Parliament Question: Port-Road Connectivity in Sagarmala Programme

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

Executive Summary: This document summarizes port road connectivity projects under the Sagarmala Programme. It provides details on completed and under-implementation projects, including project costs, timelines, and reasons for delays or cost overruns. The information is current as of August 7, 2025, and includes annexures with specific project details. Key Points / Main Content: Completed Projects: * A total of 11 port connectivity projects have been completed by MoRTH. * Details of each completed project are listed in Annexure I, including state, port name, project name, status, length, appointed date, scheduled completion, actual completion, reasons for delays, and cost overruns. * Reasons for delays in completed projects include land acquisition issues, utility shifting, COVID-19 pandemic, and changes in scope. Under Implementation Projects: * A total of 22 port connectivity projects are currently under implementation by MoRTH. * Details of each project are listed in Annexure II, including state, port name, project name, status, length, appointed date, scheduled completion, likely completion date, reasons for delays, and cost overruns. * Reasons for delays in under-implementation projects include land acquisition issues, utility shifting, forest clearances, poor contractor performance, and public resistance. Cost and Time Overruns: * Both completed and under-implementation projects have faced cost and time overruns. * Cost overruns are attributed to changes in scope, escalation, and additional work requirements. * Time overruns are primarily due to delays in land acquisition, utility shifting, and obtaining necessary clearances. Dropped/Shelved Projects: * No sanctioned port connectivity projects have been dropped or shelved. Impact Analysis: Ministry of Road Transport and Highways (MoRTH): * Impact: Responsible for the implementation and completion of port connectivity projects. * Action Required: Monitor project progress, address delays, and manage cost overruns. Ministry of Ports, Shipping and Waterways: * Impact: Oversees the Sagarmala Programme and its objectives for port-led development. * Action Required: Coordinate with MoRTH to ensure port connectivity projects align with Sagarmala goals. State Governments: * Impact: Involved in land acquisition, utility shifting, and obtaining necessary clearances for projects within their jurisdiction. * Action Required: Expedite land acquisition processes, facilitate utility shifting, and provide necessary clearances to minimize project delays. Contractors: * Impact: Responsible for executing the port connectivity projects. * Action Required: Improve project management, address resource mobilization issues, and mitigate the impact of external factors such as weather and public resistance. Local Communities: * Impact: Affected by project implementation, including potential disruptions and displacement. * Action Required: Cooperate with project authorities, address concerns through appropriate channels, and seek fair compensation for any losses incurred.

Key Entities Referenced

Sagarmala Programme: A flagship program of the Government of India under the Ministry of Ports, Shipping and Waterways which aims to unlock the untapped potential of India's extensive coastline, navigable waterways, and strategic maritime trade routes for port-led development and coastal community upliftment. Ministry of Road Transport and Highways (MoRTH): The government ministry responsible for road transport and highways in India, overseeing the port connectivity projects mentioned in the document. Nitin Jairam Gadkari: The Minister of Road Transport and Highways. Andhra Pradesh: A state in India where several port connectivity projects are under implementation or have been completed, including projects related to Visakhapatnam and Kakinada ports. Visakhapatnam Port: A port in Andhra Pradesh, India, which is the focus of several port connectivity projects detailed in the document. Kakinada Port: A port in Andhra Pradesh, India, which is the focus of several port connectivity projects detailed in the document. Maharashtra: A state in India where Jawaharlal Nehru Port (JNPT) is located and is a site for port connectivity projects. Jawaharlal Nehru Port (JNPT): A port in Maharashtra, India, which is the focus of several port connectivity projects detailed in the document.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO- 3145 ANSWERED ON 07th August, 2025 PORT-ROAD CONNECTIVITY IN SAGARMALA PROGRAMME 3145. DR. KALYAN VAIJINATHRAO KALE: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन एवं िाजमार्ग मंत्री be pleased to state: (a) The number and length (in kilometers) of port-road connectivity projects identified and sanctioned under the Sagarmala Programme along with the total estimated cost, State-wise; (b) the number and cost of completed projects and the number of projects yet to be started/under implementation/pending due to delays, State-wise; (c) the list of port-road projects that have faced cost/time overruns including the reasons therefor; and (d) whether any port-road projects have been dropped/shelved, if so, the reasons therefor and the names of such projects? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI)(a) Sagarmala is a flagship Programme of the Government under the Ministry of Ports, Shipping & Waterways which aims to unlock the untapped potential of India's extensive coastline, navigable waterways, and strategic maritime trade routes for port-led development and coastal community upliftment. By leveraging coastal and waterway transportation, the program aims to minimize the need for extensive infrastructure investments, thus making logistics more efficient and improving the competitiveness of Indian exports. (b), (c) & (d) The list of completed and under implementation port connectivity projects undertaken by the Government showing cost / time overruns are attached at Annexure- I & Annexure –II respectively. No sanctioned port connectivity project has been dropped /shelved.ANNEXURE-I ANNEXURE REFERRED TO IN PART (b), (c) & (d) OF REPLY TO LOK SABHA UNSTARRED QUESTION NO. 3145 ASKED BY DR. KALYAN VAIJINATHRAO KALE FOR ANSWER ON 07.08.2025 REGARDING “PORT- ROAD CONNECTIVITY IN SAGARMALA PROGRAMME” List of 11 Completed Port Connectivity Projects undertaken by MoRTH Tim e Cos Sche Actu Awa Comp Reason Ove t S Leng Appo duled al rded letion s for Project State Port Statu rrun Ove N th(in inted Comp Comp Cos Cost Time/ Name Name Name s (in rrun o. km) Date letion letion t (in (in Cost Mo (in date date Cr.) Cr.) overrun nth Cr.) s) 2 to 4 Work laning of delayed road due to connectin Andhra Com 18.0 delay in Kakina 18.05 10.04 251. 1 g Prades 27.5 plete 5.20 11 251.1 - approv da .2018 .2019 1 Achampe h d 16 al of ta ROB Junction Drawin to joining gs byNH 16 at Railway Kathipudi s in East Godavri District in AP Work delayed Construct due to ion of delay in grade shifting separator of from H-7 electric area to al Port Andhra Visakh Com 22.0 utility connectiv 21.12 06.10 39.3 2 Prades apatna 0.77 plete 6.20 10 39.38 - and ity Road .2019 .2020 8 h m Port d 18 Vishak by hapatn passing am Port Convent Authori Junction - ty Visakhap (VPA) atnam Compo Port und wall Road Andhra Visakh Com 30.0 30.09 30.09 76.9 No 3 4.15 - 76.93 - Connectiv Prades apatna plete 3.20 .2017 .2017 3 delayity of VPT h m Port d 16 to NH-16 - Phase II 2 to 4 Work laning of dealyed port road Andhra Visakh Com 27.0 due to 26.11 30.04 77.7 4 connectiv Prades apatna 12.5 plete 5.20 15 77.78 - delay in .2004 .2006 8 ity to NH h m Port d 02 Land – 5 -Phase acquisi II tion Delay in Improvem shifting ent/upgra of dation of Railway 4 lane line by road to 6 Andhra Vishak Com 01.0 26.12 30.11 35.7 VPA & 5 lane road Prades hapatn 3.49 plete 4.20 23 35.79 - .2022 .2024 9 providi from East h am d 22 ng Breakwat traffic er to closure convent by junction VPA/Rai lway Improvem Andhra Vishak Com 05.0 Work 04.01 31.03 14.5 6 ent works Prades hapatn 11 plete 4.20 3 14.54 - slightly .2024 .2024 4 for h am d 23 delayedVisakhap due atnam todelay Port Road in providi ng traffic closure (VPA/R ailway) The project was execut ed by Construct the Goa ion of State balance PWD portion of Com Mormu 14.1 13.10 397. 719.1 322 under a 7 4 lane Goa 7.52 plete 31.12 64 gao 0.20 .2018 00 0 .10 Tripart ports d .2024 15 e connectiv Agreem ity (NH ent 566) betwee n the NHAI, Govt. of Goa &Mormu gao Port Authori ty. The work was delayed due to Covid pandem ic. Project cost increas ed due to Change of Scope due to additio n of ROB and overbridge and added cost implica tions, esclati on Com 01.0 Trapaj- Gujara 12.03 12.03 72.4 60.1 No 8 Alang 9.12 plete 6.20 - - Manar t .2024 .2024 3 7 delay d 22 JNPT - 6 to 8 Jawaha laning of Com Mahar rlal 9 NH-4B- plete Project developed in 4 packages ashtra Nehru SH-54 d Port and Amra MargWork delayed due to delay in utility shifting , Corona epidemi c, approv al of Jawaha Com 16.0 RoB by 9( Mahar rlal 15.05 31.03 Package I 4.60 plete 5.20 47 539 771 232 Central a) ashtra Nehru .2018 .2022 d 16 Railway Port s, delay in permiss ion for cutting mangro ves and frequen t stoppa ge of work byVillager s of Jaskha r & Sonari etc. Cost overrun due to Change of scope for additio nal works require d for fulfillm ent of Central Railway Guideli nes & Jawaha r LalNehru Port Authori ty require ments Work delayed due to Delay in obtaini ng Jawaha Com 16.0 Permis 9( Package Mahar rlal 15.05 31.03 594. 758.2 163 18.27 plete 5.20 46 sion for b) II ashtra Nehru .2018 .2022 7 3 .53 d 16 cutting Port of Trees and Mangro ves, Forest Landand utility shifting Project Cost Overrun on accoun t of Change in scope for additio nal work as per requirm ents of Port Authori ty, Railway , and local demand sDelay in utility shifting , Corona epidemi c, frequen t stoppa Jawaha ge of Com 16.0 9( Package Mahar rlal 15.05 31.03 604.6 100 work by 11.09 plete 5.20 46 504 c) III ashtra Nehru .2018 .2022 4 .64 Villager d 16 Port s of Jasai etc. Cost overrun due to CoS, shifting of Shanka r mandirWork delayed due to Delay in obtaini ng Permis sion for cutting of Mangro Jawaha Com 16.0 ves and 9( Package Mahar rlal 15.05 30.11 445.8 31. 10.56 plete 5.20 30 414 utility d) IV ashtra Nehru .2018 .2020 3 83 d 16 shifting Port Project Cost Overrun on accoun t of Change in scope for additio nalwork as per requirm ents of Port Authori ty, Railway , and to meet local demand s Madkhol- Com Mahar 10 Sankesh Redi plete Project developed in 2 packages ashtra war d 10 Madhkol – Com 07.1 Mahar 06.10 10.05 24.3 No (a Amboli Redi 29 plete 0.20 - 0 - ashtra .2025 .2025 2 delay ) section d 24 Amboli 10 Jn. to Com 25.1 Mahar 24.11 09.05 298. 291.1 No (b Sankesh Redi 61.43 plete 1.20 - - ashtra .2024 .2024 99 1 delay ) war d 22 sectionWork delayed due to delay in shifting Widening of EHT of 4 to 6 Tower laning V. O. Com 05.0 & (VOC Port Tamil Chidam 04.07 30.06 130. 11 5.16 plete 7.20 12 - - procure to Nadu baranar .2024 .2025 2 d 23 ment of Junction Port borrow of NH 138 earth/ & NH 38) fly ash, heavy/ unseas onal rainfall. 216.1 347 4085. Total 6 0.16 43ANNEXURE-II ANNEXURE REFERRED TO IN PART (b), (c) & (d) OF REPLY TO LOK SABHA UNSTARRED QUESTION NO. 3145 ASKED BY DR. KALYAN VAIJINATHRAO KALE FOR ANSWER ON 07.08.2025 REGARDING “PORT- ROAD CONNECTIVITY IN SAGARMALA PROGRAMME” List of 22 Under Implementation port connectivity projects undertaken by MoRTH Tim Cos Sche e Awa Mod Reason Likely t S. Leng Appoi duled Ove rded ified for Project State Port Comp Ove N th(in Status nted Comp rrun Cost Cos Time/ Name Name Name letion rrun o. km) Date letion (in (in t (in Cost date (in date Mon Cr.) Cr.) overrun Cr.) ths) Construc Delay tion of in flyover/u obtaini nderpass ng NOC at from Andhr Under Visakha Visakha irrigati a Implem 16.08 13.02 31.08 1 patnam patnam 1.94 6 38 - - on Prade entatio .2023 .2025 .2025 airport Port depart sh n junction ment to and ensure impact flow of of containe cyclonr trailers es. to /from MMLP set up at NH-16 Improve ments / Upgrada tion of existing 4 lane road to 6 Andhr Under Visakha lane a Implem 14.02 13.02 13.02 501. No 2 patnam 9.58 - - - from Prade entatio .2024 .2026 .2026 65 delay Port Convent sh n junction to Sheelan agar Junction (NH-16) 2 to 4 Delay laning of Andhr Under in Land road a Kakina 12.2 Implem 17.08 15.08 31.12 acquisi 3 5 408 - - connecti Prade da 5 entatio .2023 .2025 .2025 tion, ng sh n shifting Kakinad ofa port to Utilitie NH 16 at s, NOC Rajanag from aram in Irrigati Godavri on District - Depart package ment, 2 - Change Samalko in ta to Mining Achamp Policy eta of State Govt, Impact of Michua ng Cyclon e and hevay rainfall.Initial delay due to delay in 2 to 4 mobilis laning of ation of road resourc connecti es by ng Contra Kakinad ctor, a port to Delay NH 16 at Andhr Under in Rajanag a Kakina 13.2 Implem 13.07 12.07 31.12 79.2 4 29 90.2 - Utility aram in Prade da 0 entatio .2022 .2023 .2025 6 Shifting Godavri sh n Change District - in package Mining 3 - Policy Achamp of eta to State Kakinad Govt, a Impact of Michua ng Cyclone and hevay rainfall. Project Cost revised due to descop ing of 2.1 Km length on accoun t of length overlap ping with other project s of NHAI.Delay due to contrac tual dispute s with Contra ctor on Dedicate various d Port issues road to includi Krishnap ng atnam Andhr Under Krishna liability Port a 18.9 Implem 20.12 18.12 31.12 254. 291. 37. 5 patnam 57 of cost (Packag Prade 8 entatio .2018 .2020 .2025 43 56 13 Port towrad e-I) from sh n s Km. loading 0.000 to & Km. transpo 18.000 rtation of Pond ash for the project. Project Cost modified due to escalat ion and Change of Scope. Delay due to Heavy flood on 6 lane entire road to project Krishnap alignm Andhr Under atnam Krishna ent, a 34.8 Implem 20.10 19.10 28.02 961. 6 Port patnam 14 - - Tree Prade 8 entatio .2023 .2025 .2027 2 from Port felling sh n Naidupet permis a in AP sion (pkg - IV) and hindera nces in the Right of WayProject cost modifie d due to CoS for additio nal items not covere d in scope of work. Greenfiel Time d road and connecti cost ng north over Andhr Under and Krishna run on a 15.9 Implem 25.09 24.09 31.03 512. 7 south patnam 6 - - accoun Prade 5 entatio .2023 .2025 .2026 56 industria Port t of sh n l cluster Change of of Khandal Scope eru for 25Creek Nos. of near additio Krishnap nal atnam structu port res propos ed by Irrigati on Depart ment. Detaile d designs & drawin gs submitt ed for review by Indepe ndent Engine er.Time and cost over run on accoun t of impact of Construc Michau tion of 4- ng laning of Cyclon Andhr Under Chilakar Krishna e, a 36.0 Implem 07.12 06.12 22.11 686. 8 u cross- patnam 11 - - inclusi Prade 7 entatio .2023 .2025 .2026 68 road to Port on of sh n Turpu additio Kanupur nal u structu res require ment by Irrigati on Depart ment not inthe scope of work and Land acquisi tion issues. Upgrada tion of the propose d NH-67 Andhr Under From Krishna a Implem 9 Bellary - patnam Project corridor being developed in 5 packages Prade entatio Karnata Port sh n ka to Krishnap atnam - Andhra PradeshWork delaye d due to poor perfor mance of Contra 4 laning ctor; of work Karnata termina ka/AP ted by Border- Andhr Krishna the 9( Gooty a 57.2 Termina 06.05 05.05 539. patnam - 71 - - State a) section Prade 9 ted .2016 .2018 99 Port PWD on from km sh 26.04.2 368+920 024 to km due to 424+225 Contac NH-67 tor's failure to achiev e project milesto nes.Tender s to be invited for balanc e work. 2L+PS of Under Andhr Gooty- Krishna Mainten 9( a 42.7 30.07 29.07 29.07 43.8 No Tadipatri patnam ance - - - b) Prade 8 .2024 .2029 .2029 6 Delay section Port contrac sh of NH-67 t 4 laning of Andhr Tadipatri Krishna 9( a 51.1 Comple 23.02 20.08 08.03 424. No - patnam - - - c) Prade 2 ted .2023 .2025 .2025 99 Delay Muddanu Port sh r Section of NH-67 2L+PS Work fof delaye Muddanu Andhr Krishna d due 9( r to a 21.6 Comple 08.07 07.07 14.08 91.1 patnam 13 - - to Land d) Jammal Prade 8 ted .2015 .2017 .2018 2 Port acquisi madugu sh tion Section issues of NH-67The 4 lanning work was carried out by the State Govern ment 4L from by its Jammal own Andhr madugu Krishna funds 9( a Comple to patnam 32.5 - - 2016 - - - - in e) Prade ted Mydukur Port 2014- sh Section 16. of NH-67 Present ly the stretch has been taken up for wideni ng from 4 lane to 4lane with paved should ers in current Annual Plan 2025- 26. Work 4 Laning delaye of Andhr Under Krishna d due 9(f Mydukur a 45.1 Implem 21.09 19.09 15.06 718. patnam 9 - - to Wild ) - Badvel Prade 4 entatio .2023 .2025 .2026 9 Port Life Section sh n Clearan of NH-67 ce 4 Laning Andhr Badvel - Krishna 9( a 108. Bids Nellore patnam - - - - - - - - g) Prade 13 invited Section Port sh of NH-67 Construc Project Andhr tion of Krishna DPR in scope 9( a Four- patnam 5.43 progres - - - - - - - change h) Prade lane loop Port s d as sh connecti perng from decisio Narikella n taken palli to in the Krishnap Meetin atnam g at Port MoRTH North and gate DPR for a loop connec ting to another gate of the port is in progres s. Upgrada tion of the Andhr Under hinterlan Krishna a Implem 10 d road patnam Project corridor being developed in 8 packages Prade entatio From Port sh n Naidupet a -in NelloreDistrict of AP to Krishnag iri -in TN Work delaye d due to delay in Land acquisi tion, 6L of public Renigunt agitatio Andhr a to Krishna Work n for 10 a 57.0 31.01 31.01 07.04 189 Naidupet patnam Comple 14 - - higher (a) Prade 5 .2022 .2024 .2025 9 a Port ted compe sh section nsation of NH-71 , delay in NOC from Airport Authori ty of India and ROBclearan ce from Railwa ys. Renigunt Andhr Under a- Krishna 10 a 17.4 Implem 14.12 13.12 13.12 862. No Mallavar patnam - (b) Prade 0 entatio .2024 .2026 .2026 11 delay am (NH- Port sh n 205) Work comple 6L of ted on Chittoor 08.06.2 to Andhr Krishna Work 023. 10 Mallavar a 61.1 04.01 29.09 233 patnam Comple 08.06 20 - - Work (c) am Prade 3 .2019 .2021 0.81 Port ted .2023 delaye section sh d due of NH- to 140 delay inhandin g over of Land Work awarde d to M/s.Ga yatri Project s Ltd Chittoor- termina SP/TN ted on Border Andhr Under 11.08.2 Krishna 10 (Shantip a Implem 18.05 02.02 149. 022. patnam 5.45 18.12 14 - - (d) uram Prade entatio .2023 .2026 77 Balanc Port .2024 Nalagam sh n e palli NH- works 4) were awarde d to M/s.SD infra is in progres sConces sion Agreem ent AP-TN signed Krishna 10 Border- Tamil 28.0 on 133 patnam - - - - - - - (e) Ranipatt Nadu 2 18.03.2 8.14 Port ai 025; Appoint ed Date to be declare d Delay in Land Acquisi tion due to Ranipatt Krishna protest 10 ai- Tamil 148. Comple 07.06 04.12 16.02 125 138 130 patnam 26 from (f) Krishnag Nadu 30 ted .2011 .2013 .2016 0 0.73 .73 Port the iri land owners deman ding higherCompe nsation . Work delaye d due to Litigati on, delay in Land Road Under Acquisi connecti Karna Beleker 54.6 Implem 07.12 07.12 31.12 360. 11 37 - - tion vity to taka i 8 entatio .2020 .2022 .2025 6 and Belekeri n obtaini ng road Closure permis sion from local authori ties.Work delaye d due Yekkam to bi-Haveri Under Forest (Sirsi- Karna Beleker 74.9 Implem 08.03 07.03 31.03 clearan 12 37 174 - - Yekkam taka i 8 entatio .2022 .2024 .2027 ce and bi- n encroa Haveri) chment in the Right of Way. Road connecti vity from Under kasarka Karna Honnav Implem 05.12 06.06 06.06 No 13 4.58 - 87.5 - - d side of taka ar entatio .2024 .2026 .2026 delay Honnava n r Port to NHWidening Work to 4 lane delaye from Km d due 51.60 to to 76.20 delay (Hebri to in land Parkala) acquisi and from tion Km and 85.20 to obtaini 88.90 ng (Karavali forerst Under junction clearan Karna Implem 26.12 25.12 30.11 181. 202. 21. 14 to Malpe 28.3 11 ce. taka entatio .2022 .2024 .2025 25 8 55 Malpe) Cost n of increas Thirthah ed due alli- to Udupi- Change Malpe of Section Scope of NH- on 169A in accoun the t of State of additio Karnata nal ka on work ofEPC Breast Mode wall, under retainin Annual g wall, plan Box 2021-22 culvert (Job No. s, RCC NH- Drains 169A- etc. not KNT- include 2021-22- d in the 927 orginal scope. 2 to 4 Work laning of delaye NH-169 Under d due from New Karna 45.0 Implem 10.10 08.10 30.06 113 to 15 Mangalo Mangal 21 - - taka 1 entatio .2022 .2024 .2026 7 delay re to ore n in Land Mudabid Acquisi ri to tion Karkala Improve Under ment of Murmug Implem 01.08 31.07 31.07 237. No 16 flyover Goa 4.57 - - - ao Port entatio .2024 .2026 .2026 60 delay from n Dabolimairport to MES College Junction on NH 566 and flyover/V UP at Queeny Nagar The original contract was terminated the concession agreement under 4 laning Article 37 on 17.11.2021 & the project of has been divided into 2 contract Panvel Jawaha packages as under: - to Mahar rlal Termina 19.12 16.06 17 84.6 (i) 0 – 42.300 Km (Panvel to Kasu) - the Indapur ashtra Nehru ted .2011 .2014 project is likely to be completed by section Port 30.09.2025 of NH 17 (ii) 42.300 – 84.600 Km (Kasu to - Phase 3 Indapur) - the project is likely to be completed by 31.12.2025. (4 Work Laning Jawaha Under delaye 17 of Mahar rlal Implem 29.03 28.12 30.09 151. 151. d due 42.3 21 - (a) Panvel ashtra Nehru entatio .2023 .2023 .2025 26 26 to to Kasu Port n delay section in landfrom km acquisi 0 – km tion, 42.300 Utility shifting , Encroa chment and also on accoun t of Slow progres s by the Contra ctor . Work 4 Laning delaye of Kasu d due to Jawaha Under to Indapur 17 Mahar rlal Implem 18.11 17.05 31.12 delay section 42.3 19 332 332 - (b) ashtra Nehru entatio .2022 .2024 .2025 in land from km Port n acquisi 42.300 – tion, km Utility 84.600 shifting, Encroa chment and also on accoun t of Slow progres s by the Contra ctor . Constr uction of 08 Nos. of VUPs 4 laning Under under of Odish Paradip Implem 11.02 08.08 31.12 492. COS, 18 Duburi- 39.4 38 577 - a Port entatio .2020 .2022 .2025 83 COVID, Paradip n rain, via NH53 public agitatio n, poor mobiliz ation ofresourc es by the Contra ctor. 8 Laning of Under Chandik Odish Paradip Implem 19 hole - Project corridor being devloped in 4 packages a Port entatio Paradip n via NH 53 Work delaye d due Paradip to Section interru of NH-53 ption in (Old NH Under supply 19 – 5A) Odish Paradip Implem 15.12 14.12 14.03 18 3 711 - - of fly (a) from a Port entatio .2023 .2025 .2026 ash, Km.0.00 n Public to resista Km.18.0 nce for 0(pkg I) deman d of additional underp asses. Work delaye d due to Paradip interru Section ption in of NH-53 supply (Old NH Under of fly 19 – 5A) Odish Paradip Implem 15.12 14.12 14.03 742. ash, 21 3 - - (b) from a Port entatio .2023 .2025 .2026 25 Public Km.18.0 n resista 0 to nce for Km.39.0 deman 0 (pkg II) d of additio nal underp asses. Paradip Work Under Section delaye 19 Odish Paradip Implem 15.12 14.12 14.03 762. of NH-53 21 3 - - d due (c) a Port entatio .2023 .2025 .2026 75 (Old NH to n – 5A) interrufrom ption in Km.39.0 supply 0 to of fly Km.60.0 ash, 0(pkg III) Public resista nce for deman d of additio nal underp asses. Work delaye d due Paradip to Section interru of NH-53 Under ption in (Old NH 19 Odish Paradip 16.6 Implem 01.11 31.10 31.01 808. supply – 5A) 3 - - (d) a Port 4 entatio .2024 .2026 .2027 48 of fly fromKm. n ash, 60.00 to Public Km.76.4 resista 6(pkg IV) nce for deman d ofadditio nal underp asses. Work delaye d due to Delay in handin g over Madurav of oyal Under coovu Elevated Tamil Chenna 20.9 Implem 23.11 20.05 20.02 357 m 20 9 - - road Nadu i Port 4 entatio .2023 .2026 .2027 0 bounda corridor n ry by project Water Resour ces Depart ment (WRD) and NGT directions for stoppa ge of work in coovu m river during monso on season. Syama Under Kona West Prasad Implem 06.06 03.12 03.12 720. No 21 Express Benga 7.19 - - - Mookerj entatio .2024 .2026 .2026 67 delay way l ee Port n Double Gaigha Lane to- t Jetty 4 Lane is Road being connecti connec Under ng ted to Gaighat Implem 19.07 31.12 22 Gaighat Bihar 1.18 - - 3.26 - - NH-19 Jetty entatio .2024 .2026 Jetty through n and NH- 2 Lane 19/82 Service (National Road Waterwa running y-1) alongNH-19. One Upram p facility to Connec t 2 Lane Service Road with Main Carriag eway is being constru cted under CoS of New MG Setu Work. CoS Order ofUpram p work was given on 19.07.2 024. Work is expect ed to get comple ted by 31.12.2 026 236 1266 Total 58.0 .32 3 *****