GOVERNMENT OF INDIA
MINISTRY OF PORTS, SHIPPING AND WATERWAYS
LOK SABHA
UNSTARRED QUESTION NO. 5606
ANSWERED ON 27.03.2026
PROGRESS OF THE SAGARMALA PROGRAMME
5606. SHRI BALRAM NAIK PORIKA:
Will the Minister of PORTS, SHIPPING AND WATERWAYSbe pleased to state:
प(cid:517)न,पोत प(cid:303)रवहन और जलमाग(cid:330) मं(cid:361)ी
(a) the progress on the Sagarmala Programme, including new port projects,
modernisation of existing ports and capacity addition achieved during the last three
years;
(b) the funds allocated and utilised, along with private investment attracted;
(c) the development of inland waterways (National Waterways 1, 2, and others) with
cargo movement statistics and reduction in logistics cost; and
(d) the details of employment generated and coastal community development schemes
being implemented?
ANSWER
MINISTER OF PORTS, SHIPPING AND WATERWAYS
(SHRI SARBANANDA SONOWAL)
(a) to (b) Sagarmala is a central sector scheme of Ministry of Ports, Shipping and
Waterways with the target to promote port-led development in the countryunder which,
the Ministry provides financial assistance for the projects under 5 pillars, namely port
modernization, port connectivity, port-led industrialization, coastal community
development, and coastal shipping & inland water transport.So far, 129 projects have
been sanctioned for financial assistance under Sagarmala scheme. Details of projects
including funds allocation and funds released under Sagarmala scheme is available at
annexure-I.(c) The Government has undertaken various initiatives for development of inland
waterways, including National Waterway (NW) 1,NW 2 and other NWs. These initiatives
include development of fairways, terminals, navigation aids, River Information System
(RIS), night navigation facilities, and promotion of multimodal connectivity.Development
of NWs is expected to enable modal shift of cargo / passenger transportation from road
and rail to waterways, thereby reducing overall logistics costs, easing congestion,
lowering fuel consumption and reducing carbon emissions. The statistics of cargo
movement on NWs is available at annexure-II.
(d) Skill development under Sagarmala scheme has been implemented through
convergence with DDU-GKY to train coastal youth for maritime sector employment.
Centre of Excellence in Maritime and Shipbuilding (CEMS) has been established to
provide industry-relevant training and certification. The number of beneficiaries trained,
certified and placed during last five years under Sagarmala-DDUGKY convergence
program and CEMS are at annexure-III and annexure-IV respectively. The initiatives
have led to measurable improvements in employability and livelihoods with over 9,583
candidates trained and 4,270 placed under Sagarmala–DDU‑GKY convergence since
2015. These efforts have supported transition from informal to formal employment in
maritime sectors. Complementary interventions such as fishing harbour development,
coastal tourism, and CEMS training have enhanced income opportunities and increased
participation of traditional coastal communities. In addition, development and operations
of NWs has generated employment by way of contractual engagements, construction
activities, and direct &indirect jobs in logistics and allied sectors.Annexure-I
The details of 129 projects funded under Sagarmala scheme:
Proj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Providing
separate
approach way Coastal
10.9 10.9
1 for cargo Havelock Shipping Completed 10.91
1 1
movement in and IWT
Havelock jetty
at Havelock
Construction Coastal
Visakhapat 43.0 30.0
2 of coastal Shipping Completed 30.00
nam 0 0
Berth at VPT and IWT
Construction
of grade
separator from
H-7 area to
Port
Port
connectivity Visakhapat 46.3 23.1
3 Connectivit Completed 23.17
Road by nam 4 7
y
passing
Convent
Junction -
Visakhapatna
m Port
2 to 4 laning of
port road Port
Visakhapat 77.0 20.0
4 connectivity to Connectivit Completed 20.00
nam 0 0
NH – 5 -Phase y
II
DDUGKY Coastal
Phase I Andhra Community
5 Completed 0.28 0.14 0.14
Andhra Pradesh Developme
Pradesh nt
Centre of Coastal
6 Completed 36.76
Visakhapat 574. 36.7
Excellence in CommunityProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Maritime and nam Developme 00 6
Shipbuilding - nt
CEMS - AP -
18 out of 24
Labs in AP
Construction
of fishing
harbour at Coastal
Juvvaladinne Juvvaladinn Community 288. 69.1
7 Completed 69.14
in Nellore e Developme 00 4
District of nt
Andhra
Pradesh
Improvement
of Kakinada
Anchorage
Ports Port
73.3 36.6
8 infrastructure Kakinada Modernizati Completed 36.67
4 7
in East on
Godavari
district, Andhra
Pradesh
Recycling/Reu
se of Sewage
Treated Water
from
Sewarage
Port
Infrastructure
9 Mormugao Modernizati Completed 3.18 3.18 3.02
Development
on
Corporation of
goa Ltd
(SIDCGL)
located at
KatemBaina
19.3
Road Port
10 Mormugao Completed 9.67 9.67
5
circulation plan ConnectivitProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
for ease of y
movement of
break bulk
cargo at
Mormugao
Full rake
wagon
Port
handling line 17.6
11 Mormugao Connectivit Completed 8.82 8.82
with paving 5
y
30m wide at
Mormugao
Removal of 2
No.s Mooring
Port
of Spiral in the 13.8
12 Mormugao Modernizati Completed 6.94 6.94
area of Cruise 7
on
Berth -
Mormugao
2nd Full rake
Port
handling line
13 Mormugao Connectivit Completed 6.59 3.30 3.30
RD 8A with
y
30m paving
Construction
of an Up- Port
21.9 11.0
14 Ramp at MPT Mormugao Connectivit Completed 11.09
9 9
Railway yard y
Baina.
Construction
of 12m wide
concrete road Port
15 connecting Mormugao Connectivit Completed 9.51 4.81 4.81
berth 5 6 7 8 & y
9 to new entry
/ exit road
719. 85.0
Balance Port
16 Mormugao Completed 83.80
00 0
Portion 4 Lane ConnectivitProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
road y
connectivity to
NH17 - for
Mormugao
Port
Installation of
3 MWp Solar
Power Plant Port
11.9
17 with Virtual Mormugao Modernizati Completed 5.95 5.95
1
Net Metering on
on Turnkey
Basis
Coastal jetty at Coastal
108. 41.3
18 Navlakhi for Navlakhi Shipping Completed 20.65
00 0
cement and IWT
Capital
Dredging work
of Ro-Pax
Coastal
Ferry services 208. 104.
19 Dahej Shipping Completed 99.18
between 85 42
and IWT
Gogha and
Dahej in Gulf
of Cambay.
Construction
Coastal
of RoRO/ Ro- 98.4 48.4
20 Hazira Shipping Completed 48.42
Pax Facility at 2 2
and IWT
Hazira
Upgradation of
Dredging of
Ghogha
Coastal
62.4 45.8
Channel,
21 Ghogha Shipping Completed 45.81
9 1
Turning Circle
and IWT
and Approach
Channel to
achieve depthProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
of 7 meter".
Third stage
expansion
including
Coastal
modernisation
Community 50.0
22 of the existing Malpe Completed 7.94 7.94
Developme 0
fishing harbour
nt
of Malpe in
Udupi District
in Karnatak
Modernisation
of the existing Coastal
fishing harbour Community 19.0
23 Amadalli Completed 4.69 4.69
at Amadalli in Developme 0
Uttara nt
Kannada
Coastal
DDUGKY
Community
24 Phase I Karnataka Completed 1.53 0.76 0.76
Developme
Karnataka
nt
Installation of
Fire Fighting Port
18.2
25 Equipment at Karwar Modernizati Completed 9.10 8.65
1
Karwar Port in on
Karnataka
Refurbishment
and Capacity
enhancement Port
19.2 14.4
26 of Coastal Cochin Modernizati Completed 14.45
7 5
liquid terminal on
-COT and NTB
at CoPT
Construction
18.5
Coastal
27 Kollam Completed 7.24 7.24
of
0
Shipping
MultipurposeProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Coastal Berth and IWT
at Kollam
Construction
of Fishing Coastal
Harbour at Community 35.0
28 Thalai Completed 6.90 6.90
Thalai in Developme 0
Kannur District nt
in Kerala
Construction
of Mini Fishing
Coastal
Harbour
Community 30.0
29 Chettuva in Chettuva Completed 4.68 4.68
Developme 0
Thrissur
nt
District in
Kerala
Reconstruction
of South Coal
Port
Berth at 19.3 10.5
30 Cochin Modernizati Completed 10.55
Cochin Port for 0 5
on
handling
chemicals
Development
of RORO
facilities for Coastal
12.4 12.4
31 handling Cochin Shipping Completed 11.84
6 6
propylene and and IWT
other cargo at
Cochin Port
Passenger
Coastal
Jetty at Janjira 121. 55.4
32 Janjira Shipping Completed 52.63
Fort, Raigad 23 1
and IWT
District
Construction Coastal
72.1 30.0
33 of break water Mandwa Shipping Completed 30.00
4 0
at Mandwa and IWTProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Ro Ro service
at Mandwa - Coastal
63.0 27.5
34 Phase 2 of Mandwa Shipping Completed 27.51
0 1
Mandwa port and IWT
development
Construction Coastal
35 of Ro-Ro Vasai Shipping Completed 6.73 3.33 3.33
jetties at Vasai and IWT
Construction
of approach
jetty and
sloping berth
Coastal
jetty and
36 Bhayander Shipping Completed 7.25 3.54 3.54
approach road
and IWT
to facilitate Ro
Ro jetty at
Bhayander,
Maharashtra
Construction
of Ro Rojetty Coastal
37 atNarangi(Vira Virar Shipping Completed 6.75 3.40 3.40
r)' in and IWT
Maharashtra.
Construction Coastal
Ghodbunde
38 of jetties at Shipping Completed 7.40 3.70 3.70
r
Ghodbunder and IWT
Construction
of Ro Ro Jetty
at Malvan
Coastal
Passenger 10.6
39 Malvan Shipping Completed 4.84 4.84
Jetty at 3
and IWT
Sindhudurg
Port in
Maharashtra
40 Mandwa Completed 8.27 8.27
Dredging in Coastal 16.5Proj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
the Shipping 4
Navigational and IWT
Channel for
Ro-Ro Pax
Services at
Mandwa
Stage II
expansion of
Coastal
Mirkawada
Community 75.0 17.9
41 Fishing Ratnagiri Completed 17.95
Developme 0 5
Harbour in
nt
RatnagiriDistri
ct
Coastal
DDUGKY
Maharashtr Community
42 Phase I Completed 5.50 2.18 2.18
a Developme
Maharashtra
nt
Centre of
Excellence in
Maritime and Coastal
Shipbuilding - Community 191. 12.4
43 Mumbai Completed 12.48
CEMS - Developme 00 8
Maharashtra-6 nt
out of 24 Labs
in Maharashtra
Construction
of passenger
Coastal
boat landing KanhojiAng
44 Shipping Completed 7.68 3.84 3.84
jetty at re
and IWT
KanhojiAngre
Island
Construction Coastal
Jawaharlal 143. 25.0
45 of Coastal Shipping Completed 25.00
Nehru Port 00 0
Berth at JNPT and IWT
46 Karanja Completed 68.27
Construction Coastal 149. 68.5Proj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
of Fishing Community 80 1
Harbor at Developme
Karanja, nt
Raigad district,
Maharashtra
Construction
of Tourism Coastal
47 jetty at Belapur Shipping Completed 6.50 4.05 4.05
Belapur, and IWT
Maharashtra.
Construction
of tourism
Coastal
Jetty at Veldur,
48 Veldur Shipping Completed 7.06 3.45 3.45
Distt.-
and IWT
Ratnagiri,
Maharashtra
Construction
of Ro-Ro Jetty
at Coastal
Ambadave
49 AmbadaveShi Shipping Completed 7.37 3.44 3.44
Shigwan
gwan in and IWT
Raigad
District".
‘Construction
of Approach
road to
Port
Kharwadeshw 15.0
50 Palghar Connectivit Completed 7.50 7.50
ari Jetty in 0
y
District
Palghar,
Maharashtra.
Construction
Port
161. 140. 140.4
of Third
51 Mumbai Modernizati Completed
00 46 6
Chemical
on
Berth atProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Pirpau, MbPT
SCADA and
PLC
automation Port
22.7 22.7
52 system at Mumbai Modernizati Completed 22.77
7 7
Marine Oil on
Terminal at
Mumbai Port
Coastal
DDUGKY
Community
53 Phase I Odisha Completed 3.72 1.84 1.84
Developme
Odisha
nt
Capital
Port
Dredging for 27.6 27.4
54 Puducherry Modernizati Completed 27.45
Puducherry 5 5
on
Port
Development
and Operation
of a full-
fledged Truck
Parking
Terminal Port
Thoothukud 23.6 10.0
55 adjacent to Modernizati Completed 10.00
i 9 0
NH7A on
opposite to
Fisheries
college at V. O
.Chidambaran
ar
Coastal berth
with dredged
Coastal
depth of 10.0m
Thoothukud 36.0 29.9
56 Shipping Completed 29.99
to handle
i 0 9
and IWT
vessels up to
15000 DWT -
length 150m atProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
VoCPT
Coastal
Coastal Cargo 80.0 30.0
57 Chennai Shipping Completed 30.08
Berth at ChPT 0 8
and IWT
Construction
of Breakwater
both in North
and South side
of entrance
channel-
Port
Berth-1- Berth- 135. 67.5
58 Cuddalore Modernizati Completed 67.50
2 and Capital 00 0
on
Dredging at
Cuddalore
Port -From
entrance
channel till
cargo berths
Development
of paved
Port
storage yard at 51.4 25.7
59 Chennai Modernizati Completed 25.73
Chennai Port 6 3
on
for handling
export cargo
Construction
Port
of Bunker 44.0 22.0
60 Chennai Modernizati Completed 22.00
berth at 0 0
on
Chennai Port
Construction
of a fishing
Coastal
harbour at
Nagapattina Community 148. 37.0
61 Poompuhar in Completed 37.00
m Developme 00 0
Nagapattinam
nt
District in
Tamil NaduProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Expansion of
fishing harbour
at Coastal
Chinnamuttom Kanyakuma Community 74.0 18.3
62 Completed 18.38
in ri Developme 0 8
Kanyakumari nt
District in
Tamil Nadu
Coastal
DDUGKY
Community
63 Phase I Tamil Tamil Nadu Completed 2.94 0.59 0.59
Developme
Nadu
nt
Construction
of widening
the
Korampallam
Surplus course
bridge and rail Port
Thoothukud 41.5 20.0
64 over bridge - Connectivit Completed 20.00
i 5 0
RoB including y
widening of
road from
western
boundary to
TTPS
Dredging the
dock basin for
coastal cargo
berth at Port
Thoothukud 98.0 20.8
65 VOCPT - Modernizati Completed 20.89
i 0 9
Dredging in on
front of
dedicated
coastal berth
77.0 39.6
National Coastal
66 Chennai Completed 39.67
3 7
Technology CommunityProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Centre for Developme
Ports, nt
Waterways
and Coasts
(NTCPWC) at
IIT Madras.
Fishing harbor
at Mookaiyur Coastal
in Community 113. 28.4
67 Mookaiyur Completed 28.48
Ramanathapur Developme 90 8
am district in nt
Tamil Nadu
Construction
of fish landing
Coastal
centre at
Community 74.0 18.5
68 Kunthukal in Kunthukal Completed 16.65
Developme 0 0
Ramanathapur
nt
am District of
Tamil Nadu.
Modern
elevated steel
bridge for safe
trasport of Port
Kanyakuma 37.0 15.5
69 tourists from Connectivit Completed 15.53
ri 0 3
Vivekananda y
Rock to
Thiruvalluvur
statue
Development
of Buffer
Parking yard
Port
49.0 39.4
for Trailers /
70 Chennai Modernizati Completed 39.42
6 2
Trucks at the
on
backup areas
of Berth No.
24B(BD-II) inProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Chennai Port
Authority
RoB cum
Flyover at Port
127. 50.0
71 Ranichak level Kolkata Connectivit Completed 50.00
80 0
crossing at y
KoPT
Improvement
of road
Port
connectivity to 13.5
72 Kolkata Connectivit Completed 6.76 6.76
facilitate trade 2
y
and port users
at KoPT
Upgradation of
the track 10-
Port
12-14-16-18- 47.0 14.0
73 Kolkata Connectivit Completed 14.00
19-20-21- 22 0 0
y
and 23 at EJC
yard of KoPT
Upgrade of
existing rail Port
74 network at Kolkata Connectivit Completed 9.00 4.00 4.00
Kolkata Dock y
System
2nd Railway
Line from
Durgachak Port
117. 20.0
75 take off point Haldia Connectivit Completed 20.00
00 0
to ‘A’ cabin at y
Durgachak at
HDC
Improvement
Port
87.9 20.0
of road
76 Kolkata Connectivit Completed 20.04
1 4
connectivity to
y
facilitate tradeProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
and port users
at KoPT,
Phase-2
Design,
Engineering &
Construction
for
Rehabilitation
of No.7, NSD Port
80.7 80.7
77 Old Berth Kolkata Modernizati Completed 80.74
4 4
including on
Development
of Backyard at
N.S. Dock of
KDS - SMP,
Kolkata’
Anti erosion
work on the
left bank of
river Hooghly/ Coastal
16.6 16.6
78 Bhagirathi Kolkata Shipping Completed 16.63
3 3
Block & P.S. and IWT
Kalyani, Nadia
district,
Kolkata (WB)
DDUGKY
Coastal
Phase II Andaman & Under
Community
79 Andaman & Nicobar Implementati 7.09 2.30 2.30
Developme
Nicobar Island on
nt
Islands
Development
of Sea Port Coastal Under
48.9 48.9
80 Terminal at Havelock Shipping Implementati 22.38
9 9
Havelock and IWT on
SwarajDweepProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Modernisation
Coastal
of Under
Visakhapat Community 178. 50.0
81 Visakhapatna Implementati 40.00
nam Developme 51 0
m Fishing on
nt
Harbour
DDUGKY Coastal
Under
Phase II Andhra Community
82 Implementati 5.98 5.98 5.98
Andhra Pradesh Developme
on
Pradesh nt
Augmentation
of Firefighting
Port Under
facilities at 17.7
83 Mormugao Modernizati Implementati 8.88 7.10
Berth no. 8 of 6
on on
MgPA on
Turnkey basis
International &
Domestic
Cruise Coastal Under
87.4 43.7
84 Terminal and Mormugao Shipping Implementati 41.42
4 2
Ferry Terminal and IWT on
at Mormugao
Port, Goa
Construction
Coastal Under
of Ro-Ro/ Ro- 90.4 45.2
85 Muldwarka Shipping Implementati 8.16
Paxfacility at 9 5
and IWT on
Muldwarka
Coastal
DDUGKY Under
Community 10.8
86 Phase II Gujarat Implementati 7.32 3.62
Developme 5
Gujarat on
nt
Coastal
Under
Community 573. 223. 223.7
87 NMHC Lothal Implementati
Developme 12 76 6
on
ntProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Construction
of fishing
Coastal
harbor at Under
Community 158. 12.5
88 Mangrol Mangrol Implementati 11.25
Developme 00 0
(Phase-III), on
nt
Junagarh,
Gujarat.
Occupational
Coastal
Safety and Under
Community 30.0 30.0
89 Health Alang Implementati 22.28
Developme 0 0
Training in on
nt
Alang
Coastal
DDUGKY Under
Community
90 Phase II Karnataka Implementati 2.18 0.55 0.55
Developme
Karnataka on
nt
Development Coastal
Under
of Fishing Community 196. 98.2
91 Kulai Implementati 49.13
Harbour at Developme 51 5
on
Kulai nt
Development
of existing fish
landing center Coastal
Under
at Community 138. 34.6
92 Hejamadi Implementati 32.92
HejamadiKodi Developme 60 5
on
in Udupi nt
district of
Karnataka."
Construction
of coastal Coastal Under
65.0 25.0
93 cargo berth at Mangaluru Shipping Implementati 23.75
0 0
Old Mangaluru and IWT on
Port
25.4 10.1
DDUGKY Coastal Under
94 Kerala 7.57
6 6
Phase II Community ImplementatiProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Kerala Developme on
nt
"Modernization
Coastal
and up- Under
Community 169. 50.0
95 gradation of Cochin Implementati 47.50
Developme 17 0
Cochin Fishing on
nt
Harbour".
Coastal
DDUGKY Under
Maharashtr Community 15.1
96 Phase II Implementati 8.58 5.04
a Developme 1
Maharashtra on
nt
Modernization
Coastal
of existing Under
Community 92.5 23.1
97 Fishing Harbor Sassoon Implementati 11.56
Developme 2 3
at Sassoon on
nt
Dock, Mumbai
Development
Coastal
of Fishing Under
Community 96.6 48.3
98 Harbour at Mumbai Implementati 45.89
Developme 0 0
Mallet Bunder, on
nt
Mazgaon
Construction
of Ro-Pax jetty
Coastal Under
and Terminal 82.9 41.4
99 Mora Shipping Implementati 20.73
at Mora, Distt. 2 6
and IWT on
Raigad,
Maharashtra
Development
Coastal Under
of Ro-Ro 21.6 10.8
100 Rewas Shipping Implementati 5.53
Service at 6 3
and IWT on
Rewas
Construction
Under
Coastal
88.4 12.5
of fishing
101 Anandwadi Implementati 11.25
Community
4 0
harbour at
on
Developme
AnandwadiProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
(Deogad) in nt
Sindhudurg
District
Construction
of Approach
Jetty and
sloping berth
jetty and Coastal Under
102 Approach Manori Shipping Implementati 6.59 3.29 3.13
Road to and IWT on
facilitate Ro-
Ro Jetty at
Manori,
Maharashtra
Construction
of jetty at Coastal Under
103 Arnala fort- Tal Arnala Shipping Implementati 9.94 4.97 4.72
Vasai- Dist. and IWT on
Thane.
Up-
gradation/mod
ernization of
Coastal Under
International 363. 139. 132.1
104 Mumbai Shipping Implementati
Cruise 30 15 9
and IWT on
Terminal at
Indira Dock,
Mumbai
Tourism Jetty Coastal Under
99.8 49.9
105 at Kashid in Kashid Shipping Implementati 47.41
2 1
Raigad District and IWT on
Coastal
DDUGKY Under
Community 22.8
106 Phase II Odisha Implementati 2.27 1.86
Developme 3
Odisha on
ntProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Ro-pax Jetty
and allied
infrastructure
connecting
Coastal Under
Kaninali in 136. 50.3
107 Bhadrak Shipping Implementati 40.24
Bhadrak 98 0
and IWT on
District
&Talchua in
Kendrapada
District".
Modernization
and Coastal
Under
upgradation of Community 99.7 49.8
108 Paradip Implementati 39.90
Paradip Developme 5 8
on
Fishing nt
Harbour"
Construction
of fishing
harbor at Coastal
Under
Chandipur Community 49.9 12.4
109 Chandipur Implementati 11.86
(Balaramagadi Developme 4 9
on
) in Balasore nt
district,
Odisha.
Ro-pax Jetty
and allied
infrastructure
connecting Coastal Under
37.0 18.5
110 Balugaon in Khurda Shipping Implementati 14.81
2 1
Khurda District and IWT on
&Krishnaprasa
dGada in Puri
District".
DDUGKY Under
Coastal
111 Phase II Puducherry Implementati 2.22 2.22 2.17
Community
Puducherry on
DevelopmeProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
nt
Upgradation of
Nagapattinam
Port
Infrastructure
for the
Coastal Under
passenger Nagapattina 10.4 10.4
112 Shipping Implementati 7.00
ferry service m 7 7
and IWT on
from
Nagapattinam
(India) to
Kankesanthur
ai (Sri Lanka)
Creation of
Berthing
facilities for the Coastal Under
Rameshwar
113 tourist vessels Shipping Implementati 7.58 7.58 7.21
am
at Agni and IWT on
Theertham,
Tamil Nadu'.
Creation of
additional
berthing
facilities for the Coastal Under
Rameshwar
114 tourist vessels Shipping Implementati 3.66 3.66 0.73
am
at and IWT on
VilloondiTheert
ham, Tamil
Nadu'.
Coastal
DDUGKY Under
Community 10.6
115 Phase II Tamil Tamil Nadu Implementati 3.66 3.37
Developme 7
Nadu on
nt
Modernization Coastal
97.9 48.9
Under
116 Chennai 44.39
and up- Community
5 7
Implementati
gradation of DevelopmeProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Chennai nt on
Fishing
Harbour”.
Development
Coastal Under
of Passenger Kanyakuma 20.0 10.0
117 Shipping Implementati 9.50
jetty at ri 0 0
and IWT on
Kanyakumari
Setting up of
Centre for
Inland and
Coastal Coastal
Under
Maritime Community 69.2 69.2
118 Kharagpur Implementati 49.89
Technology Developme 0 0
on
(CICMT) at nt
Indian Institute
of Technology,
Kharagpur
Development
of River Cruise
terminal and
river tourism Coastal Under
75.8 37.9
119 facility along Kolkata Shipping Implementati 18.96
2 1
with riverfront and IWT on
beautification
works at KDS,
SMP, Kolkata’
Augmentation
of Firefighting
Port Under
facilities at Pir 52.6 26.3
120 Mumbai Modernizati Implementati 25.03
Pau Terminal 9 4
on on
of Mumbai
Port
Port Under
Construction
29.4 14.7
121 Narangi Connectivit Implementati 13.97
of Approach
1 0
y on
road toProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
Narangi Jetty
Construction
of four EXIM
Godowns and Port Under
54.3 27.1
122 concrete roads Chennai Connectivit Implementati 21.74
4 7
around EXIM y on
Godowns at
Chennai Port
Development
of paved
storage yard at
marshalling Port Under
45.9 22.9
123 yard and JD Chennai Modernizati Implementati 21.80
0 5
(east) back up on on
area for
handling EXIM
cargoes
Smart Lighting Port Under
124 on Willingdon Cochin Modernizati Implementati 2.01 2.01 0.00
Island on on
2.3 MWp roof
mounted grid
connected Port Under
15.3
125 solar power Kolkata Modernizati Implementati 30.7 7.68
5
plant at on on
Khidderpre
Dock-II
Extension and
Improvement
of Loading
Port Under
Platform of full
12.5 12.5
126 Mormugao Modernizati Implementati 2.52
rake No.8 and
8 8
on on
modification to
railway
infrastructure
for HandlingProj MoP
Fund
ect SW
Relea
Cos Shar
Sl. Project sed
Project Name Location Status t e
No. Pillar (₹
(₹ (₹
crore
cror cror
)
e) e)
two rakes
simultaneously
at Line No. 08
and 8A at
Mormugao
Port
Revamping/up
gradation of 6
(Six) roads in Port Under
19.3
127 port Kolkata Modernizati Implementati 9.67 9.19
5
operational on on
areas of KDS
under SMPA
Creation of
additional
birthing and Coastal
Under
Land side Community
128 Chellanam Implementati 7.65 6.88 1.32
facilities at Developme
on
Chellanam nt
Fishing Harbor
in Kerala
Revamping of
Port Under
Bascule 117.
129 Kolkata Connectivit Implementati 41 20.50
Bridge at 54
y on
Kolkata PortAnnexure II
Details of cargo movement on various national waterways (NWs) from 2020-21 to 2024-
25(in million tons):
2020- 2021- 2022- 2023- 2024-
National Waterways (NW) 21 22 23 24 25
NW-1 (Ganga-Bhagirathi-Hooghly
River System Haldia-Allahabad) 9.21 10.93 13.17 12.82 16.38
NW-2 (Brahmaputra river (Dhubri-
Sadiya)) 0.31 0.43 0.63 0.59 0.90
NW-3 (West Coast Canal) 0.73 1.70 3.23 3.29 3.49
NW-4 (Krishna Godavari River
Systems) 6.83 11.23 8.42 4.30 10.40
NW-5 (East Coast Canal And Matai
river/BrahmaniKharsua-Dhamra
Rivers/Mahanadi delta rivers) 0.01 0. 40 0.64 0.38
NW-8 (Alappuzha-Changanassery
Canal) 0.03 0.04 0.04
NW-9 (Alappuzha-Kottayam
Athirampuzha Canal) 0. 02 0.02 0.03
NW-14 (Baitarni River) 0.00
NW-16 (Barak River) 0.00 0.01 0.01 0.00 0.18
NW-23 (BudhaBalanga) 0.03 0.02 0.02
NW-27 (Cumberjua River)
NW-31 (Dhansiri/Chathe) 0.01 0.00
NW-40 (Ghaghra River)
NW-44 (Ichamati River) 0.28 0.82 0.46 0.48 0.49
NW-47 (Jalangi River)
NW-48 (Jawai-Luni-Rann Of Kutch
River) 2.40
NW-53 (Kalyan-Thane-Mumbai
Waterway, Vasai creek And Ulhas
River) 2.70
NW-57 (Kopili River)
NW-64 (Mahanadi River) 0.01 0.45 0.67 0.40NW-86 (Rupnarayan River) 0.00 0.00 0.09 0.10 0.14
NW-94 (Sone River) 1.16 0.97
NW-97 (Sunderbans Waterway) 3.86 6.10 5.47 5.19
Sub Total (National Waterways 21.22 31.24 32.41 29.34 44.91
Maharashtra Waterways
NW- 10 (Amba River) 17.69 20.23 28.54 30.17 29.69
NW-83 (Rajpuri Creek) 0.21 0.23 0.24 0.45 0.27
NW-85 (Revadanda Creek-
Kundalika River System) 1.08 0.70 0.50 0.99 0.82
NW-91 (Shastri River - Jaigad Creek
System) 9.23 22.45 33.87 37.05 32.64
Total Maharashtra Waterways 28.21 43.61 63.15 68.66 63.41
Goa Waterways
NW-68 (Mandovi River) 4.00 2.62 2.54 2.42 2.80
NW-111 (Zuari River) 4.46 1.96 0.39 1.10 1 .32
Total Goa Waterways 8.46 4.58 2.93 3.52 4.16
Gujarat Waterways
NW-73 (Narmada River) 0.08 0.05 0.04 0.06 0.0
NW- 100 (Tapi River) 25.63 29.32 27.62 31.46 33.31
Total Gujarat Waterways 25.71 29.37 27.66 31.51 33.36
Grand Total Million Tonnes 83.61 108.79 126.15 133.03 145.84Annexure-III
Stae-Wise Candidates Trained/Certified/Placed under Sagarmala DDUGKY Convergence Program in Last 5 Years
FY 2021-22 2022-23 2023-24 2024-25 2025-26 (till
17.03.2026)
State/UT Trained Certifie Place Traine Certifie Place Trained Certifie Place Traine Certifie Place TraineCertified Place
d d d d d d d d d d d d
Andaman 0 0 0 0 0 0 70 61 0 105 23 24 55 95 14
& Nicobar
Islands
Andhra 368 213 229 1409 288 858 743 1767 857 61 0 0 0 0 0
Pradesh
Gujarat 212 0 5 180 205 122 232 73 249 392 187 150 0 113 151
Karnataka 0 0 0 0 0 0 50 0 0 0 0 0 0 0 0
Kerala 0 0 6 0 0 2 0 0 4 663 368 245 371 287 277
Maharashtr 0 0 0 0 0 0 66 91 0 661 487 264 208 34 142
a
Odisha 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0
Puducherr 0 0 0 0 0 0 62 26 12 145 79 65 173 190 91
y
Tamil 117 53 130 53 25 28 151 18 88 158 95 168 0 110 17
Nadu
Total 697 266 371 1642 518 101 1374 2036 121 2185 1239 916 807 829 692
0 0Annexure-IV
Candidates Trained by CEMS in Last 5 Years
State Trained Certified Placed
Maharashtra 100 100 75
Karnataka 25 25 21
Tamil Nadu 125 125 102
Andhra Pradesh 1763 1763 1466
West Bengal 81 81 0
Total 2094 2094 1664
*****