GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO. 647
TO BE ANSWERED ON 22.07.2026
PM GATI SHAKTI NATIONAL MASTER PLAN
647. SHRI SUKANTA KUMAR PANIGRAHI:
Will the Minister of RAILWAYS be pleased to state:
(a) whether the Government has accelerated railway modernisation under
Kavach 4.0, PM Gati Shakti National Master Plan and the Union Budget
2026–27 to enhance rail safety, logistics efficiency and regional
economic development and if so, the details thereof;
(b) the budget estimates, funds allocated, expenditure incurred and major
railway projects sanctioned in Odisha during the last three years
including new lines, electrification, line doubling, station redevelopment
and Gati Shakti Cargo Terminals, year-wise;
(c) the status of the proposed Gopalpur–Phulbani–Rairakhol railway line
including survey, DPR, cost estimates, sanction and implementation
timeline;
(d) whether AI-enabled signalling, Kavach 4.0, predictive maintenance and
digital monitoring systems have been introduced in Odisha and if so, the
details thereof; and
(e) whether additional railway infrastructure and logistics projects are
proposed for Odisha during 2026–27 and if so, the details thereof?
ANSWER
MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND
ELECTRONICS & INFORMATION TECHNOLOGY
(SHRI ASHWINI VAISHNAW)
(a) to (e):
Safety is accorded the highest priority on Indian Railways. As a
consequence of various safety measures taken over the years, there has
been a steep decline in the number of accidents.
§ Page 1 of 19Number of Consequential Train Accidents has reduced as shown in the
table below:-
Year Consequential Accidents
2014-15 135
2025-26 16 (88% lesser)
2026-27 ( upto June 2026) 2
Another important index showing improvement in safety in train operations
is Consequential Accident Index, the details of which are as under:-
Consequential Accident Index:-
Year Accident Index
2014-15 0.11
2025-26 0.01 ( 91% lesser)
This index measures number of consequential accidents as a ratio of total
running kilometers of all trains.
No. of consequential accidents
Accident Index =
No. of trains X million kilometers runThe various safety measures taken to enhance safety in train operations
are as under:-
1. On Indian Railways, the expenditure on Safety related activities has
increased over the years as under:-
Expenditure/Budget on Safety related activities
Year
(Rs. in Cr.)
2013-14 39,200
2022-23 87,336
2023-24 1,01,662
2024-25 1,14,022
2025-26 1,17,693
2026-27 1,20,389
2. Electrical/Electronic Interlocking Systems with centralized operation
of points and signals have been provided at 6,671 stations up to
30.06.2026 to reduce accidents due to human failure.
3. Interlocking of Level Crossing (LC) Gates has been provided at 10,395
Level Crossing Gates up to 30.06.2026 for enhancing safety at LC
Gates.
4. Complete Track Circuiting of stations to enhance safety by verification
of track occupancy by electrical means has been provided at 6,671
stations up to 30.06.2026.
5. Detailed instructions on issues related with safety of Signalling, e.g.
mandatory correspondence check, alteration work protocol,
preparation of completion drawing, etc. have been issued.
6. System of disconnection and reconnection for S&T equipment as per
protocol has been re-emphasized.
7. All locomotives are equipped with Vigilance Control Devices (VCD) to
improve alertness of Loco Pilots.
Page 3 of 198. Retro-reflective sigma boards are provided on the mast which is
located two OHE masts prior to the signals in electrified territories to
alert the crew about the signal ahead when visibility is low due to
foggy weather.
9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog
affected areas which enables loco pilots to know the distance of the
approaching landmarks like signals, level crossing gates, etc.
10. Modern track structure consisting of 60kg, 90 Ultimate Tensile
Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide
base sleepers with elastic fastening, fan shaped layout turnout on PSC
sleepers, Steel Channel/H-beam Sleepers on girder bridges is used
while carrying out primary track renewals.
11. Mechanisation of track laying activity through use of track machines
like PQRS, TRT, T-28 etc. to reduce human errors.
12. Maximizing supply of 130m/260m long rail panels for increasing
progress of rail renewal and avoiding welding of joints, thereby
improving safety.
13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and
timely removal of defective rails.
14. Laying of longer rails, minimizing the use of Alumino Thermic Welding
and adoption of better welding technology for rails i.e., Flash Butt
Welding.
15. Monitoring of track geometry by OMS (Oscillation Monitoring System)
and TRC (Track Recording Cars).
16. Patrolling of railway tracks to look out for weld/rail fractures.
17. The use of Thick Web Switches and Weldable CMS Crossing in turnout
renewal works.
18. Inspections at regular intervals are carried out to monitor and educate
staff for observance of safe practices.
Page 4 of 1919. Web based online monitoring system of track assets viz. Track
database and decision support system has been adopted to decide
rationalized maintenance requirement and optimize inputs.
20. Detailed instructions on issues related with safety of Track, e.g.
integrated block, corridor block, worksite safety, monsoon
precautions, etc. have been issued.
21. Preventive maintenance of railway assets (Coaches & Wagons) is
undertaken to ensure safe train operations.
22. Replacement of conventional ICF design coaches with LHB design
coaches is being done.
23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have
been eliminated by January 2019.
24. Safety of Railway Bridges is ensured through regular inspection of
Bridges. The requirement of repair/rehabilitation of Bridges is taken up
based upon the conditions assessed during these inspections.
25. Indian Railways has displayed Statutory “Fire Notices” for widespread
passenger information in all coaches. Fire posters are provided in
every coach so as to educate and alert passengers regarding various
Do’s and Don’ts to prevent fire. These include messages regarding not
carrying any inflammable material, explosives, prohibition of smoking
inside the coaches, penalties etc.
26. Production Units are providing Fire detection and suppression system
in newly manufactured Power Cars and Pantry Cars, Fire and Smoke
detection system in newly manufactured coaches. Progressive fitment
of the same in existing coaches is also underway by Zonal Railways in
a phased manner.
27. Regular counselling and training of staff is undertaken.
28. Concept of Rolling Block introduced in Indian Railways (Open Lines)
General Rules vide Gazette notification dated 30.11.2023, wherein
work of integrated maintenance/ repair/replacement of assets is
Page 5 of 19planned up to 52 weeks in advance on rolling basis and executed as
per plan.
The details of the Safety related works related to better maintenance
practices, Technological improvements, better infrastructure and rolling
stock etc. undertaken by Railways are tabulated below:-
2004-05 to 2014-15 to 2014-26 Vs.
S.No. Item
2013-14 2025-26 2004-14
Technological Improvements
1. Use of high-quality 57,450 Km 1.63 Lakh Km More than
rails (60 Kg) (Km) 2.8 times
2. Longer Rail Panels 9,917 Km 87,219 Km Nearly 9
(260m) (Km) times
3. Electronic Interlocking 837 3,691 Stations More than
(Stations) Stations 4 times
4. Fog Pass Safety As on As on 31.03.26: 352 times
Devices (Nos.) 31.03.14: 31,693 Nos.
90 Nos.
5. Thick Web Switches Nil 35,971 Nos.
(Nos.)
Better Maintenance Practices
1. Primary Rail Renewal 32,260 Km 57,583 Km 1.78 times
(Track Km)
2. USFD (Ultra Sonic Flaw 79.43 Lakh 2.25 Crore More than
detection) Testing of 2.8 times
Welds (Nos.)
3. Weld failures (Nos.) In 2013-14: In 2025-26: 93 %
3,699 Nos. 272 Nos. reduction
4. Rail fractures (Nos.) In 2013-14: In 2025-26: 92%
2,548 Nos. 208 Nos. reduction
Better Infrastructure and Rolling Stock
1. New Track KM added 14,985 Km 36,429 Km Almost 2.5
(Track Km) times
2. Flyovers 4,148 Nos. 14,362 Nos. More than
(RoBs)/Underpasses 3 times
(RUBs) (Nos.)
3. Unmanned Level As on As on 31.03.26: Nil Removed
crossings (Nos.) on BG 31.03.14: (All eliminated by
8,948 31.01.19)
4. Manufacture of LHB 2,337 Nos. 49,366 More than
Coaches (Nos.) 21 times
Page 6 of 19Kavach Implementation
1. Kavach is an indigenously developed Automatic Train Protection (ATP)
system. Kavach is a highly technology intensive system, which requires
safety certification of highest order (SIL-4).
2. Kavach aids the Loco Pilot in running of trains within specified speed
limits by automatic application of brakes in case Loco Pilot fails to do
so and also helps the trains to run safely during inclement weather.
3. The first field trials on the passenger trains were started in February
2016. Based on the experience gained and Independent Safety
Assessment of the system by Independent Safety Assessor (ISA), three
firms were approved in 2018-19, for supply of Kavach Ver 3.2.
4. Kavach was adopted as National ATP system in July, 2020.
5. Implementation of Kavach System involves following Key Activities:
a. Installation of Station Kavach at each and every station, block
section.
b. Installation of RFID Tags throughout the track length.
c. Installation of telecom Towers throughout the section.
d. Laying of Optical Fibre Cable along the track.
e. Provision of Loco Kavach on each and every Locomotive running on
Indian Railways.
6. Based on deployment of Kavach version 3.2 on 1,465 RKm on South
Central Railway and experience gained, further improvements were
made. Finally, Kavach specification version 4.0 was approved by RDSO
on 16.07.2024.
7. Kavach version 4.0 covers all the major features required for the diverse
railway network. This is a significant milestone in safety for Indian
Page 7 of 19Railways. Within a short period, IR has developed, tested and started
deploying Automatic Train Protection System.
8. Major improvement in Version 4.0 includes increased Location
Accuracy, Improved Information of Signal Aspects in bigger yards,
Station to Station Kavach interface on OFC and Direct Interface to
existing Electronic Interlocking System. With these improvements,
Kavach Ver.4.0. is planned for large scale deployment over Indian
Railways.
9. After extensive and elaborate trials, Kavach Version 4.0 has been
successfully commissioned on 2,490 Route Kilometres as on 13.07.26,
covering the high density Delhi- Mumbai and Delhi-Howrah routes
including sections passing through as below:
SN Section Progress (Route
Km)
(1) Delhi-Mumbai route: 1,344 Rkm
i Tilak Bridge - Junction cabin – Palwal – 1,248
Mathura –Nagda –Vadodra-Virar section
(Except Mangalmhudi – Panchpipliya)
ii Vadodara – Ahmedabad section 96
(2) Delhi – Howrah route: 1,146 Rkm
i. Chipyana - Tundla - Kanpur - Subedarganj 563
section
ii. Kanpur – Lucknow section 71
iii. DDU(FOC)-Bhabua Road section 50
iv. Sasaram - Pheser section 43
v. Gaya -Sarmatarn- Nimiaghat section 159
vi. Chota Ambana - Bardhaman – Howrah 260
section
Page 8 of 1910. In addition, track side Kavach implementation work is being taken up
on 21,937 RKM covering all GQ,GD,HDN and identified sections of
Indian Railways including sections passing through Odisha.
11. The total Progress of key items of Kavach on Indian Railway sections
are as under:
SN Item Progress
i Laying of Optical Fibre Cable 11,253 Km
ii Installation of Telecom 1,668 Nos.
Towers
iii Station Data Centre 958 station
iv Installation of Track side 7,721 RKm
equipment
v Provision of Kavach in Loco 6,045 Nos.
12. In addition, work for installation of Kavach in 7,435 Locomotives and
1,200 EMU/MEMU has been taken up.
13. Specialized training programmes on Kavach are being conducted at
centralized training institutes of Indian Railways to impart training to
all concerned officials. By now more than 94,000 technicians,
operators and engineers have been trained on Kavach technology. This
includes about 57,000 Loco Pilots & Assistant Loco Pilots. Courses
have been designed in collaboration with IRISET.
14. The funds utilized on Kavach works so far up to Jun’26 is Rs.3874.9 cr.
The allocation of funds during the year 2026-27 is Rs.2066.24 crore.
Requisite funds are made available as per the progress of works.
The PM Gati Shakti National Master Plan (NMP) was launched in October,
2021 to bring a transformative change in the approach towards planning
Page 9 of 19and execution of infrastructural projects pertaining to the transportation
sector. The NMP, spanning across the entire country has brought in synergy
between the infrastructural sectors such as railways, shipping, roadways,
telecommunications, pipelines, etc. through collaboration amongst
concerned Ministries/State Governments/Departments, speeding up the
clearances needed for the project completion as well as planning at a
faster pace.
Indian Railways has immediately imbibed the principles of Gati Shakti in its
project planning process, expediting appraisal, sanction and execution of
projects. On ground survey, route alignment, deciding alternative route to
avoid passing through forest and wildlife areas, connectivity to ports,
mines, collieries is done through PM Gati Shakti Institutional mechanism
developed by BISAG-N. This has led to enhancement in the quality of
preparation of Detailed Project Report and reduction in project cost.
Now survey of all New Line, Gauge Conversion and Doubling projects are
taken up under PM Gati Shakti Institutional mechanism developed by
BISAG-N for the development of multimodal connectivity infrastructure
to various Economic Zones with an objective to have integrated planning,
enhanced logistics efficiency, first and last mile connectivity, throughput
enhancement and remove gaps for seamless movement of people, goods/
commodities i.e. agricultural products, fertilizers, coal, iron ore, steel,
cement, limestone etc.
ODISHA
Budget allocation in recent years has increased significantly. Budget
allocation for infrastructure projects and safety works, falling fully/partly in
the State of Odisha is as under:
Page 10 of 19Period Outlay
2009-14 ₹ 838 Cr./year
2026-27 ₹ 10,928 Cr. (More than 13 times)
Track Construction:
The details of commissioning/laying of new track falling fully/partly in the
State of Odisha is as under:
Period New Track Average Commissioning of new
Commissioned tracks per year
2009-14 267 Km 53 Km
2014-26 2,236 Km 186 Km (More than 3.5 times)
Project Sanctioned:
As on 01.04.2026, 55 projects (19 New Lines and 36 Doubling/Multi-
tracking), of a total length of 4,256 Km, costing ₹ 81,739 crore, falling
fully/partly in Odisha, are sanctioned. The summary is as under:-
Category No of Total Length Total Exp
sanctioned Length Commissioned upto
Projects NL/GC/DL till Mar'26 Mar'26
(in Km) (in Km) (₹ in Cr)
New Lines 19 1,544 277 7,288
Doubling/Multi- 36 2,712 1,309 21,675
tracking
Total 55 4,256 1,586 28,963
Recently Completed Projects:
Details of some of the recently completed projects falling fully/partly in
Odisha are as under:
Page 11 of 19S. Name of Project Cost
No. (In Crores of
₹)
1 Daitari-Banspani New Line and Jakhapura- 1,317
Haridaspur 3rd Line (179 Km)
2 Jharsuguda - Sardega New Line (53 Km) 1,598
3 Haridaspur-Paradeep New Line (82 Km) 2,397
4 Angul-Sukinda New Line (104 Km) 2,834
5 Champa-Jharsuguda 3rd Line (152 Km) 1,227
6 Sambalpur-Titlagarh Doubling (182 Km) 2,262
7 Rourkela-Jharsuguda 3rd Line (101 Km) 1,313
8 Banspani- Jakhapura Doubling (164 Km) 1,827
9 Sambalpur-Talcher Doubling (174 Km) 1,539
10 Raipur - Titlagarh Doubling (203 Km) 1,171
11 Jharsuguda-Sardega Doubling (50 Km) 3,200
Ongoing Projects in Odisha:
Further, some of the main projects falling fully/partly in Odisha which have
been taken up are as under:
S. Name of Project Total Cost
No. (In Crores of
₹)
1 Junagarh-Nabarangpur New Line (116 Km) 2,865
2 Nabarangpur-Jeypore New Line (41 Km) 748
3 Jeypore-Malkangiri New Line (130 Km) 2,344
4 Malkangiri – Pandurangapuram New Line (174 3,592
Km)
5 Buramara-Chakulia New Line (60 Km) 1,459
6 Gunupur-Therubali New Line (74 Km) 1,166
7 Puri - Konark New Line (32 Km) 492
8 Badampahar-Kendujhargarh New Line (82 Km) 1,876
Page 12 of 19S. Name of Project Total Cost
No. (In Crores of
₹)
9 Bangriposi-Gorumahisani New Line (86 Km) 2,269
10 Bargarh Road-Nawapara Road New Line (138 2,622
Km)
11 Nergundi - Vizianagaram 3rd Line (385 Km) 4,963
12 Vizianagram-Titlagarh 3rd Line (265 Km) 6,996
13 Sambalpur - Jarapada 3rd and 4th line (127 Km) 3,574
14 Budhapank- Salegaon via Rajatgarh 3rd & 4th Line 3,035
(170 Km)
15 Kottavalasa-Koraput Doubling (189 Km) 3,580
16 Koraput-Singapur Road Doubling (165 Km) 2,462
17 Jagdalpur-Koraput Doubling (107 Km) 1,547
18 Jharsuguda-Bilaspur 4th line (206 Km) 2,596
19 Jharsuguda-Sason 3rd and 4th line (35 Km) 1,113
20 Bondamunda-Ranchi Doubling (159 Km) 3,029
21 Narayangarh-Bhadrak 3rd line (153 Km) 3,425
22 Bhadrak-Nergundi 3rd Line (92 Km) 1,632
23 Cuttack-Nergundi 4th line along with Rail flyover 759
at Nergundi (16 Km)
24 Dangoaposi-Jaroli (Banspani) 3rd & 4th Line (43 1,638
Km)
25 Jarapada- Budhapank 3rd & 4th Line with flyover at 929
Talcher (101 Km)
26 Flyover from Bondamunda A Cabin to 135
Bondamunda Link B Cabin (5 Km)
Page 13 of 19Amrit Bharat Stations:
Ministry of Railways has launched Amrit Bharat Station Scheme for
redevelopment of stations with a long-term approach.
The scheme involves preparation of master plans and their implementation
in phases to improve the stations of Indian Railways. The master planning,
keeping in view the necessity of each station, includes:
Improvement of access to station and circulating areas
Integration of station with both sides of city
Improvement of station building
Improvement of waiting halls, toilets, sitting arrangement, water
booths
Provision of wider foot over bridge/subway to commensurate with
passenger traffic
Provision of lifts/escalators/ramps
Improvement of platform surface/ provision of platform shelter
Provision of kiosks for local products through schemes like ‘One
Station One Product’
Parking development
Amenities for Divyangjans
Better passenger information systems
Provision of air concourse, executive lounges, Multimodal integration,
landscaping, etc.
The scheme also envisages sustainable and environment friendly solutions
etc. as per necessity, phasing and feasibility and creation of city centre at
the station in the long term.
So far, 1,340 stations have been identified for development under this
scheme, out of which 59 stations are located in Odisha. The names of
Page 14 of 19stations identified for development under Amrit Bharat Station Scheme in
Odisha are as following:
State Name of Name of Stations
Stations
Odisha 59 Angul, Badampahar, Balangir, Baleshwar,
Balugaon,Barbil, Bargarh Road, Baripada, Barpali,
Belpahar, Betnoti, Bhadrak, Bhawanipatna,
Bhubaneswar,Bhubaneswar New, Bimlagarh,
Brahmapur, Brajrajnagar,Chatrapur, Cuttack,
Damanjodi, Dhenkanal, Gunupur, Harishanker Road,
Himgir, Hirakud, Jajpur Keonjhar Road, Jaleswar,
Jaroli, Jeypore, Jharsuguda Jn, Jharsuguda Road,
Kantabanji, Kendujhargarh, Kesinga, Khariar Road,
Khurda Road Jn, Koraput Jn, Lingaraj Temple Road,
Mancheswar, Meramandali, Muniguda, Panposh,
Paradeep, Parlakhemundi, Puri, Raghunathpur,
Rairakhol, Rairangpur, Rajgangpur, Rayagada,
Rourkela, Sakhi Gopal, Sambalpur, Sambalpur City,
Soro, Talcher, Talcher Road, Titlagarh Jn.
Completed stations:
Development works at railway stations under Amrit Bharat Station Scheme
in Odisha have been taken up at a good pace. Details of stations completed
in Odisha are as under:
State No. of stations Name of stations
Odisha 09 Balangir, Baripada, Barpali,
Bimalgarh, Cuttack, Kesinga,
Khariar Road,
Parlakhemundi, Talcher
Page 15 of 19The activities for development at other stations have also been taken up at
good pace and progress of some of the stations is as given below:
Bhubaneswar station: The works of new West side and East side station
building, air concourse, elevated driveway at West and East side and
extension of foot over bridge have been completed. The works of
improvement of platform surface, improvement of circulating area, platform
shelters, lifts and escalators have been taken up.
Cuttack station: The works of new second entry station building, structural
work of new main entry station building and improvement of platform
surface have been completed. The works of air concourse, improvement of
circulating area, foot over bridge, platform shelters, finishing works of new
main entry station building, lifts and escalators have been taken up.
Puri station: The structural works of new station building and platform
shelters have been completed. The works of improvement of platform
surface, improvement of circulating area, finishing works of new station
building, lifts and escalators have been taken up.
Mancheswar station: The works of extension of station building,
improvement of circulating area, approach road, booking office, platform
shelters and toilet have been completed. The works of improvement of
station building, skywalk connecting extended station building and lifts
have been taken up.
Lingaraj Temple Road station: The works of improvement of platform
surface, platform shelters and toilet have been completed. The works of
extension and improvement of station building, 12 m wide foot over bridge,
lifts, installation of Train Indication Board and Coach Indication Board have
been taken up.
Page 16 of 19Further, development / redevelopment / upgradation / modernisation of
stations on Indian Railways is a continuous and ongoing process and works
in this regard are undertaken as per requirement, subject to inter-se
priority and availability of funds. Development / redevelopment /
upgradation / modernisation of a station is carried out based on category of
station/condition/traffic handled etc.
Development / upgradation / modernisation of stations including under
Amrit Bharat Station Scheme is generally funded under Plan Head-53
'Customer Amenities'. The details of allocation and expenditure under Plan
Head-53 are maintained Zonal Railway-wise and not station-wise or state-
wise. Odisha is covered under the jurisdiction of three railway zones,
namely, South Eastern Railway, East Coast Railway, and South East Central
Railway. For these zones, an allocation of 4,630 crore has been made for
the last two financial years and the current financial year, out of which an
expenditure (up to June, 2026) of 3,647 crore has been incurred so far.
Gopalpur-Rairakhol new line
The Detailed Project Report (DPR) for Gopalpur - Rairakhol new rail line
was prepared by Odisha Rail Infrastructure Development Limited (ORIDL).
However the alignment of proposed new line was not passing through
Phulbani, therefore ORIDL was advised to review the alignment of Gopalpur
Rairakhol new rail line. To extend rail connectivity to Phulbani, Final
Location Survey of Adenigarh to Phulbani (30km) has been sanctioned.
Adenigarh is a proposed station on the under construction Khurda –
Bolangir rail line.
Completion of Railway project/s depends on various factors which include the
following:
Land acquisition
Page 17 of 19 Forest clearance
Shifting of infringing utilities
Statutory clearances from various authorities
Geological and topographical conditions of area
Law and order situation in the area of project site
Number of working months in a year for particular project site etc.
All these factors drive the completion time and cost of the project/s.
Gati Shakti Cargo:
“In order to boost investment from industry in development of additional
terminals for handling rail cargos, ‘Gati Shakti Multi-Modal Cargo Terminal
(GCT)’ policy has been launched. The Gati Shakti Cargo Terminals (GCTs)
are being developed by private players, and can be developed on non-
Railway land or fully / partially on Railway land where the location of GCTs
is being decided on the basis of demand from industry and potential of
Cargo traffic.
So far, 142 Gati Shakti Cargo Terminals (GCTs) have been commissioned.
In addition, In-Principle Approvals (IPAs) have been granted for the
development of GCTs at 310 more locations. The 142 commissioned GCTs
have an estimated freight handling capacity of 224 million tonnes per
annum (MTPA). The policy has mobilized private investment of
approximately ₹10,000 crore through these GCTs. Freight handled at these
GCTs during 2025-26 is 146 MT.
In Odisha state, 12 Gati Shakti Cargo Terminals (GCTs) have been
commissioned and further In-Principle Approvals (IPAs) have been granted
Page 18 of 19at 36 more locations. The detail of GCTs commissioned in Odisha State is
as under :
1 Paradeep Jagatsinghapur
2 Paradeep Jagatsinghapur
3 Between Kechobahal- Jharsuguda
Laikera
4 Jajpur keonjhar Road Jajpur
5 Brajrajnagar Jharsuguda
6 Machapar Cuttack
7 Barpali Road Sundargarh
8 Sogra Sambalpur
9 Brundamal Jharsuguda
10 Jakhpura Jajpur
11 Bondamunda Jn. Sundargarh
12 Paradeep Jagatsinghpur
Railway Electrification:
Electrification of railway network on Indian Railways has been taken up in
mission mode. So far, about 99.6% of Broad Gauge (BG) network has been
electrified. The electrification in remaining network has been taken up.
Electrification carried out during 2014-26 and before 2014 is as under:
Period Route
Before 2014 (about 60 21,801
years)
2014-26 48,072
In Odisha state, entire existing BG network has been electrified. Further,
all new line / multi-tracking projects are being sanctioned and constructed
with electrification.
*****
Page 19 of 19