PETROLEUM, CHEMICAL AND PETROCHEMICAL INVESTMENT REGIONS
3256. SHRI G LAKSHMINARAYANA
Will the Minister of CHEMICALS AND FERTILIZERS, be pleased to state:
(a) the details of Petroleum, Chemical and Petrochemical Investment Regions (PCPIRs) in
the county, including approved investment, actual investment realized and employment
generated during the last five years, State-wise;
(b) the details of infrastructure projects completed, under implementation and pending in
PCPIRs, indicating approved cost, funds released and expenditure incurred, State-wise;
(c) the extent of land allotted, land utilized and vacant land available in each PCPIR, State-
wise;
(d) the number of manufacturing units operational / non-operational / under construction in
each PCPIR, state -wise; and
(e) the present status of infrastructure development, investment realization and employment
generation of Kakinada PCPIR in Visakhapatnam?
ANSWER
THE MINISTER OF STATE FOR CHEMICALS & FERTILIZERS
(SMT. ANUPRIYA PATEL)
(a): Government of India notified the Petroleum, Chemical and Petrochemical Investment
Region(s) (PCPIR) Policy, 2007 to attract investment and for generation of employment.
PCPIRs are conceptualized in cluster-based approach with common infrastructure and basic
utilities to provide a competitive environment conducive for setting up of industry in an
integrated and environmentally friendly manner. Currently, three Petroleum, Chemical and
Petrochemical Investment Regions (PCPIRs) have been notified in the states of Andhra
Pradesh (Vishakhapatnam-Kakinada), Gujarat (Dahej) and Odisha (Paradeep).
The PCPR-wise details of employment generated, number of units established, total investment
made as on date, and investment realized during the last five years are given as under:Indicator Gujarat Andhra Pradesh Odisha Total
Vishakhapatnam–
Location/ Region Dahej, Bharuch Paradeep -
Kakinada
Approval Feb, 2009 Feb, 2009 Dec, 2010 -
MoA signed Jan, 2010 Oct, 2009 Nov, 2011 -
Total Area
453.00 640.00 284.15 1,377.15
(Sq. kms.)
Investment made
till 31.03.2021 (Rs. 1,21,227 51,481 47,000 2,19,708
Crore)
Investment made
15,936 16,667 96,881 1,29,484
in last 5 years
Total investment
made as on date 1,37,163 68,148 1,43,881 3,49,192
(Rs. Crore)
Employment
generated as on 2,45,140 86,123 40,000 3,71,263
date (No.)
No. of Chemical
2079 154 13 2246
Units as on date
(b) to (e): Details of infrastructure projects completed and under implementation in the
three PCPIRs as provided by the respective State Governments, including Vishakhapatnam-
Kakinada PCPIR, are placed at Annexure.
The three PCPIR regions, including Vishakahpatnam-Kakinada PCPIR, till date have attracted
a total investment of Rs.3,49,192 Crore. A total of 2,246 industrial units have been established,
generating employment for 3,71,263 persons. Out of the total investment of Rs.3,49,192 Crore,
an investment of Rs. 2,95,301 Crore has been made by the manufacturing units.
The total delineated area of the Dahej PCPIR in Gujarat is 453.00 sq. km, of which 230.06 sq.
km has been earmarked as processing area. Out of this 230.06 sq. Km. of processing area, 97.03
sq. km is held by Gujarat Industrial Development Corporation (GIDC) and is fully occupied.
Out of the balance processing area, approximately 27.18 sq. km. is partially occupied. This
includes entities related to medium and large scale Chemical and Petrochemical industries,
engineering industries, ship building, warehousing, oil terminals, logistics etc. 105.76 sq. km
of the delineated processing area presently remains un-utilized.
The total delineated area of the Visakhapatnam–Kakinada PCPIR in Andhra Pradesh is 640.00
sq. km. Out of this, 269.44 sq. km has been acquired by the State as processing area, which
includes 247.94 sq. km for industrial use and 21.5 sq. km earmarked for Common Infrastructure
facilities and basic utilities. Out of 247.94 sq. km. of land earmarked for industrial use, 195.00
sq. km is occupied by the industries, while the remaining 52.94 sq. km is presently vacant. Out
of 21.5 sq. km. of land earmarked for common infrastructure facilities and basic utilities, 5.00
sq. km. has been developed while the remaining 16.50 sq. km. is presently vacant.The Paradeep PCPIR in Odisha spans a total delineated area of 284.15 sq. km. Out of this 48.13
sq. km. has been earmarked for development, of which, 43.75 sq. km. has been allotted to
industry, while the remaining 4.38 sq. km is presently vacant.
*****Annexure referred to in reply to parts (b) and (c) of Lok Sabha Unstarred
Question No. 3256 for answer on 07.08.2026
Annexure
The details of the various infrastructure projects at Gujarat PCPIR
(i) Existing Infrastructure: -
Infrastructure Details
Roads & Highways (i) 50 km long stretch of Dahej - Bharuch State Highway
(ii) Construction of identified stretches of priority roads on need
basis in Draft T.P. Scheme no.1 and 2A under process. Out of
5.3 Km Road 2.8 Km Road has been constructed. More 5.5.
Km road possession has been taken in Draft T.P. Scheme no.
2A for development on road.
Rail Links (i) Delhi - Mumbai Dedicated Freight Corridor (DFC), connecting
PCPIR at Bharuch, which is 62 km from Dahej.
(ii) A cargo transportation line from Bharuch to Dahej
Air Connectivity (i) International airport at Ahmedabad (distance-250 km) and
(ii) Vadodara international Airport (90 Km) and
(iii) Surat Airport (85 km)
Ports (i) Adani Petro net Dahej Port Ltd. with the capacity of 11
ΜΜΤΡΑ
(ii) Gujarat Chemical Port Ltd. (GCPTCL) Liquid Chemicals
Terminal with the capacity of 4.9 ΜΜΤΡΑ
(iii) LNG Petronet (Gas Terminal) with the capacity of 10 ΜΜΤΡΑ
(iv) Reliance Jetty with capacity of 2 MMTPΑ
(v) Birla Copper Bulk Cargo Jetty with the capacity of 5 ΜΜΤΡΑ
Power Supply (i) Four 220 KV sub-stations are located at Dahej, Dahej SEZ,
Rahiyad - Suva and Vilayat within PCPIR.
(ii) Eight 66 KV sub stations are located at Dahej, Luna, Bhensali,
Vadadala, Genlanda, Sambheti, Jolva and Vilayat within
PCPIR.
(iii) Gujarat Energy Transmission Corporation Limited (GETCO)
has completed construction of 220 KV substations at Suva
Dehej.
(iv) 1200 MW gas based power plant set up by Torrent Power Ltd.
In Dahej SEZ.
(v) Two 66 KV substations in Saykha has been commenced.
Water Supply: (i) GIDC has installed water supply capacity of 555 MLD based
on Narmada River
(ii) 100 MLD Desalination plant has been commissioned by the
joint venture of L&T Construction and Tecton Engineering &
Construction LLC, UAE. (881 crore)
Gas Supply (i) Gujarat Gas Company Limited (GGCL) currently owns and
operates the distribution pipelines, nearly 900 Km in length, in
Bharuch district.
(ii) All the gas suppliers operating in Gujarat will extend their
pipeline network to the PCPIR. This will ensure adequate gas
supply for industrial requirement in the PCPIR.Drainage & Effluent (i) Common Effluent Treatment Plants: GIDC has set up a CETP
Treatment & Waste facility having a capacity of 40 MLD, at Dahej GIDC Estate and
Management 40 MLD at sayakha
(ii) Treatment Storage and Disposal Facility (TSDF): Bharuch
Envrio Infrastructure Ltd. has developed hazardous waste
management facility having the capacity of 1.4 MMT per annum
(iii) GIDC has proposed to develop another Common Hazardous
Waste site at Saykha having capacity of 3,58,285 MT
(iv) Incinerators: Incinerators with capacity of 10 Million Kcal/hour
are installed by Detox India Pvt Ltd
Multi Modal Logistic (i) Logistic Park is being developed by GIDC in joint venture with
Park Container Corporation of India Ltd (CONCOR). First Phase is
being developed in 25 ha at the cost of 200 Cr (excluding land).
Phase-I of the project has been completed with cost of Rs. 100
Crore.
Private Industrial (i) Payal Industrial Park is spread over 1416 hectares in Dahej
Park PCPIR. It is a state of art infrastructure with adequate water
infrastructure, utilities etc. Common facilities such as CETP,
Common landfill sites, Multiple Effective evaporators, common
hydrogen gas facility, common boiler and steam facilities are
available in the park.
The details of the various infrastructure projects in pipeline at Gujarat PCPIR
Infrastructure Details
Roads and Highways Controlled access expressway from Dahej to Dahegam (near
Connectivity Ahmedabad), length of 40 km (estimated cost: 800 crore).
Elevated corridor: (estimated cost: 400 crore)
Other Roads (estimated cost: 300 crore)
Drainage and Effluent Gujarat Industrial Development Corporation (GIDC) has
Treatment and Waste commenced the work of 90 MLD effluent disposal pipeline
Management from Sayakha CETP to deep into the sea at Dahej.
(estimated cost: 558 crore)
GIDC has proposed to develop another Common
Hazardous Waste site at Sayakha having capacity of 2.69
MMT.
Power Supply Two 220 KV, one 400 KV, six 66 KV substations are planned in
Dahej and Saykha (Land has been recently allotted to Gujarat
Energy Transmission Corporation Limited (GETCO) for
substation having a capacity of 66 KV in Saykha area) area
respectively within the PCPIR. (estimated cost: 415 crore)
Water Supply Kalpasar Department, Govt of Gujarat is developing Bhadbhut
Barrage with 599 million cubic meter (MCM) capacity reservoir.
(estimated cost: 4,254 crore)
Ports Development of Marine Shipbuilding Park (MSP) at Dahej Gujarat Chemical Port Limited (GCPL) is expanding
capacity to 12 MMTPA by setting up 2nd berth (estimated
cost: 2000 crore)The details of the various infrastructure projects at Odisha PCPIR
(i) Existing Infrastructure:
Infrastructure Details
Road Connectivity (i) Chandikhol is the junction of NH5A (Paradeep
Chandikhol) & NH 53
(ii) State Highway (SH)-12 (Paradeep to Katak)
(iii) Cuttak-Chandbali 106 Km (2 LANE) Crosses NH53 at
Duhuria
Railway Connectivity (i) Paradeep Cuttack BG Line
(ii) Haridaspur to Cuttack BG
Air port (i) Biju Patnaik International Airport
Power Supply (i) 2x40 MVA 220/33 KV substation by OPTCL under
operation
Water Supply (i) IOCL has been fed by 34 Cusec water
(ii) Instream storage of capacity 120 Cusec is under
implementation near Paradip
Sea Port (i) Paradeep Port - Deep drought all weather port with a
capacity of 277 MTPA
The details of the various infrastructure projects in pipeline at Odisha PCPIR
Infrastructure Details
Road Network (i) Chadikhole-Paradeep (NH5A) -72 Km from 4 lane to 8
lane
(ii) Cuttack-Tritol (SH-12) - 53 Km from 2 lanes to 4 lanes
(iii)Marsaghai-Mahakalpada Road of 23 Km from 2 lanes to 4
lanes
(iv) Freight priority Corridor (also a part of Industrial and port
connectivity) of 32 Km from 2 lanes to 6 lanes
(v) Industrial Connectivity road in Mahakalpada - 9 km: 4
lanes
(vi) JSW road of 8 Km from 2 lanes to 4 lanes.
Power Supply 765 KVA ISS approved by Energy Department 400 KVA
substation under implementationThe details of the various infrastructure projects at Andhra Pradesh PCPIR
(i) Existing Infrastructure:
Infrastructure Details
CETPS (i) 1 MLD CETP at Atchutapuram SEZ is commissioned.
(ii) CETP at Brandix has been completed.
(iii) CETP at JNPC-Parawada has been completed.
(iv) CETP at HETERO SEZ Nakkapalli has been completed.
Power Supply (i) 220 KV Sub station at Brandix has been completed
Waste Management (i) Solid Waste Management Plant work has been completed at
Parawada
(ii) Liquid Waste discharge outfall works completed at AP SEZ,
Brandix, JNPC and HETERO
Airport (i) International Airport at Visakhapatnam
(ii) Rajmundary Airport has been established in 2023.
(iii) Bhogapuram International Airport inaugurated in August
2026.
Ports There are 3 existing ports at
(i) Kakinada (ii) Gangavaram and (iii) Vishakhapatnam
The details of the various infrastructure projects in pipeline at Andhra Pradesh PCPIR
Infrastructure Details
Road Works (i) State Highway-97:2 lane to 4 lane upgradation
(ii) NH-16- Anakapalli - Atchutapuram Road under PPP mode
(iii)NH 215: 4 lane to 6 lane upgradation
(iv) Asian Development Bank road widening is under progress.
Rail Links (i) South Central Railway (SCR) Gangawaram Lane
(ii) PCPIR Freight line
(iii)Kakinada SEZ freight lane
Port (i) Captive port at Nakkapalli
(ii) Upgradation of Vishakhapatnam Port
(iii)Kakinada Deep Water Sea Port work
Water Resources (i) Polavaram Project work has commenced.
CETP Works (i) 5 MLD CETP at Atchutapuram
(ii) 12 MLD CETP at Nakkapalli with 5.27 MLD marine
discharge
Power Supply (i) 400 KV substation at Nakapalli & Annavaram