including river bridge
construction, have been completed and 87% of the track bed has been
laid.
However, Bullet train project is a very complex and technology intensive
project. Exact timelines for the completion of the entire project can be
reasonably ascertained after the completion of all associated works of
Civil Structures, Track, Electrical, Signaling& Telecommunication and
supply of Trainsets.
Further, to strengthen national transport infrastructure, provide a fillip to
regional connectivity, economic growth, tourism, investment and
employment generation, and encourage modal shift from road and air
transport to rail, the Government has announced the development of the
following seven new High-Speed Rail (HSR) corridors in the Union Budget
2026-27:-
(i) Mumbai–Pune
(ii) Pune–Hyderabad
(iii) Hyderabad–Bengaluru
(iv) Hyderabad–Chennai
(v) Chennai–Bengaluru
(vi) Delhi–Varanasi
(vii) Varanasi–Siliguri
Being highly capital intensive, the decision to sanction any HSR
Corridor/Project depends on many factors such as outcome of DPR, techno-
economic feasibility studies and availability of resources such as financing
options etc.
Page 24 of 26Dedicated freight corridor:
Ministry of Railways has taken construction of two Dedicated Freight
Corridors (DFC) viz. Eastern Dedicated Freight Corridor (EDFC) from
Ludhiana to Sonnagar (1337 Km) and the Western Dedicated Freight
Corridor (WDFC) from Jawaharlal Nehru Port Terminal (JNPT) to Dadri
(1506 Km).
The work on EDFC & WDFC has been completed and commissioned.On an
average more than 443 trains are operated per day on DFCs. The fully
commissioned sections of the Eastern and Western Dedicated Freight
Corridors (EDFC & WDFC) have demonstrated robust operational
performance. Freight volumes have steadily increased, with higher average
speeds, faster turnarounds, and enhanced reliability. The corridors are
witnessing consistent growth in container, coal, and bulk cargo movement,
contributing significantly to capacity augmentation in freight
transportation.
DFC has contributed to creating additional paths on the conventional
network by diverting freight traffic to EDFC and WDFC. As a result,
Railways have been able to run additional goods and coaching services
over its network. The DFCs have enabled faster transit times, higher
throughput, and double-stack container operations (especially on the
Western DFC). These improvements have contributed to lowering overall
logistics costs, improving supply chain efficiency, and enhancing
competitiveness of Indian industries.
A new Dedicated Freight Corridor connecting Dankuni in East to Surat
in West, has been announced in the Union Budget 2026. The work of
Page 25 of 26preparation/ updation of Detailed Project Report (DPR) for this corridor has
been taken up.
*****