Parliament Question: Rail Projects in Shahdol

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is an answer to Unstarred Question No. 523 in the Lok Sabha, concerning rail projects in the Shahdol Lok Sabha Constituency, to be answered on December 3, 2025. It outlines the status of rail projects, steps to introduce premium trains, initiatives to improve rail connectivity and safety, and plans for new freight corridors or terminal facilities in the region. The budget allocation for infrastructure projects and safety works in Madhya Pradesh has significantly increased. **Key Points / Main Content** * **Budget and Infrastructure Development:** * Budget allocation for infrastructure projects and safety works in Madhya Pradesh has increased significantly. * Outlay increased from ₹632 crore/year (2009-14) to ₹14,745 crore (2025-26). * New track commissioned increased from 145 km (29 Km/year) (2009-14) to 2,651 Km (241 Km/year) (2014-25). * **Rail Projects Status (as of 01.04.2025):** * 24 railway projects sanctioned in Madhya Pradesh, including Shahdol Lok Sabha Constituency, costing ₹89,543 crore. * Total length of sanctioned projects: 4,740 km. * Length commissioned: 2,092 km. * Expenditure incurred up to March 2025: ₹41,401 crore. * New Lines: 8 projects, 1,914 km total length, 544 km commissioned, ₹15,069 crore expenditure. * Gauge Conversion: 2 projects, 809 km total length, 430 km commissioned, ₹6,766 crore expenditure. * Doubling/Multitracking: 14 projects, 2,017 km total length, 1,118 km commissioned, ₹19,566 crore expenditure. * **Recently Completed Projects (Madhya Pradesh, including Shahdol):** * Lists 14 recently completed projects with their names and costs. Example: Anuppur-Katni 3rd line (165 Km) (passing through Shahdol constituency) - ₹2,311 crore. * Lists 10 additional project surveys that have been taken up to improve connectivity * **Projects Taken Up (Madhya Pradesh):** * Lists 24 projects with their names and costs. Example: Shahdol-Singhpur 4th Line (6 Km) (passing through Shahdol constituency) - ₹54 crore. * **Train Services and Electrification:** * Electrification of the railway network has been taken up, with approximately 99.1% of the Broad Gauge network electrified. * Entire existing BG network in Madhya Pradesh, including Shahdol Lok Sabha Constituency, has been electrified. * 70, 74 and 46 train services currently serve Shahdol, Anuppur, and Umaria stations, respectively. * Introduction of new train services depend on various factors, including section capacity, route availability and other factors. * **Safety and Capacity Initiatives:** * Automatic Signaling System sanctioned for Anuppur-Shahdol-Umaria-Katni section (166 RKm). * Work of Kavach (automatic train protection system) sanctioned in Anuppur-Shahdol-Umaria-Katni section. * All Unmanned level crossings (UMLCs) eliminated by 31.01.2019. * In-Principle Approval (IPA) granted for GCT proposal near Shahdol (Ghunguti and Amlai railway stations). * **Factors Affecting Project Completion:** * Completion of railway projects depends on land acquisition, forest clearance, shifting of utilities, statutory clearances, geological conditions, law and order, and number of working months. **Impact Analysis** **Stakeholder: Residents of Shahdol, Anuppur and Umaria Stations** * **Impact:** Increased rail connectivity, improved safety, and potential for enhanced passenger and freight services. * **Action Required:** None specified. **Stakeholder: Ministry of Railways** * **Impact:** Needs to oversee the execution of sanctioned projects, ensure timely completion, and manage budget allocations effectively. * **Action Required:** Monitor progress of ongoing projects, address factors hindering completion, and plan for future infrastructure development. **Stakeholder: State Government of Madhya Pradesh** * **Impact:** Required to facilitate land acquisition, ensure law and order, and provide necessary clearances for railway projects. * **Action Required:** Expedite land acquisition processes, coordinate with railway authorities for clearances, and support infrastructure development.

Key Entities Referenced

Ministry of Railways: The primary governmental body responsible for rail projects mentioned in the document. Madhya Pradesh: The state where the rail projects are located. Shahdol Lok Sabha Constituency: The constituency that many of the railway projects pass through. Indian Railways: The railway network that is being electrified. Vande Bharat Express: Premium train service whose introduction is discussed in the context of railway projects.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 523 TO BE ANSWERED ON 03.12.2025 RAIL PROJECTS IN SHAHDOL †523. SMT HIMADRI SINGH: Will the Minister of RAILWAYS be pleased to state: (a) the present status of important rail projects (such as new lines, doubling or electrification) passing through the Shahdol Lok Sabha Constituency and their revised completion timelines; (b) the details of the steps being taken by the Government to introduce premium trains like the Vande Bharat Express or roll out new intercity/express trains keeping in view of increasing number of passengers at major stations in the region (such as Shahdol, Anuppur or Umaria); (c) whether any special initiatives such as improvement of signaling and removal of unmanned crossing are being taken by the Government to improve rail connectivity and safety in the Shahdol region especially in tribal areas and if so, the details thereof; and (d) whether there is any plan to develop a new freight corridor or terminal facility to make freight transportation (coal, forest produces etc.) in the region more efficient and increase railway revenue and if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d): Budget allocation in the recent years has increased ---2/--:2:- significantly. Budget allocation for Infrastructure projects and safety works, falling fully/partly in the State of Madhya Pradesh is as under: Period Outlay 2009-14 ₹632 crore/year 2025-26 ₹14,745 crore (More than 23 times) The details of commissioning/laying of new track falling fully/partly in the State of Madhya Pradesh during 2009-14 and 2014-25 is as under: New Track Average Commissioning of new Period Commissioned tracks 2009-14 145 Km 29 Km/year 2014-25 2,651 Km 241 Km/year (More than 8 times) As on 01.04.2025, 24 Railway projects (08 New Lines, 02 Gauge Conversion and 14 Doubling), of total length of 4,740 Km costing ₹89,543 crore falling fully/partly in the State of Madhya Pradesh including Shahdol Lok Sabha Constituency are sanctioned, out of which 2,092 Km length has been commissioned and an expenditure of ₹41,401 crore has been incurred upto March’ 2025. The summary is as under: Plan Head No. of Total Length Expenditure projects Length Commissioned upto March (in Km) (in Km) 2025 (₹ in Cr) New Lines 8 1,914 544 15,069 Gauge 2 809 430 6,766 Conversion Doubling / 14 2,017 1,118 19,566 Multitracking Total 24 4,740 2,092 41,401 ---3/--:3:- Details of some of the recently completed projects falling fully/partly in the State of Madhya Pradesh including Shahdol are as under: S.No. Name of Project Cost (₹ in Crores) 1. Anuppur-Katni 3rd line (165 Km) (passing through 2,311 Shahdol constituency) 2. Pendra Road-Anuppur 3rd line (50 Km) (passing 394 through Shahdol constituency) 3. Khodri-Anuppur Doubling with flyover at Bilaspur 792 (72 Km) (passing through Shahdol constituency) 4. Bhopal-Bina 3rd line (145 km) 1,075 5. Bina-Kota Doubling (283 km) 2,477 6. Jabalpur-Gondia Gauge Conversion including 2,005 Balaghat-Katangi (300 Km) 7. Chhindwara-Nagpur Gauge Conversion (150 Km) 1,512 8. Chhindwara-Mandla Fort Gauge Conversion (182 1,268 Km) 9. Ghat Pindari-Balkheda Doubling (6 Km) 29 10. Guna-Ruthiyai Doubling (20 Km) 175 11. Jukhei Chord line, Bye Passing the Katni Yard 12 (2 Km) 12. Sontalai-Bagratawa Doubling (7 Km) 110 13. Itarsi-Budhni 3rd line (25 Km) 286 14. Teegaon-Chichonda Ghat Section 3rd line (17 Km) 176 ---4/--:4:- S.No. Name of Project Latest Cost (₹ in Crores) 15. Barkhera-Bhopal 3rd line (41 km) 473 16. Nagda-Ujjain Doubling of Gambhir Bridge (2 Km) 28 17. Nimach-Chittaurgarh Doubling (56 Km) 560 18. Budhni-Barkhera 3rd line (27 Km) 1,703 19. Indore-Dewas-Ujjain Doubling (79 Km) 757 20. Powerkheda-Jujharpur Rail flyover (16 Km) 443 21. Guna- Etawah New Line (348 Km) 683 22. Ramna-Singrauli doubling (160 Km) 2,436 23. Karaila Road- Shaktinagar Doubling (32 Km) 763 24. Malkhedi-Mahadeokhedi Doubling (12 Km) 59 Some of the projects falling fully/partly in the State of Madhya Pradesh which have been taken up are as under: S. Project Cost No (₹ in Crores) 1. Shahdol-Singhpur 4th Line (6 Km) (passing 54 through Shahdol constituency) 2. Katni- Grade separator / Bypass (35 Km) 2,300 3. Katni- Singrauli Doubling (257 Km) 4,377 4. Lalitpur-Satna, Rewa-Singrauli & Mahoba- 8,914 Khajuraho New Line (541 Km) ---5/--:5:- S. Project Cost No (₹ in Crores) 5. Ramganjmandi-Bhopal New Line (277 Km) 5,073 6. Indore-Budni New Line (198 Km) 7,474 7. Nimach-Badi Sadri New Line (48 Km) 495 8. Gwalior-Sheopurkalan Gauge Conversion with 2,913 extension to Kota (284 Km) 9. Itarsi- Nagpur 3rd line (280 Km) 2,450 10. Jhansi-Bina 3rd line (153 Km) 2,002 11. Mathura-Gwaior-Jhansi 3rd line (274 Km) 5,924 12. Katni - Bina 3rd line (260 Km) 3,138 13. Satna-Rewa Doubling (50 Km) 590 14. Ruthiyai Bye Pass line (3 Km) 54 15. Guna Bye Pass line (2 Km) 179 16. Ujjain Fly Over (2 Km) 100 17. Indore - Manmad New Line (360 Km) 18,529 18. Bhusawal-Khandwa 3rd & 4th Line (131 Km) 3,285 19. Dahod-Indore New Line (205 Km) 9,746 20. Nimach-Ratlam Doubling (133 Km) 1,096 21. Chhota Udepur-Dhar New Line (147 Km) 1,794 22. Ratlam-Nagda 3rd and 4th line (41 Km) 964 23. Vadodara-Ratlam 3rd and 4th line (259 Km) 8,387 24. Ratlam-Khandwa Gauge Conversion (299 Km) 7,265 ---6/--:6:- S. Project Cost No (₹ in Crores) 25. Bina-Itarsi 4th Line (237 km) 4,329 26. Itarsi-Nagpur 4th Line (297 Km) 5,010 In last three years, 2022-23, 2023-24, 2024-25 and current financial year 2025-26, 61 surveys (18 New Line & 43 Doubling) covering a total length of 5,901 Km has been sanctioned falling fully/partly in the State of Madhya Pradesh. Moreover to improve further connectivity in the State of Madhya Pradesh following major surveys have been taken up: S.No. Name of Project Length (In Km) 1. Pendra Road - Shahdol - Katni 4th Line (passing 201 through Shahdol constituency) 2. Nimach-Dahod-Nandurbar New Line 380 3. Ratlam bypass line 24 4. Katni-Manikpur 3rd line 176 5. Dr. Ambedkar Nagar (Indore) – Khandwa Doubling 112 6. Nagda-Bhopal 3rd & 4th line 240 7. Katni-Itarsi 3rd Line 336 8. Katni-Singrauli 3rd and 4th line 251 9. Nagda Jn - Ramganjmandi Jn. 3rd & 4th Line 153 10. Khandwa-Itarsi 3rd & 4th line 187 ---7/--:7:- Electrification of railway network on Indian Railways has been taken up in mission mode. So far, about 99.1% of Broad Gauge (BG) network has been electrified. The electrification in remaining network has been taken up. Electrification carried out during 2014-25 and before 2014 is as under: Period Route (Kilometer) Before 2014 (about 60 years) 21,801 2014-25 46,900 In Madhya Pradesh, entire existing BG network has been electrified including Shahdol Lok Sabha Constituency. Further, all new line/ multitracking projects are being sanctioned and constructed with electrification. Introduction of new trains including Vande Bharat train services on any route/section depends on various factors which include:  Capacity of that section  Availability of path  Availability of required rolling stock  Availability of matching infrastructure for rolling stock.  Maintenance requirement of railway tracks and other assets. Accordingly, 70 train services, 74 train services and 46 train services respectively are presently catering to the needs of the passengers of Shahdol, Anuppur and Umaria stations. Besides, introduction of train services, including Vande Bharat service, is an ongoing process on Indian Railways subject to operational feasibility, traffic justification, competing demands etc. ---8/--:8:- To increase the capacity of section, the work of Automatic Signaling System for Anuppur-Shahdol-Umaria-Katni section (166 RKm) has been sanctioned. Further to improve safety, work of Kavach has been sanctioned in Anuppur-Shahdol-Umaria-Katni section. All Unmanned level crossings (UMLCs) on running lines of Broad Gauge (BG) network of Indian Railways including Shahdol in Madhya Pradesh have been eliminated by 31.01.2019. In-Principle Approval (IPA) have been granted by Bilaspur Division to the GCT proposal near Shahdol i.e. at Ghunguti and Amlai railway stations. Completion of Railway project/s depends on various factors which include the following:  Land acquisition by State Government  Forest clearance  Shifting of infringing utilities  Statutory clearances from various authorities  Geological and topographical conditions of area  Law and order situation in the area of project site  Number of working months in a year for particular project site etc. All these factors affect the completion time and cost of the project/s. *****