Parliament Question: Private Investment in National Highway Projects

Issued by Ministry of Road Transport and Highways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 1852 ANSWERED ON 30TH JULY, 2026 PRIVATE INVESTMENT IN NATIONAL HIGHWAY PROJECTS 1852. SHRI ARVIND DHARMAPURI: SHRI ALOK SHARMA: SHRI PRADEEP PUROHIT: SHRI BHARTRUHARI MAHTAB: SHRI VIJAY KUMAR DUBEY: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the details of National Highway projects implemented through Public-Private Partnership (PPP), Hybrid Annuity Model (HAM), Toll- Operate-Transfer (TOT), Infrastructure Investment Trust (InvIT) or other financing models, project-wise and State/UT-wise including Telangana, Odisha and Madhya Pradesh; (b) the private investment attracted in highway infrastructure during the last five years; (c) whether the Government has taken any specific measures to promote private investment in the development of National Highway, if so, the details thereof; (d) whether the concession framework has been revised to attract greater private investment, if so, the details thereof; and (e) the details of highway projects proposed to be developed through PPP or other alternative financing models, State-wise particularly Telangana, Odisha and Bhopal Lok Sabha Constituency in Madhya Pradesh?ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) Assets worth Rs.1,72,898 crore have been monetized till date through Toll-Operate-Transfer (TOT), Infrastructure Investment Trust (InvIT) and project-based financing. A total of 317 projects under Hybrid Annuity Model (HAM) and Build-Operate-Transfer (BOT) mode, with a length of 11,711.81 km and total capital cost of Rs. 4,57,547.46 crore, have been awarded during the Financial Year (FY) 2021-22 to FY 2025-26. The details are enclosed at Annexure-I. The details of the projects awarded during FY 2021-22 to FY 2025- 26 on Public Private Partnership (PPP) mode in the States of Telangana, Odisha and Madhya Pradesh are enclosed at Annexure- II. (b) Private investment of Rs. 1,27,293.20 crore was attracted in highway infrastructure during FY 2021-22 to FY 2025-26. The year- wise details are as under: S. No. Financial Year Private Investment (in Cr) 1 FY 2021-22 19,206.00 2 FY 2022-23 21,897.09 3 FY 2023-24 34,805.25 4 FY 2024-25 30,251.28 5 FY 2025-26 21,133.58 Total 1,27,293.20 (c) and (d) The Model Concession Agreements (MCA) has been revised for BOT (Toll) and HAM modes to attract greater private participation. The key amendments include: i. Strengthening project readiness requirements by aligning project approval, award and declaration of the Appointed Date with prescribed milestones for land acquisition and environmental, forest and wildlife clearances; ii. Standardization of Change of Scope items, with predefined rates and indexation provisions;iii. Introduction of formula-based compensation for delay in handing over the required land; and iv. Revised provisions relating to traffic shortfall, revenue support and competing roads, namely:  Revenue support if tollable traffic is less than 90% of target traffic in the first 7 years;  After 7 years, the Concession Period is extended by 1% for every 1% shortfall in tollable traffic where total traffic falls more than 10% below the target traffic, with a corresponding reduction where tollable traffic exceeds the target traffic; and  The Concessionaire has the right to terminate the contract if traffic remains below 20% of target traffic in 2 out of any block of 3 years. (e) Development of National Highways, including through PPP mode, is a continuous process. New projects are taken up depending upon techno-economic feasibility, financial viability, traffic density and synergy with the PM Gati Shakti National Master Plan.ANNEXURE-I ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 1852 ANSWERED ON 30TH JULY, 2026 ASKED BY SHRI ARVIND DHARMAPURI, SHRI ALOK SHARMA, SHRI PRADEEP PUROHIT, SHRI BHARTRUHARI MAHTAB AND SHRI VIJAY KUMAR DUBEY REGARDING “PRIVATE INVESTMENT IN NATIONAL HIGHWAY PROJECTS”. A. Details of funds raised under Asset Monetization: (in Rs. Cr.) S. No. Financial Year ToT InvIT Project based Financing Sub-Total Prior to FY2021-22 14,693 10,813 25,506 1 FY 2021-22 1,011 7,350 13,901 22,262 2 FY 2022-23 10,662 2,825 11,600 25,087 3 FY 2023-24 15,968 15,625 9,486 41,079 4 FY 2024-25 6,661 17,641 4,325 28,627 5 FY 2025-26 12,357 15,721 - 28,078 FY 2026-27 2,259 2,259 Sub-Total 46,659 59,162 39,312 1,45,133 Grand Total 63,611 59,162 50,125 1,72,898 B. Details of works awarded under HAM and BOT mode: HAM BoT Total S. Financial Total Project Total Total Length Length Length No. Year Nos Cost Nos Project Cost Nos Project Cost (in km) (in km) (in km) (in Cr) (in Cr) (in Cr) FY 2021- 1 22 95 3,684.40 1,45,879.33 2 67.00 2,330.71 97 3751.40 148210.04 FY 2022- 2 23 98 3,400.31 1,28,225.94 1 90.90 1,553.76 99 3491.21 129779.70 FY 2023- 3 24 40 1,201.10 48,875.86 0 0.00 0.00 40 1201.10 48875.86 FY 2024- 4 25 42 1,513.00 57,708.14 2 209.80 10,342.12 44 1722.83 68050.26 FY 2025- 5 26 37 1,545.27 62,631.60 0 0.00 0.00 37 1545.27 62631.60 Total 312 11,344.07 4,43,320.87 5 368 14,226.59 317 11711.80 457547.46ANNEXURE-II ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 1852 ANSWERED ON 30TH JULY, 2026 ASKED BY SHRI ARVIND DHARMAPURI, SHRI ALOK SHARMA, SHRI PRADEEP PUROHIT, SHRI BHARTRUHARI MAHTAB AND SHRI VIJAY KUMAR DUBEY REGARDING “PRIVATE INVESTMENT IN NATIONAL HIGHWAY PROJECTS”. Details of Highway Projects awarded in Telangana, Odisha and Madhya Pradesh on PPP Mode during FY 2021-22 to FY 2025-26 S. Project Name State Length Total Mode No. (in km) Capital Cost (in Rs. Cr) 1 Hyderabad - Maneguda Telangana 46.405 958.86 HAM 2 Khammam-Devarapalle Pkg II [4L Telangana 29.513 615.78 HAM Access Controlled (Greenfield) from Somavaram village to Chintagudem village (Design Chainage 33+604 to 63+117)] 3 Khammam-Devarapalle Pkg I Telangana 33.604 797.36 HAM [4L Access Controlled (Greenfield) from Thallampadu village to Somavaram village (Design Chainage 0+000 to 33+604)] 4 6L Access Controlled Greenfield Telangana 39.3 972.06 HAM Highway of Nandinne village to Julekal village from Km 202.900 to Km 242.200 (Pkg-1) 5 4L Access Controlled Greenfield Telangana 29.92 973.45 HAM Highway section on NH-163G (Khammam– Vijayawada) from V. Venkatayapalem village at Design Ch. 220.480 Km to Brahmanapalli(K) village at Design Ch. 250.400 Km (Package-I). 6 4L Access Controlled Greenfield Telangana 30.83 1105.25 HAM Highway section on NH-163G (Warangal-Khammam) from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at DesignCh. 220.480 Km(Package-III) 7 4L Access Controlled Greenfield Telangana 39.41 1092.88 HAM Highway section on NH-163G (Warangal-Khammam) from Venkatpur village in Warangal District at Design Ch. 150.240 Km to Thallasenkesa village in Mahabubabed District at Design Ch. 189.650 km(Package-II) 8 4L Access Controlled Greenfield Telangana 38 1142.6 HAM Highway section on NH163G (Warangal-Khammam) from Oorugonda village in Hanamkonda District at Design Ch. 112.240 Km to Venkatpur village in Warangal District at Design Ch. 150.240 Km(Package-I) 9 4L Access Controlled Greenfield Telangana 31.466 1127.9 HAM Section (Mancherial – Warangal) from Narva village at Design Ch. 3.834 Km to Puttapaka village at Design Ch. 35.300 Km (Package-I) 10 4L Access Controlled Greenfield Telangana 37.05 1129.33 HAM Section (Mancherial – Warangal) from Puttapaka village at Design Ch. 35.300 Km to Pangidipalle village at Design Ch. 72.350 KmPackage-II) 11 4L Access Controlled Greenfield Telangana 39.89 1183.71 HAM Highway Section (Mancherial – Warangal) from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 Km(Package-III) 12 4L of Karimnagar-Warangal section Telangana 68.015 2146.86 HAM from km 49.500 to km 117.820 of NH- 563 13 4-laning of NH-167 from Gudebellur at Telangana 80.1 3175.08 HAM Design Km.182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad- Panaji section 14 Khammam-Devarapalle Pkg III [4L Andhra 42.12 829.5 HAM Access Controlled (Greenfield) from Pradesh, Chintagudem village to Recherla Telangana village (Design Chainage 63+117 to 105+236)] 15 6L Access Controlled Greenfield Andhra 38.2 1227.57 HAM Highway of Julekal village to Pradesh, Dinnedevarapadu village from Km Telangana242.200 to Km 280.400 (Pkg-2) 16 4L Access Controlled Greenfield Andhra 29.709 1183.23 HAM Highway section on NH-163G Pradesh, (Khammam– Vijayawada) from Telangana Remidicherla village at Design Ch. 280.200 Km to Jakkampudi village (on NH-16) at Design Ch. 309.909 Km (Package-III) 17 4L Access Controlled Greenfield Andhra 29.8 826.01 HAM Highway section on NH-163G Pradesh, (Khammam – Vijayawada) from Telangana Brahmanapalli(K) village at Design Ch. 250.400 Km to Remidicherla village at Design Ch. 280.200 Km(Package-II) 18 6L of MH/KN Border (Nimbal Village) Karnataka, 40.6 1499.73 HAM to KN/TS Border (Singnodi Village) Telangana from Km. 162.5 to Km. 203.100 in Raichur of NH-150C (Pkg-IV) 19 Construction of Rewa Bypass to 4-lane Madhya 19.2 648.05 HAM with paved shoulder along with Pradesh service road from Ratahara Chowk to Chorhata Chowk Road section of NH- 30 from km 00.000 to 19.200 in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM). 20 Upgradation of Shahdol- Sagartola Madhya 69.4 851.4 HAM Section of NH 543 from km 0+000 to Pradesh km 69+400 to 2 lane with paved shoulders under Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh 21 4L of Ujjain to Badnawar from km Madhya 69.1 1352.56 HAM 26.900 to km 96.00 of NH-752D Pradesh 22 4L of Khedakhajuriya to Suhagadi Madhya 47.8 876.37 HAM from Km. 41.400 to Km. 89.200 of NH-Pradesh 148NG (New NH 752D) (Pkg-II) 23 4L of Chandesara to Madhya 42.15 909.84 HAM Khedakhajuriya from Km. 0.000 to (-) Pradesh 750 & Km 0.000 to km 41.400 of NH- 148NG (Pkg-I) 24 Indore - Edlabad (Pkg-II) [Tejajinagar Madhya 33.4 1162.8 HAM to Balwara] Pradesh 25 Indore - Harda (Pkg-II) [Raghavgarh to Madhya 63.67 1081.51 HAM Nanasa from km. 29.30 to km. 92.30] Pradesh 26 (i) 4L Vidisha to Hinotiya from km Madhya 47.476 1003.87 HAM 0.000 to Km 27.000 (Vidisha – Pradesh Mehulwa-Talbehat Pkg-I) Section of NH- 346 and (ii) 4L Vidisha to Morikori from Km 39.000 to 59.476 section of NH-14627 4L Boregaon Buzurg to Shahpur (Pkg I Madhya 47 1504.37 HAM of Boregaon Buzurg to Muktainagar) of Pradesh NH 753L 28 Construction work of 4-laning of Madhya 40.357 784.14 HAM Shahganj bypass end to Badi Pradesh (Package-IV) of NH-146B from design km 102.000 to design km 142.357 (Design length 40.357 km) 29 4L of Budhni to Shahganj Bypass End Madhya 28.25 1102.97 HAM (Package-III) of NH-146B from Km. Pradesh 73.750 to Km. 102.000 30 Construction of 6 lane Indore western Madhya 30 1430.56 HAM bypass from km 34+000 to Km 64+000 Pradesh (Pkg-II) in the state of Madhya Pradesh on Hybrid Annuity Mode under NH(O) 31 Construction of 6 lane Indore western Madhya 34 1534.7 HAM bypass from km 0+000 to Km 34+000 Pradesh (Pkg -l ) in the State of Madhya Pradesh on Hybrid Annuity Mode under NH(O) 32 Six laning with both sides Service Madhya 16.439 1123.17 HAM Road of Ayodhya Bypass from Design Pradesh Km 0+000 near Ashram Tiraha on NH- 46 to Km 16+439 end at Ratnagiri Tiraha on Nh-146 33 4 Laning of Sandalpur to Nasrullaganj Madhya 43.2 1425.98 HAM (Pkg-1) section of NH-146B Length Pradesh 43.2 Km. 34 Outer Ring Road of Jabalpur Town Madhya 18.55 794.7 HAM from Amjhar Road including Airport Pradesh Connectivity to barela (Pkg-V) 35 4-lanning of Gyaraspur to Rahatgarh Madhya 36.109 903.44 HAM section of NH-146 from Design Ch. Pradesh 88+361 to Ch 124+470 in the state of MP on HAM mode 36 4-lanning of Rahatgarh to Berkhedi Madhya 10.645 618.33 HAM section of NH-146 from Design Ch Pradesh 124+470 to Ch. 134.549 37 4L of Chowka to Kaimaha near MP/UP Madhya 43.924 996.5 HAM Border section NH-34 from D. Ch. Pradesh 145.000 to D. Ch. 197.266 excluding existing Chhatarpur bypass from D. Ch. 160.307 to D. Ch. 168.630 (Package-4) 38 4L of near Satai Ghat to Chowka Madhya 55.125 1005.59 HAM section of NH-34 from D. Ch. 89.875 to Pradesh D. Ch. 145.000 (Package-3)39 4L Vidisha Gyaraspur section of NH-Madhya 28.886 980.2 HAM 146 from Design Chainage km 59+475 Pradesh (existing chainage km 81+240 ) to Design Chainage km 88+361 (existing chainage km 110.315) 40 4L from km 0.000 to 42.040 Bhopal Madhya 42.04 1032.3 HAM (Ratnaigiri Tiraha) to Vidisha Pradesh (Morikodi) 41 Bypass on Western side of Gwalior Madhya 30 998.95 HAM City Pradesh 42 Construction of 4 Lanning of Madhya 80.45 3842.41 HAM Badnawar-Petlawad-Thandla- Pradesh Timarwani section of (NH-752D) from Badnawar Bypass Ch. 70+400 to Timarwani Interchange of Delhi Mumbai expressway (NE-4) Ch. 150+850 in the state of Madhya Pradesh on Hybrid Annuity Mode under NH(O) 43 Widening of existing 2 lane to 4 lane Madhya 54.2 1595.79 HAM divided carriageway with paved Pradesh shoulder from Km 243+800 to Km 270+500 of NH 39 (Rewa to Churhat Tunnel North portal excluding Churhat Tunnel) and from Km 286+200 to Km 313+700 of NH 39 (Churhat to Sidhi section) (Design Length- 54.20 Km) under NH(O) in the State of Madhya Pradesh on Hybrid Annuity Mode. 44 Construction of 4-lane Greenfield Madhya 20.19 771.14 HAM western Bypass from Design Km Pradesh 0+000 (Ex Km 181+000 on NH-146) near Lahdara Village Junction on NH- 146 to Design Km 20+193 (Ex Km 223+200 on NH-44) near Berkheri Guru village Junction on NH-44 of Length- 20.193 km 45 4L Shahpur to Muktainagar from Km. Madhya 30.14 784.35 HAM 186.000 to km 216.278 of NH 753L Pradesh, (Pkg II of Boregaon Buzurg to Maharashtra Muktainagar) 46 4L of Suhagadi to Bardiya Amra from Madhya 46.15 823.05 HAM Km. 89.200 to Km. 135.351 of NH-Pradesh, 148NG (Pkg-III) Rajasthan 47 Development of access controlled 6 Madhya 88.4 4612.65 BOT Lane Agra-Gwalior greenfield NH Pradesh, section starting from Agra Inner Ring Rajasthan, road ( K.M. 0+000) near Deori village Uttar Pradesh and termination at Gwalior bypass(K.M. 88+400) near Susera village 48 6L Greenfield Kandili - Aluru Section Odisha 22.533 1492.74 HAM of NH-130-CD Road from km 342+500 to km 365+033 (Package-OD-8) 49 6L Greenfield Baraja - Kandili Section Odisha 4 838.02 HAM of NH- 130-CD Road from km 338+500 to km 342+500 (Package-OD-7) 50 6L Greenfield Baunsaguar - Baraja Odisha 45.5 1265.59 HAM Section of NH-130-CD Road from km 293+000 to km 338+500 (Package – OD-6) 51 6L Greenfield Kaliagura – Baunsaguar Odisha 44 1539.75 HAM Section of NH-130-CD Road from km 249+000 to km 293+000 (Package – OD-5) 52 Rehabilitation and Up gradation from 4 Odisha 18 929.91 HAM to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH – 5A) from Km.0.00 to Km.18.00(Package-1) 53 Rehabilitation and Up gradation from 4 Odisha 21 920.47 HAM to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH – 5A) from Km 18.00 to Km 39.00 in the State of Odisha on HAM mode (Package-2) 54 Rehabilitation and Up gradation from 4 Odisha 21 861.84 HAM to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH – 5A) from Km.39.000 to Km.60.00 (Package-3) 55 Rehabilitation and Up gradation from 4 Odisha 16.646 882.45 HAM to 8 laning of Chandikhole – Paradip Section of NH-53 (Old NH – 5A) from Km.60.000 to Km.76.646 (Package-4) 56 4L Godibandha to Ballhar Chhak, Odisha 17.455 973.12 HAM Ballhar Chhak to Banarpal & Banarpal to Start of Angul bypass at Km.314.130 to Km.321.035 of NH53, at Km.75.200 to Km.84.000 of NH149 & at Km.84.000 to Km.86.100 of NH55 57 Construction of new four-lane Access Odisha 21.225 1274.06 HAM controlled Highway from Cuttack (end point of CRRR at NH-16 near Tangi) to Kandarpur on SH-12 from Design Ch. 0+000 km to 21+225 under NH(O) on Hybrid Annuity Mode in the State of Odisha 58 Construction of New four lane Odisha 35.384 1411.17 HAM Sambalpur Bypass from Km 0.000 to Km 35.38459 Construction of new Six-lane Access Odisha 30.295 2453.18 HAM Controlled Capital Region Ring Road from Rameswar (NH-16) to Gobindpur Package Il from Design Ch. Km. 40.700 to Km. 70.995 in the State of Odisha 60 Construction of new Six-lane Access Odisha 40.7 2944.36 HAM Controlled Capital Region Ring Road from Rameshwar (NH-16) to Bilipada from Km. 0.000 to Km. 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode- (Pkg- 1) 61 Construction of new 6-lane Capital Odisha 40.33 2910.2 HAM Region Ring Road (CRRR) from Gobindpur near Kuspangi (NH-42) to Tangi near Bandalo Toll Palza (NH-16) (Km.70.540 to Km. 110.870) Total 2,318.25 79,235.71 *****

Continue your research