See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF INFORMATION & BROADCASTING
LOK SABHA
UNSTARRED QUESTION No. 1629
(TO BE ANSWERED ON 29.07.2026)
PROGRESS UNDER BIND SCHEME
1629. SHRI DHAIRYASHEEL SAMBHAJIRAO MANE:
SHRI MUKESHKUMAR CHANDRAKAANT DALAL:
SHRI YOGENDER CHANDOLIA:
SHRI DULU MAHATO:
SHRI CHAVAN RAVINDRA VASANTRAO:
SHRI RADHESHYAM RATHIYA:
SHRI KOTA SRINIVASA POOJARY:
SMT. SMITA UDAY WAGH:
SHRI SUDHEER GUPTA:
DR. HEMANT VISHNU SAVARA:
Will the Minister of INFORMATION AND BROADCASTING be pleased to state:
(a) whether the Government has reviewed the progress made under the Broadcasting
Infrastructure and Network Development (BIND) Scheme for modernisation of Prasar
Bharati during the last one year and if so, the details thereof;(b) whether the Government has undertaken infrastructure and technological upgrades,
including digitisation, High Definition broadcasting, transmitter modernisation and
strengthening of broadcasting facilities and if so, the details thereof;
(c) whether the Government has assessed the quality, reach and accessibility of
Doordarshan and Akashvani services across the country and if so, the details thereof,
State and district-wise particularly in Maharashtra including Jalgaon Lok Sabha
Constituency along with the steps taken in this regard;
(d) whether the Government proposes to further modernise broadcasting infrastructure
and expand digital public service broadcasting in underserved regions of the country
and if so, the details thereof, State and district-wise particularly for Jalgaon Lok Sabha
Constituency;
(e) whether the Government has evaluated the impact of the BIND Scheme on
strengthening public service broadcasting and digital media outreach and if so, the
details thereof; and
(f) the status of Doordarshan and Akashvani Kendra in Palghar district and provision to
enhance the regional services in regional language like Marathi?
ANSWER
THE MINISTER OF STATE FOR INFORMATION AND BROADCASTING AND
PARLIAMENTARY AFFAIRS
(DR. L. MURUGAN)
(a) to (f): Broadcasting Infrastructure and Network Development (BIND) scheme is a Central
Sector Scheme for development, modernization and upgradation of Doordarshan and
Akashvani's broadcasting infrastructure, approved with an outlay of ₹2539.61 crore for 2021-
26 and extended upto 31.03.2027.The Scheme provides for modernization of broadcasting infrastructure through upgradation of
transmitters, studios, production and transmission facilities, expansion of the DD Free Dish
DTH platform and Doordarshan channels, and other initiatives to strengthen public service
broadcasting.
Major infrastructure and technological upgrades undertaken under the Scheme include:
i. Digitalisation: Most Doordarshan studios have been digitalised. File-based workflow
facilities have been provided, including an end-to-end facility at Hyderabad and a two-channel
automated play-out system for the DD National channel. E-governance has been completed at
125 Akashvani stations.
ii. High Definition broadcasting: DD Sahyadri, DD Girnar and DD Odia were launched in
HD format in June 2025. Four studios of DD News and the Central Production Centre, Delhi
have been upgraded to HD. Native UHD mobile production facilities (OB vans), UHD modular
fly-pack OB units, 4K cameras and allied equipment have been provided. HD BARC
watermarking systems have been installed to collect viewership data.
iii. Transmitter modernisation: 116 FM transmitters have been commissioned. In sensitive
areas along the Indo-Nepal border, Jammu & Kashmir and Ladakh, 5 FM transmitters have
been commissioned and 7 supplied. Four digital-ready high-power TV transmitters have been
commissioned in Jammu & Kashmir and a 10 kW HD-ready transmitter at Himbotingla in
Ladakh. Tower strengthening has been completed at 16 locations.
iv. Strengthening of broadcasting facilities: Earth stations at various Kendras have been
upgraded to HD-compliant and spectrum-efficient set-ups. The DD Free Dish platform has
been expanded from 112 to 118 SDTV channels. Refurbishing of Akashvani studios has been
completed at 18 locations, air-conditioning plants replaced at 31 locations and 15 gensets
replaced. Visual Radio has been introduced.The Government continuously assesses impact of its programmes. Akashvani's combined
MW/FM coverage is about 98% by population and about 90% by area. "DD Free Dish" is
receivable anywhere in the country free of subscription. Over 260 Akashvani channels,
including 28 from Maharashtra, are on the "NewsOnAir" app; Doordarshan and Akashvani
content is also available on "WAVES" and on social media.
Maharashtra has three Programme Production Centres - Doordarshan Kendra, Mumbai, and
Programme Generating Facilities at Pune and Nagpur. UHD mobile production facilities and
fly-pack OB units have been provided for field production in the State.
In Jalgaon Lok Sabha Constituency, Akashvani's Jalgaon station has a 20 kW Medium Wave
and a 5 kW FM transmitter, and DD Free Dish signals (including DD Sahyadri) are receivable
in the Constituency.
Projects for further modernisation and expansion of broadcasting facilities- including in Left
Wing Extremism affected areas, border areas, aspirational districts and underserved areas —
have been approved, comprising 82 new FM transmitters and upgradation of 126 existing ones.
In Maharashtra, 2 new FM transmitters and upgradation of 11 (including Jalgaon's 5 kW
transmitter to 10 kW) have been approved.
Digital public service broadcasting continues to expand through DD Free Dish, WAVES,
"NewsOnAir" and other social media platforms.
Palghar district is covered by the Medium Wave coverage of Akashvani, Mumbai, which
broadcasts in Marathi. DD Sahyadri, a 24x7 Marathi channel for Maharashtra beamed from
Doordarshan Kendra, Mumbai, covers art, culture, heritage, news and Government schemes
for the entire State including Jalgaon and Palghar. It is also available on DD Free Dish,
"WAVES" and YouTube. Akashvani Maharashtra channels are also on the "NewsOnAir" app,
enhancing regional language content in the district.
*****