Home India Ministry of Railways Parliament Question: Railway accidents and compensation paid...
Date: 2026-02-06 Category: RAJYASABHA_QNA State: Union Government Country: India

Parliament Question: Railway accidents and compensation paid to victims

Issued by Ministry of Railways · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAJYA SABHA STARRED QUESTION NO. 83 ANSWERED ON 06.02.2026 RAILWAY ACCIDENTS AND COMPENSATION PAID TO VICTIMS *83 Shri Imran Pratapgarhi: Will the Minister of RAILWAYS be pleased to state: (a) the total number of deaths caused due to railway accidents in the country during the last three years, year-wise; (b) the total number of railway accidents reported during the same period, along with their classification and causes; (c) the total amount of compensation paid to victims and their families in these accidents during the last three years; and (d) the details of compensation paid accident-wise, including the norms followed and timelines for disbursement? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d): A Statement is laid on the Table of the House. *****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED QUESTION NO. 83 BY SHRI IMRAN PRATAPGARHI ANSWERED IN RAJYA SABHA ON 06.02.2026 REGARDING RAILWAY ACCIDENTS AND COMPENSATION PAID TO VICTIMS. (a) to (d): Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, there has been a steep decline in the number of accidents. Number of Consequential Train Accidents has reduced as shown in the table below:- Year Consequential Accidents 2014-15 135 2025-26 (Till date) 12 (90% lesser) Another important index showing improvement in safety in train operations is Consequential Accident Index, the details of which are as under:- Consequential Accident Index:- Year Accident Index 2014-15 0.11 2024-25 0.03 (73% lesser) This index measures number of consequential accidents as a ratio of total running kilometers of all trains. No. of consequential accidents Accident Index = No. of trains X million kilometers run 234 s t n e d i c c A n 165 i a r T l 135 a i t n e u q e s n o 55 C f o .o 31 N 12 2005-06 2009-10 2014-15 2019-20 2024-25 2025-26 (upto Jan)The causes of the accidents that took place over Indian Railways broadly include track defects, loco/coach defects, equipment failures, human errors, etc. Consequential Train Accidents on Indian Railways and casualties (including railway passengers and railway personnel) therein are as follows:- Period No. of Consequential Train No. of Deaths No. of Injuries Accidents 2004-05 to 2013-14 1,711 904 3,155 2014-15 to 2023-24 678 748 2,087 2024-25 31 18 92 Accidents victims are paid ex-gratia relief soon after an accident or untoward incident. Total amount of ex-gratia paid by the Railways to the next of kin of deceased in train accidents during the last three years (2022-23 to 2024-25) is Rs. 30.75 Crores. Compensation for death and injury of railway passengers in train accidents and untoward incidents, as defined under Section 124 and Section 124-A (read with Section 123) of the Railways Act, 1989, is decided by Railway Claims Tribunal (RCT) on the basis of a claim application filed by the victims/their dependents before RCT and it disposes of the cases after following the due judicial process. Railway Administration pays compensation when a decree is awarded by Hon’ble RCT in favour of the claimant and Railways decide to implement the decree. Compensation amount is over and above the ex-gratia amount. The amount of compensation paid by the Railways to the next of kin of deceased in train accidents during the last three years (2022-23 to 2024-25) is Rs. 23.53 Crores. It may be noted that the compensation paid in a year need not necessarily relate to the accidents/ casualities in that year alone. The amount paid in a year depends upon the number of cases finalized by Railway Claims Tribunals (RCTs) or other Courts of Law in a particular year irrespective of the year(s) in which the accidents have occurred. Compensation is paid within 30 days after the receipt of judgment. The various safety measures taken to enhance safety in train operations are as under:- 1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under:- Expenditure/Budget on Safety related activities (Rs. in Cr.) 2013-14 2022-23 2023-24 2024-25 2025-26 39,200 87,336 1,01,662 1,14,022 1,17,6932. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,660 stations up to 31.12.2025 to reduce accidents due to human failure. 3. Interlocking of Level Crossing (LC) Gates has been provided at 10,037 Level Crossing Gates up to 31.12.2025 for enhancing safety at LC Gates. 4. Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,665 stations up to 31.12.2025. 5. Detailed instructions on issues related with safety of Signalling, e.g. mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued. 6. System of disconnection and reconnection for S&T equipment as per protocol has been re- emphasized. 7. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots. 8. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to alert the crew about the signal ahead when visibility is low due to foggy weather. 9. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates, etc. 10. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals. 11. Mechanisation of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to reduce human errors. 12. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety. 13. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails. 14. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better welding technology for rails i.e., Flash Butt Welding. 15. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars). 16. Patrolling of railway tracks to look out for weld/rail fractures. 17. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works. 18. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices.19. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs. 20. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block, worksite safety, monsoon precautions, etc. have been issued. 21. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations. 22. Replacement of conventional ICF design coaches with LHB design coaches is being done. 23. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019. 24. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these inspections. 25. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc. 26. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner. 27. Regular counselling and training of staff is undertaken. 28. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan. The details of the Safety related works related to better maintenance practices, Technological improvements, better infrastructure and rolling stock etc. undertaken by Railways are tabulated below:- S. 2004-05 to 2014-15 to 2014-25 Vs. Item No. 2013-14 2024-25 2004-14 Technological Improvements 1. Use of high-quality rails 57,450 Km 1.43 Lakh Km More than 2 times (60 Kg) (Km)2. Longer Rail Panels 9,917 Km 77,522 Km Nearly 8 times (260m) (Km) 3. Electronic Interlocking 837 Stations 3,691 Stations More than 4 times (Stations) 4. Fog Pass Safety Devices As on As on 31.03.25: 288 times (Nos.) 31.03.14: 25,939 Nos. 90 Nos. 5. Thick Web Switches (Nos.) Nil 28,301 Nos. Better Maintenance Practices 1. Primary Rail Renewal (Track 32,260 Km 49,941 Km 1.5 times Km) 2. USFD (Ultra Sonic Flaw 79.43 Lakh 2 Crore More than 2 times detection) Testing of Welds (Nos.) 3. Weld failures (Nos.) In 2013-14: In 2024-25: 90 % reduction 3699 Nos. 370 Nos. 4. Rail fractures (Nos.) In 2013-14: In 2024-25: More than 88% 2548 Nos. 289 Nos. reduction Better Infrastructure and Rolling Stock 1. New Track KM added (Track 14,985 Km 34,428 Km More than 2 times Km) 2. Flyovers (RoBs)/Underpasses 4,148 Nos. 13,808 Nos. More than 3 times (RUBs) (Nos.) 3. Unmanned Level crossings As on As on 31.03.24:Nil Removed (Nos.) on BG 31.03.14: (All eliminated by 8,948 31.01.19) 4. Manufacture of LHB Coaches 2,337 Nos. 42,677 More than 18 times (Nos.) Kavach Implementation: i. Kavach is an indigenously developed Automatic Train Protection (ATP) system. Kavach is a highly technology intensive system, which requires safety certification of highest order (SIL-4). ii. Kavach aids the Loco Pilot in running of trains within specified speed limits by automatic application of brakes in case Loco Pilot fails to do so and also helps the trains to run safely during inclement weather.iii. The first field trials on the passenger trains were started in February 2016. Based on the experience gained and Independent Safety Assessment of the system by Independent Safety Assessor (ISA), three firms were approved in 2018-19, for supply of Kavach Ver 3.2. iv. Kavach was adopted as National ATP system in July, 2020. v. Implementation of Kavach System involves following Key Activities: a. Installation of Station Kavach at each and every station, block section. b. Installation of RFID Tags throughout the track length. c. Installation of telecom Towers throughout the section. d. Laying of Optical Fibre Cable along the track. e. Provision of Loco Kavach on each and every Locomotive running on Indian Railways. vi. Based on deployment of Kavach version 3.2 on 1465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024. vii. Kavach version 4.0 covers all the major features required for the diverse railway network. This is a significant milestone in safety for Indian Railways. Within a short period, IR has developed, tested and started deploying Automatic Train Protection System. viii. Major improvement in Version 4.0 includes increased Location Accuracy, Improved Information of Signal Aspects in bigger yards, Station to Station Kavach interface on OFC and Direct Interface to existing Electronic Interlocking System. With these improvements, Kavach Ver.4.0. is planned for large scale deployment over Indian Railways. ix. After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 1297 Route Kilometres, covering the high density Delhi - Mumbai and Delhi – Howrah routes. On the Delhi – Mumbai route Kavach ver 4.0 has been commissioned on Junction cabin – Palwal – Mathura – Nagda section (667 Rkm) & Ahmedabad – Vadodara – Virar section (432 Rkm) and on the Delhi – Howrah route on Gaya – Saramatanr (93 Rkm) and Bardhaman - Howrah section (105 Rkm). x. Further, track side Kavach implementation work has been taken up on 23,360 RKM covering all GQ,GD,HDN and identified sections of Indian Railways. xi. Progress of key items of Kavach on High density routes including Delhi– Mumbai & Delhi– Howrah corridors are as under:- S. No. Item Progress i Laying of Optical Fibre Cable 8570 Km ii Installation of Telecom Towers 938 nosiii Station Data Centre 767 station iv Installation of Track side equipment 5672 RKm v Provision of Kavach in Loco 4154 xii. Tender has been finalised for equipping 6,300 Electric Locomotives with Kavach version 4.0 and another tender for equipping 2,679 Diesel Locomotives is under finalisation. xiii. Specialized training programmes on Kavach are being conducted at centralized training institutes of Indian Railways to impart training to all concerned officials. By now more than 48,000 technicians, operators and engineers have been trained on Kavach technology. This includes about 45,000 Loco Pilots & Assistant Loco Pilots. Courses have been designed in collaboration with IRISET. xiv. The cost for provision of Track Side including Station equipment of Kavach is approximately Rs. 50 Lakhs/Km and cost for provision of Kavach equipment on locomotives is approximately Rs. 80 Lakh/Loco. xv. The funds utilized on Kavach works so far up to Dec'25 is Rs. 2,573.36 Crores. The allocation of funds during the year 2025-26 is Rs. 1673.19 Crores. Requisite funds are made available as per the progress of works. *****

Continue your research